ESBD_364903_1719342867840_Bid Proposal 24-068.xls
XLS spreadsheet 59 KB Posted
- Solicitation number
- ITB24-068
- Issued by
- Brazos County, College Station City, Texas
About this file
This document is an Excel worksheet containing a Kimley-Horn and Associates, Inc. Opinion of Probable Construction Cost for the City of College Station's Stonebridge Roundabout project. The project involves the full demolition and reconstruction of the existing intersection at Stonebridge Drive and Scarborough Drive as a roundabout. The document details the project's construction items, quantities, and unit prices across categories such as general construction, demolition, and roadway construction. A pre-bid meeting will be held on July 9, 2024, and bid documents are available for download from the Brazos Valley e-Marketplace. The project is located within the jurisdictions of Brazos County and the City of College Station in the state of Texas.
The Opinion of Probable Construction Cost worksheet does not provide specific pricing details, but it lists the various construction items and their estimated quantities. No information is given on set-asides, incumbents, funding sources, or other salient financial details. The document appears to be an internal cost estimate prepared by the engineering firm Kimley-Horn and Associates, Inc. for the City of College Station's upcoming Stonebridge Roundabout construction project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Worksheet (EDIT HERE!)
| Kimley-Horn and Associates, Inc. | Opinion of Probable Construction Cost | ||||||||
| Client: | City of College Station | Date: | 6/4/24 | ||||||
| Project: | Stonebridge Roundabout | Prepared By: | TLL | ||||||
| KHA No.: | 64295081 | Checked By: | JCH | ||||||
| Item No. | Item Description | Quantity | Unit | Unit Price | Item Cost | ||||
| 0 | 0 | 0 | 0 | $0.00 | $0 | ||||
| 0 | 0 | 0 | 0 | $0.00 | $0 | ||||
| 0 | 0 | 0 | 0 | $0.00 | $0 | ||||
| 0 | 0 | 0 | 0 | $0.00 | $0 | ||||
| A. GENERAL CONSTRUCTION ITEMS | |||||||||
| 1 | Mobilization (8%) | 1 | LS | ||||||
| 2 | Traffic Control | 1 | LS | ||||||
| 3 | Erosion and Sedimentation Control | 1 | LS | ||||||
| 4 | Irrigation Repair | 1 | LS | ||||||
| 5 | Tree Protection | 1 | LS | ||||||
| Sub-total | $0 | ||||||||
| B. DEMOLITION ITEMS | |||||||||
| 6 | Removal of Existing Concrete Pavement | 514 | SY | ||||||
| 7 | Removal of Exisiting Sign | 1 | EA | ||||||
| 8 | Salvage and Relocate Existing Fire Hydrant | 1 | EA | ||||||
| 9 | Sawcut Existing Pavement | 113 | LF | ||||||
| Sub-total | $0 | ||||||||
| C. ROADWAY CONSTRUCTION ITEMS | |||||||||
| 10 | Subgrade Preparation, Stabilization and Compaction (2' Off BOC) | 566 | SY | ||||||
| 11 | 6" Cement Stabilized Sand | 566 | SY | ||||||
| 12 | Concrete Pavement | 451 | SY | ||||||
| 13 | Laydown Curb and Gutter | 95 | LF | ||||||
| 14 | 6" Concrete Curb and Gutter | 230 | LF | ||||||
| 15 | Common Bermuda | 590 | SF | ||||||
| 16 | 3" Raised Mountable Median Stamped Concrete | 368 | SF | ||||||
| 17 | 4" Thermoplastic Striping Solid Yellow Line w/ sealant | 270 | LF | ||||||
| 18 | 6" Thermoplastic Striping Solid White Line w/ sealant | 74 | LF | ||||||
| 19 | Street Sign | 15 | EA | ||||||
| 20 | Install Bronze Street Sign Post with Wedge Anchor System | 6 | EA | ||||||
| 21 | 36" White Yield Markers | 11 | EA | ||||||
| 22 | Type I Solid White Pavement Marking w/ sealant- Turn Arrow | 1 | EA | ||||||
| 23 | Type I Solid White Pavement Marking w/ sealant- Double Turn Arrow | 3 | EA | ||||||
| Sub-total | $0 | ||||||||
| Basis for Cost Projection: | Subtotal: | $0 | $0.00 | <-Do not erase | 3937127 | contract est 20% conting | |||
| Conting. (%,+/-) | $0 | ||||||||
| No Design Completed | Total: | $0 | |||||||
| 60% Design | |||||||||
| Final Design | |||||||||
| This total does not reflect engineering or technical services. | |||||||||
| The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. |
Bid Proposal 24-068
| A. GENERAL CONSTRUCTION ITEMS | |||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| 1 | Mobilization | 1 | LS | $ | $ |
| 2 | Traffic Control | 1 | LS | $ | $ |
| 3 | Erosion and Sedimentation Control | 1 | LS | $ | $ |
| 4 | Irrigation Repair | 1 | LS | $ | $ |
| 5 | Tree Protection | 1 | LS | $ | $ |
| TOTAL SECTION A - GENERAL CONSTRUCTION ITEMS | $ | ||||
| B. DEMOLITION ITEMS | |||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| 6 | Removal of Existing Concrete Pavement | 514 | SY | $ | $ |
| 7 | Removal of Existing Sign | 1 | EA | $ | $ |
| 8 | Salvage and Relocate Existing Fire Hydrant | 1 | EA | $ | $ |
| 9 | Sawcut Existing Pavement | 113 | LF | $ | $ |
| TOTAL SECTION B - DEMOLITION ITEMS | $ | ||||
| C. ROADWAY CONSTRUCTION ITEMS | |||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| 10 | Subgrade Preparation, Stabilization and Compaction (2' Off BOC) | 566 | SY | $ | $ |
| 11 | 6" Cement Stabilized Sand | 566 | SY | $ | $ |
| 12 | Concrete Pavement | 451 | SY | $ | $ |
| 13 | Laydown Curb and Gutter | 95 | LF | $ | $ |
| 14 | 6" Concrete Curb and Gutter | 230 | LF | $ | $ |
| 15 | Common Bermuda | 590 | SF | $ | $ |
| 16 | 3" Raised Mountable Median Stamped Concrete | 368 | SF | $ | $ |
| 17 | 4" Thermoplastic Striping Solid Yellow Line w/ sealant | 270 | LF | $ | $ |
| 18 | 6" Thermoplastic Striping Solid White Line w/ sealant | 74 | LF | $ | $ |
| 19 | Street Sign | 15 | EA | $ | $ |
| 20 | Install Bronze Street Sign Post with Wedge Anchor System | 6 | EA | $ | $ |
| 21 | 36" White Yield Markers | 11 | EA | $ | $ |
| 22 | Type I Solid White Pavement Marking w/ sealant- Turn Arrow | 1 | EA | $ | $ |
| 23 | Type I Solid White Pavement Marking w/ sealant- Double Turn Arrow | 3 | EA | $ | $ |
| TOTAL SECTION C - ROADWAY CONSTRUCTION ITEMS | $ | ||||
| GRAND TOTAL (A+B+C) | $ | ||||
| CONTRACTOR NAME: ____________________________________________ | |||||
| CONTRACTOR SIGNATURE: ______________________________________ | |||||
| Total Number of Addenda is hereby acknowledged ____________ |
&CCITY OF COLLEGE STATION
BID 24-068
CONSTRUCTION OF STONEBRIDGE AND SCARBOROUGH DRIVE ROUNDABOUT
Bid Opening: Tuesday, July 30, 2024 @ 2:00 pm CT
File details come from the government source that posted it. Updated .