TE-1_Performance Requirements Summary.docx

DOCX document 12 KB Posted

Attached to
Cross Connection Survey Federal contract opportunity
Solicitation number
PANMCC-21-P-0000007455
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Joint Base Lewis-McChord

View the file

Other files for this federal contract opportunity

Other files attached to Cross Connection Survey, newest first.
File Type Posted
PWS_Cross-Connection Survey 01.05.2021.docx DOCX document
TE-3_Irrigation BFP (Lewis-Main).xlsx XLSX spreadsheet
TE-4_CCC Hazard Survey Report.pdf PDF
TE-2_Deliverables_12.22.2020.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHICNAL EXHIBIT 1

PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective
Standard
Performance Threshold
Method of Surveillance

PRS #1

Survey (PWS paragraph 5.1.1)

Contractor shall perform cross- connection control survey of the irrigation systems in accordance with PWS paragraph 5.1.1.
All work identified by the COR to be inspected during performance shall be in accordance with PWS paragraph 5.1.1.
Periodic Sampling

PRS #2

Database and Report (PWS paragraph 5.1.2)

Contractor shall submit detailed cross-connection survey database and report in accordance with PWS paragraph 5.1.2.
100% of items accounted for during performance in accordance with PWS paragraph 5.1.2. Performance will not be considered complete until database and report is submitted to and received by the COR.
100% Inspection