Technical Exhibit 1 Flooring.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Flooring Requirements Contract Federal contract opportunity
Solicitation number
W911S7-20-Q-0100
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

View the file

Other files for this federal contract opportunity

Other files attached to Flooring Requirements Contract, newest first.
File Type Posted
Q and As W911S720Q0100 September 2 2020.pdf PDF
W911S720Q0100 Amendment 0006pdf.pdf PDF
Flooring PWS Amended 082420.pdf PDF
W911S720Q0100 0005pdf.pdf PDF
Questions and Answers 082420.pdf PDF
Wage Determination 05-18-2020.pdf PDF
Wage Determination.pdf PDF
W911S720Q0100 0003pdf.pdf PDF
W911S720Q0100 0004pdf.pdf PDF
W911S720Q0100 0002pdf.pdf PDF
W911S720Q0100 July 29 2020.pdf PDF
W911S720Q0100 0001pdf.pdf PDF
W911S720Q0100 July 27 2020.pdf PDF
W911S720Q0100 July 27 2020.pdf PDF
Flooring PWS 06292020.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Yr

Technical Exhibit 1: Base
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove Glued Down Roll Carpeting. Remove & dispose of glued down Roll carpeting4000SY$ - 0
2Remove Glued Down Carpet Squares. Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0
3Remove Adhesive Backed Carpet Squares. Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0
4Furnish & Install Carpet Border with Adhesive Backing. Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0
5Furnish Carpet Border w/Adhesive Backing, Material Only. Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0
6Furnish & Install Glued Down Roll Carpeting. Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0
7Furnish Glued Down Roll Carpeting, Material Only. Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0
8Furnish & Install Carpet Squares, Type I. Furnish & Install Carpet Squares, Type 15000SY$ - 0
9Furnish Carpet Squares, Type I, Material Only. Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0
10Furnish & Install Carpet Squares, Type 2. Furnish & Install Carpet Squares, Type 25000SY$ - 0
11Furnish Carpet Squares, Type 2, Material Only. Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0
12Furnish & Install Carpet Squares, Type 3. Furnish & Install Carpet Squares, Type 350SY$ - 0
13Furnish Carpet Squares, Type 3, Material Only. Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0
14Install Government Furnished Carpet Squares, Labor Only. Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges. Furnish & Install Metal Edge Strips & Door Edges50FT$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges. Furnish & Install Vinyl Carpet Edge Strips & Door Edges1500FT$ - 0
17Furnish & Install Carpet to Vinyl Adapter w/Track Base. Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0
19
18Furnish & Install Vinyl Composition Tile (VCT). Furnish & Install Vinyl Composition Tile (VCT)60000SF$ - 0
19Furnish & Install Bio-Based Tile (BBT). Furnish & Install BBT2000SF$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0
21Remove & Dispose of VCT. Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0
5.5 Underlayment
22Furnish & Install Self-Leveling Underlayment. Furnish & Install Self-Leveling Underlayment600SY$ - 0
23Wood Underlayment. Furnish & Install Wood Underlayment2000SY$ - 0
5.6 Ceramic Tile
24Furnish & Install Ceramic Tile. Furnish & Install Ceramic Tile2000SF$ - 0
5.7 Base
25Remove & Replace 4" Vinyl Wall Base. Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.15000FT$ - 0
26Furnish & Install 4" Vinyl Wall Base. Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1280FT$ - 0
27Remove & Replace 6" Vinyl Wall Base. Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.2500FT$ - 0
28Furnish & Install 6" Vinyl Wall Base. Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.600FT$ - 0
29Remove & Replace Wood Base. Replace Wood Base, including removal & disposal of existing wood base.600FT$ - 0
30Remove & Reinstall Wood Base. Remove & Reinstall Wood Base600FT$ - 0
31Remove & Reinstall Base on Demountable Partition. Remove & Reinstall Base at Demountable Partition300FT$ - 0
5.8 Stair Tread, Risers, & Nosing
32Remove & Dispose of Rubber Stair Tread & Riser. Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0
33Furnish & Install Rubber Stair Tread & Riser. Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0
34Furnish & Install Rubber Carpet Stair Nosing. Furnish & Install Carpet Stair Nosing.250FT$ - 0
35Furnish & Install Extruded Aluminum Stair Tread. 11" only250FT$ - 0
5.9 Rubber Matting
36Remove & Dispose of Rubber Matting. Remove & Dispose of Rubber Matting500SF$ - 0
37Furnish & Install Rubber Matting. Furnish & Install Rubber Matting2000SF$ - 0
5.10 Floor Mats
38Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0
39Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0
5.11 Additional Services
40Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.3000SY$ - 0
41Afterhours Labor for Carpet1000SY$ - 0
42Afterhours Labor for Resilient Flooring3000SF$ - 0
43Afterhours Labor for Base3000FT$ - 0
44Trimming the Bottom of Wood Doors20EA$ - 0
45Trimming the Bottom of Metal Doors20EA$ - 0
46Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal10000SF$ - 0
47Apply roll-on masonary floor sealant10000SF$ - 0
48Furnish and install welded vinyl flooring with intergral cove base10000SF$ - 0
49CMR. Contractor Manpower Reporting1EA$ - 0
NOTE: Please insure bid totals are annotated to the Solicitation bid schedule of the Solicitaion document.
Base Year Total$ - 0

OPt Yr 1

Technical Exhibit 1: Option Year 1
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove Glued Down Roll Carpeting. Remove & dispose of glued down Roll carpeting4000SY$ - 0
2Remove Glued Down Carpet Squares. Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0
3Remove Adhesive Backed Carpet Squares. Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0
4Furnish & Install Carpet Border with Adhesive Backing. Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0
5Furnish Carpet Border w/Adhesive Backing, Material Only. Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0
6Furnish & Install Glued Down Roll Carpeting. Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0
7Furnish Glued Down Roll Carpeting, Material Only. Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0
8Furnish & Install Carpet Squares, Type I. Furnish & Install Carpet Squares, Type 15000SY$ - 0
9Furnish Carpet Squares, Type I, Material Only. Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0
10Furnish & Install Carpet Squares, Type 2. Furnish & Install Carpet Squares, Type 25000SY$ - 0
11Furnish Carpet Squares, Type 2, Material Only. Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0
12Furnish & Install Carpet Squares, Type 3. Furnish & Install Carpet Squares, Type 350SY$ - 0
13Furnish Carpet Squares, Type 3, Material Only. Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0
14Install Government Furnished Carpet Squares, Labor Only. Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges. Furnish & Install Metal Edge Strips & Door Edges50FT$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges. Furnish & Install Vinyl Carpet Edge Strips & Door Edges1500FT$ - 0
17Furnish & Install Carpet to Vinyl Adapter w/Track Base. Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0
19
18Furnish & Install Vinyl Composition Tile (VCT). Furnish & Install Vinyl Composition Tile (VCT)60000SF$ - 0
19Furnish & Install Bio-Based Tile (BBT). Furnish & Install BBT2000SF$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0
21Remove & Dispose of VCT. Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0
5.5 Underlayment
22Furnish & Install Self-Leveling Underlayment. Furnish & Install Self-Leveling Underlayment600SY$ - 0
23Wood Underlayment. Furnish & Install Wood Underlayment2000SY$ - 0
5.6 Ceramic Tile
24Furnish & Install Ceramic Tile. Furnish & Install Ceramic Tile2000SF$ - 0
5.7 Base
25Remove & Replace 4" Vinyl Wall Base. Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.15000FT$ - 0
26Furnish & Install 4" Vinyl Wall Base. Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1280FT$ - 0
27Remove & Replace 6" Vinyl Wall Base. Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.2500FT$ - 0
28Furnish & Install 6" Vinyl Wall Base. Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.600FT$ - 0
29Remove & Replace Wood Base. Replace Wood Base, including removal & disposal of existing wood base.600FT$ - 0
30Remove & Reinstall Wood Base. Remove & Reinstall Wood Base600FT$ - 0
31Remove & Reinstall Base on Demountable Partition. Remove & Reinstall Base at Demountable Partition300FT$ - 0
5.8 Stair Tread, Risers, & Nosing
32Remove & Dispose of Rubber Stair Tread & Riser. Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0
33Furnish & Install Rubber Stair Tread & Riser. Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0
34Furnish & Install Rubber Carpet Stair Nosing. Furnish & Install Carpet Stair Nosing.250FT$ - 0
35Furnish & Install Extruded Aluminum Stair Tread. 11" only250FT$ - 0
5.9 Rubber Matting
36Remove & Dispose of Rubber Matting. Remove & Dispose of Rubber Matting500SF$ - 0
37Furnish & Install Rubber Matting. Furnish & Install Rubber Matting2000SF$ - 0
5.10 Floor Mats
38Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0
39Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0
5.11 Additional Services
40Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.3000SY$ - 0
41Afterhours Labor for Carpet1000SY$ - 0
42Afterhours Labor for Resilient Flooring3000SF$ - 0
43Afterhours Labor for Base3000FT$ - 0
44Trimming the Bottom of Wood Doors20EA$ - 0
45Trimming the Bottom of Metal Doors20EA$ - 0
46Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal10000SF$ - 0
47Apply roll-on masonary floor sealant10000SF$ - 0
48Furnish and install welded vinyl flooring with intergral cove base10000SF$ - 0
49CMR. Contractor Manpower Reporting1EA$ - 0
NOTE: Please insure bid totals are annotated to the Solicitation bid schedule of the Solicitaion document.
Base Year Total$ - 0

Opt Yr 2

Technical Exhibit 1: option Year 2
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove Glued Down Roll Carpeting. Remove & dispose of glued down Roll carpeting4000SY$ - 0
2Remove Glued Down Carpet Squares. Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0
3Remove Adhesive Backed Carpet Squares. Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0
4Furnish & Install Carpet Border with Adhesive Backing. Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0
5Furnish Carpet Border w/Adhesive Backing, Material Only. Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0
6Furnish & Install Glued Down Roll Carpeting. Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0
7Furnish Glued Down Roll Carpeting, Material Only. Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0
8Furnish & Install Carpet Squares, Type I. Furnish & Install Carpet Squares, Type 15000SY$ - 0
9Furnish Carpet Squares, Type I, Material Only. Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0
10Furnish & Install Carpet Squares, Type 2. Furnish & Install Carpet Squares, Type 25000SY$ - 0
11Furnish Carpet Squares, Type 2, Material Only. Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0
12Furnish & Install Carpet Squares, Type 3. Furnish & Install Carpet Squares, Type 350SY$ - 0
13Furnish Carpet Squares, Type 3, Material Only. Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0
14Install Government Furnished Carpet Squares, Labor Only. Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges. Furnish & Install Metal Edge Strips & Door Edges50FT$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges. Furnish & Install Vinyl Carpet Edge Strips & Door Edges1500FT$ - 0
17Furnish & Install Carpet to Vinyl Adapter w/Track Base. Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0
19
18Furnish & Install Vinyl Composition Tile (VCT). Furnish & Install Vinyl Composition Tile (VCT)60000SF$ - 0
19Furnish & Install Bio-Based Tile (BBT). Furnish & Install BBT2000SF$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0
21Remove & Dispose of VCT. Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0
5.5 Underlayment
22Furnish & Install Self-Leveling Underlayment. Furnish & Install Self-Leveling Underlayment600SY$ - 0
23Wood Underlayment. Furnish & Install Wood Underlayment2000SY$ - 0
5.6 Ceramic Tile
24Furnish & Install Ceramic Tile. Furnish & Install Ceramic Tile2000SF$ - 0
5.7 Base
25Remove & Replace 4" Vinyl Wall Base. Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.15000FT$ - 0
26Furnish & Install 4" Vinyl Wall Base. Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1280FT$ - 0
27Remove & Replace 6" Vinyl Wall Base. Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.2500FT$ - 0
28Furnish & Install 6" Vinyl Wall Base. Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.600FT$ - 0
29Remove & Replace Wood Base. Replace Wood Base, including removal & disposal of existing wood base.600FT$ - 0
30Remove & Reinstall Wood Base. Remove & Reinstall Wood Base600FT$ - 0
31Remove & Reinstall Base on Demountable Partition. Remove & Reinstall Base at Demountable Partition300FT$ - 0
5.8 Stair Tread, Risers, & Nosing
32Remove & Dispose of Rubber Stair Tread & Riser. Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0
33Furnish & Install Rubber Stair Tread & Riser. Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0
34Furnish & Install Rubber Carpet Stair Nosing. Furnish & Install Carpet Stair Nosing.250FT$ - 0
35Furnish & Install Extruded Aluminum Stair Tread. 11" only250FT$ - 0
5.9 Rubber Matting
36Remove & Dispose of Rubber Matting. Remove & Dispose of Rubber Matting500SF$ - 0
37Furnish & Install Rubber Matting. Furnish & Install Rubber Matting2000SF$ - 0
5.10 Floor Mats
38Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0
39Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0
5.11 Additional Services
40Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.3000SY$ - 0
41Afterhours Labor for Carpet1000SY$ - 0
42Afterhours Labor for Resilient Flooring3000SF$ - 0
43Afterhours Labor for Base3000FT$ - 0
44Trimming the Bottom of Wood Doors20EA$ - 0
45Trimming the Bottom of Metal Doors20EA$ - 0
46Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal10000SF$ - 0
47Apply roll-on masonary floor sealant10000SF$ - 0
48Furnish and install welded vinyl flooring with intergral cove base10000SF$ - 0
49CMR. Contractor Manpower Reporting1EA$ - 0
NOTE: Please insure bid totals are annotated to the Solicitation bid schedule of the Solicitaion document.
Base Year Total$ - 0

Opt Yr 3

Technical Exhibit 1: Option Year 3
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove Glued Down Roll Carpeting. Remove & dispose of glued down Roll carpeting4000SY$ - 0
2Remove Glued Down Carpet Squares. Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0
3Remove Adhesive Backed Carpet Squares. Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0
4Furnish & Install Carpet Border with Adhesive Backing. Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0
5Furnish Carpet Border w/Adhesive Backing, Material Only. Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0
6Furnish & Install Glued Down Roll Carpeting. Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0
7Furnish Glued Down Roll Carpeting, Material Only. Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0
8Furnish & Install Carpet Squares, Type I. Furnish & Install Carpet Squares, Type 15000SY$ - 0
9Furnish Carpet Squares, Type I, Material Only. Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0
10Furnish & Install Carpet Squares, Type 2. Furnish & Install Carpet Squares, Type 25000SY$ - 0
11Furnish Carpet Squares, Type 2, Material Only. Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0
12Furnish & Install Carpet Squares, Type 3. Furnish & Install Carpet Squares, Type 350SY$ - 0
13Furnish Carpet Squares, Type 3, Material Only. Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0
14Install Government Furnished Carpet Squares, Labor Only. Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges. Furnish & Install Metal Edge Strips & Door Edges50FT$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges. Furnish & Install Vinyl Carpet Edge Strips & Door Edges1500FT$ - 0
17Furnish & Install Carpet to Vinyl Adapter w/Track Base. Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0
19
18Furnish & Install Vinyl Composition Tile (VCT). Furnish & Install Vinyl Composition Tile (VCT)60000SF$ - 0
19Furnish & Install Bio-Based Tile (BBT). Furnish & Install BBT2000SF$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0
21Remove & Dispose of VCT. Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0
5.5 Underlayment
22Furnish & Install Self-Leveling Underlayment. Furnish & Install Self-Leveling Underlayment600SY$ - 0
23Wood Underlayment. Furnish & Install Wood Underlayment2000SY$ - 0
5.6 Ceramic Tile
24Furnish & Install Ceramic Tile. Furnish & Install Ceramic Tile2000SF$ - 0
5.7 Base
25Remove & Replace 4" Vinyl Wall Base. Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.15000FT$ - 0
26Furnish & Install 4" Vinyl Wall Base. Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1280FT$ - 0
27Remove & Replace 6" Vinyl Wall Base. Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.2500FT$ - 0
28Furnish & Install 6" Vinyl Wall Base. Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.600FT$ - 0
29Remove & Replace Wood Base. Replace Wood Base, including removal & disposal of existing wood base.600FT$ - 0
30Remove & Reinstall Wood Base. Remove & Reinstall Wood Base600FT$ - 0
31Remove & Reinstall Base on Demountable Partition. Remove & Reinstall Base at Demountable Partition300FT$ - 0
5.8 Stair Tread, Risers, & Nosing
32Remove & Dispose of Rubber Stair Tread & Riser. Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0
33Furnish & Install Rubber Stair Tread & Riser. Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0
34Furnish & Install Rubber Carpet Stair Nosing. Furnish & Install Carpet Stair Nosing.250FT$ - 0
35Furnish & Install Extruded Aluminum Stair Tread. 11" only250FT$ - 0
5.9 Rubber Matting
36Remove & Dispose of Rubber Matting. Remove & Dispose of Rubber Matting500SF$ - 0
37Furnish & Install Rubber Matting. Furnish & Install Rubber Matting2000SF$ - 0
5.10 Floor Mats
38Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0
39Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0
5.11 Additional Services
40Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.3000SY$ - 0
41Afterhours Labor for Carpet1000SY$ - 0
42Afterhours Labor for Resilient Flooring3000SF$ - 0
43Afterhours Labor for Base3000FT$ - 0
44Trimming the Bottom of Wood Doors20EA$ - 0
45Trimming the Bottom of Metal Doors20EA$ - 0
46Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal10000SF$ - 0
47Apply roll-on masonary floor sealant10000SF$ - 0
48Furnish and install welded vinyl flooring with intergral cove base10000SF$ - 0
49CMR. Contractor Manpower Reporting1EA$ - 0
NOTE: Please insure bid totals are annotated to the Solicitation bid schedule of the Solicitaion document.
Base Year Total$ - 0

Opt Yr 4

Technical Exhibit 1: Option Year 4
TaskDescriptionQTYU/MUnit PriceTotal
5.2 Carpet
1Remove Glued Down Roll Carpeting. Remove & dispose of glued down Roll carpeting4000SY$ - 0
2Remove Glued Down Carpet Squares. Remove & Dispose of Glued-Down Carpet Squares9000SY$ - 0
3Remove Adhesive Backed Carpet Squares. Remove & Dispose Adhesive-Backed Carpet Squares50SY$ - 0
4Furnish & Install Carpet Border with Adhesive Backing. Furnish & Install Carpet Border with Adhesive Backing50SY$ - 0
5Furnish Carpet Border w/Adhesive Backing, Material Only. Furnish Carpet Border with Adhesive Backing (Material Only)50SY$ - 0
6Furnish & Install Glued Down Roll Carpeting. Furnish & Install Glued-Down Roll Carpeting2000SY$ - 0
7Furnish Glued Down Roll Carpeting, Material Only. Furnish Glue-Down Roll Carpeting (Material Only)50SY$ - 0
8Furnish & Install Carpet Squares, Type I. Furnish & Install Carpet Squares, Type 15000SY$ - 0
9Furnish Carpet Squares, Type I, Material Only. Furnish Carpet Squares, Type 1 (Material Only)600SY$ - 0
10Furnish & Install Carpet Squares, Type 2. Furnish & Install Carpet Squares, Type 25000SY$ - 0
11Furnish Carpet Squares, Type 2, Material Only. Furnish Carpet Squares, Type 2 (Material Only)600SY$ - 0
12Furnish & Install Carpet Squares, Type 3. Furnish & Install Carpet Squares, Type 350SY$ - 0
13Furnish Carpet Squares, Type 3, Material Only. Furnish Carpet Squares, Type 3 (Material Only)300SY$ - 0
14Install Government Furnished Carpet Squares, Labor Only. Install Government Furnished Carpet Squares (Labor Only)200SY$ - 0
5.3 Carpet Edge Strips & Adaptors
15Furnish & Install Metal Edge Strips & Door Edges. Furnish & Install Metal Edge Strips & Door Edges50FT$ - 0
16Furnish & Install Vinyl Carpet Edge Strips & Door Edges. Furnish & Install Vinyl Carpet Edge Strips & Door Edges1500FT$ - 0
17Furnish & Install Carpet to Vinyl Adapter w/Track Base. Furnish & Install Carpet-to-Vinyl Adapter with Mechanically Fastened Track Base600FT$ - 0
19
18Furnish & Install Vinyl Composition Tile (VCT). Furnish & Install Vinyl Composition Tile (VCT)60000SF$ - 0
19Furnish & Install Bio-Based Tile (BBT). Furnish & Install BBT2000SF$ - 0
20Furnish & Install Luxury Vinyl Tile (LVT).5000SF$ - 0
21Remove & Dispose of VCT. Remove & Dispose of Vinyl Composition Tile (VCT)50000SF$ - 0
5.5 Underlayment
22Furnish & Install Self-Leveling Underlayment. Furnish & Install Self-Leveling Underlayment600SY$ - 0
23Wood Underlayment. Furnish & Install Wood Underlayment2000SY$ - 0
5.6 Ceramic Tile
24Furnish & Install Ceramic Tile. Furnish & Install Ceramic Tile2000SF$ - 0
5.7 Base
25Remove & Replace 4" Vinyl Wall Base. Replace 4" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.15000FT$ - 0
26Furnish & Install 4" Vinyl Wall Base. Furnish & Install 4" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.1280FT$ - 0
27Remove & Replace 6" Vinyl Wall Base. Replace 6" Vinyl Wall Base, Including removal & disposal of existing vinyl wall base & preparing wall surfaces as needed to get proper adhesion of new base.2500FT$ - 0
28Furnish & Install 6" Vinyl Wall Base. Furnish & Install 6" Vinyl Wall Base, & prep wall surface as needed to get proper adhesion of new base.600FT$ - 0
29Remove & Replace Wood Base. Replace Wood Base, including removal & disposal of existing wood base.600FT$ - 0
30Remove & Reinstall Wood Base. Remove & Reinstall Wood Base600FT$ - 0
31Remove & Reinstall Base on Demountable Partition. Remove & Reinstall Base at Demountable Partition300FT$ - 0
5.8 Stair Tread, Risers, & Nosing
32Remove & Dispose of Rubber Stair Tread & Riser. Remove & Dispose of Rubber Stair Tread & Riser.600FT$ - 0
33Furnish & Install Rubber Stair Tread & Riser. Furnish & Install Rubber Stair Tread & Riser.1000FT$ - 0
34Furnish & Install Rubber Carpet Stair Nosing. Furnish & Install Carpet Stair Nosing.250FT$ - 0
35Furnish & Install Extruded Aluminum Stair Tread. 11" only250FT$ - 0
5.9 Rubber Matting
36Remove & Dispose of Rubber Matting. Remove & Dispose of Rubber Matting500SF$ - 0
37Furnish & Install Rubber Matting. Furnish & Install Rubber Matting2000SF$ - 0
5.10 Floor Mats
38Furnish & Install Recessed-Mounted Floor Mats. Furnish & Install Recessed Floor Mats10SF$ - 0
39Furnish & Install Carpet Entryway Walk-off Mat. Carpet Walk-off Mat300SF$ - 0
5.11 Additional Services
40Move Furniture. Move furniture. Not to be used with rolled carpet. No personal items.3000SY$ - 0
41Afterhours Labor for Carpet1000SY$ - 0
42Afterhours Labor for Resilient Flooring3000SF$ - 0
43Afterhours Labor for Base3000FT$ - 0
44Trimming the Bottom of Wood Doors20EA$ - 0
45Trimming the Bottom of Metal Doors20EA$ - 0
46Remove, containerize and dispose of vinyl-asbestos floor tile (1 to 3 layers) to include mastic removal10000SF$ - 0
47Apply roll-on masonary floor sealant10000SF$ - 0
48Furnish and install welded vinyl flooring with intergral cove base10000SF$ - 0
49CMR. Contractor Manpower Reporting1EA$ - 0
NOTE: Please insure bid totals are annotated to the Solicitation bid schedule of the Solicitaion document.
Base Year Total$ - 0

File details come from the government source that posted it. Updated .