TECH SPECS.pdf
PDF 11 MB Posted
- Solicitation number
- ITB24-068
- Issued by
- Brazos County, College Station City, Texas
About this file
This document contains the technical specifications for the Construction of Stonebridge and Scarborough Drive Roundabout project in College Station, Texas. The project is being led by the City of College Station, located in Brazos County, Texas. The project involves the full demolition and reconstruction of an existing intersection as a roundabout. A pre-bid meeting is scheduled for July 9, 2024 and attendance is highly recommended, though not mandatory. Bid documents are available for download from the Brazos Valley e-Marketplace and complete sets must be used when preparing bids. The City assumes no responsibility for errors or misinterpretations resulting from the use of incomplete bid documents.
The document does not provide details on pricing terms, set asides, incumbents, funding requirements or sources, or other salient financial information. It focuses solely on the technical specifications and administrative details of the construction project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS
STONEBRIDGE AND SCARBOROUGH DRIVE ROUNDABOUT
CITY OF COLLEGE STATION
CITY JOB NO.: 23300721
Prepared By:
Kimley-Horn & Associates, Inc.
3/21/2024
2800 South Texas Avenue, Suite 201 Bryan, TX 77802
TBPE Registration No: F928
SPECIAL PROVISIONS - TABLE OF CONTENTS
SECTION NUMBER DESCRIPTION
SP 1. Project Description SP 2. City Project Manager SP 3. Sequence of Construction SP 4. Project Specifications
SP 5. Site Conditions SP 6. Protection of Existing Facilities and Structures SP 7. Project Parking, Equipment, and Material Storage SP 8. Solid Waste Coordination SP 9. Access for Residents SP 10. Preservation of Landscaping, Sprinkler Systems, and Other
Private Property SP 11. Sampling and Testing SP 12. Traffic Control SP 13. Submittals SP 14. Description of Pay Items SP 15. Contractor Provided As-Built Survey
SP 1. PROJECT DESCRIPTION:
This roadway project includes the reconstruction of an existing intersection at Stonebridge and Scarborough. The proposed roundabout intersection includes a mountable center circle with stamped concrete.
Improvements include traffic striping, paving, and water installation. Paving includes reworking and stabilization of base, as well as installation of concrete pavement. Utility installation includes a fire hydrant relocation. A Traffic Control Plan has been provided. Erosion control shall include a SWPPP, NOI, and sodding of disturbed areas during construction.
SP 2. CITY PROJECT MANAGER:
Michael Holmes P.O. Box 9960
College Station, TX 77840 979-764-6247
MHolmes@cstx.gov
SP 3. SEQUENCE OF CONSTRUCTION:
Contractor shall follow traffic control as outlined on plan sheet C4.0. Before commencing construction and at each Progress Meeting, the Contractor shall submit to the City’s Project Manager a detailed construction schedule that clearly shows the critical path of the construction project for review and approval. The work plan shall be kept updated and detailed enough that the Owner’s Project Manager can determine potential effects on the overall project schedule. Revised project schedules showing changes from the original along with detailed explanation on how the Contractor plans to get back on schedule will be submitted every 2 weeks.
SP 4. PROJECT SPECIFICATIONS:
The City of College Station, Texas along with Bryan, Texas has prepared common standards and specifications for streets, drainage, water, and sewer construction that may be obtained with most recent updates from the internet at: http://www.bcsunited.net
Specifications from the 2020 BCS United Technical Specifications and the Texas Department of Transportation Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (2014 edition) specific to this job have been selected and made a part of this document. In case of any conflict or ambiguity amongst these selected specifications, the most stringent standard shall apply.
Specifications may be augmented or replaced by the Special Provisions of this document.
SP 5. SITE CONDITIONS:
The contractor shall pothole and physically verify the location and depths of all underground utilities and structure prior to work in the area of the project. This work shall be considered subsidiary to “Mobilization”.
Damage to structures or facilities shown on the plans, marked in the field, or surmised from visual evidence shall be the sole responsibility of the Contractor.
Relocation or repair of damage to (except as provided above) structures or facilities which have been found in the field to be in conflict with proposed improvements that could have been surmised from the plans or visual evidence in the field shall be performed by the Contractor at no extra expense as they are considered subsidiary to the item of work being performed.
Relocation or repair of damage to structures which have been found to be in conflict with the proposed improvements and were clearly not evident through field investigation shall be performed by the contractor as Extra Work or by the Owner of the facility under the City Franchise rights, as determined and decided by the City’s Project Manager.
SP 6. PROTECTION OF EXISTING FACILITIES AND STRUCTURES:
It shall be sole responsibility of the Contractor to protect all existing facilities from damage caused by or arising out of the work. The Contractor shall utilize such methods as he deems necessary to progress with the work without causing damage to facilities or structures both above and below ground.
Methods employed by the Contractor which, in the opinion of the Project Manager, are causing or will cause damage to existing structures or facilities will be modified or terminated upon written notice of such damage to the Contractor by the Project Manager, with no delay or damage charges payable to the Contractor for compliance with this section.
Information and data provided in the bidding documents with respect to underground facilities at or contiguous to the site is based upon information and data provided by Utility Owners, pothole locations and record drawings. Before submitting a Bid, each bidder will be responsible to make or obtain such explorations, tests and data concerning physical conditions (surface, subsurface, and underground facilities) at or contiguous to the site, or which otherwise may affect cost, progress, performance or furnishing of the Work and which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the terms and conditions of the Bidding documents.
SP 7. PROJECT PARKING, EQUIPMENT, AND MATERIAL STORAGE:
The Contractor’s equipment, private automobiles, and materials shall be kept to those areas of the public’s rights-of-way in a fashion which does not obstruct any other roadway or driveway and in accordance with the Traffic Control Plan. The Contractor may obtain additional offsite parking and storage area(s). Written permission allowing the use of such areas will be required from the property owner(s) prior to the use of such areas. Any areas damaged by the parking, equipment, material storage, etc. shall be repaired to “as good or better” condition including re-grading and re-vegetation as required. No separate pay shall be granted for the repair of these areas.
SP 8. SOLID WASTE COORDINATION:
Construction is not to impede weekly waste collection. Residential waste and brush & bulky service each occur once per week (not typically on the same day). The schedules are available through the City of College Station’s Sanitation & Recycling Division or at the City of College Station’s website at the following link.
https://www.cstx.gov/departments___city_hall/publicworks/solid_waste_recycling The contractor is to coordinate with the City of College Station Sanitation & Recycling Division to make certain the impact to citizens is minimized. The city may be able to schedule pickup early on particular streets so that construction delay is minimized. The contractor is to work with the city as needed including scheduling, assisting in relocating garbage cans, etc. Whenever city garbage collection trucks are denied vehicular access to residential curb side pickup, the contractor must collect the filled cans from each property and locate them in an area accessible to the collection truck prior to scheduled pickup. The contractor must also return the empty cans that day. Cans that are not addressed are interchangeable amongst properties. The contractor may want to note on the door hanger notifications that residential waste and brush and bulky pickup will occur on regularly scheduled days but that pick-up will occur as early as 7:00 a.m. during this time to facilitate construction.
SP 9. ACCESS FOR RESIDENTS:
The Contractor shall assure that all property owners within the project site have adequate and continuous access to their property at all times.
The contractor may close the roadway in sections as long as all of the following criteria are met:
a. No resident is denied vehicular access to their driveway
b. Non-residential driveways must have access throughout construction, or as we agreed upon with the property owner.
c. Traffic control barricades clearly delineate well marked detour notes.
SP 10. PRESERVATION OF LANDSCAPING, SPRINKLER SYSTEMS, AND OTHER
PRIVATE PROPERTY:
The contractor shall assume full responsibility for the preservation of existing landscaping (sod, shrubbery, trees, etc.), sprinkler systems, and other private property at the site during the installation of items in this contract document. Damaged landscaping, sprinkler systems, and other private property shall be replaced within a reasonable time, by the Contractor at his own expense, to the satisfaction of the Inspector.
No trees or shrubbery shall be removed outside of the work area unless specifically authorized by the City Inspector or Arborist.
Existing trees located outside of the work zone shall be protected. The contractor is responsible for replacing, at his expense, all trees or vegetation that are damaged as a result of his negligence.
SP 11. SAMPLING AND TESTING:
Material testing shall be performed by Dudley Engineering.
SP 12. TRAFFIC CONTROL:
The contractor is responsible for providing Traffic Control for all construction. The Contractor shall use the plan provided or provide an alternate which is designed in accordance with Texas MUTCD. The preparation, implementation, and maintenance of this plan shall be paid for in the bid item “Traffic Control”. The Traffic Control Plan must address pedestrians, bicycles, and vehicular traffic. Any modifications to the plan initiated by the Contractor must be approved by a licensed PE in the state of Texas, sealed prior to submission at the cost of the Contractor. In addition, the contractor’s plan must be approved by the Engineer, City Representative and TxDOT, where applicable, prior to use.
SP 13. SUBMITTALS:
The contractor shall submit to the City’s Project Manager for review and approval all items required in the specification of the following items prior to beginning work:
a. Work Plan indicating sequence and schedule
b. Material storage locations
c. Subcontractors to be used, if applicable
d. SWPPP and TCEQ NOI and NOT
e. Trench safety plan and/or trench box certifications
f. Test reports, mill reports, specifications, product data, and product/materials submittals as required by the Technical Specifications and these special provisions
g. Certifications per General Specifications
SP 14. DESCRIPTION OF PAY ITEMS
Any and all work specifically called for in the Contract Documents or which is required for the proper construction of items called for in the Contract Documents is to be performed by the Contractor. The cost of all work for which there is no separate pay item in the proposal shall be subsidiary and included in the price for related pay items such that work called for or required by the Contract Documents will be completed for the Contract Price.
SP 15. CONTRACTOR PROVIDED AS BUILT SURVEY
The contractor shall provide an as built survey of all underground water and sewer utilities installed per contract documents. This as built survey shall include all connection points to existing infrastructure and include points at all fittings and joints. The cost associated with this requirement shall be included in the related bid item. The contractor shall provide the design engineer with the as built survey in a .DWG format.
TECHNICAL SPECIFICATIONS
2020 B/CS UDG – GENERAL SPECIFICATIONS:
Section 01 30 00……….Digital Construction Pictures Section 01 55 26……….Traffic Control Section 01 71 13……….Mobilization Section 01 71 23……….Construction Surveying Section 02 14 13.13……Removal of Existing Concrete Section 03 30 00……….Concrete Section 03 30 01……….Concrete Blocking or Anchorage Section 03 34 00……….Flowable Fill Existing Line Section 09 03 12……….Conductive Trace Wire for Water and Sewer Force Main Section 31 11 00……….Clearing and Grubbing Section 31 23 23.53……Cement Stabilized Sand Backfill Section 31 23 33……….Excavating, Trenching, and Backfilling Section 31 25 13……….Erosion and Sedimentation Control Section 31 50 00……….Trench Safety Section 32 92 13……….Hydro Mulch Seeding Section 32 92 19……….Seeding for Erosion Control Section 32 92 23……….Sodding for Erosion Control (Block Sodding) Section 33 05 01……….Polyvinylchloride Pipe and Fittings Section 33 05 02……….Ductile Iron Pipe
2020 B/CS UDG – STREETS:
Section 31 23 00……….Excavation and Embankment Section 31 23 23……….Roadway Embankment Section 32 05 17……….Asphalts, Oils, and Emulsions Section 32 11 14……….Flexible Base Crushed Stone Limestone Section 32 11 16……….Subgrade Preparation and Compaction Section 32 11 27….……Reworking Base Material Section 32 11 29……….Lime Stabilization Section 32 11 29.01...….Sprinkling Section 32 11 29.02……Rolling Section 32 11 34……….Cement Stabilization of Material in Place Section 32 12 13.16……Tack Coat – Asphaltic Section 32 12 13.23……Prime Coat – Asphaltic Section 32 12 16……….Hot-Mix Asphaltic Concrete Pavement Section 32 13 13……….Concrete Pavement Section 32 16 13……….Concrete Curb and Gutter Section 32 16 13.01……Concrete Sidewalk Section 32 17 23.23……Pavement Markers (Reflectorized) Section 34 41 13……….Signage
2004 TxDOT Standard Specifications:
Refer to TxDOT’s “Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges 2004” for the specifications listed in this section.
100 Preparing Right-of-Way 636 Aluminum Signs 656 Foundations for Traffic Control Devices* 666 Reflectorized Pavement Markings 668 Prefabricated Pavement Markings 672 Raised Pavement Markers* 678 Pavement Surface Preparation for Markings*
* Items will be considered subsidiary to applicable bid items and not paid directly.
PR
EP
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F
EXISTING UNDERGROUND UTILITIES IN THE AREA CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE HORIZONTAL AND VERTICAL
LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY REPAIRS TO EXISTING UTILITIES
DUE TO DAMAGE INCURED DURING CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE
PLANS.
CAUTION!!
Know what's below.
Call before you dig.
CONSTRUCTION PLANS FOR
COLLEGE STATION, TEXAS
STONEBRIDGE AND SCARBOROUGH
DRIVE ROUNDABOUT
THE CITY OF COLLEGE STATION
VICINITY MAP
MARCH 2024
N.T.S.ENGINEER
KHA #064295081
SURVEYOR
KERR SURVEYING
CoCS #23300721
PROJECT
LOCATION
ROCK PRAIRIE ROAD
STATE HIGHWAY 6
WOODCREEK DRIVE
STONEBRIDGE
DRIVE
SCARBOROUGH
DRIVE
SCOTT &
WHITE DRIVE
ST
ON
EB
RO
OK
DR
IV
E
C0.0
C O
VE
R
Sheet List Table Sheet Number Sheet Title
C0.0 COVER
C1.0 GENERAL NOTES
C2.0 HORIZONTAL CONTROL
C3.0 PAVING DETAILS
C4.0 DETOUR PLAN
C5.0 PAVEMENT DEMOLITION PLAN
C6.0 PAVING PLAN
C7.0 PAVEMENT JOINT PLAN
C8.0 GRADING
C9.0 STRIPING & SIGNAGE
C10.0 UTILITY PLAN
C11.0 EROSION CONTROL
ST1 BRYAN - COLLEGE STATION STANDARD STREET DETAILS
SWPP1 BRYAN - COLLEGE STATION STANDARD STORM WATER POLLUTION
PREVENTION DETAILS
W1 BRYAN - COLLEGE STATION STANDARD WATER DETAILS
EC (9) - 16 (1) TEMPORARY EROSION, SEDIMENT AND WATER POLLUTION CONTROL
MEASURES - EROSION CONTROL LOG
EC (9) - 16 (2) TEMPORARY EROSION, SEDIMENT AND WATER POLLUTION CONTROL
MEASURES - EROSION CONTROL LOG
EC (9) - 16 (3) TEMPORARY EROSION, SEDIMENT AND WATER POLLUTION CONTROL
MEASURES - EROSION CONTROL LOG
CS ST 2 COLLEGE STATION SIGN STANDARD
http://www.kimley-horn.com
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F
GENERAL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES,
WHETHER PRIVATE OR PUBLIC, PRIOR TO EXCAVATION. THE
INFORMATION AND DATA SHOWN WITH RESPECT TO EXISTING
UNDERGROUND FACILITIES AT OR CONTIGUOUS TO THE SITE IS
APPROXIMATE AND BASED ON INFORMATION FURNISHED BY THE
OWNERS OF SUCH UNDERGROUND FACILITIES OR ON PHYSICAL
APPURTENACES OBSERVED IN THE FIELD. THE OWNER AND ENGINEER
SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF
ANY SUCH INFORMATION OR DATA, AND THE CONTRACTOR SHALL HAVE
THE FULL RESPONSIBILITY FOR REVIEWING AND CHECKING ALL SUCH
INFORMATION AND DATA, FOR LOCATING ALL UNDERGROUND FACILITIES,
FOR COORDINATION OF THE WORK WITH THE OWNERS OF SUCH
UNDERGROUND FACILITIES DURING CONSTRUCTION, FOR THE SAFETY
AND PROTECTION THEREOF, AND FOR REPAIRING ANY DAMAGE THERETO
RESULTING FROM THE WORK. THE COST OF ALL WILL BE CONSIDERED
AS HAVING BEEN INCLUDED IN THE CONTRACT PRICE. THE CONTRACTOR
SHALL NOTIFY ANY AFFECTED UTILITY COMPANIES OR AGENCIES IN
WRITING AT LEAST 48 HOURS PRIOR TO THE BEGINNING OF
CONSTRUCTION SO THAT THE LOCATION OF UNDERGROUND UTILITIES
CAN BE MARKED.
FRANCHISE UTILITY CONTACTS
FRONTIER COMMUNICATIONS (KEVIN MOSELEY):
(512) 869-2257
ALTICE COMMUNICATIONS EAST TEXAS (DAN AUGSBURGER):
(979) 595-2429
CITY OF COLLEGE STATION - ELECTRIC (SAM WEIDO):
(979) 764-6255
CITY OF COLLEGE STATION - WATER (RAMIRO MARTINEZ):
(979) 764-6349
CITY OF COLLEGE STATION - SEWER (RAMIRO MARTINEZ):
(979) 764-6349
ATMOS ENERGY CORPORATION (KOREY LEMOND):
(979) 286-4939
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE BRYAN -
COLLEGE STATION STANDARD DETAILS AND B/CS UNIFIED TECHNICAL
SPECIFICATIONS UNLESS NOTED OTHERWISE.
3. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PERFORMING ALL
CONSTRUCTION LAYOUTS AND STAKING FROM THE SITE LAYOUT
CONTROL POINTS, AND FROM THE DIMENSIONS AND CENTERLINES
SHOWN. THE CONTRACTOR MUST NOTIFY THE ENGINEER OF ANY
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
4. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING STREETS AND
DRIVEWAYS ADJACENT TO THE PROJECT FREE OF MUD AND DEBRIS
FROM THE CONSTRUCTION AT ALL TIMES. NO SEPARATE PAY.
5. THE CONTRACTOR SHALL MAINTAIN THE EXISTING ROADBED AND
DITCHES TO ENSURE PROPER DRAINAGE AT ALL TIMES.
6. GRAVEL OR BASE MATERIAL ON ALL EXISTING STREETS AND DRIVEWAYS
MAY BE SALVAGED AND USED TO TIE-IN NEW CONSTRUCTION WITH
EXISTING. DRIVEWAYS WILL BE GRADED TO PROVIDE SMOOTH
CONNECTIONS TO NEW CONSTRUCTION AND SHALL BE RESTORED TO A
CONDITION EQUAL TO OR BETTER THAN THAT EXISTING BEFORE WORK.
ALL SALVAGEABLE ASPHALT, GRAVEL OR ROCK BASE MATERIAL NOT
USED IN THE WORK WILL BECOME THE PROPERTY OF THE CONTRACTOR.
7. ALL DISTURBED AREAS SHALL BE SOLID BLOCK SOD UNLESS OTHERWISE
NOTED. AREAS THAT ARE HYDROMULCHED OR SODDED SHALL BE
CHECKED PERIODICALLY TO SEE THAT GRASS COVERAGE IS PROPERLY
MAINTAINED. RESTORED AREAS SHALL BE WATERED, FERTILIZED, AND
HYDROMULCHED AND/OR RESODDED, IF NECESSARY.
8. THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE ANY
DAMAGES TO PRIVATE PROPERTY, INCLUDING, BUT NOT LIMITED TO,
FENCES, WALLS, PAVEMENT, IRRIGATION, LANDSCAPE, GRASS, AND
TREES, AT NO ADDITIONAL COST TO THE OWNER. THIS WORK SHALL BE
SUBSIDIARY TO THE CONTRACT AMOUNT. ALL ADJACENT PROPERTY
DAMAGED BY THE PROPOSED CONSTRUCTION SHALL BE RESTORED TO
EQUAL OR BETTER CONDITION THAN WHICH IT WAS FOUND BEFORE SUCH
WORK WAS UNDERTAKEN, NO SEPARATE PAY.
9. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY
PERMITS AND APPROVALS BEFORE CONSTRUCTION BEGINS. CITY OF
COLLEGE STATION FEES WILL BE WAIVED.
10. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A NEAT AND
ACCURATE RECORD OF CONSTRUCTION FOR THE CITY'S RECORDS. AT
THE CONCLUSION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE
THE CITY FULL SIZE MARKUPS THAT RECORD ALL CONSTRUCTION
DEVIATING FROM THE PLANS AND ALL EXISTING PRIVATE UTILITIES
ENCOUNTERED, BOTH HORIZONTALLY AND VERTICALLY.
11. CONTRACTOR SHALL NOT STORE MATERIALS, EQUIPMENT OR OTHER
CONSTRUCTION ITEMS ON ADJACENT PROPERTIES OR RIGHT-OF-WAY
WITHOUT THE PRIOR WRITTEN CONSENT OF THE PROPERTY OWNER OR
THE CITY (FOR R.O.W.) ALL CONSTRUCTION MATERIALS TO BE REMOVED
SHALL BE DISPOSED OF AT A LEGAL DISPOSAL LOCATION OFF SITE,
UNLESS WRITTEN APPROVAL IS OBTAINED FROM THE PROPERTY OWNER
AND THE CITY.
12. THE CONTRACTOR SHALL TAKE ALL AVAILABLE PRECAUTIONS TO
CONTROL DUST. CONTRACTOR SHALL CONTROL DUST BY SPRINKLING
WATER, OR AS APPROVED BY THE CITY ENGINEER. NO SEPARATE PAY.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ANY IRON RODS
AND/OR BENCHMARKS ADJACENT TO THE ROW DURING THE COURSE OF
CONSTRUCTION. ANY IRON RODS AND/OR BENCHMARKS DISTURBED
DURING CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR AT
NO EXTRA PAY.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING SURVEY
MONUMENTS SHOWN ON PLANS. CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL REQUIRED CONSTRUCTION SURVEYING.
15. ALL PAVING DIMENSIONS ARE TO EDGE OF PAVEMENT AND/OR FACE OF
CURB UNLESS OTHERWISE NOTED.
16. MANHOLES AND VALVE BOXES SHALL BE BLOCKED OUT IN PAVED AREAS.
ROADWAY PAVEMENT CONSTRUCTION IS TO RUN CONTINUOUS.
17. WHERE APPLICABLE, THE CONTRACTOR SHALL PROTECT NEW AND
EXISTING PAVEMENT BY PLACING RUBBER MATS OR EARTH ON THE
PAVEMENT TO PROTECT IT FROM TRACK MARKS AND/OR CRACKING
DURING CONSTRUCTION (NON-PAY ITEM).
18. THE CONTRACTOR SHALL PROTECT ANY EXISTING AND/OR PROPOSED
STORM SEWER PIPE, WHICH IS IN THE PROPOSED SUBGRADE DURING
THE SUBGRADE STABILIZATION PROCESS.
19. CONNECTION OF THE PROPOSED SIDEWALK TO EXISTING PAVING,
SIDEWALK, AND WHEELCHAIR RAMPS SHALL BE CONSIDERED SUBSIDIARY
TO THE COST OF THE CONSTRUCTION OF THE SIDEWALK.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ACCESS
TO ADJACENT RESIDENTS, EMERGENCY AND FIRE FIGHTING VEHICLES AT
ALL TIMES, AND FOR THE UNINTERRUPTED COLLECTION OF SOLID WASTE.
A MINIMUM 72 HOUR NOTICE IS REQUIRED.
21. CONTRACTOR SHALL EXERCISE CAUTION AND MAINTAIN A CLEAR ZONE
OF AT LEAST 6 FEET BETWEEN THE CONTRACTOR'S EQUIPMENT AND ANY
POWER LINES. CONTRACTOR SHALL TAKE ALL NECESSARY BRACING AND
SHORING MEASURES TO PREVENT ANY DAMAGES TO POWER POLES.
CONTRACTOR SHALL COORDINATE BRACING AND SHORING WITH CSU or
BTU.
22. MANHOLE, VALVE, METER, CLEANOUT AND OTHER EXISTING OR
INSTALLED ITEMS SHALL BE PROTECTED OR CONSTRUCTED AND
ADJUSTED TO MATCH FINISHED GRADE. NO SEPARATE PAY.
23. ALL PIPE INSTALLED UNDER PAVEMENT SHALL BE INSTALLED WITH
STRUCTURAL BACKFILL PER DETAIL W2-02.
24. THE CONTRACTOR SHALL VERIFY THE ELEVATION OF ALL UTILITY
CROSSINGS IN ADVANCE OF THE INSTALLATION OF ANY PIPE IN ORDER
TO ALLOW FOR ADEQUATE TIME FOR REQUIRED RELOCATIONS FOR
ADJUSTMENTS. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY
DELAYS RESULTING FROM HIS FAILURE TO IDENTIFY CONFLICTS.
25. THE CONTRACTOR SHALL MAINTAIN WATER SERVICE AND SEWER
SERVICE TO ALL CUSTOMERS THROUGHOUT CONSTRUCTION (IF
NECESSARY, BY USE OF TEMPORARY METHODS APPROVED BY THE
OWNER). IN NO CASE SHALL SERVICES BE ALLOWED TO REMAIN OUT OF
SERVICE OVERNIGHT. THIS WORK SHALL BE CONSIDERED SUBSIDIARY
TO THE PROJECT AND NO ADDITIONAL COMPENSATION SHALL BE
ALLOWED. THE CONTRACTOR SHALL GIVE THE CITY, RESIDENTS, AND
BUSINESSES AFFECTED BY ANY ANTICIPATED WATER OR SEWER
SERVICE DISRUPTIONS AT LEAST FORTY EIGHT (48) HOURS PRIOR
NOTICE.
26. THE REMOVAL OF A FIRE HYDRANT SHALL INCLUDE THE COMPLETE
REMOVAL OF THE EXISTING FIRE HYDRANT, VALVE, AND LEAD, PLUGGING
OF THE EXISTING TEE, BACKFILL OF THE EXCAVATION, AND DELIVERY OF
THE SALVAGED FIRE HYDRANT ASSEMBLY TO THE CITY OF COLLEGE
STATION. THIS WORK SHALL BE CONSIDERED AS A SUBSIDIARY COST TO
PROJECT.
27. CONTRACTOR SHALL INSTALL DETECTABLE TRACER WIRE FOR WATER
AND WARNING TAPE FOR SEWER IN ACCORDANCE WITH B/CS UNIFIED
TECHNICAL SPECIFICATION 175 CONDUCTIVE TRACE WIRE FOR
NON-METALLIC PIPE INSTALLATION. NO SEPARATE PAYMENT.
28. LOCATION OF ALL UNDERGROUND UTILITIES AND STORM DRAINAGE
FACILITIES IN THE AREA OF STORM DRAIN CONSTRUCTION AND OTHER
AREAS OF POSSIBLE CONFLICT SHALL BE UNCOVERED TO DETERMINE
EXACT LOCATION PRIOR TO START OF CONSTRUCTION.
29. REMOVAL AND INSTALLATION OF EXISTING AND TEMPORARY PAVEMENT
MARKINGS IS SUBSIDIARY TO ALL PAVEMENT MARKING BID ITEMS.
30. TREES LOCATED WITHIN THE RIGHT-OF-WAY SHALL ONLY BE REMOVED
AS NOTED. TREE REMOVAL IS SUBSIDIARY TO RIGHT-OF-WAY
PREPARATION.
31. BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY THAT IN NO
CASE HANDICAP RAMP SLOPES EXCEED 1 VERTICAL TO 12 HORIZONTAL.
IN NO CASE SHALL PROPOSED SIDEWALK CROSS SLOPES EXCEED 2.0
PERCENT. IN NO CASE SHALL PROPOSED LONGITUDINAL SIDEWALK
SLOPES EXCEED 5.0 PERCENT. CONTRACTOR SHALL CONTACT ENGINEER
PRIOR TO PAVING IF ANY EXCESSIVE SLOPES ARE ENCOUNTERED. NO
CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR A.D.A. AND
T.A.S. COMPLIANCE ISSUES. ADA ROUTES BEYOND RAMPS AND
SIDEWALKS DESIGNATED TO BE CONSTRUCTED ARE NOT WITHIN THE
SCOPE OF THESE PLANS.
32. CONTRACTOR SHALL PROTECT EXISTING IRRIGATION ADJACENT TO THE
RIGHT OF WAY. ANY IRRIGATION SYSTEM DISTURBED BY CONSTRUCTION
SHALL BE REPAIRED AND LEFT IN WORKING CONDITION WITH NO
SEPARATE PAY.
SIGNAGE NOTES
1. SIGN SUBSTRATE (EXCEPT STREET NAME SIGNS) SHALL MEET
REQUIREMENTS FOR ASTM B 209 AND HAVE THE FOLLOWING
THICKNESSES: 0.080” FOR SIGNS LESS THAN 7.5 SQ. FEET, 0.100” FOR
SIGNS 7.5 TO 15 SQ. FEET, AND 0.125” FOR SIGNS GREATER THAN 15 SQ.
FEET.
2. ALL SIGN SHEETING MATERIALS SHALL MEET THE REQUIREMENTS OF
ASTM D 4956 TYPE, AS FOLLOWS:
- RED BACKGROUND - ASTM TYPE VII, VIII, IX, OR X (OR TXDOT TYPE D),
WITH ASTM TYPE III OR IV (TXDOT TYPE C) LEGEND /BORDER.
- WHITE BACKGROUND - ASTM TYPE III OR IV (TXDOT TYPE C) WITH
BLACK ACRYLIC LEGEND/BORDER
- YELLOW BACKGROUND - ASTM TYPE VII, VIII, IX, OR X (OR TXDOT TYPE
E) WITH BLACK ACRYLIC LEGNED/BORDER OR ASTM TYPE VII, VII, IX, OR
X (OR TXDOT TYPE D) LEGEND/SYMBOL.
- FLUORESCENT YELLOW-GREEN BACKGROUND - ASTM TYPE VII, VIII, IX,
OR X (OR TXDOT TYPE E), WITH BLACK ACRYLIC LEGEND/BORDER
(SCHOOL RELATED WARNING SIGNS)
- GREEN, BROWN, BLUE BACKGROUNDS - ASTM TYPE III OR IV (TXDOT
TYPE C) WITH WHITE ASTM TYPE VII, VIII, IX, OR X (TXDOT TYPE D)
LEGEND/BORDER.
3. SIGN SUPPORTS SHALL MEET CRASHWORTHY REQUIREMENTS OF NCHRP
350, AND UNLESS OTHERWISE SPECIFIED, SHALL BE THE STEEL
“TRIANGULAR SLIPBASE SYSTEM AND WEDGE ANCHOR SYSTEM.”
4. USE GALVANIZED STEEL, STAINLESS STEEL, OR DICHROMATE-SEALED
ALUMINUM FOR BOLTS, NUTS, WASHERS, LOCK WASHERS, SCREWS, AND
OTHER SIGN ASSEMBLY HARDWARE. USE PLASTIC OR NYLON WASHERS
TO AVOID TEARING THE SHEETING MATERIAL.
5. ALL SIGN COMPONENTS (SUBSTRATE, SHEETING, POST, SUPPORT,
MOUNTING, HARDWARE, ETC.) WILL NOT BE MEASURED OR PAID FOR
DIRECTLY BUT WILL BE SUBSIDIARY TO EACH UNIT SIGN.
TRAFFIC CONTROL NOTES
1. ALL BARRICADES, WARNING SIGNS, LIGHTS, DEVICES, ETC. FOR THE
GUIDANCE AND PROTECTION OF TRAFFIC AND PEDESTRIANS SHALL
CONFORM TO THE INSTALLATION AND LOCATION GUIDELINES SHOWN IN
THE LATEST VERSION OF THE TEXAS MANUAL OF UNIFORM TRAFFIC
CONTROL DEVICES (TMUTCD), AS CURRENTLY AMENDED, AS PUBLISHED
BY THE TEXAS DEPARTMENT OF TRANSPORTATION.
2. BARRICADES AND SIGNS SHALL BE PLACED IN SUCH A MANNER AS TO
NOT INTERFERE WITH THE SIGHT DISTANCE OF DRIVERS ENTERING THE
ROADWAYS, SIDE STREETS, OR PARKING.
STORM WATER DISCHARGE AUTHORIZATION:
1. CONTRACTOR SHALL COMPLY WITH ALL TCEQ AND EPA STORM WATER
POLLUTION PREVENTION REQUIREMENTS.
2. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE TCEQ
GENERAL PERMIT TO DISCHARGE UNDER THE TEXAS POLLUTANT
DISCHARGE ELIMINATION SYSTEM TXR 150000.
3. THE CONTRACTOR SHALL ENSURE THAT ALL PRIMARY OPERATORS
SUBMIT A NOI TO TCEQ AT LEAST SEVEN DAYS PRIOR TO COMMENCING
CONSTRUCTION (IF APPLICABLE), OR IF UTILIZING ELECTRONIC
SUBMITTAL, PRIOR TO COMMENCING CONSTRUCTION. ALL PRIMARY
OPERATORS SHALL PROVIDE A COPY OF THE SIGNED NOI TO THE
OPERATOR OF ANY MS4 (TYPICALLY THE CITY) RECEIVING DISCHARGE
FROM THE SITE.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMPLEMENTATION OF
THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IF
APPLICABLE, INCLUDING POSTING SITE NOTICE, INSPECTIONS,
DOCUMENTATION, AND SUBMISSION OF ANY INFORMATION REQUIRED BY
THE TCEQ AND EPA (E.G. NOI).
5. ALL CONTRACTORS AND SUBCONTRACTORS PROVIDING SERVICES
RELATED TO THE SWPPP SHALL SIGN THE REQUIRED CONTRACTOR
CERTIFICATION STATEMENT ACKNOWLEDGING THEIR RESPONSIBILITIES
AS SPECIFIED IN THE SWPPP.
6. A COPY OF THE SWPPP, INCLUDING NOI, SITE NOTICE, CONTRACTOR
CERTIFICATIONS, AND ANY REVISIONS, SHALL BE SUBMITTED TO THE CITY
BY THE CONTRACTOR AND SHALL BE RETAINED ON-SITE DURING
CONSTRUCTION.
7. A NOTICE OF TERMINATION (NOT) SHALL BE SUBMITTED TO TCEQ BY ANY
PRIMARY OPERATOR WITHIN 30 DAYS AFTER ALL SOIL DISTURBING
ACTIVITIES AT THE SITE HAVE BEEN COMPLETED AND A UNIFORM
VEGETATIVE COVER HAS BEEN ESTABLISHED ON ALL UNPAVED AREAS
AND AREAS NOT COVERED BY STRUCTURES, A TRANSFER OF
OPERATIONAL CONTROL HAS OCCURRED, OR THE OPERATOR HAS
OBTAINED ALTERNATIVE AUTHORIZATION UNDER A DIFFERENT PERMIT. A
COPY OF THE NOT SHALL BE PROVIDED TO THE OPERATOR OF ANY MS4
RECEIVING DISCHARGE FROM THE SITE.
STORM DRAINAGE:
1. ALL STORM SEWER MATERIALS AND CONSTRUCTION SHALL COMPLY
WITH CITY STANDARD CONSTRUCTION DETAILS AND SPECIFICATIONS.
2. THE SITE UTILITY CONTRACTOR SHALL PROVIDE ALL MATERIALS AND
APPURTENANCES NECESSARY FOR COMPLETE INSTALLATION OF THE
STORM SEWER.
3. THE CONTRACTOR SHALL FIELD VERIFY THE SIZE, CONDITION,
HORIZONTAL, AND VERTICAL LOCATIONS OF ALL EXISTING STORM SEWER
FACILITIES THAT ARE TO BE CONNECTED TO, PRIOR TO START OF
CONSTRUCTION OF ANY STORM SEWER, AND SHALL NOTIFY THE
ENGINEER OF ANY CONFLICTS DISCOVERED.
4. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL DIMENSIONS
SHOWN, INCLUDING THE HORIZONTAL AND VERTICAL LOCATION OF CURB
INLETS AND GRATE INLETS AND ALL UTILITIES CROSSING THE STORM
SEWER.
5. FLOW LINE, TOP-OF-CURB, RIM, THROAT, AND GRATE ELEVATIONS OF
PROPOSED INLETS SHALL BE VERIFIED WITH THE GRADING PLAN AND
FIELD CONDITIONS PRIOR TO THEIR INSTALLATION.
6. ALL PUBLIC STORM SEWER CONSTRUCTION, PIPE, STRUCTURES, AND
FITTINGS SHALL ADHERE TO CITY PUBLIC WORKS STANDARD DETAILS
AND SPECIFICATIONS. CONTRACTOR SHALL ARRANGE FOR REQUIRED
CITY INSPECTIONS.
7. ALL PRIVATE STORM SEWER CONSTRUCTION, PIPE, STRUCTURES, AND
FITTINGS SHALL ADHERE TO THE APPLICABLE PLUMBING CODE.
CONTRACTOR SHALL ARRANGE FOR REQUIRED CITY INSPECTIONS.
8. ALL PVC TO RCP CONNECTIONS AND ALL STORM PIPE CONNECTIONS
ENTERING STRUCTURES OR OTHER STORM PIPES SHALL HAVE A
CONCRETE COLLAR AND BE GROUTED TO ASSURE THE CONNECTION IS
WATERTIGHT.
9. ALL PUBLIC STORM SEWER LINES SHALL BE MINIMUM CLASS III RCP.
PRIVATE STORM SEWER LINES 18-INCHES AND GREATER SHALL BE CLASS
III RCP OR OTHER APPROVED MATERIAL.
10. WHERE COVER EXCEEDS 20-FEET OR IS LESS THAN 2-FEET, CLASS IV RCP
SHALL BE USED.
11. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION SURVEYING FOR ALL
STORM SEWER LINES.
12. EMBEDMENT FOR ALL STORM SEWER LINES, PUBLIC OR PRIVATE, SHALL
BE PER CITY STANDARD DETAILS.
13. USE 4 FOOT JOINTS WITH BEVELED ENDS IF RADIUS OF STORM SEWER IS
LESS THAN 100 FEET.
14. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND SUBMITTING A
TRENCH SAFETY PLAN, PREPARED BY A PROFESSIONAL ENGINEER IN THE
STATE OF TEXAS, TO THE CITY PRIOR TO CONSTRUCTION. CONTRACTOR
IS RESPONSIBLE FOR MAINTAINING TRENCH SAFETY REQUIREMENTS IN
ACCORDANCE WITH CITY, STATE, AND FEDERAL REQUIREMENTS,
INCLUDING OSHA FOR ALL TRENCHES. NO OPEN TRENCHES SHALL BE
ALLOWED OVERNIGHT WITHOUT PRIOR WRITTEN APPROVAL OF THE CITY.
15. THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM WATER.
C1.0
G
EN
ER
AL
N O
TE
S
Know what's below.
Call before you dig.
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' SS
6'' SS
6'' SS
UGE
UGE
UGE
UGE
T
T
S
G
S
S
TBM #1
N:10200863.31 E:3571899.64
ELEV:311.68
TBM #2
N:10200802.73
E:3572003.47
ELEV:310.78
STONEBRIDGE DRIVE
SCARBOROUGH DRIVE
EX. ROW
EX. ROW
EX. ROW
EX. ROW
FINCH & NANCY RAY
9401 STONEBRIDGE DR
MIRZA & SARA WAJAHAT
9315 STONEBRIDGE DR
DONALD LANE HAMBLIN
9312 STONEBRIDGE DR
WOODCREEK PH1
LOT STONEBRIDGE COMMON AREA
9.33 ACRES
PR
EP
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F
C2.0
H O
R
IZ
O N
TA
L
C O
N
TR
O L
NORTH
LEGEND
EXISTING UNDERGROUND UTILITIES IN THE AREA CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE HORIZONTAL AND VERTICAL
LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY REPAIRS TO EXISTING UTILITIES
DUE TO DAMAGE INCURED DURING CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE
PLANS.
CAUTION!!
Know what's below.
Call before you dig.
RIGHT OF WAY
EX. CURB
PROP. CURB
ROUNDABOUT TYPICAL SECTION
PROPOSED ROADWAY TYPICAL SECTION
C/LEX ROW EX ROW
±50' ROW
25.0' 25.0'
12.0' 12.0' 2.0' 2.0'
PROP. STANDARD 6"
MONOLITHIC CURB
2.0'
PROP. PAVEMENT SECTION
REF. 2/C3.0
EX GROUND EX GROUND
C/L
VARIESVARIES
2.0'
2.0'
EX GROUND
PROP. 6" REINFORCED
CONCRETE PAVEMENT 3,500 PSI
@ 28 DAYS WITH #4 BARS 12"
O.C.E.W PER B/CS SPEC 32 13 13
VARIES
VARIES VARIES
2.0'
2.0'
EX GROUND
VARIES
4" INTEGRAL COLORED
CONCRETE CENTRAL ISLAND
RE: INTEGRAL CONCRETE
COLOR DETAIL SHEET C6.0
PROP. PAVEMENT SECTION
REF. 2/C3.0
PR
EP
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F
PA
VI
N
G D
ET
AI
LS
C3.0
C3.0
C3.0
LAYDOWN CURB PER ST1-00
24" DOWEL
EXPANSION JOINT
C3.0
SCALE: N.T.S.
CURB TRANSITION DETAIL
TRANSITIONIN 5'
6"
6"
12"
4"
1.5"
4"x12" CURB
6" CURB
#4 BAR
3"
3"
2"
3"
<-FACE OF CURB->
6"
THE EXPOSED SUBGRADE SOILS SHALL
MEET PROOF ROLLING REQUIREMENTS. IN
ADDITION, THE UPPER 6" OF SUBGRADE
SHALL BE SCARIFIED AND COMPACTED TO
AT LEAST 95% OF THE MAXIMUM DRY
DENSITY DETERMINED IN ACCORDANCE
WITH ASTM 698. THE MOISTURE CONTENT
OF THE SOILS SHALL BE WITHIN ±2% OF THE
OPTIMUM MOISTURE CONTENT , INCLUSIVE.
NO. 4 BARS 18" O.C.E.W.
3500 PSI CONCRETE AT 28 DAYS
3.0 "6"
C3.0
SCALE: N.T.S.
CONCRETE PAVEMENT SECTION
6"
6" CEMENT STABILIZED SAND WITH A
MINIMUM COMPRESSIVE STRENGTH OF 100
PSI AND A MAXIMUM COMPRESSIVE
STRENGTH OF 300 PSI.
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F
C4.0
D
ET
O U
R P
LA
N
TRAFFIC DIRECTION
TYPE 3 BARRICADE
NORTH
LEGEND
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W
6'' W
6'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE
UGE
UGE
U G
E
U G
E
U G
E
U G
E
UG
E
T
S
G
NORTHING: 10200993.87
EASTING: 3571865.01
SAWCUT EX. PVMT
NORTHING: 10200984.16
EASTING: 3571838.81
SAWCUT EX. PVMT
NORTHING: 10201077.87
EASTING: 3571837.88
SAWCUT EX. PVMT
NORTHING: 10201069.91
EASTING: 3571811.16
SAWCUT EX. PVMT
NORTHING: 10201043.31
EASTING: 3571888.83
SAWCUT EX. PVMT
NORTHING: 10201062.81
EASTING: 3571882.18
SAWCUT EX. PVMT
NORTHING: 10201066.62
EASTING: 3571896.10
SAWCUT EX. PVMT
NORTHING: 10201088.31
EASTING: 3571890.15
SAWCUT EX. PVMT
EX. ROW
EX. TREE
TO REMAIN
EX. WATER VALVE
TO REMAIN
EX. SANITARY
SEWER MANHOLE
TO REMAIN
EX. TREE
TO REMAIN
CONTRACTOR
SHALL REMOVE
EX. TREE
EX. STREET LIGHT
TO REMAIN
EX. TREE
TO REMAIN
EX. 6" WATER
EX. UNDERGROUND
ELECTRIC
EX. 6" SANITARY
SEWER
EX. FIRE HYDRANT
ASSEMBLY TO BE
REMOVED AND
RELOCATED
STO
N
EBR
ID
G E D
R
IVE
SCARBOROUGH DRIVE
EX. ROW
EX. ROW
EX. ROW
FINCH & NANCY RAY
9401 STONEBRIDGE DR
MIRZA & SARA WAJAHAT
9315 STONEBRIDGE DR
DONALD LANE HAMBLIN
9312 STONEBRIDGE DR
EX. 6" WATER
REMOVE EXISTING SIGN
AND SALVAGE STREET
SIGNS
WOODCREEK PH1
LOT STONEBRIDGE COMMON AREA
9.33 ACRES
PR
EP
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F
PA
VE
M
EN
T
D
EM
O
LI
TI
O
N
PL
AN
C5.0
1. ALL SALVAGED MATERIAL DAMAGED DURING
REMOVAL SHALL BE REPLACED AT
CONTRACTOR'S EXPENSE. NO SEPARATE PAY.
2. ALL EXISTING PAVEMENT, STORM DRAIN, AND
UTILITIES TO REMAIN UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL REMOVE PAVEMENT
MARKINGS AS REQUIRED.
4. REMOVE ALL PAVEMENT MARKINGS AS REQUIRED
FOR INSTALLATION OF NEW MARKINGS,
SUBSIDIARY TO RIGHT-OF-WAY PREPARATION.
5. MANHOLE, VALVE, METER, CLEANOUT AND OTHER
EXISTING OR INSTALLED ITEMS SHALL BE
PROTECTED OR CONSTRUCTED AND ADJUSTED
TO MATCH FINISHED GRADE. NO SEPARATE PAY.
6. IF EXISTING SIGNS ARE NOT TO BE USED AS
CONSTRUCTION TEMPORARY SIGNAGE THEN
THEY SHALL BE RETURNED TO THE CITY OF
COLLEGE STATION. CONTACT TRAFFIC SIGNS &
MARKINGS SUPERVISOR. EXISTING SIGN TOPPERS
TO BE RETURNED TO THE CITY OF COLLEGE
STATION FOR INSTALL ON NEW SIGNAGE
7. THE CONTRACTOR SHALL DESIGN BUILD THE
EXISTING IRRIGATION SYSTEMS REQUIRED
MODIFICATION. ALL IRRIGATION WORK SHALL BE
COMPLETED BY A LICENSED IRRIGATOR.
NOTES
LEGEND
CONCRETE PAVEMENT REMOVAL
SAWCUT
NORTH
ROW
EXISTING UNDERGROUND UTILITIES IN THE AREA CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE HORIZONTAL AND VERTICAL
LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY REPAIRS TO EXISTING UTILITIES
DUE TO DAMAGE INCURED DURING CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE
PLANS.
CAUTION!!
Know what's below.
Call before you dig.
ROW
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE
UGE
S
G
SCARBOROUGH DRIVE
EX. ROW
EX. ROW
EX. ROW
EX. ROW
FINCH & NANCY RAY
9401 STONEBRIDGE DR
MIRZA & SARA WAJAHAT
9315 STONEBRIDGE DR
DONALD LANE HAMBLIN
9312 STONEBRIDGE DR
28.04'
27.79'
.6
0'
14.43'
.4
9'
.00
9.00'
EX. TREE
(TYP)
EX. WATER VALVE
TO REMAIN
EX. SANITARY
SEWER MANHOLE
TO REMAIN
STO
N
EBR
ID
G E D
R
IVE
5' CURB TRANSITION
(REF. SHEET C3.0 FOR DETAIL)
5' CURB TRANSITION
(REF. SHEET C3.0 FOR DETAIL)
5' CURB TRANSITION
(REF. SHEET C3.0 FOR DETAIL)
5' CURB TRANSITION
(REF. SHEET C3.0 FOR DETAIL)
5' CURB TRANSITION
(REF. SHEET C3.0 FOR DETAIL)
5' CURB TRANSITION AROUND THE RADIUS
(REF. SHEET C3.0 FOR DETAIL)
EX. CONCRETE
PAVEMENT
EX. CONCRETE
PAVEMENT
EX. CONCRETE
PAVEMENT
EX. MONOLITHIC
LAYDOWN CURB
EX. MONOLITHIC
LAYDOWN CURB
PROP. MONOLITHIC
LAYDOWN CURB
(REF. DETAIL ST1-00)
TYPICAL MONOLITHIC CURB
(REF. DETAIL ST1-01)
TYPICAL MONOLITHIC CURB
(REF. DETAIL ST1-01)
TYPICAL MONOLITHIC CURB
(REF. DETAIL ST1-01)
2.50'
WOODCREEK PH1
LOT STONEBRIDGE COMMON AREA
9.33 ACRES
R44.50'
R24.50'
R 44.50'
R3.50'
R 333.50'
R
.5 0'
R14.50'
R24.50'
R49.50'
R35.50'
R25.50'
R24.50'
9.00'
.00
EX. MONOLITHIC
LAYDOWN CURB
EX. MONOLITHIC
LAYDOWN CURB
POINT TABLE
DESC.
ME
ME
ME
PT
PCC
PCC
PCC
PC
ME
ME
ME
PT
PCC
PCC
PC
PT
PCC
PC
BC
ME
ME
ME
ME
ME
PT
PCC
PCC
PC
BC
BC
BC
BC
BC
BC
CEN
NORTHING:
10200993.87
10200989.04
10200984.20
10200988.75
10201000.01
10201013.92
10201039.50
10201065.12
10201069.93
10201073.89
10201077.84
10201072.04
10201065.89
10201059.70
10201061.49
10201065.18
10201067.69
10201071.97
10201087.60
10201088.31
10201066.62
10201062.81
10201054.30
10201043.41
10201041.47
10201028.33
10201020.77
10200998.80
10201020.21
10201017.85
10201033.20
10201041.32
10201042.16
10201026.82
10201030.01
EASTING:
3571865.01
3571851.96
3571838.90
3571837.00
3571824.66
3571810.79
3571810.28
3571812.38
3571811.25
3571824.52
3571837.79
3571839.53
3571842.57
3571852.65
3571870.56
3571881.38
3571889.64
3571892.04
3571887.76
3571890.15
3571896.10
3571882.18
3571885.09
3571888.81
3571884.27
3571868.49
3571864.65
3571863.66
3571841.16
3571832.55
3571828.74
3571835.22
3571841.77
3571845.57
3571837.16
ELEV.
308.91
309.01
308.79
309.22
308.82
308.36
307.75
307.14
306.62
306.79
306.52
307.18
307.38
307.75
308.09
308.26
308.37
308.43
308.74
308.37
307.96
307.79
308.02
307.87
308.29
308.08
308.37
309.17
308.72
308.50
308.10
308.10
308.12
308.50
308.36
PR
EP
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F
PA
VI
N
G P
LA
N
C6.0
1. ALL DIMENSIONS ARE TO BACK OF CURB UNLESS
OTHERWISE NOTED.
2. ALL ELEVATIONS ARE TO TOP OF CURB UNLESS
OTHERWISE NOTED.
3. SOLID SOD ALL DISTURBED AREAS OUTSIDE OF PAVING.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING
ADA REQUIREMENTS ON ALL SIDEWALKS.
5. CONTRACTOR SHALL PROTECT ALL POWER POLES
LOCATED IN THE RIGHT-OF-WAY.
6. CONTRACTOR SHALL REFERENCE SHEET C3.0 FOR
PAVEMENT SECTIONS
7. POINT TABLE ABBREVIATIONS STAND FOR THE
FOLLOWING:
ME MATCH EXISTING
PV PAVEMENT
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
PT POINT OF TANGENCY
BC BACK OF CURB
CEN CENTER
NOTES
EX. CURB
PROP. CURB
NORTH
EXISTING UNDERGROUND UTILITIES IN THE AREA CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE HORIZONTAL AND VERTICAL
LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY REPAIRS TO EXISTING UTILITIES
DUE TO DAMAGE INCURED DURING CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE
PLANS.
CAUTION!!
Know what's below.
Call before you dig.
LEGEND
PROP. CONCRETE PAVEMENT
RIGHT OF WAY
STAMPED CONCRETE
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W
6'' W
6'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE
UGE
UGE
U G
E
T
S
G
STO
N
EBR
ID
G E D
R
IVE
SCARBOROUGH DRIVE
EJ
EJ
EJ
EJEJEJ
EJ
EJ
EJ
EJ
12.24' 11.42'
.1
7'
9.00'
(TYP.)
50' R.O.W.
' R
.O .W
50' R.O.W.
EX. ROW
EX. ROW
EX. ROW
EX. ROW
FINCH & NANCY RAY
9401 STONEBRIDGE DR
MIRZA & SARA WAJAHAT
9315 STONEBRIDGE DR
DONALD LANE HAMBLIN
9312 STONEBRIDGE DR
9.00'
(TYP.)
9.
(T
YP
9.
(T
YP
9.00'
(TYP.)
9.00'
(TYP.)
13.34'
EJEJ
EJ
EJ
EJ EJ
WOODCREEK PH1
LOT STONEBRIDGE COMMON AREA
9.33 ACRES
PR
EP
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F
PA
VE
M
EN
T
JO
IN
T
PL
AN
C7.0
EXISTING UNDERGROUND UTILITIES IN THE AREA CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE HORIZONTAL AND VERTICAL
LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY REPAIRS TO EXISTING UTILITIES
DUE TO DAMAGE INCURED DURING CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE
PLANS.
CAUTION!!
Know what's below.
Call before you dig.
1. CONTRACTOR SHALL PROVIDE JOINTING PER PLAN.
ANY DEVIATION SHALL BE SUBMITTED TO ENGINEER
FOR APPROVAL.
2. CONTRACTOR SHALL COORDINATE AND SCHEDULE AN
IN-PERSON MEETING TO REVIEW THE REINFORCING
STEEL PATTERNS AT THE ROUNDABOUT BEFORE
CONCRETE IS PLACED. THE ENGINEER, OR DELEGATE
OF THE ENGINEER, SHALL BE INVITED TO THIS MEETING
AND GIVEN AT LEAST 48 HOURS ADVANCE NOTICE OF
THE MEETING. IF THE ROUNDABOUT IS BUILT IN PHASES
THEN EACH PHASE WILL REQUIRE THIS COORDINATION
MEETING.
3. CURB SHALL BE POURED MONOLITHICALLY WHERE
POSSIBLE.
4. EXPANSION JOINT REQUIRED FOR EACH LANE
SEPARATION.
5. STEEL SHALL BE PLACED RADIALLY WITHIN THE
CIRCULATING LANES.
6. ALL DIMENSIONS ARE TO FACE OF CURB OR CONTROL
JOINT.
7. MAXIMUM JOINT SPACING SHALL COMPLY WITH THE
CITY STANDARDS.
8. PROVIDE CONTINUOUS NO. 4 REBAR 2" OFF FACE AT
ALL CONTROL JOINTS, AT BOTH SIDES OF JOINT.
9. ALL REBAR 12" MAXIMUM SPACING.
10. REFER TO PAVING STANDARD DETAILS FOR
ADDITIONAL JOINTING INFORMATION.
NOTES
LEGEND
PROP. CONCRETE PAVEMENT
RIGHT OF WAY
STAMPED CONCRETE
PROPOSED EXPANSION JOINT
PROPOSED CONTROL JOINT
PROPOSED BUTT JOINT
EJ
NORTH
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W
6'' W
6'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE
UGE
UGE
U G
E
U G
E
U G
E
U G
E
UG
E
T
S
G
FINCH & NANCY RAY
9401 STONEBRIDGE DR
MIRZA & SARA WAJAHAT
9315 STONEBRIDGE DR
DONALD LANE HAMBLIN
9312 STONEBRIDGE DR
STO
N
EBR
ID
G E D
R
IVE
SCARBOROUGH DRIVE
308.5
307.5
308.0
307.0
7.
309.0
9.5
308.5
8.0
307.5
307.0
308.0
7.5
308.0
308.0
308.0
307.5
306.5
306.0
307.0
306.5
308.5
308.0
7.
308.84 ME 308.79 ME
307.84 ME
307.79 ME
307.96 ME
308.38 ME
306.61 ME
306.48 ME
308.12
307.76
307.80
308.12
308.37
307.73
308.5
309.0
309.5
310.0
305.5
2.
1.93%
2.
2.40%
3.
1.39%
3.
1.93%
2.10% 2.12%
306.79 ME
308.02 ME
1.
1.47%
1.
1.92%
0.
308.69
307.86
307.25
306.96
307.25
307.57
307.76 307.87
308.36
308.05
307.59
306.68
308.0
EX. ROW
EX. ROW
EX. ROW
EX. ROW
H P
H P
H P
H P
H P
H P
H P
H P
H P
H P
H P
H P
H P
H P
H P
H P
WOODCREEK PH1
LOT STONEBRIDGE COMMON AREA
9.33 ACRES
306.64 306.65
308.32
308.72 308.67
307.87
307.58
307.79
308.5
309.01 ME
PR
EP
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F G
R
AD
IN
G
C8.0
LEGEND
EX. 0.5-FOOT TOPO
PROP. 0.5-FOOT TOPO
100.0 100.5
100.0 100.5
0.00 ME
0.00 SPOT ELEVATION
MATCH EXISTING
GRADING HIGH POINTHP HP
EXISTING UNDERGROUND UTILITIES IN THE AREA CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE HORIZONTAL AND VERTICAL
LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY REPAIRS TO EXISTING UTILITIES
DUE TO DAMAGE INCURED DURING CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE
PLANS.
CAUTION!!
Know what's below.
Call before you dig.
NORTH
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W
6'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE
UGE
UGE
U G
E
U G
E
U G
E
U G
E
UG
E
T
S
G
EX. ROW
EX. ROW
EX. ROW
EX. ROW
FINCH & NANCY RAY
9401 STONEBRIDGE DR
MIRZA & SARA WAJAHAT
9315 STONEBRIDGE DR
DONALD LANE HAMBLIN
9312 STONEBRIDGE DR
R1-2 36" x 36" x 36"
D1-1 VARIES x 36"
SCARBOROUGH DRIVE
R6-5P 30" x 30"
M.P.H.
100.0'
0.
0'
STO
N
EBR
ID
G E D
R
IVE
SCARBOROUGH DRIVE
R1-2 36" x 36" x 36"
D1-1 VARIES x 36"
STONEBRIDGE DRIVE
R6-5P 30" x 30"
R1-2 36" x 36" x 36"
D1-1 VARIES x 36" SCARBOROUGH DRIVE
R6-5P 30" x 30"
W2-6 30" x 30"
M.P.H.
W13-1P 18" x 18"
W2-6 30" x 30"
M.P.H.
W13-1P 18" x 18"
W2-6 30" x 30"
W13-1P 18" x 18"
WOODCREEK PH1
LOT STONEBRIDGE COMMON AREA
9.33 ACRES
PR
EP
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F
ST
R
IP
IN
G
S
IG
N
AG
E
C9.0
1. ALL DIMENSIONS ARE TO FRONT OF CURB UNLESS
OTHERWISE NOTED.
2. ALL TYPE I STRIPING SHALL BE PER TxDOT
SPECIFICATION ITEM 666.
3. ALL SIGNS SHALL HAVE A WEDGE ANCHOR SYSTEM PER
TXDOT DETAIL SMD (TWT) - 08. SYSTEM SHALL HAVE
BRONZE POLES PER CITY OF COLLEGE STATION PUBLIC
STREET NAME SIGN STANDARD DETAIL. CONTRACTOR
TO COORDINATE LOCATION PRIOR TO CONSTRUCTION.
NOTES
LEGEND
RIGHT OF WAY
EX. CURB
PROP. CURB
SIGN
NORTH
EXISTING UNDERGROUND UTILITIES IN THE AREA CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE HORIZONTAL AND VERTICAL
LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY REPAIRS TO EXISTING UTILITIES
DUE TO DAMAGE INCURED DURING CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE
PLANS.
CAUTION!!
Know what's below.
Call before you dig.
4 INSTALL 4" DOUBLE YELLOW STRIPE
WITH A-A RPM'S.
TYPE I THERMOPLASTIC
INSTALL SOLID WHITE DOUBLE ARROW.
TYPE I THERMOPLASTIC
1 INSTALL 6" SOLID WHITE STRIPING.
TYPE I THERMOPLASTIC
INSTALL 6" X 24" BROKEN WHITE STRIPING
SPACED 24" APART.
INSTALL WHITE CROSS WALK STRIPING
24" STRIPE WITH 4' GAP.
TYPE I THERMOPLASTIC
5 INSTALL 4" SINGLE YELLOW STRIPE.
TYPE I THERMOPLASTIC
6 INSTALL SOLID WHITE SINGLE ARROW.
TYPE I THERMOPLASTIC
TYPE I THERMOPLASTIC
INSTALL 36" X 24" SOLID YIELD TRIANGLES
SPACED 12" APART.
TYPE I THERMOPLASTIC
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W
6'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE
UGE
UGE
U G
E
U G
E
U G
E
U G
E
UG
E
T
S
G
EX. ROW
EX. ROW
EX. ROW
EX. ROW
STO
N
EBR
ID
G E D
R
IVE
SCARBOROUGH DRIVE
FINCH & NANCY RAY
9401 STONEBRIDGE DR
MIRZA & SARA WAJAHAT
9315 STONEBRIDGE DR
DONALD LANE HAMBLIN
9312 STONEBRIDGE DR
EX. SANITARY
SEWER MANHOLE
TO REMAIN
EX. STREET LIGHT
TO REMAIN
EX. 6" WATER
EX. UNDERGROUND
ELECTRIC
EX. 6" SANITARY
SEWER
EX. 6" WATER
NORTHING: 10201024.97
EASTING: 3571869.87
INSTALL RELOCATED
FIRE HYDRANT
ASSEMBLY W/ GATE VALVE
WOODCREEK PH1
LOT STONEBRIDGE COMMON AREA
9.33 ACRES
PR
EP
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F U
TI
LI
TY
P
LA
N
C10.0
LEGEND
W
GAS EX GAS
EX WATER
EX STORM SEWER
EX SANITARY SEWER
MANHOLES
SS EX SANITARY SEWER
OHP EX OVERHEAD POWER
FOL EX FIBER OPTIC LINE
EXISTING UNDERGROUND UTILITIES IN THE AREA CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE HORIZONTAL AND VERTICAL
LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY REPAIRS TO EXISTING UTILITIES
DUE TO DAMAGE INCURED DURING CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE
PLANS.
CAUTION!!
Know what's below.
Call before you dig.
NORTH
W PROP WATER
PROP WATER GATE VALVE
PROP WATER FIRE HYDRANT
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W
6'' W
6'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE
UGE
UGE
U G
E
U G
E
U G
E
U G
E
UG
E
T
S
G
SF
SF
STO
N
EBR
ID
G E D
R
IVE
SCARBOROUGH DRIVE
EX. ROW
EX. ROW
EX. ROW
EX. ROW
MIRZA & SARA WAJAHAT
9315 STONEBRIDGE DR
DONALD LANE HAMBLIN
9312 STONEBRIDGE DR
FINCH & NANCY RAY
9401 STONEBRIDGE DR
WOODCREEK PH1
LOT STONEBRIDGE COMMON AREA
9.33 ACRES
PR
EP
AR
ED
F O
R
C O
LL
EG
E
ST
AT
IO
N C
O
LL
EG
E
ST
AI
O N
, T
EX
AS
ST
ON
EB
RI
DG
E
AN
D
SC
AR
BO
RO
UG
H
DR
IV
E
RO
UN
DA
BO
UT
TH
E
C
IT
Y O
F
ER
O
SI
O N
C O
N
TR
O L
C11.0
1. STREETS AT THE CONSTRUCTION ENTRANCE/EXIT SHALL BE
SWEPT AND MAINTAINED DURING CONSTRUCTION.
2. CONTRACTOR SHALL PLACE INLET PROTECTION PER BCS
UDO DETAIL SWPP1-00 AT THE INTERSECTION OF
WOODCREEK DRIVE AND STONEBRIDGE DRIVE
LEGEND
EX 1-FOOT TOPO
PROP 1-FOOT TOPO
NOTES
EROSION CONTROL LOGS
FLOW ARROWS
EXISTING UNDERGROUND UTILITIES IN THE AREA CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE HORIZONTAL AND VERTICAL
LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY REPAIRS TO EXISTING UTILITIES
DUE TO DAMAGE INCURED DURING CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE
PLANS.
CAUTION!!
Know what's below.
Call before you dig.
NORTH
SILT FENCESF
Wedge
Stub pipe
Plastic Insert
See Detail A
27"
30"
12" Dia
10"
14"
30"
12" Dia
Post
Detail A
0.2W
H
0.6W 0.2W
W
W(max)=8FT
Note 4)
(See General
Post
Note 4)
(See General
Post
Sign Installation Using a Prefabricated T-Bracket for Thin-Wall Tubing Post
(* - See General Note 6)
T-Bracket
SM RD SGN ASSM TY TWT(X)WS(X)
SM RD SGN ASSM TY TWT(X)UA(P)
View A-A reusability.
for optimal ground
1/4" above flush to should be
Tubular socket
Socket
Tubular
(Approx.)
3" of concrete.
approx. 2.0 cf should take
Foundation in the plans).
elsewhere unless noted
(shall be used
Footing
Concrete
Non-reinforced of concrete.
approx. 2.0 cf should take
Foundation in the plans).
elsewhere unless noted
(shall be used
Footing
Concrete
Non-reinforced
(3" Nominal)
Stub Pipe
Schedule 40
Diameter
3 1/2"
(3" Nominal)
Stub Pipe
Schedule 40
Diameter
3 1/2"
Ring
Compression
(2" Nominal)
Wall Tube
0.095 Thin
2.375" Diameter
Spaced)
Slots (4 Equally
1/4 x 2 7/8"
A A
6" min or joint to edge
10"
10" Pipe Stub
Plate
Base
Coupler
3/4" dia.
1/2"
3 1/2"
Concrete anchor consists of 5/8" diameter stud bolt with
UNC series bolt threads on the upper end. A heavy hex nut washers shall be galvanized per Item 445, "Galvanizing."
Adhesive type anchors shall have stud bolts installed with
Adhesive anchors may be loaded after adequate epoxy cure per ASTM A563 and hardened washer per ASTM F436. The time per the manufacturer's recommendations.
allowable tension and shear of 2450…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .