TE-1_Performance Requirements Summary.docx
DOCX document 12 KB Posted
- Attached to
- Cross Connection Survey Federal contract opportunity
- Solicitation number
- PANMCC-21-P-0000007455
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS_Cross-Connection Survey 01.05.2021.docx | DOCX document | |
| TE-3_Irrigation BFP (Lewis-Main).xlsx | XLSX spreadsheet | |
| TE-4_CCC Hazard Survey Report.pdf | ||
| TE-2_Deliverables_12.22.2020.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHICNAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
| Performance Objective |
| Standard |
| Performance Threshold |
| Method of Surveillance |
PRS #1
Survey (PWS paragraph 5.1.1)
| Contractor shall perform cross- connection control survey of the irrigation systems in accordance with PWS paragraph 5.1.1. |
| All work identified by the COR to be inspected during performance shall be in accordance with PWS paragraph 5.1.1. |
| Periodic Sampling |
PRS #2
Database and Report (PWS paragraph 5.1.2)
| Contractor shall submit detailed cross-connection survey database and report in accordance with PWS paragraph 5.1.2. |
| 100% of items accounted for during performance in accordance with PWS paragraph 5.1.2. Performance will not be considered complete until database and report is submitted to and received by the COR. |
| 100% Inspection |
File details come from the government source that posted it. Updated .