Base Year

TE1 - Unit Price for Annual Inspection, Load Testing and On-Call Inspection
Item No.DescriptionEstimated Q'tyUnitUnit PriceAmount (W)
USAG Yongsan-Casey (Base Year)
0001Annual Inspection and Maintenance Services
0001ACasey Cluster
0001AAManual Operated, 1/2 ton thru 3 ton2Each0
0001ABManual Operated, 5.01 ton thru 10 ton1Each0
0001ACElectric Operated, 1 ton thru 5 ton10Each0
0001ADElectric Operated, 5.01 ton thru 10 ton19Each0
0001AEElectric Operated, 10.01 ton thru 20 ton5Each0
0001AFElectric Operated, 20.01 ton thru 35 ton18Each0
Amount for 0001A550
0001BYongsan Cluster
0001BAManual Operated, 1/2 ton thru 3 ton3Each0
0001BBElectric Operated, 1 ton thru 5 ton12Each0
0001BCElectric Operated, 5.01 ton thru 10 ton3Each0
Amount for 0001B180
Sub-Total for 0001730
0002Load Testing
0002ACasey Cluster
0002AAManual Operated, 1/2 ton thru 3 ton1Each0
0002ABManual Operated, 5.01 ton thru 10 ton1Each0
0002ACElectric Operated, 1 ton thru 5 ton3Each0
0002ADElectric Operated, 5.01 ton thru 10 ton6Each0
0002AEElectric Operated, 10.01 ton thru 20 ton2Each0
0002AFElectric Operated, 20.01 ton thru 35 ton6Each0
Amount for 0002A190
0002BYongsan Cluster
0002BAManual Operated, 1/2 ton thru 3 ton2Each0
0002BBElectric Operated, 1 ton thru 5 ton4Each0
0002BCElectric Operated, 5.01 ton thru 10 ton2Each0
Amount for 0002B80
Sub-Total for 0002270
0003On-Call inspection for diagnostic
0003ACasey Cluster
0003AAManual Operated, 1/2 ton thru 3 ton1Each0
0003ABManual Operated, 5.01 ton thru 10 ton1Each0
0003ACElectric Operated, 1 ton thru 5 ton3Each0
0003ADElectric Operated, 5.01 ton thru 10 ton10Each0
0003AEElectric Operated, 10.01 ton thru 20 ton3Each0
0003AFElectric Operated, 20.01 ton thru 35 ton12Each0
Amount for 0003A300
0003BYongsan Cluster
0003BAManual Operated, 1/2 ton thru 3 ton1Each0
0003BBElectric Operated, 1 ton thru 5 ton4Each0
0003BCElectric Operated, 5.01 ton thru 10 ton2Each0
Amount for 0003B70
Sub-Total for 0003370
Total for USAG Yongsan-Casey (Base Year)0

1st

TE1 - Unit Price for Annual Inspection, Load Testing and On-Call Inspection
Item No.DescriptionEstimated Q'tyUnitUnit PriceAmount (W)
USAG Yongsan-Casey (1st Option Year)
1001Annual Inspection and Maintenance Services
1001ACasey Cluster
1001AAManual Operated, 1/2 ton thru 3 ton2Each0
1001ABManual Operated, 5.01 ton thru 10 ton1Each0
1001ACElectric Operated, 1 ton thru 5 ton10Each0
1001ADElectric Operated, 5.01 ton thru 10 ton19Each0
1001AEElectric Operated, 10.01 ton thru 20 ton5Each0
1001AFElectric Operated, 20.01 ton thru 35 ton18Each0
Amount for 1001A550
1001BYongsan Cluster
1001BAManual Operated, 1/2 ton thru 3 ton3Each0
1001BBElectric Operated, 1 ton thru 5 ton12Each0
1001BCElectric Operated, 5.01 ton thru 10 ton3Each0
Amount for 1001B180
Sub-Total for 1001730
1002Load Testing
1002ACasey Cluster
1002AAManual Operated, 1/2 ton thru 3 ton1Each0
1002ABManual Operated, 5.01 ton thru 10 ton1Each0
1002ACElectric Operated, 1 ton thru 5 ton3Each0
1002ADElectric Operated, 5.01 ton thru 10 ton6Each0
1002AEElectric Operated, 10.01 ton thru 20 ton2Each0
1002AFElectric Operated, 20.01 ton thru 35 ton6Each0
Amount for 1002A190
1002BYongsan Cluster
1002BAManual Operated, 1/2 ton thru 3 ton2Each0
1002BBElectric Operated, 1 ton thru 5 ton4Each0
1002BCElectric Operated, 5.01 ton thru 10 ton2Each0
Amount for 1002B80
Sub-Total for 0002270
1003On-Call inspection for diagnostic
1003ACasey Cluster
1003AAManual Operated, 1/2 ton thru 3 ton1Each0
1003ABManual Operated, 5.01 ton thru 10 ton1Each0
1003ACElectric Operated, 1 ton thru 5 ton3Each0
1003ADElectric Operated, 5.01 ton thru 10 ton10Each0
1003AEElectric Operated, 10.01 ton thru 20 ton3Each0
1003AFElectric Operated, 20.01 ton thru 35 ton12Each0
Amount for 1003A300
1003BYongsan Cluster
1003BAManual Operated, 1/2 ton thru 3 ton1Each0
1003BBElectric Operated, 1 ton thru 5 ton4Each0
1003BCElectric Operated, 5.01 ton thru 10 ton2Each0
Amount for 1003B70
Sub-Total for 1003370
Total for USAG Yongsan-Casey (1st option Year)0

2nd

TE1 - Unit Price for Annual Inspection, Load Testing and On-Call Inspection
Item No.DescriptionEstimated Q'tyUnitUnit PriceAmount (W)
USAG Yongsan-Casey (2nd Option Year)
2001Annual Inspection and Maintenance Services
2001ACasey Cluster
2001AAManual Operated, 1/2 ton thru 3 ton2Each0
2001ABManual Operated, 5.01 ton thru 10 ton1Each0
2001ACElectric Operated, 1 ton thru 5 ton10Each0
2001ADElectric Operated, 5.01 ton thru 10 ton19Each0
2001AEElectric Operated, 10.01 ton thru 20 ton5Each0
2001AFElectric Operated, 20.01 ton thru 35 ton18Each0
Amount for 2001A550
2001BYongsan Cluster
2001BAManual Operated, 1/2 ton thru 3 ton3Each0
2001BBElectric Operated, 1 ton thru 5 ton12Each0
2001BCElectric Operated, 5.01 ton thru 10 ton3Each0
Amount for 2001B180
Sub-Total for 2001730
2002Load Testing
2002ACasey Cluster
2002AAManual Operated, 1/2 ton thru 3 ton1Each0
2002ABManual Operated, 5.01 ton thru 10 ton1Each0
2002ACElectric Operated, 1 ton thru 5 ton3Each0
2002ADElectric Operated, 5.01 ton thru 10 ton6Each0
2002AEElectric Operated, 10.01 ton thru 20 ton2Each0
2002AFElectric Operated, 20.01 ton thru 35 ton6Each0
Amount for 2002A190
2002BYongsan Cluster
2002BAManual Operated, 1/2 ton thru 3 ton2Each0
2002BBElectric Operated, 1 ton thru 5 ton4Each0
2002BCElectric Operated, 5.01 ton thru 10 ton2Each0
Amount for 2002B80
Sub-Total for 2002270
2003On-Call inspection for diagnostic
2003ACasey Cluster
2003AAManual Operated, 1/2 ton thru 3 ton1Each0
2003ABManual Operated, 5.01 ton thru 10 ton1Each0
2003ACElectric Operated, 1 ton thru 5 ton3Each0
2003ADElectric Operated, 5.01 ton thru 10 ton10Each0
2003AEElectric Operated, 10.01 ton thru 20 ton3Each0
2003AFElectric Operated, 20.01 ton thru 35 ton12Each0
Amount for 2003A300
2003BYongsan Cluster
2003BAManual Operated, 1/2 ton thru 3 ton1Each0
2003BBElectric Operated, 1 ton thru 5 ton4Each0
2003BCElectric Operated, 5.01 ton thru 10 ton2Each0
Amount for 2003B70
Sub-Total for 2003370
Total for USAG Yongsan-Casey (2nd option Year)0

3rd

TE1 - Unit Price for Annual Inspection, Load Testing and On-Call Inspection
Item No.DescriptionEstimated Q'tyUnitUnit PriceAmount (W)
USAG Yongsan-Casey (3rd Option Year)
3001Annual Inspection and Maintenance Services
3001ACasey Cluster
3001AAManual Operated, 1/2 ton thru 3 ton2Each0
3001ABManual Operated, 5.01 ton thru 10 ton1Each0
3001ACElectric Operated, 1 ton thru 5 ton10Each0
3001ADElectric Operated, 5.01 ton thru 10 ton19Each0
3001AEElectric Operated, 10.01 ton thru 20 ton5Each0
3001AFElectric Operated, 20.01 ton thru 35 ton18Each0
Amount for 3001A550
3001BYongsan Cluster
3001BAManual Operated, 1/2 ton thru 3 ton3Each0
3001BBElectric Operated, 1 ton thru 5 ton12Each0
3001BCElectric Operated, 5.01 ton thru 10 ton3Each0
Amount for 3001B180
Sub-Total for 3001730
3002Load Testing
3002ACasey Cluster
3002AAManual Operated, 1/2 ton thru 3 ton1Each0
3002ABManual Operated, 5.01 ton thru 10 ton1Each0
3002ACElectric Operated, 1 ton thru 5 ton3Each0
3002ADElectric Operated, 5.01 ton thru 10 ton6Each0
3002AEElectric Operated, 10.01 ton thru 20 ton2Each0
3002AFElectric Operated, 20.01 ton thru 35 ton6Each0
Amount for 3002A190
3002BYongsan Cluster
3002BAManual Operated, 1/2 ton thru 3 ton2Each0
3002BBElectric Operated, 1 ton thru 5 ton4Each0
3002BCElectric Operated, 5.01 ton thru 10 ton2Each0
Amount for 3002B80
Sub-Total for 3002270
3003On-Call inspection for diagnostic
3003ACasey Cluster
3003AAManual Operated, 1/2 ton thru 3 ton1Each0
3003ABManual Operated, 5.01 ton thru 10 ton1Each0
3003ACElectric Operated, 1 ton thru 5 ton3Each0
3003ADElectric Operated, 5.01 ton thru 10 ton10Each0
3003AEElectric Operated, 10.01 ton thru 20 ton3Each0
3003AFElectric Operated, 20.01 ton thru 35 ton12Each0
Amount for 3003A300
3003BYongsan Cluster
3003BAManual Operated, 1/2 ton thru 3 ton1Each0
3003BBElectric Operated, 1 ton thru 5 ton4Each0
3003BCElectric Operated, 5.01 ton thru 10 ton2Each0
Amount for 3003B70
Sub-Total for 3003370
Total for USAG Yongsan-Casey (3rd option Year)0

4th

TE1 - Unit Price for Annual Inspection, Load Testing and On-Call Inspection
Item No.DescriptionEstimated Q'tyUnitUnit PriceAmount (W)
USAG Yongsan-Casey (4th Option Year)
4001Annual Inspection and Maintenance Services
4001ACasey Cluster
4001AAManual Operated, 1/2 ton thru 3 ton2Each0
4001ABManual Operated, 5.01 ton thru 10 ton1Each0
4001ACElectric Operated, 1 ton thru 5 ton10Each0
4001ADElectric Operated, 5.01 ton thru 10 ton19Each0
4001AEElectric Operated, 10.01 ton thru 20 ton5Each0
4001AFElectric Operated, 20.01 ton thru 35 ton18Each0
Amount for 4001A550
4001BYongsan Cluster
4001BAManual Operated, 1/2 ton thru 3 ton3Each0
4001BBElectric Operated, 1 ton thru 5 ton12Each0
4001BCElectric Operated, 5.01 ton thru 10 ton3Each0
Amount for 4001B180
Sub-Total for 4001730
4002Load Testing
4002ACasey Cluster
4002AAManual Operated, 1/2 ton thru 3 ton1Each0
4002ABManual Operated, 5.01 ton thru 10 ton1Each0
4002ACElectric Operated, 1 ton thru 5 ton3Each0
4002ADElectric Operated, 5.01 ton thru 10 ton6Each0
4002AEElectric Operated, 10.01 ton thru 20 ton2Each0
4002AFElectric Operated, 20.01 ton thru 35 ton6Each0
Amount for 4002A190
4002BYongsan Cluster
4002BAManual Operated, 1/2 ton thru 3 ton2Each0
4002BBElectric Operated, 1 ton thru 5 ton4Each0
4002BCElectric Operated, 5.01 ton thru 10 ton2Each0
Amount for 4002B80
Sub-Total for 4002270
4003On-Call inspection for diagnostic
4003ACasey Cluster
4003AAManual Operated, 1/2 ton thru 3 ton1Each0
4003ABManual Operated, 5.01 ton thru 10 ton1Each0
4003ACElectric Operated, 1 ton thru 5 ton3Each0
4003ADElectric Operated, 5.01 ton thru 10 ton10Each0
4003AEElectric Operated, 10.01 ton thru 20 ton3Each0
4003AFElectric Operated, 20.01 ton thru 35 ton12Each0
Amount for 4003A300
4003BYongsan Cluster
4003BAManual Operated, 1/2 ton thru 3 ton1Each0
4003BBElectric Operated, 1 ton thru 5 ton4Each0
4003BCElectric Operated, 5.01 ton thru 10 ton2Each0
Amount for 4003B70
Sub-Total for 4003370
Total for USAG Yongsan-Casey (4th option Year)0