Technical Reasons for NETA Prime.pdf
PDF 159 KB Posted
- Attached to
- Electrical Maintenance Contract
- Solicitation number
- 2026_EMC_001_032426
About this file
This memorandum from the Air Force Research Laboratory (AFRL) at Wright-Patterson Air Force Base establishes the requirement for the prime contractor on the forthcoming Electrical Maintenance Contract (FA2396-26-R-BXXX) to be a NETA (National Electrical Testing Association) Accredited Company (NAC). The requirement applies to electrical maintenance and repair services supporting AFRL operations. The memorandum, dated March 24, 2026, was issued by Derek R. Longshore (Program Manager, AFRL/RQOO) and Matthew J. Main (Contracting Officer, AFRL/PZLEB) and references Government-wide Portal of Entry Request for Information 2026_EMC_001_032426.
The government mandates NETA accreditation for the prime contractor based on five primary justifications: (1) Technical Oversight and Responsibility—the prime must possess internal expertise to manage complex electrical testing and maintenance rather than delegating core responsibilities; (2) Comprehensive Contract Risk Management—NETA accreditation ensures work is performed under rigorous industry standards with properly calibrated equipment, established safety procedures, trained technicians, and consistent documentation to mitigate high-voltage and personnel safety risks; (3) Ensuring Core Competency and Avoiding "Pass-Through" Contracts—the prime must retain core technical capabilities and serve as the subject matter expert rather than subcontracting substantially all technical work; (4) Streamlined and Effective Contract Administration—NACs adhere to standardized procedures, technician certification programs, and reporting formats that reduce administrative ambiguity and ensure consistent quality benchmarks; and (5) Personnel Protection—uniform technician training and qualification standards protect government interests and all personnel involved. All offerors are encouraged to meet this standard to be considered for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EMC DRAFT PWS 03_16_2026.docx | DOCX document | |
| EMC_Market Research Questions.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE RESEARCH LABORATORY
WRIGHT-PATTERSON AIR FORCE BASE OHIO
24 March 2026
FROM: AFRL/PZLEB
2130 Eighth Street, Building 45 Wright-Patterson AFB OH 45433-7251
SUBJECT: Requirement for Prime Contractor to be an International Electrical Testing
Association (NETA) Accredited Company
REFERENCE: (a) Forthcoming Solicitation: Electrical Maintenance Contract (FA2396-26-
R-BXXX)
(b) Government-wide Portal of Entry Request for Information
2026_EMC_001_032426
1. Air Force Research Laboratory has a need to obtain high-quality, affordable, and responsive NETA-certified services supporting the electrical maintenance and repair of equipment. This memorandum outlines the rationale for requiring the prime contractor on the forthcoming solicitation to be a NETA Accredited Company (NAC). This requirement is essential to ensure technical expertise, manage risk, protect people and infrastructure and guarantee efficient contract administration.
2. Technical Oversight and Responsibility: The prime contractor is ultimately responsible for all aspects of contract performance, including safety, quality control, and technical execution. Given that the substantial majority of the work under this contract will involve complex electrical testing and maintenance, it is imperative that the prime contractor possesses the internal expertise to effectively manage and oversee these critical tasks.
NETA accreditation ensures the Prime has a deep understanding of the required procedures and standards, rather than simply delegating this core responsibility.
3. Comprehensive Contract Risk Management: The nature of electrical testing and maintenance involves significant risks, including those associated with high-voltage equipment and personnel safety. Requiring a prime who is a NAC serves as a critical risk mitigation measure because NETA ensures all work is performed under a rigorously enforced framework of industry-recognized standards, using properly calibrated equipment, established safety procedures, and consistent documentation. This requirement also guarantees that all technicians are trained, qualified, and evaluated to a uniform standard, eliminating variability in execution. This level of rigor is non-negotiable and protects the interests of the government and all personnel involved.
4. Ensuring Core Competency and Avoiding "Pass-Through" Contracts: The government requires that the prime contractor holds the core technical capabilities central to the contract's purpose. Without the prime being a NAC, there is a risk that a prime contractor could be awarded the contract and subsequently subcontract nearly all of the technical work. This "pass-through" scenario is undesirable, as it distances the primary responsible party from the actual work being performed. The prime must be the subject matter expert.
5. Streamlined and Effective Contract Administration: NACs adhere to a comprehensive set of standardized procedures, technician certification programs, and reporting formats. By selecting a prime who is a NAC, the government can anticipate a more efficient and predictable administration process. This inherent standardization reduces ambiguity, simplifies oversight, and ensures that all deliverables meet a consistent, industry-accepted benchmark for quality and clarity.
6. We trust this clarifies the importance of this requirement. All offerors are encouraged to ensure they meet this standard to be considered for award.
Derek R. Longshore Matthew J. Main Program Manager Contracting Officer
AFRL/RQOO AFRL/PZLEB