TE A - Tank Testing Types and Frequencies.pdf

PDF 62 KB Posted

Attached to
Fort Leavenworth Underground Fuel Tank Testing and Repair Services
Solicitation number
PANMCC-26-P-048611
Issued by

About this file

This is a technical exhibit specifying tank testing requirements and frequencies for underground storage tank systems at two facilities (30512 and 23462). The document establishes a comprehensive testing matrix for ten tanks of varying capacities, ranging from 5,000 gallons to 300,000 gallons, including both pressure and safe suction tank configurations.

The testing requirements apply uniformly across most tanks and include probe function tests, interstitial sensor tests, tank tightness tests, console (ATG) tests, MLD/ALM functions checks, line tightness testing, overfill tests, overfill valve tests, and STP sump testing. Spill bucket testing and under dispenser containment/sensor testing apply selectively based on tank configuration, with notation that tanks equipped with double wall spill buckets or under dispenser cabinets are marked as N/A for certain tests. Triennial testing is scheduled for 2027 and 2030. The document notes that tanks U061–U063, while maintained by DPW Environmental, are tested and repaired through the LRC. Physical tests noted with an asterisk are not connected to the Veeder-Root console system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit A

Tank Test Type and Frequency

* Physical test not connected to the Veeder-Root console

** Triennial Testing due 2027 and 2030.

Tanks U061 – U063 permits are maintained by DPW Environmental but are tested and repairs through the LRC.

N/A – Has double wall spill buckets and/or Under Dispenser Cabinet (UDC)

Facility 30512 & 23462

5000gl Pressure

300000gl Pressure

10000gl Pressure

10000gl Pressure

10000gl Pressure

20000gl Safe

Suction

10000gl Safe

Suction

10000gl Safe

Suction

10000gl Safe

Suction

10000gl Safe

Suction U001 U057 U058 U059 U060 U064 U065 U066 U067 U068

Probe Function Test

X X X X X X X X X X

Interstitial Sensor Test

X X X X X X X X X X

Tank Tightness

Test

X X X X X X X X X X

Console (ATG) Test

X X X X X X X X X X

MLD/ALM

Functions

Check

X X X X X X X X X X

Line Tightness

Testing

X X X X X X X X X X

Overfill Test X X X X X X X X X X

Overfill Valve Test*

X X X X X X X X X X

Spill Bucket Test **

X N/A N/A N/A N/A N/A N/A N/A X X

Under Dispenser

Containment/ Sensor Test

X N/A X X X N/A N/A N/A N/A N/A

STP Sump Testing **

X X X X X X X X X X

File details come from the government source that posted it. Updated .