This is a Statement of Work (SOW) dated April 18, 2024, for the acquisition and installation of an Optical Emission Spectrometer (OES) system for the Defense Logistics Agency (DLA) Product Test Center Division's Mechanical Lab in Columbus, Ohio. The contractor must provide and deliver one SPECTROMAXx Advanced floor model OES (range 120-766nm) configured with a single ICAL sample, 22" monitor and PC, argon cleaning option, and argon pressure regulator. The system must include five analytical matrices (Fe, Al, Cu, Ni, Ti) with specified analytical programs, a PC stand without trackball, nitrogen (HON) option, SIRCAL argon purifier (100-120V), LMX10 spectrum scan, wire adapters (0.8-10mm and 0.8-3mm diameter), sheet adapter (0.1-1mm thickness), small parts adapter, spark stand plate with ceramic disk, ceramic disc (6mm ID), and a standard line conditioner. The equipment requires a 30-amp 110V power supply.
The contractor is responsible for all labor, tools, transportation, and supplies necessary for installation, setup, calibration, and three days (24 hours) of on-site training for up to four MPTC associates. A minimum 12-month warranty from installation date (or 18 months from shipment, whichever occurs first) covering parts, labor, and travel expenses is required. Delivery occurs at Defense Supply Center Columbus (300 North James Road, Building 17-3, Columbus, Ohio 43218-3990), with installation and training at DSCC Columbus (3990 East Broad Street, Whitehall, OH 43213, Building 9, Section 2). The contractor must report labor hours via SAM.gov by October 31 each year, comply with DLA facility security requirements including background vetting of personnel at least one week prior to service start, and submit invoices to the Wide Area Workflow system within 10 workdays after training conclusion. The WAWF acceptance DODAAC is SL0702. Key points of contact include Contract Officer Representative Kyle Palmer (614-692-8860, Kyle.Palmer@dla.mil) and Technical Representative/Project Manager Mark Watkins (614-693-7619, Mark.Watkins@dla.mil).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
April 18th, 2024
1. Title
Acquisition of an Optical Emission Spectrometer
Requiring Activity: DLA Product Test Center Division, Mechanical Lab, located at Columbus, Ohio. Contracting Activity: DLA Contracting Services located at Columbus, Ohio.
2. Introduction The Mechanical Product Test Center (MPTC) is looking to acquire an Optical Emission Spectrometer (OES) to expand testing capability for the analysis of various metal matrices.
3. Background The MPTC is looking to expand its metal analysis capabilities with the acquisition of an Optical Emission Spectrometer to replace an ageing and out-of-commission system. This equipment will be used with an existing program library developed by MPTC engineers and metallurgists.
4. Scope The contractor shall:
• Provide three (3) days of on-site training for up to four (4) MPTC associates.
• Install the equipment and supporting hardware and software at the place of performance listed in section 9.
• Set-up of OES
• Calibration of OES
5. Applicable Directives
None.
6. Performance Requirements The contractor shall provide all labor, tools, transportation, supplies necessary to provide one (1) Optical Emissions Spectrometer to the Mechanical Product Test Center. The test system shall meet the following criteria:
1. Brand Name Product: SPECTROMAXx Advanced
1. Single ICAL Sample
2. 22” Monitor and PC
3. Argon Cleaning option
4. Argon Pressure Regulator
2. Model: Floor Version, Range 120-766nm
3. System shall be provided with the following add-ons and options:
1. PC Stand without Trackball
2. Matrices: Fe, Al, Cu, Ni, Ti
3. Analytical Programs: FE-01, 10, 15, 20, 30, 40, 50, 60, 65 Al-01 Ni-01, 10, 20, 30, 40 Cu-01, 10, 20, 30, 40, 50, 60, 70, 80 Ti-01 10, 20, 30, 40
4. Nitrogen (HON) Option
5. SIRCAL Argon Purifier 100 – 120V
6. LMX10 Spectrum Scan
7. Wire adapter 0.8 – 10 millimeter Diameter
8. Wire adapter 0.8 – 3 millimeter Diameter
9. Adapter for sheets 0.1 – 1 millimeter thickness
10. Adapter for small parts
11. Spark stand plate with ceramic disk
12. Ceramic disc ID 6mm
13. Standard Line Conditioner
4. Electrical: Requires a 30 Amp 110 V power supply. A standard line conditioner
(Powervar Line Conditioner abc600-11) is recommended.
5. Installation: Installation & Familiarization Training for 24 hours (3 days) is required.
6. Calibration: Calibration to include a single ICAL Sample for Standardization of all
Matrices.
7. Warranty: The warranty period shall be for a minimum of twelve (12) months from the date of installation or eighteen (18) months from the date of shipment, whichever occurs first. The warranty must include parts, labor, and travel expenses.
7. Deliverables Contractor shall provide:
• One (1) Optical Emission Spectrometer
• Installation
• Set-up
• Calibration
• On-site training
• 12-month Warranty from date of installation
8. General Information for Contractor
• Contractor Manpower Reporting o The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Logistics Agency via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.sam.gov/.
Reporting input will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at:
http://www.sam.gov/.
• Common Access Card (CAC): Common Access Card Not Required o Prior to gaining access to any DLA facility, contractor personnel must be vetted through the local security office. Due to DoD security requirements, foreign nationals and illegal aliens will not be permitted access to any DLA facility. Individuals with outstanding warrants or certain convictions also will be denied access. Contractor personnel must ensure they have the appropriate identification required to access DLA facilities. Contractor personnel entering a DLA facility should anticipate their vehicle will undergo a security check by DLA Security, and should ensure that no drugs, alcohol, or weapons of any kind are found within the vehicle. It is the contractor’s responsibility to ensure the personnel performing under this contract can and will meet these requirements for accessing DLA facilities. Names of contractor personnel will be provided to the local POC for vetting purposes no less than one week prior to the service start date.
• Security Requirements o Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by Security Office.
Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
• Recognized Holidays o The following are recognized US holidays. The contractor shall not perform services on these days.
Dates Holidays
January 1 New Year’s Day http://www.sam.gov/ http://www.sam.gov/
Third Monday in January Birthday of Martin Luther King, Jr.
Third Monday in February
Washington’s Birthday
Last Monday in May Memorial Day
June 19th Juneteenth
July 4th Independence Day
First Monday in September
Labor Day
Second Monday in October
Columbus Day
November 11th Veteran’s Day
Fourth Thursday in November
Thanksgiving Day
December 25th Christmas Day
9. Place of Performance
Delivery shall be to:
Defense Supply Center Columbus (DSCC) 300 North James Road, Building 17-3 Mark For: DLA Product Test Center, Building 9-2 (VTM Lab) Attention: Mark Watkins ((614) 693-7619, Mark.Watkins@dla.mil) Columbus, Ohio 43218-3990
Installation & Training shall be conducted at:
DSCC Columbus 3990 East Broad Street Whitehall, OH 43213 Building 9, Section 2
10. Travel (if applicable)
The contractor is responsible for shipping to delivery address described in Place of Performance section. The contract is responsible for travel to/from installation and training location described in Place of Performance.
11. Invoicing Payment of invoices will be accomplished by payment through the Defense Finance and Accounting Service. Invoices will be submitted to the Wide Area Workflow system in accordance with DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports and DFARS 252.232-7006 Wide Area Workflow Payment Instructions within 10 workdays after the conclusion of each training session.
mailto:Mark.Watkins@dla.mil
11. WAWF Acceptance DODAAC#
SL0702
11. Point of Contacts
The Government Contract Officer:
TBD
The Government Contract Officer Representative (COR):
Kyle Palmer Kyle.Palmer@dla.mil 614-692-8860
The Government Technical Representative/Project Manager:
Name: Mark Watkins Phone Number: (614) 693-7619 Email Address: Mark.Watkins@dla.mil