Technical Proposal Instructions.pdf

PDF 155 KB Posted

Attached to
Repair MFH Plumbing & HVAC Systems
Solicitation number
FA557525B0013
Issued by

About this file

This Technical Proposal Instructions document outlines a two-step sealed bidding process for a Department of the Air Force contract (FA5575-25-B0013) to repair Plumbing and HVAC Systems. The solicitation requires offerors to submit a comprehensive technical proposal by 29 July 2025 at 10:00 hours local time via email to specific contracting team members. Bidders must demonstrate capabilities through seven key technical requirements, including A-E design capabilities, economic and financial solvency, refrigerant handling certifications, subcontractor agreements, organizational charts, key staff qualifications, and past project experience.

Critical submission requirements include providing classification certificates under Spanish Law 9/2017, certificates for handling refrigerants, memorandums of agreement with subcontractors, organizational charts, key personnel details, and 1-3 example projects demonstrating design-build management experience. The proposal must be in English, cannot include pricing information, and will be evaluated based on technical merit. Only offerors with acceptable technical proposals will be invited to submit sealed priced bids in the second stage of the procurement process, with the exact bid submission date to be specified in a subsequent Invitation for Bids.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Proposal Instructions

FA5575-25-B0013, Repair MFH Plumbing & HVAC Systems, Multi

DEFINITIONS

As used in this solicitation/contract, the term "Government" shall refer to the "United States

Government" unless express reference to a different named government is made.

1. STEP ONE OF TWO-STEP SEALED BIDDING INSTRUCTIONS

1.1. This requirement will be procured using FAR 14 and FAR 36, Sealed Bidding and

Construction Contracts. The two-step sealed bidding method will be used.

Offerors must follow the instructions contained herein. Offerors are cautioned that noncompliance with the instructions of this technical proposal request may result in their technical proposal being deemed ineligible for consideration.

1.2 Step One: Submission of technical proposal:

Offerors shall submit only one technical proposal containing all required submission requirements to meet the evaluation criteria. The technical proposal shall NOT include prices or pricing information. The Government will review only one technical proposal per offeror.

Offerors shall submit proposals that are acceptable without additional explanation or information.

The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted.

The Government may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

A notice of unacceptability or acceptability will be forwarded to the offeror upon completion of the proposal evaluation and final determination. Offerors determined to have submitted an acceptable technical proposal will receive an invitation for bids and will be expected to submit their sealed priced bids within one or two weeks. A site visit may or may not be scheduled. The exact date and time of submission and bid opening date will be notified in the Invitation for Bids.

1.3 Step Two: Submission of Sealed Priced Bids if technical proposal determined acceptable by

Contracting Officer.

Only those offerors that have submitted an acceptable technical proposal will proceed to Step

Two and will receive an invitation for bids with instructions.

2. TECHNICAL PROPOSAL INSTRUCTIONS

2.1.1 Proposals shall be in the English language.

2.1.2. The Government is not responsible for any costs incurred or associated with preparation and submission of a technical proposal in response to this request. NO OFFEROR WILL BE

COMPENSATED FOR SUBMITTING A TECHNICAL PROPOSAL.

2.1.3. Any proposal which modifies or fails to conform to the essential requirements or specifications of, the request for technical proposals shall be considered nonresponsive and categorized as unacceptable.

2.1.4. If an offeror believes the requirements in these instructions contain an error, omission, ambiguities, or are otherwise unsound, the offeror shall immediately notify the Contract Officer in writing with supporting rationale no later than seven (7) calendar days after the request for technical proposal release date.

2.1.5. Technical Proposals must be sent by e-mail to all members of the Contracting

Construction Team (below) by 29 July 2025, no later than 10:00 hours local time. It is the offeror’s responsibility to ensure that Contracting has received the proposal before the due date and time. Technical proposals delivered after the exact date and time for receipt of proposals will not be considered.

elia.portz_cueli.1.es@us.af.mil; ryan.kulpa@us.af.mil; augustus.shinn@us.af.mil;

ryan.hopkin@us.af.mil

2.2 TECHNICAL PROPOSAL REQUIREMENTS AND EVALUATION CRITERIA

2.2.1 TECHNICAL REQUIREMENT NUMBER 1: TECHNICAL AND MANAGEMENT

APPROACH AND CAPABILITIES

a. A-E Design Capabilities: The Bidder shall include in his proposal his proposed A-E design firm and the capabilities of the A-E design firm, demonstrating their experience performing design-build construction projects, as well as design of projects of similar type/scope, physical size, and dollar value. Provided experience information must be detailed sufficiently to allow the Government to ascertain the Bidder’s capability to perform works similar to this effort.

b. Schedule Plan: The Bidder shall include in his proposal the description of his ability to execute the design and construction, minimizing the impact on operations. The plan will include a preliminary summary schedule for the design and construction, including all events associated with the work. The preliminary summary for the design shall include events associated with site visits, site surveys, design review meetings and design submittals. This plan shall be in the form of a bar chart schedule (Gantt chart), showing relationship between activities, the critical path and floats. The Bidder mailto:elia.portz_cueli.1.es@us.af.mil mailto:ryan.kulpa@us.af.mil mailto:augustus.shinn@us.af.mil mailto:ryan.hopkin@us.af.mil shall use appropriate planning techniques to reduce to a minimum basewide power outages required for this project.

This requirement is met when the offeror submits sufficient A-E design firm experience and capabilities to demonstrate capability to perform the required design. Additionally, the offeror must submit a schedule plan that is deemed acceptable during technical review.

2.2.2. TECHNICAL REQUIREMENT NUMBER 2: ECONOMIC, FINANCIAL, SKILL AND

PROFESSIONAL SOLVENCY

Bidder must demonstrate his economic, financial, skill and professional solvency including the following documents in his proposal:

Classification Certificate: Based on the Spanish Law 9/2017, Law of Public Sector Contracts, approved on 8 November 2017, the Bidder shall include in his proposal the following current

Classification Certificate held by the Bidder and/or key subcontractors, if any, and issued by the

Spanish "Registro Oficial de Licitadores y Empresas Clasificadas del Estado" of the "Ministerio de Hacienda y Administraciones Públicas". The certificate holder must execute the activities related to the certificate. The submitted certificates shall be original or a notarized copy.

Group Subgroup Category

C 2 2

C 4 2

I 6 2

J 2 2

This requirement is met when all the classification certificates above are held by the offeror and have been submitted.

2.2.3. TECHNICAL REQUIREMENT NUMBER 3: HANDLING REFRIGERANTS

CERTIFICATE AND INSTALLING COMPANY CERTIFICATE.

The contractor and subcontractor, if any, shall submit Certificate of Competence for the handling of equipment with refrigeration systems of any charge of fluorinated refrigerants complying with Royal Decree 115/2017, of February 17, which regulates the marketing and handling of fluorinated gases and equipment based on them, as well as the certification of professionals who use them and establishing the technical requirements for facilities that develop activities that emit fluorinated gases and its subsequent amendments.

The contractor and subcontractor, if any, must submit a document authorizing them to act as an installation company in order to comply with Royal Decree 178/2021, of

March 23, which amends Royal Decree 1027/2007, of July 20, which approves the

Regulation of Thermal Installations in Buildings and its subsequent amendments.

This requirement is met when the Certificate of Competence and authorization document described above are held by the offeror and have been submitted.

2.2.4. TECHNICAL REQUIREMENT NUMBER 4: AGREEMENT WITH

SUBCONTRACTOR

Memorandum of Agreement between the Bidder and each Key Subcontractor, if any:

Bidder must include in his proposal a memorandum of agreement between the Bidder and each key subcontractor, if any, establishing that the key subcontractor will perform the corresponding work activity if the contract is awarded to the Bidder. The memorandum of agreement has to be signed by the Bidder and the key subcontractor and shall be original or a notarized copy.

This requirement is met when the offeror submits a Memorandum of Agreement signed by both parties when the bidder is to perform less than 100% of the total work required to complete the project.

2.2.5. TECHNICAL REQUIREMENT NUMBER 5: ORGANIZATION CHART

Organizational Chart: The Bidder must include in his proposal the organizational chart identifying roles and responsibilities of the key personnel, teaming partners and key subcontractors, if any.

This requirement is met when the required Organizational Chart is submitted, and it is demonstrated that all parties involved are indicated, and they are properly engaged to provide a high-quality project.

2.2.6. TECHNICAL REQUIREMENT NUMBER 6: KEY STAFF

Key Staff: The Bidder shall include in his proposal the proposed key staff (Project

Manager, Designer of Record (DOR), Superintendent, Surveyor, and Safety

Officer). The Bidder shall identify Teaming Partners/Key Subcontractors and describe the extent of their involvement in the project and applicable qualifications, certifications, and specialized experience.

This requirement is met when it is demonstrated that the proposed Key Staff is competent and experienced enough to provide a high-quality project.

2.2.7. TECHNICAL REQUIREMENT NUMBER 7: PAST EXPERIENCE

The Bidder shall include in his proposal the following documents:

a. 1 to 3 example projects demonstrating the design-build project management experience of the Bidder and/or Key subcontractor, if any, and his (their) capability on a construction project of similar type and scope. The offeror shall include in his proposal the specific applications of best management practices and lessons learned related to management and technical approach from one (1) of the example projects.

b. 1 to 3 example projects demonstrating the experience and capability of the Architect-

Engineer Design Firm on a design of similar type and scope. At least one of those example projects must be a design of a project involving power generation changes/upgrades in a Base Power plant of similar type.

c. 1 to 3 example projects demonstrating the experience and capability of the

Construction Firm on a construction of similar type and scope.

This requirement is met when the required sample projects are submitted and demonstrates experience and capability in similar projects.