TE 6.5 Laboratory Personnel Staffing Requirements.pdf
PDF 61 KB Posted
- Solicitation number
- Not on record
About this file
This document is a Request for Information (RFI) issued by the U.S. Army Contracting Command-Redstone in support of the U.S. Army Oil Analysis Program (AOAP). The RFI is seeking market research information to identify potential sources that can provide management and operation of AOAP laboratories within the continental U.S. (CONUS) and outside the CONUS that support both U.S. and Foreign Military Sales (FMS) program customers. The contractor will be required to provide trained laboratory personnel to operate and maintain both fixed-based and mobile laboratories in the specified locations according to the Statement of Work (SOW) and Technical Exhibits (TEs). Interested parties are requested to respond with a white paper by October 15, 2024 at 2:00pm CST. The white paper should be limited to 3 pages and include the company's full name, business size, socio-economic status, and point of contact information. No phone calls will be accepted, and all responses must be submitted via email.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TE 6.4 Laboratory Personnel Qualifications.pdf | ||
| AOAP SOW 09 04 2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LABORATORY PERSONNEL STAFFING REQUIREMENTS
Fort
Liberty
Fort
Cavazos
Joint Base
Lewis-McChord
Redstone
Arsenal
Camp
Doha Semarang
Laboratory Manager 1 1 1
Assistant Laboratory
Manager
1 1 1
Laboratory Technicians 1 2 1 11 11
Senior Condition
Monitoring Analyst
(CMA)
Condition Monitoring
Analyst
NOTE: At Fort Liberty, Fort Cavazos and Joint Base Lewis-McChord, the contractor shall maintain at all times a minimum of 2 personnel at each lab, one of whom must be LLA II certified.
The Government will deduct payment from contractor invoices for any positions which are unstaffed or understaffed during any given billing period. The Government will calculate the decrement and provide the contractor with a spreadsheet showing its derivation, along with instructions on how the contractor shall invoice for the billing period. It is therefore imperative that the contractor communicate with the AOAP PMO staff on a regular and frequent basis regarding unstaffed or understaffed positions. Frequent communication will prevent the Government from making erroneous deductions. Questions regarding the deduction or its derivation should be directed to the AOAP PMO staff through the Contracting Officer’s Representative (COR).
1 Laboratory technicians assigned to Camp Doha, Kuwait and Semarang, Indonesia must have LLA II certification.
File details come from the government source that posted it. Updated .