BASE YEAR
| 100 | Dismantle, Demo, Removal of One Story Wooden Structure | SF | $0.00 | 80,000 |
| 200 | Dismantle, Demo, Removal of Two Story Wooden Structure | SF | $0.00 | 20,000 |
| 300 | Dismantle, Demo, Removal of One Story Masonry Structure | SF | $0.00 | 30,000 |
| 400 | Dismantle, Demo, Removal of Multi-Story Masonry Structure | SF | $0.00 | 10,000 |
| 500 | Dismantle, Demo, Removal of Metal Building with Exterior Walls | SF | $0.00 | 15,000 |
| 600 | Dismantle, Demo, Removal of Metal Structures with No Exterior Walls | SF | $0.00 | 8,000 |
| 700 | Dismantle of Relocatable Structures | SF | $0.00 | 10,000 |
| 800 | Mobilization / Demobilization Charge | EA | $0.00 | 60 |
| SELECTIVE DEMOLITION, UTILITIES AND COMMUNICATIONS, INCLUDE HAUL, SALVAGE | ||||
| 900 | Potholing for Utilities | EA | $0.00 | 80 |
| 1000 | Remove Existing Utility Pole, Including Accessories | EA | $0.00 | 8 |
| 1100 | Privatized Utilities Fees to System Owners | LS | ||
| DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE. | ||||
| 1200 | Demo Bollards | EA | $0.00 | 50 |
| 1300 | Demo Man-hole/ Hand-hole | EA | $0.00 | 15 |
| 1400 | Remove Outside Communication Line | LF | $0.00 | 3,000 |
| 1500 | Disconnect and move SIPR safe | EA | $0.00 | 5 |
| 1600 | Place Flowable Fill in Abandoned Pipe, 2"-4" | LF | $0.00 | 1,500 |
| 1700 | Place Flowable Fill in Abandoned Pipe, >4"-8" | LF | $0.00 | 1,500 |
| SELECTIVE DEMOLITION, SITE, INCLUDE HAUL, SALVAGE | ||||
| 1800 | Pavement Removal, Bituminous, to 4" thickness | SY | $0.00 | 40,000 |
| 1900 | Pavement Removal, Bituminous, Additional 1" | SY | $0.00 | 10,000 |
| 2000 | Pavement Removal. Sidewalk, 4" Typ. | SY | $0.00 | 10,000 |
| 2100 | Pavement Removal, Concrete, to 6" Thickness | SY | $0.00 | 8,000 |
| 2200 | Pavement Removal, Concrete, +6" to 12" Thickness | SY | $0.00 | 4,000 |
| 2300 | Curbs, Concrete, Reinforced | LF | $0.00 | 3,000 |
| 2400 | Remove Fencing Post & Fabric, Barbwire, Gates, Up to 7' Tall | LF | $0.00 | 4,000 |
| 2500 | Remove Fencing Post & Fabric, Barbwire, Gates, Greater Than 7' Tall | LF | $0.00 | 1,000 |
| SITE REESTABLISHMENT | ||||
| 2600 | Fill, Compact, Grading | CY | $0.00 | 30,000 |
| 2700 | Excavation | CY | $0.00 | 5,000 |
| 2800 | Place Top Soil and Prepare for Seeding | SY | $0.00 | 70,000 |
| 2900 | Hydromulch | SY | $0.00 | 30,000 |
| 3000 | Install Bermuda Sod | SY | $0.00 | 40,000 |
| 3100 | Flexterra FGM | SY | $0.00 | 5,000 |
| 3200 | Scour Stop | SF | $0.00 | 200 |
| ASBESTOS REMOVAL, INCLUDING HAUL, DISPOSAL | ||||
| 3300 | Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, 1/2" through 6" pipe | LF | $0.00 | 2,000 |
| 3400 | Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, above 6", pipe | LF | $0.00 | 2,000 |
| 3500 | Remove Asbestos Insulation From Duct-work,Complete | SF | $0.00 | 2,000 |
| 3600 | Remove Asbestos From Furnaces, Water Tanks, Stacks, Water Heaters and Other Equipment to Include Attached Fittings, Valves & Accessories, Complete | SF | $0.00 | 2,000 |
| 3700 | Remove Blown-in Asbestos Insulation from Building Walls and Ceilings | SF | $0.00 | 20,000 |
| 3800 | Remove Asbestos Type Blown-in Acoustical Insulation | SF | $0.00 | 3,300 |
| 3900 | Remove Wall Acoustical Plaster w/ ACH, Complete | SF | $0.00 | 3,300 |
| 4000 | Remove Wall , Hard Veneer Plaster w/ ACH, Complete | SF | $0.00 | 1,200 |
| 4100 | Remove Asbestos Cement Board, Complete | SF | $0.00 | 3,300 |
| 4200 | Remove Asbestos Floor Tile & Carpet Over Floor Tile Complete, w/ Underlayments and Any Floor Overlays to Subfloor, Complete | SF | $0.00 | 20,000 |
| 4300 | Remove Existing Asbestos Contaminated Soil | CF | $0.00 | 2,000 |
| 4400 | Clean-up Gross Contaminated Areas | CF | $0.00 | 5,000 |
| 4500 | Remove Asbestos Contaminated Suspended Ceiling Tile and Grid to Include Disposal | SF | $0.00 | 30,000 |
| 4600 | Remove Carpet Glued to Concrete or Wood with Asbestos Contaminated Mastic to Include Disposal | SF | $0.00 | 20,000 |
| 4700 | Remove and Dispose of Asbestos Containing Roof Felt and Mastic (up to 3 Layers) | SF | $0.00 | 2,000 |
| 4800 | Remove and Dispose of Asbestos Containing Roof Flashing | LF | $0.00 | 6,000 |
| 4900 | Remove and Dispose of Asbestos Containing Glazing and Puty | SF | $0.00 | 2,000 |
| LEAD-BASED PAINT REMOVAL | ||||
| 5000 | Lead-Based Paint Removal | SF | $0.00 | 4,000 |
| 5100 | Mold Remediation | SF | $0.00 | 4,000 |
| 5200 | Initial Asbestos, Lead-Based Pain, Mold Building Survey: | |||
| 5200-1 Building Up to 5000 SF | EA | $0.00 | 15 | |
| 5200-2 Building Greater Than 5000SF, Up to 10,000 SF | EA | $0.00 | 20 | |
| 5200-3 Building Greater Than 10,000 SF, Up to 20,000 SF | EA | $0.00 | 8 | |
| 5200-4 Building Greater Than 20,000 SF | EA | $0.00 | 2 | |
| 5300 | Construction/Post-Construction Asbestos Sample Testing | EA | $0.00 | 10 |
| 5400 | Unpriced Unit Items (10%) | LS | ||
| DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE. | ||||
| 5500 | Bond (2.5% of Total) | LS | ||
| 5600 | Asbestos Fees | EA | $0.00 | 60 |
| 5700 | As-Built Drawings | EA | $0.00 | 10 |
OPTION YEAR 1
| 100 | Dismantle, Demo, Removal of One Story Wooden Structure | SF | $0.00 | 80,000 |
| 200 | Dismantle, Demo, Removal of Two Story Wooden Structure | SF | $0.00 | 20,000 |
| 300 | Dismantle, Demo, Removal of One Story Masonry Structure | SF | $0.00 | 30,000 |
| 400 | Dismantle, Demo, Removal of Multi-Story Masonry Structure | SF | $0.00 | 10,000 |
| 500 | Dismantle, Demo, Removal of Metal Building with Exterior Walls | SF | $0.00 | 15,000 |
| 600 | Dismantle, Demo, Removal of Metal Structures with No Exterior Walls | SF | $0.00 | 8,000 |
| 700 | Dismantle of Relocatable Structures | SF | $0.00 | 10,000 |
| 800 | Mobilization / Demobilization Charge | EA | $0.00 | 60 |
| SELECTIVE DEMOLITION, UTILITIES AND COMMUNICATIONS, INCLUDE HAUL, SALVAGE | ||||
| 900 | Potholing for Utilities | EA | $0.00 | 80 |
| 1000 | Remove Existing Utility Pole, Including Accessories | EA | $0.00 | 8 |
| 1100 | Privatized Utilities Fees to System Owners | LS | ||
| DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE. | ||||
| 1200 | Demo Bollards | EA | $0.00 | 50 |
| 1300 | Demo Man-hole/ Hand-hole | EA | $0.00 | 15 |
| 1400 | Remove Outside Communication Line | LF | $0.00 | 3,000 |
| 1500 | Disconnect and move SIPR safe | EA | $0.00 | 5 |
| 1600 | Place Flowable Fill in Abandoned Pipe, 2"-4" | LF | $0.00 | 1,500 |
| 1700 | Place Flowable Fill in Abandoned Pipe, >4"-8" | LF | $0.00 | 1,500 |
| SELECTIVE DEMOLITION, SITE, INCLUDE HAUL, SALVAGE | ||||
| 1800 | Pavement Removal, Bituminous, to 4" thickness | SY | $0.00 | 40,000 |
| 1900 | Pavement Removal, Bituminous, Additional 1" | SY | $0.00 | 10,000 |
| 2000 | Pavement Removal. Sidewalk, 4" Typ. | SY | $0.00 | 10,000 |
| 2100 | Pavement Removal, Concrete, to 6" Thickness | SY | $0.00 | 8,000 |
| 2200 | Pavement Removal, Concrete, +6" to 12" Thickness | SY | $0.00 | 4,000 |
| 2300 | Curbs, Concrete, Reinforced | LF | $0.00 | 3,000 |
| 2400 | Remove Fencing Post & Fabric, Barbwire, Gates, Up to 7' Tall | LF | $0.00 | 4,000 |
| 2500 | Remove Fencing Post & Fabric, Barbwire, Gates, Greater Than 7' Tall | LF | $0.00 | 1,000 |
| SITE REESTABLISHMENT | ||||
| 2600 | Fill, Compact, Grading | CY | $0.00 | 30,000 |
| 2700 | Excavation | CY | $0.00 | 5,000 |
| 2800 | Place Top Soil and Prepare for Seeding | SY | $0.00 | 70,000 |
| 2900 | Hydromulch | SY | $0.00 | 30,000 |
| 3000 | Install Bermuda Sod | SY | $0.00 | 40,000 |
| 3100 | Flexterra FGM | SY | $0.00 | 5,000 |
| 3200 | Scour Stop | SF | $0.00 | 200 |
| ASBESTOS REMOVAL, INCLUDING HAUL, DISPOSAL | ||||
| 3300 | Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, 1/2" through 6" pipe | LF | $0.00 | 2,000 |
| 3400 | Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, above 6", pipe | LF | $0.00 | 2,000 |
| 3500 | Remove Asbestos Insulation From Duct-work,Complete | SF | $0.00 | 2,000 |
| 3600 | Remove Asbestos From Furnaces, Water Tanks, Stacks, Water Heaters and Other Equipment to Include Attached Fittings, Valves & Accessories, Complete | SF | $0.00 | 2,000 |
| 3700 | Remove Blown-in Asbestos Insulation from Building Walls and Ceilings | SF | $0.00 | 20,000 |
| 3800 | Remove Asbestos Type Blown-in Acoustical Insulation | SF | $0.00 | 3,300 |
| 3900 | Remove Wall Acoustical Plaster w/ ACH, Complete | SF | $0.00 | 3,300 |
| 4000 | Remove Wall , Hard Veneer Plaster w/ ACH, Complete | SF | $0.00 | 1,200 |
| 4100 | Remove Asbestos Cement Board, Complete | SF | $0.00 | 3,300 |
| 4200 | Remove Asbestos Floor Tile & Carpet Over Floor Tile Complete, w/ Underlayments and Any Floor Overlays to Subfloor, Complete | SF | $0.00 | 20,000 |
| 4300 | Remove Existing Asbestos Contaminated Soil | CF | $0.00 | 2,000 |
| 4400 | Clean-up Gross Contaminated Areas | CF | $0.00 | 5,000 |
| 4500 | Remove Asbestos Contaminated Suspended Ceiling Tile and Grid to Include Disposal | SF | $0.00 | 30,000 |
| 4600 | Remove Carpet Glued to Concrete or Wood with Asbestos Contaminated Mastic to Include Disposal | SF | $0.00 | 20,000 |
| 4700 | Remove and Dispose of Asbestos Containing Roof Felt and Mastic (up to 3 Layers) | SF | $0.00 | 2,000 |
| 4800 | Remove and Dispose of Asbestos Containing Roof Flashing | LF | $0.00 | 6,000 |
| 4900 | Remove and Dispose of Asbestos Containing Glazing and Puty | SF | $0.00 | 2,000 |
| LEAD-BASED PAINT REMOVAL | ||||
| 5000 | Lead-Based Paint Removal | SF | $0.00 | 4,000 |
| 5100 | Mold Remediation | SF | $0.00 | 4,000 |
| 5200 | Initial Asbestos, Lead-Based Pain, Mold Building Survey: | |||
| 5200-1 Building Up to 5000 SF | EA | $0.00 | 15 | |
| 5200-2 Building Greater Than 5000SF, Up to 10,000 SF | EA | $0.00 | 20 | |
| 5200-3 Building Greater Than 10,000 SF, Up to 20,000 SF | EA | $0.00 | 8 | |
| 5200-4 Building Greater Than 20,000 SF | EA | $0.00 | 2 | |
| 5300 | Construction/Post-Construction Asbestos Sample Testing | EA | $0.00 | 10 |
| 5400 | Unpriced Unit Items (10%) | LS | ||
| DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE. | ||||
| 5500 | Bond (2.5% of Total) | LS | ||
| 5600 | Asbestos Fees | EA | $0.00 | 60 |
| 5700 | As-Built Drawings | EA | $0.00 | 10 |
OPTION YEAR 2
| 100 | Dismantle, Demo, Removal of One Story Wooden Structure | SF | $0.00 | 80,000 |
| 200 | Dismantle, Demo, Removal of Two Story Wooden Structure | SF | $0.00 | 20,000 |
| 300 | Dismantle, Demo, Removal of One Story Masonry Structure | SF | $0.00 | 30,000 |
| 400 | Dismantle, Demo, Removal of Multi-Story Masonry Structure | SF | $0.00 | 10,000 |
| 500 | Dismantle, Demo, Removal of Metal Building with Exterior Walls | SF | $0.00 | 15,000 |
| 600 | Dismantle, Demo, Removal of Metal Structures with No Exterior Walls | SF | $0.00 | 8,000 |
| 700 | Dismantle of Relocatable Structures | SF | $0.00 | 10,000 |
| 800 | Mobilization / Demobilization Charge | EA | $0.00 | 60 |
| SELECTIVE DEMOLITION, UTILITIES AND COMMUNICATIONS, INCLUDE HAUL, SALVAGE | ||||
| 900 | Potholing for Utilities | EA | $0.00 | 80 |
| 1000 | Remove Existing Utility Pole, Including Accessories | EA | $0.00 | 8 |
| 1100 | Privatized Utilities Fees to System Owners | LS | ||
| DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE. | ||||
| 1200 | Demo Bollards | EA | $0.00 | 50 |
| 1300 | Demo Man-hole/ Hand-hole | EA | $0.00 | 15 |
| 1400 | Remove Outside Communication Line | LF | $0.00 | 3,000 |
| 1500 | Disconnect and move SIPR safe | EA | $0.00 | 5 |
| 1600 | Place Flowable Fill in Abandoned Pipe, 2"-4" | LF | $0.00 | 1,500 |
| 1700 | Place Flowable Fill in Abandoned Pipe, >4"-8" | LF | $0.00 | 1,500 |
| SELECTIVE DEMOLITION, SITE, INCLUDE HAUL, SALVAGE | ||||
| 1800 | Pavement Removal, Bituminous, to 4" thickness | SY | $0.00 | 40,000 |
| 1900 | Pavement Removal, Bituminous, Additional 1" | SY | $0.00 | 10,000 |
| 2000 | Pavement Removal. Sidewalk, 4" Typ. | SY | $0.00 | 10,000 |
| 2100 | Pavement Removal, Concrete, to 6" Thickness | SY | $0.00 | 8,000 |
| 2200 | Pavement Removal, Concrete, +6" to 12" Thickness | SY | $0.00 | 4,000 |
| 2300 | Curbs, Concrete, Reinforced | LF | $0.00 | 3,000 |
| 2400 | Remove Fencing Post & Fabric, Barbwire, Gates, Up to 7' Tall | LF | $0.00 | 4,000 |
| 2500 | Remove Fencing Post & Fabric, Barbwire, Gates, Greater Than 7' Tall | LF | $0.00 | 1,000 |
| SITE REESTABLISHMENT | ||||
| 2600 | Fill, Compact, Grading | CY | $0.00 | 30,000 |
| 2700 | Excavation | CY | $0.00 | 5,000 |
| 2800 | Place Top Soil and Prepare for Seeding | SY | $0.00 | 70,000 |
| 2900 | Hydromulch | SY | $0.00 | 30,000 |
| 3000 | Install Bermuda Sod | SY | $0.00 | 40,000 |
| 3100 | Flexterra FGM | SY | $0.00 | 5,000 |
| 3200 | Scour Stop | SF | $0.00 | 200 |
| ASBESTOS REMOVAL, INCLUDING HAUL, DISPOSAL | ||||
| 3300 | Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, 1/2" through 6" pipe | LF | $0.00 | 2,000 |
| 3400 | Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, above 6", pipe | LF | $0.00 | 2,000 |
| 3500 | Remove Asbestos Insulation From Duct-work,Complete | SF | $0.00 | 2,000 |
| 3600 | Remove Asbestos From Furnaces, Water Tanks, Stacks, Water Heaters and Other Equipment to Include Attached Fittings, Valves & Accessories, Complete | SF | $0.00 | 2,000 |
| 3700 | Remove Blown-in Asbestos Insulation from Building Walls and Ceilings | SF | $0.00 | 20,000 |
| 3800 | Remove Asbestos Type Blown-in Acoustical Insulation | SF | $0.00 | 3,300 |
| 3900 | Remove Wall Acoustical Plaster w/ ACH, Complete | SF | $0.00 | 3,300 |
| 4000 | Remove Wall , Hard Veneer Plaster w/ ACH, Complete | SF | $0.00 | 1,200 |
| 4100 | Remove Asbestos Cement Board, Complete | SF | $0.00 | 3,300 |
| 4200 | Remove Asbestos Floor Tile & Carpet Over Floor Tile Complete, w/ Underlayments and Any Floor Overlays to Subfloor, Complete | SF | $0.00 | 20,000 |
| 4300 | Remove Existing Asbestos Contaminated Soil | CF | $0.00 | 2,000 |
| 4400 | Clean-up Gross Contaminated Areas | CF | $0.00 | 5,000 |
| 4500 | Remove Asbestos Contaminated Suspended Ceiling Tile and Grid to Include Disposal | SF | $0.00 | 30,000 |
| 4600 | Remove Carpet Glued to Concrete or Wood with Asbestos Contaminated Mastic to Include Disposal | SF | $0.00 | 20,000 |
| 4700 | Remove and Dispose of Asbestos Containing Roof Felt and Mastic (up to 3 Layers) | SF | $0.00 | 2,000 |
| 4800 | Remove and Dispose of Asbestos Containing Roof Flashing | LF | $0.00 | 6,000 |
| 4900 | Remove and Dispose of Asbestos Containing Glazing and Puty | SF | $0.00 | 2,000 |
| LEAD-BASED PAINT REMOVAL | ||||
| 5000 | Lead-Based Paint Removal | SF | $0.00 | 4,000 |
| 5100 | Mold Remediation | SF | $0.00 | 4,000 |
| 5200 | Initial Asbestos, Lead-Based Pain, Mold Building Survey: | |||
| 5200-1 Building Up to 5000 SF | EA | $0.00 | 15 | |
| 5200-2 Building Greater Than 5000SF, Up to 10,000 SF | EA | $0.00 | 20 | |
| 5200-3 Building Greater Than 10,000 SF, Up to 20,000 SF | EA | $0.00 | 8 | |
| 5200-4 Building Greater Than 20,000 SF | EA | $0.00 | 2 | |
| 5300 | Construction/Post-Construction Asbestos Sample Testing | EA | $0.00 | 10 |
| 5400 | Unpriced Unit Items (10%) | LS | ||
| DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE. | ||||
| 5500 | Bond (2.5% of Total) | LS | ||
| 5600 | Asbestos Fees | EA | $0.00 | 60 |
| 5700 | As-Built Drawings | EA | $0.00 | 10 |
OPTION YEAR 3
| 100 | Dismantle, Demo, Removal of One Story Wooden Structure | SF | $0.00 | 80,000 |
| 200 | Dismantle, Demo, Removal of Two Story Wooden Structure | SF | $0.00 | 20,000 |
| 300 | Dismantle, Demo, Removal of One Story Masonry Structure | SF | $0.00 | 30,000 |
| 400 | Dismantle, Demo, Removal of Multi-Story Masonry Structure | SF | $0.00 | 10,000 |
| 500 | Dismantle, Demo, Removal of Metal Building with Exterior Walls | SF | $0.00 | 15,000 |
| 600 | Dismantle, Demo, Removal of Metal Structures with No Exterior Walls | SF | $0.00 | 8,000 |
| 700 | Dismantle of Relocatable Structures | SF | $0.00 | 10,000 |
| 800 | Mobilization / Demobilization Charge | EA | $0.00 | 60 |
| SELECTIVE DEMOLITION, UTILITIES AND COMMUNICATIONS, INCLUDE HAUL, SALVAGE | ||||
| 900 | Potholing for Utilities | EA | $0.00 | 80 |
| 1000 | Remove Existing Utility Pole, Including Accessories | EA | $0.00 | 8 |
| 1100 | Privatized Utilities Fees to System Owners | LS | ||
| DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE. | ||||
| 1200 | Demo Bollards | EA | $0.00 | 50 |
| 1300 | Demo Man-hole/ Hand-hole | EA | $0.00 | 15 |
| 1400 | Remove Outside Communication Line | LF | $0.00 | 3,000 |
| 1500 | Disconnect and move SIPR safe | EA | $0.00 | 5 |
| 1600 | Place Flowable Fill in Abandoned Pipe, 2"-4" | LF | $0.00 | 1,500 |
| 1700 | Place Flowable Fill in Abandoned Pipe, >4"-8" | LF | $0.00 | 1,500 |
| SELECTIVE DEMOLITION, SITE, INCLUDE HAUL, SALVAGE | ||||
| 1800 | Pavement Removal, Bituminous, to 4" thickness | SY | $0.00 | 40,000 |
| 1900 | Pavement Removal, Bituminous, Additional 1" | SY | $0.00 | 10,000 |
| 2000 | Pavement Removal. Sidewalk, 4" Typ. | SY | $0.00 | 10,000 |
| 2100 | Pavement Removal, Concrete, to 6" Thickness | SY | $0.00 | 8,000 |
| 2200 | Pavement Removal, Concrete, +6" to 12" Thickness | SY | $0.00 | 4,000 |
| 2300 | Curbs, Concrete, Reinforced | LF | $0.00 | 3,000 |
| 2400 | Remove Fencing Post & Fabric, Barbwire, Gates, Up to 7' Tall | LF | $0.00 | 4,000 |
| 2500 | Remove Fencing Post & Fabric, Barbwire, Gates, Greater Than 7' Tall | LF | $0.00 | 1,000 |
| SITE REESTABLISHMENT | ||||
| 2600 | Fill, Compact, Grading | CY | $0.00 | 30,000 |
| 2700 | Excavation | CY | $0.00 | 5,000 |
| 2800 | Place Top Soil and Prepare for Seeding | SY | $0.00 | 70,000 |
| 2900 | Hydromulch | SY | $0.00 | 30,000 |
| 3000 | Install Bermuda Sod | SY | $0.00 | 40,000 |
| 3100 | Flexterra FGM | SY | $0.00 | 5,000 |
| 3200 | Scour Stop | SF | $0.00 | 200 |
| ASBESTOS REMOVAL, INCLUDING HAUL, DISPOSAL | ||||
| 3300 | Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, 1/2" through 6" pipe | LF | $0.00 | 2,000 |
| 3400 | Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, above 6", pipe | LF | $0.00 | 2,000 |
| 3500 | Remove Asbestos Insulation From Duct-work,Complete | SF | $0.00 | 2,000 |
| 3600 | Remove Asbestos From Furnaces, Water Tanks, Stacks, Water Heaters and Other Equipment to Include Attached Fittings, Valves & Accessories, Complete | SF | $0.00 | 2,000 |
| 3700 | Remove Blown-in Asbestos Insulation from Building Walls and Ceilings | SF | $0.00 | 20,000 |
| 3800 | Remove Asbestos Type Blown-in Acoustical Insulation | SF | $0.00 | 3,300 |
| 3900 | Remove Wall Acoustical Plaster w/ ACH, Complete | SF | $0.00 | 3,300 |
| 4000 | Remove Wall , Hard Veneer Plaster w/ ACH, Complete | SF | $0.00 | 1,200 |
| 4100 | Remove Asbestos Cement Board, Complete | SF | $0.00 | 3,300 |
| 4200 | Remove Asbestos Floor Tile & Carpet Over Floor Tile Complete, w/ Underlayments and Any Floor Overlays to Subfloor, Complete | SF | $0.00 | 20,000 |
| 4300 | Remove Existing Asbestos Contaminated Soil | CF | $0.00 | 2,000 |
| 4400 | Clean-up Gross Contaminated Areas | CF | $0.00 | 5,000 |
| 4500 | Remove Asbestos Contaminated Suspended Ceiling Tile and Grid to Include Disposal | SF | $0.00 | 30,000 |
| 4600 | Remove Carpet Glued to Concrete or Wood with Asbestos Contaminated Mastic to Include Disposal | SF | $0.00 | 20,000 |
| 4700 | Remove and Dispose of Asbestos Containing Roof Felt and Mastic (up to 3 Layers) | SF | $0.00 | 2,000 |
| 4800 | Remove and Dispose of Asbestos Containing Roof Flashing | LF | $0.00 | 6,000 |
| 4900 | Remove and Dispose of Asbestos Containing Glazing and Puty | SF | $0.00 | 2,000 |
| LEAD-BASED PAINT REMOVAL | ||||
| 5000 | Lead-Based Paint Removal | SF | $0.00 | 4,000 |
| 5100 | Mold Remediation | SF | $0.00 | 4,000 |
| 5200 | Initial Asbestos, Lead-Based Pain, Mold Building Survey: | |||
| 5200-1 Building Up to 5000 SF | EA | $0.00 | 15 | |
| 5200-2 Building Greater Than 5000SF, Up to 10,000 SF | EA | $0.00 | 20 | |
| 5200-3 Building Greater Than 10,000 SF, Up to 20,000 SF | EA | $0.00 | 8 | |
| 5200-4 Building Greater Than 20,000 SF | EA | $0.00 | 2 | |
| 5300 | Construction/Post-Construction Asbestos Sample Testing | EA | $0.00 | 10 |
| 5400 | Unpriced Unit Items (10%) | LS | ||
| DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE. | ||||
| 5500 | Bond (2.5% of Total) | LS | ||
| 5600 | Asbestos Fees | EA | $0.00 | 60 |
| 5700 | As-Built Drawings | EA | $0.00 | 10 |
OPTION YEAR 4
| 100 | Dismantle, Demo, Removal of One Story Wooden Structure | SF | $0.00 | 80,000 |
| 200 | Dismantle, Demo, Removal of Two Story Wooden Structure | SF | $0.00 | 20,000 |
| 300 | Dismantle, Demo, Removal of One Story Masonry Structure | SF | $0.00 | 30,000 |
| 400 | Dismantle, Demo, Removal of Multi-Story Masonry Structure | SF | $0.00 | 10,000 |
| 500 | Dismantle, Demo, Removal of Metal Building with Exterior Walls | SF | $0.00 | 15,000 |
| 600 | Dismantle, Demo, Removal of Metal Structures with No Exterior Walls | SF | $0.00 | 8,000 |
| 700 | Dismantle of Relocatable Structures | SF | $0.00 | 10,000 |
| 800 | Mobilization / Demobilization Charge | EA | $0.00 | 60 |
| SELECTIVE DEMOLITION, UTILITIES AND COMMUNICATIONS, INCLUDE HAUL, SALVAGE | ||||
| 900 | Potholing for Utilities | EA | $0.00 | 80 |
| 1000 | Remove Existing Utility Pole, Including Accessories | EA | $0.00 | 8 |
| 1100 | Privatized Utilities Fees to System Owners | LS | ||
| DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE. | ||||
| 1200 | Demo Bollards | EA | $0.00 | 50 |
| 1300 | Demo Man-hole/ Hand-hole | EA | $0.00 | 15 |
| 1400 | Remove Outside Communication Line | LF | $0.00 | 3,000 |
| 1500 | Disconnect and move SIPR safe | EA | $0.00 | 5 |
| 1600 | Place Flowable Fill in Abandoned Pipe, 2"-4" | LF | $0.00 | 1,500 |
| 1700 | Place Flowable Fill in Abandoned Pipe, >4"-8" | LF | $0.00 | 1,500 |
| SELECTIVE DEMOLITION, SITE, INCLUDE HAUL, SALVAGE | ||||
| 1800 | Pavement Removal, Bituminous, to 4" thickness | SY | $0.00 | 40,000 |
| 1900 | Pavement Removal, Bituminous, Additional 1" | SY | $0.00 | 10,000 |
| 2000 | Pavement Removal. Sidewalk, 4" Typ. | SY | $0.00 | 10,000 |
| 2100 | Pavement Removal, Concrete, to 6" Thickness | SY | $0.00 | 8,000 |
| 2200 | Pavement Removal, Concrete, +6" to 12" Thickness | SY | $0.00 | 4,000 |
| 2300 | Curbs, Concrete, Reinforced | LF | $0.00 | 3,000 |
| 2400 | Remove Fencing Post & Fabric, Barbwire, Gates, Up to 7' Tall | LF | $0.00 | 4,000 |
| 2500 | Remove Fencing Post & Fabric, Barbwire, Gates, Greater Than 7' Tall | LF | $0.00 | 1,000 |
| SITE REESTABLISHMENT | ||||
| 2600 | Fill, Compact, Grading | CY | $0.00 | 30,000 |
| 2700 | Excavation | CY | $0.00 | 5,000 |
| 2800 | Place Top Soil and Prepare for Seeding | SY | $0.00 | 70,000 |
| 2900 | Hydromulch | SY | $0.00 | 30,000 |
| 3000 | Install Bermuda Sod | SY | $0.00 | 40,000 |
| 3100 | Flexterra FGM | SY | $0.00 | 5,000 |
| 3200 | Scour Stop | SF | $0.00 | 200 |
| ASBESTOS REMOVAL, INCLUDING HAUL, DISPOSAL | ||||
| 3300 | Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, 1/2" through 6" pipe | LF | $0.00 | 2,000 |
| 3400 | Remove Asbestos Insulation from Piping to include Attached Fittings, Valves & accessories, Complete, above 6", pipe | LF | $0.00 | 2,000 |
| 3500 | Remove Asbestos Insulation From Duct-work,Complete | SF | $0.00 | 2,000 |
| 3600 | Remove Asbestos From Furnaces, Water Tanks, Stacks, Water Heaters and Other Equipment to Include Attached Fittings, Valves & Accessories, Complete | SF | $0.00 | 2,000 |
| 3700 | Remove Blown-in Asbestos Insulation from Building Walls and Ceilings | SF | $0.00 | 20,000 |
| 3800 | Remove Asbestos Type Blown-in Acoustical Insulation | SF | $0.00 | 3,300 |
| 3900 | Remove Wall Acoustical Plaster w/ ACH, Complete | SF | $0.00 | 3,300 |
| 4000 | Remove Wall , Hard Veneer Plaster w/ ACH, Complete | SF | $0.00 | 1,200 |
| 4100 | Remove Asbestos Cement Board, Complete | SF | $0.00 | 3,300 |
| 4200 | Remove Asbestos Floor Tile & Carpet Over Floor Tile Complete, w/ Underlayments and Any Floor Overlays to Subfloor, Complete | SF | $0.00 | 20,000 |
| 4300 | Remove Existing Asbestos Contaminated Soil | CF | $0.00 | 2,000 |
| 4400 | Clean-up Gross Contaminated Areas | CF | $0.00 | 5,000 |
| 4500 | Remove Asbestos Contaminated Suspended Ceiling Tile and Grid to Include Disposal | SF | $0.00 | 30,000 |
| 4600 | Remove Carpet Glued to Concrete or Wood with Asbestos Contaminated Mastic to Include Disposal | SF | $0.00 | 20,000 |
| 4700 | Remove and Dispose of Asbestos Containing Roof Felt and Mastic (up to 3 Layers) | SF | $0.00 | 2,000 |
| 4800 | Remove and Dispose of Asbestos Containing Roof Flashing | LF | $0.00 | 6,000 |
| 4900 | Remove and Dispose of Asbestos Containing Glazing and Puty | SF | $0.00 | 2,000 |
| LEAD-BASED PAINT REMOVAL | ||||
| 5000 | Lead-Based Paint Removal | SF | $0.00 | 4,000 |
| 5100 | Mold Remediation | SF | $0.00 | 4,000 |
| 5200 | Initial Asbestos, Lead-Based Pain, Mold Building Survey: | |||
| 5200-1 Building Up to 5000 SF | EA | $0.00 | 15 | |
| 5200-2 Building Greater Than 5000SF, Up to 10,000 SF | EA | $0.00 | 20 | |
| 5200-3 Building Greater Than 10,000 SF, Up to 20,000 SF | EA | $0.00 | 8 | |
| 5200-4 Building Greater Than 20,000 SF | EA | $0.00 | 2 | |
| 5300 | Construction/Post-Construction Asbestos Sample Testing | EA | $0.00 | 10 |
| 5400 | Unpriced Unit Items (10%) | LS | ||
| DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE. | ||||
| 5500 | Bond (2.5% of Total) | LS | ||
| 5600 | Asbestos Fees | EA | $0.00 | 60 |
| 5700 | As-Built Drawings | EA | $0.00 | 10 |