Technical Exhibit 3.docx
DOCX document 15 KB Posted
- Attached to
- Equity in Roadway Safety Technical Support
- Solicitation number
- 693JJ324Q000068
About this file
This document is a Pricing Schedule that is part of a Request for Quote (RFQ) for Equity in Roadway Safety Technical Support services. The RFQ is an open market, time and materials solicitation issued by the Department of Transportation Federal Highway Administration.
The Pricing Schedule outlines the contract line item structure, including a base year and two option years, with labor (not-to-exceed) and travel (cost-reimbursable not-to-exceed) pricing for the technical support services. The scope of work includes Tasks 1-4 in the base year, with an optional Task 5 that may be exercised during the contract period of performance. Offerors are required to provide labor rates and hours to arrive at the total not-to-exceed price for each CLIN. The North American Industry Classification System (NAICS) code is 541990 - All Other Professional, Scientific, and Technical Services, with a size standard of $19.5 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 3 PRICING SCHEDULE
CLIN STRUCTURE
| CLIN |
| DESCRIPTION |
| QTY |
| UNIT OF MEASURE |
| PRICE |
| TOTAL |
| 00101 |
| Equity in Roadway Safety Technical Support (Tasks 1-4) |
Base Year
Pricing: Labor (T&M) NTE – contractor determined # of labor hours (contractor should provide labor rates and hours to arrive at a total NTE price) Pricing: Time and Material T&M)
Period of Performance: 12 months from effective date award
| 12 |
| Months |
| 00201 |
| Travel |
Base Year
Pricing: Cost Reimbursable (CR) Not-to-exceed (NTE)
Period of Performance: 12 months from effective date award Ceiling: $10,000.00 $10,000.00
| 00301 |
| Optional Task 5 (T&M) NTE may be exercised at any point during the contract period of performance – based on 200 hours of labor (contractors should provide labor rates and hours to arrive at a total NTE price) |
Pricing: Time and Material (T&M)
Period of Performance: 12 months from effective date award
| 10101 |
| Equity in Roadway Safety Technical Support (Tasks 1-4) |
Option Year 1
Pricing: Labor Time and Material (T&M) NTE - contractor determined # of labor hours (contractor should provide labor rates and hours to arrive at a total NTE price)
Period of Performance: 12 months from end of Base Year
| 12 |
| Months |
| 10201 |
| Travel |
Option Year 1
Pricing: CR/NTE
Period of Performance: 12 months from end of Base Year Ceiling: $10,000.00 $10,000.00
| 20101 |
| Equity in Roadway Safety Technical Support (Tasks 1-4) |
Option Year 2
Pricing: Labor Time and Material (T&M) NTE - contractor determined # of labor hours (contractor should provide labor rates and hours to arrive at a total NTE price)
Period of Performance: 12 months from end of Option Year 1
| 12 |
| Months |
| 20201 |
| Travel |
Option Year 2
Pricing: CR/NTE
Period of Performance: 12 months from end of Option Year 1 Ceiling: $10,000.00 $10,000.00
TOTAL