TE 1 Facility Maintenance Vertical.pdf
PDF 313 KB Posted
- Attached to
- Electronic Sign Maintenance Federal contract opportunity
- Solicitation number
- W91QF521Q0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1. Annex A-Overarching PWS Electric Sign Final Rev (2) 07-23-2021.docx | DOCX document | |
| TE 5 Eectronic Signs List.pdf | ||
| (TE 4) Environmental SpecialConditions 2018.pdf | ||
| TE 3 Maintenance of Fort Lee Digital Signs.pdf | ||
| Attachment 2. Terms and Condition - ADDENDUM TO 52.212-1- RFQ - Electronic Sign Maintenance.docx2.pdf | ||
| (TE 2) BaseMap Site Map Main Post.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex H (CLS 411 Facilities Maintenance Vertical) to OPORD 18-011: IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U) i
Attachment TE 1
Facility Maintenance – Vertical
MAINTENANCE OF ELECTRONIC SIGNS
01JUNE 2021
ii
Table of Contents
1.0 GENERAL INFORMATION
1.1 Overview
1.1.1 Diagnosis and Analysis
1.2 Components
1.3 Work Management and Control
1.3.1 Reporting Requirements
1.3.2 Publications and Forms
1.3.3 Facilities Maintenance Instruction
2.0 DESCRIPTION OF SERVICES
2.1 Facility Workload
2.1.1 BUILDER Sustainment Management System
2.2 Natural Gas Appliance and Equipment
2.3 Heating, Ventilation, and Air Conditioning (HVAC)
2.3.1 General
2.3.2 Seasonal Changeover Requirements
2.3.3 Chemical Treatment
2.3.4 Building Operations Center
2.4 Eye Washes and Safety
2.5 Roof Gutters, Drains, and Downspouts
2.6 Automatic Doors
2.7 Overhead Doors
2.8 Gates and Dock Levelers
2.9 Air Compressors/Unfired Pressure Vessels
2.10 Plumbing
2.10.1 Components
2.10.2 Leaks
2.10.3 Sump Pumps
2.10.4 Hot Water Tanks
2.10.5 Backflow Preventors
2.10.6 Grease Traps
2.10.7 Urinals
2.10.8 Wash facilities/racks
iii
2.10.9 Oil Water Separators
2.11 Sanitary Wastewater Treatment and Collection System
2.12 Industrial Wastewater Treatment Plant (IWTP)
2.13 Heating/Cooling Plants
2.14 Winterization and De-Winterization
2.15 Chemical Treatment of Water Systems
2.16 Lift Stations
2.17 Maintenance Cycles
2.18 Electrical
2.18.1 General
2.18.2 Description of Equipment
2.18.3 Action After Maintenance or Repair
2.18.4 Emergency Fixtures
2.19 Auxiliary Generators
2.19.1 Perform PM of Auxiliary Generators
2.19.2 Temporary Generator
2.20 Grounding Point Checks
2.20.1 Grounding Points, Lightning Protection and Cathodic Protection Maintenance. .. 6
2.21 Security Systems
2.22 Fire Alarm/Suppression Systems
2.22.1 Fire Alarm Systems
2.22.2 Sprinkler and Hood Suppression Systems
2.23 Playgrounds
2.24 PM for Barracks Buildings
2.24.1 Unscheduled Task
2.24.2 Scheduled Tasks Scheduled Inspections
2.25 Elevator Maintenance
2.25.1 Elevator Inspection and Certification
2.25.2 Out of Service Time
2.25.3 Preventive Maintenance Requirements and Scheduled Maintenance Requirements
2.26 Swimming Pools and Hot Tubs
2.26.1 Circulation, Heating, and Filtration Systems
2.27 Keys and Locks
2.27.1 Key Control
iv
2.27.2 Lock Combinations
2.28 Food Service Equipment (FSE)
2.29 Dining Facility (DFAC) Maintenance
2.29.1 General
2.29.1 Action After Maintenance or Repair
2.29.1 Lubricants
2.29.1 Contractor Provided Training
2.29.1 Reconfigurationof Fire Suppresion Systems
2.29.1 Weekly Inspections
2.29.1 Kitchen Exhaust Systems and Hoods
2.29.1 Maintenance/Inspection of Fire Suppression Systems
2.29.1 Pest Control
2.30 Crane and Load Scales Maintenance and Load Testin
2.30.1 General
2.30.2 Preventive Maintenance Plan
2.30.3 Crane Operator Training
2.30.4 Load Scales
2.31 Glass and Glazing
2.32 Aircraft Arresting System (ASS)
2.32.1 Certification and Training
3.0 WORK CAPABILITY LEVELS
4.0 SELF-HELP PROGRAM
4.1 Scope of Services
4.2 Operation of Self-Help Supply Stores
4.2.1 Hours of Operation l
4.2.2 Location and Set up
4.3 Self-Help Training Plan
4.3.1 Scheduled Training
4.3.2 Training Certification
4.3.3 Additional Training Courses
4.4 Work Management and Control
4.4.1 Publications and Forms
4.4.2 Authorization
4.4.3 Facility Manager
v
4.5 Self-Help Center Warehousing
4.5.1 Labeling of Supplies
4.5.2 Supplies and Materials Inventory
4.6 Customer Identification and Record Keeping
4.7 Display Area
4.8 Issue of Items
4.8.1 Supplies and Materials
4.8.2 Tools and Equipment
5.0 OPERATION AND MAINTENANCE OF ENERGY CONSERVATION SYSTEMS
5.1 General
5.1.1 Replacement of Solar Panel
5.1.2 Roof Leaks
5.1.3 Occupancy Sensors
5.1.4 Replacement Standard
5.2 Preventive Maintenance Requirement
5.2.1 Monthly Inspections and Maintenance PV
5.2.2 Washing of Photo Voltaic Systems
5.2.3 Solar Day Lighting Electrical Systems
5.2.4 Sensor Adjustment. Adjustment
5.2.5 Efficient Upgrade
6.0 SIGN SHOP OPERATIONS
6.1 General
6.1.1 Sign Design
6.1.2 Type of Paint l
6.1.3 Traffic Sign Material Specification
6.1.4 Traffic Signs
6.1.5 Informational Signs
6.1.6 Directional Signs
6.1.7 Inspect and Survey
7.0 UTILITY SYSTEMS
7.1 Electric Distribution System
8.0 UNINTERRUPTIBLE POWER SUPPLY (UPS SYSTEMS)
9.0 AREA LIGHTING
9.1 Traffic Controls General
vi
9.2 Repair and Maintain Traffic Signals and Flashers
9.3 Preventive Maintenance Requirements
9.4 School Flashing Lights
9.5 Airfield Lights
10.0 UTILITY MARKING
11.0 PUMPS AND PUMPING STATIONS
12.0 NATURAL GAS AND PROPANE DISTRIBUTION SYSTEM
13.0 PROPANE TANKS AND DISTRIBUTION SYSTEMS
14.0 WATER DISTRIBUTION SYSTEMS
14.1 Secondary System
14.2 Water Lines
14.3 Backflow Prevention Program
14.4 Wastewater Collection System
14.5 Mains and Service Lines
14.6 Replacing Pipe
14.7 Sewage Lift Station for Septic Systems
14.8 Manholes
14.9 Sanitary System Maintenance
14.10 Ordinances
14.11 The Contractor shall perform the work IAW the following
15.0 STORM WATER COLLECTION SYSTEM
15.1 Provide and Install storm drain markers
15.2 Inspect storm drains and gutters
15.3 Excavation and Backfilling
15.4 Excavation and Backfilling Barricades
15.5 Storm Water Collection Main Repair
15.6 Catch Basins
15.7 Storm Sewers/System
16.0 PREVENTIVE MAINTENANCE
16.1 Maintain the Storm Water Collection System
16.2 Schedule and Inspect Storm Water Collection System
16.3 Storm Sewers
16.4 Notice of Storm Drainage Service Disruption
16.5 Compliance
vii
16.6 The Contractor shall perform the work IAW the following
17.0 REPORTING REQUIREMENTS
17.1 Current Storm Water Management Plan
17.2 Installation Storm Water Management Plan (SWMP)
17.3 Storm Water Management System Maintenance Plan (SWMSMP)
17.4 Storm Water Management System Maintenance Inspection Form
17.5 Integrated Contingency Plan (ICP) for Spill Control and Response
17.6 Safeguard the Wastewater and Storm Water Systems
17.7 Certified Plant Operator
17.8 Cleaning and Inspection Logs
18.0 TRAINING
19.0 CERTIFICATION
20.0 OTHER UTILITY SYSTEMS
21.0 FUEL STORAGE AND DISTRIBUTION SYSTEMS
21.1 Monthly and Annual Inspections on Above Ground Tanks
22.0 FUEL-POWERED PUMP MAINTENANCE
23.0 EMERGENCY/BACKUP GENERATORS
24.0 OTHER WATER DISTRIBUTION SYSTEMS
25.0 WATER STANDPIPES
26.0 OTHER SANITARY WASTEWATER COLLECTION SYSTEMS
27.0 FIRELOOP SYSTEM HYDRANTS
27.1 Flow Testing
27.2 Backflow Preventers
28.0 TRAINING OF PERSONNEL
28.1 Licenses
28.2 Water Stop Boxes
28.3 Water Testing and Disinfecting
29.0 MONITORING SYSTEMS
30.0 GOLF COURSES
31.0 ATHLETIC FIELDS
1.0 General Information.
1.1 Overview. The Contractor shall provide all parts, equipment, supplies, labor and transportation in performing preventive maintenance and service calls on four (4) electronic signs as specified herein at the Unites States Army Combined Arms Support Command and Fort Lee, Fort Lee, Virginia.
1.1.1 Diagnosis and Analysis. The Contractor shall perform preventive maintenance and service calls on electronic signs and frames, and all other related components and accessories. The Contractor shall perform the aforementioned services on electronic signs and specified accessories at the intersection of Sisisky Boulevard and Shop Road (Bldg. 1128), Liberty Chapel (Bldg. 9100), and Memorial Chapel (Bldg.10600). The Contractor shall perform PM on electronic signs and frames quarterly. PM shall be performed within the first seven (7) days of each quarterly period. The Contractor’s work and responsibility shall include all planning, administration, and management necessary to provide all operation, preventive maintenance, and service calls as specified. The work shall be conducted in strict accordance with all applicable Federal, State and local laws, regulations, codes and directives. Work shall conform to the standards shown in the Performance Requirements Summary in Technical Exhibit 5.
1.2 Components. The Contractor shall perform preventive maintenance (PM) and repairs. Facilities and components covered under this Common Level of Support (CLS) include, but are not limited to, the following:
Each sign shall receive a regular quarterly Inspection and PM visit during the period of this contract. Inspection and PM visits shall include but are not limited to the following:
Partial disassembly of equipment is for replacement of air filters, cleaning, calibrating, testing, and adjusting of sign. Partial disassembly will also be required for servicing electronic controls.
Examine and Troubleshoot data links, modems and routers at or in sign housing. Ensure proper connectivity. Repair and Replace component failures as required.
Examine and Troubleshoot power supply(s) signal controllers, bulbs, LEDs, and related display equipment. Repair and Replace component failures as required.
Examine and troubleshoot associated hardware to include adjusting, tightening, and lubrication of all sign hardware. Repair and Replace component failures as required.
All work necessary shall be performed in accordance with equipment manufacturer’s maintenance and service manuals.
1.3 Work Management and Control.
1.3.1 Reporting Requirements. The Contractor shall furnish, with each invoice submitted, reports on the condition of the equipment monthly and provide annual reports. Reports shall be submitted electronically to KO/COR within three (3) working days after the end of the month in which the work was performed. Each report shall include a resume of the services performed by the Contractor, parts replaced, and deficiencies noted that will require future corrections and recommendations relative to methods for improving the operational effectiveness of the equipment. Specific equipment items will be clearly identified in the report. The format of the report is subject to approval of the Contracting Officer. All repairs and parts that are incidental to normal continuous and safe operation of the listed systems are covered by this contract.
1.3.1.1 Service Plan.
a. Within 30 calendar days of the start of the contract, the Contractor shall submit electronically to the KO/COR a Service Plan organized by Functional Area. The Service Plan shall describe all preventive maintenance services to be performed and their frequencies as reflected by this Contract, standard operating procedures/orders, and proposed staffing.These management plans shall include, at a minimum, specific maintenance tasks and frequencies, specific instructions for accomplishment of tasks, required special tools and equipment, personnel requirements, safety requirements, emergency procedures, personnel training requirements, and documentation procedures.
The Contractor shall submit the plan annually for Contracting Officer approval.
b. Snow and Ice Removal. N/A
c. Freeze Plan. N/A
1.3.1.2 Emergency Utilities Operating Procedures. N/A
1.3.1.3 Other Emergency Services to include, but not be limited to:N/A
1.3.2 Publications and Forms. See Annex A—Overarching Performance Work Statement (PWS) paragraphs 2 and 2.1
1.3.3 Facilities Maintenance Instruction. N/A
2.0 Description of Services. The Contractor shall develop and implement (after KO/COR approval) a Comprehensive PM and Repair Program. PM consists primarily of inspection, cleaning, lubrication, adjustment, calibration, and minor part and component replacement.which are listed in TE 5 Real Property per Category Code (CATCODE) Unit of Measure IAW the PM tasks. The Contractor shall submit the Comprehensive PM and Repair Program for this service within 30 days after receipt of approval to start. Work that is outside the scope of a PMO shall be accomplished through a DMO.
2.1 Facility Workload. N/A
2.1.1 BUILDER Sustainment Management System. N/A
2.2 Natural Gas Appliance and Equipment. N/A
2.3 Heating, Ventilation, and Air Conditioning (HVAC). N/A
2.3.1 General.N/A
2.3.1.1 Work Area/System Description. N/A
2.3.1.2 Inventory List. N/A
2.3.1.3 Work Performance. N/A
2.3.1.4 High Occupancy and Critical Facilities.
2.3.1.4 Priority 1 DMOs. N/A
2.3.1 Seasonal Changeover Requirements. N/A
2.3.2 Chemical Treatment. N/A
2.3.3 Building Operations Center. N/A
2.3.4.1 System Controls. N/A
2.3.5 Related Components and Accessories. N/A
2.4 Eye Washes and Safety Showers. N/A
2.5 Roof Gutters, Drains, and Downspouts. N/A
2.6 Automatic Doors. N/A
2.7 Overhead Doors. N/A
2.8 Gates, fences, barriers and Dock Levelers. N/A
2.9 Air Compressor Maintenance & Repair. N/A
2.9.1 Refrigerated Air dryer. N/A
2.9.2 Compressor storage tanks. N/A
2.10 Plumbing. N/A
2.10.1 Components. N/A
2.10.2 Leaks. N/A
2.10.2.1 Gas Leaks. N/A
2.10.3 Sump Pumps and Septic Tanks. N/A.
2.10.4 Hot Water Tanks. N/A
2.10.5 Backflow Preventors. N/A
2.10.6 Grease Traps. N/A
2.10.7 Urinals. N/A
2.10.8 Wash facilities/racks. N/A
2.10.9 Oil Water Separators. N/A
2.11 Sanitary Wastewater Treatment and Collection System (Septic Tanks). N/A
2.12 Industrial Wastewater Treatment Plant (IWTP). N/A.
2.13 Heating/Cooling Plants. N/A
2.14 Winterization and De-Winterization. N/A
2.15 Chemical Treatment of Water Systems. N/A
2.16 Lift Stations. N/A
2.17 Maintenance Cycles. N/A
2.18 Electrical.
2.18.1 General. The Contractor shall provide all parts, equipment, supplies, labor and transportation in performing preventive maintenance and service calls on three (3) electronic signs as specified herein at the Unites States Army Combined Arms Support Command and Fort Lee, Fort Lee, Virginia.
2.18.2 Description of equipment. The Contractor shall perform the aforementioned services on electronic signs and specified accessories at the intersection of Sisisky Boulevard and Shop Road (Bldg. 1128),Liberty Chapel (Bldg. 9100), and Memorial
Chapel (Bldg.10600). The Contractor shall perform PM on electronic signs and frames quarterly.
2.18.3 Action After Maintenance or Repair. After completion of a maintenance or repair task, the Contractor shall ensure that the equipment or area is safe, operational, and clean.
2.18.4 Emergency Fixtures. N/A
2.19 Auxiliary Generators. N/A
2.19.1 Perform PM of Auxiliary Generators. N/A
2.19.2 Temporary Generators. N/A
2.20 Grounding Point Checks. N/A
2.20.1 Grounding points, Lighting Protection and Cathodic Protection Maintenance. N/A
2.21 Security Systems. N/A
2.22 Fire Alarm/Suppression Systems. N/A
2.22.1 Fire Alarm Systems. N/A
2.22.1.1 Turnover/Fire Testing Schedule. N/A
2.22.1.2 Preventive Maintenance Requirements N/A
2.22.2 Sprinkler and Hood Suppression Systems. N/A
2.22.3 The Contractor shall perform the work IAW the following:N/A
2.23 Playgrounds. N/A
2.24 PM for Barracks Buildings. N/A
2.24.1 Unscheduled Tasks. N/A
2.24.2 Scheduled Tasks Scheduled Inspections. N/A
2.25 Elevator Maintenance. N/A
2.25.1 Elevator Inspection and Certification. N/A
2.25.2 Out of Service Time. N/A
2.25.3 Preventive Maintenance Requirements and Scheduled Maintenance Requirements. N/A
2.26 Swimming Pools and Hot Tubs. N/A
2.26.1 Circulation, Heating, and Filtration Systems. N/A
2.27 Keys and Locks. N/A
2.27.1 Key Control. N/A
2.27.2 Lock Combinations. N/A
2.28 Food Service Equipment (FSE). See Section 2.29 below.
2.29 Dining Facility (DFAC) Maintenance N/A
2.29.1 General. N/A
2.29.2 Description of equipment. N/A
2.29.3 Action After Maintenance or Repair. N/A
2.29.4 Lubricants. N/A
2.29.5 Contractor Provided Training. N/A
2.29.6 Reconfiguration of Fire Suppression System N/As.
2.29.7 Weekly Inspections. N/A
2.29.8 Kitchen Exhaust Systems and Hoods. N/A
2.29.9 Maintenance/Inspection of Fire Suppression System.
N/A
2.29.10 Pest Control. N/A
2.30 Crane and Load Scales Maintenance and Load Testing. N/A
2.30.1 General. N/A
2.30.2 Preventive Maintenance Plan. N/A
2.30.3 Crane Operator Training. N/A
2.30.4 Load scales. N/A
2.31 Glass and Glazing. N/A
2.32 Aircraft Arresting System (AAS). N/A
2.32.1 Certification and Training. N/A
3.0 Work Capability Levels. N/A
4.0 Self-Help Program. N/A
4.1 Scope of Services. N/A
4.2 Operation of Self-Help Supply Stores.
4.2.1 Hours of Operation: N/A
4.2.2 Location and Set up. N/A
4.3 Self-Help Training Plan. N/A
4.3.1 Scheduled Training. N/A
4.3.2 Training Certification. N/A
4.3.3 Additional Training Courses. N/A
4.4 Work Management and Control.
4.4.1 Publications and Forms. N/A
4.4.2 Authorization. N/A
4.4.3 Facility Manager. N/A
4.5 Self-Help Center Warehousing. N/A
4.5.1 Labeling of Supplies. N/A
4.5.2 Supplies and Materials Inventory. N/A.
4.6 Customer Identification and Record Keeping. N/A
4.7 Display Area. N/A
4.8 Issue of Items. N/A
4.8.1 Supplies and Materials. N/A
4.8.2 Tools and Equipment. N/A
5.0 Operation and Maintenance of Energy Conservation Systems
5.1 General. N/A
5.1.1 Replacement of Solar Panel. N/A
5.1.2 Roof Leaks. N/A
5.1.3 Occupancy Sensors. N/A
5.1.4 Replacement Standard. N/A
5.2 Preventive Maintenance Requirements. N/A
5.2.1 Monthly Inspections and Maintenance PV. N/A
5.2.2 Washing of Photo Voltaic Systems. N/A
5.2.3 Solar Day Lighting Electrical Systems. N/A
5.2.4 Sensor Adjustment. N/A
5.2.5 Efficient Upgrade. N/A
6.0 Sign Shop Operations
6.1 General. N/A
6.1.1 Sign Design. N/A
6.1.2 Type of Paint. N/A
6.1.3 Traffic Sign Material Specification. N/A
6.1.4 Traffic Signs. N/A
6.1.5 Informational Signs. N/A
6.1.6 Directional Signs. N/A.
6.1.7 Inspect and Survey. N/A
7.0 Utility Systems. N/A
7.0.1 Electric Distribution System. N/A
8.0 Uninterruptible Power Supply (UPS) Systems. N/A
9.0 Area Lighting. N/A
9.1 Traffic Controls General. N/A
9.2 Repair and Maintain Traffic Signals and Flashers. N/A
9.3 Preventive Maintenance Requirements. N/A
9.4 School Flashing Lights. N/A
9.5 Airfield Lights. N/A
10.0 Utility Marking. N/A.
11.0 Pumps and Pumping Stations. N/A
12.0 Natural Gas and Propane Distribution System. N/A
13.0 Propane Tanks and Distribution Systems. N/A
14.0 Water Distribution Systems. N/A
14.1 Secondary System. N/A
14.2 Water Lines. N/A
14.3 Backflow Prevention Program. N/A
14.4 Wastewater Collection System. N/A
14.5 Mains and Service Lines. N/A
14.6 Replacing Pipe. N/A
14.7 Sewage Lift Station for Septic Systems. N/A
14.8 Manholes. N/A
14.9 Sanitary System Maintenance. N/A
14.10 Ordinances. N/A
14.11 The Contractor shall perform the work IAW the following: N/A
15.0 Storm Water Collection System. N/A
15.1 Storm Drain Markers. N/A
15.2 Inspect Storm Drains and Gutters. N/A
15.3 Excavation and Backfilling
15.4 Excavation and Backfilling Barricades. N/A
15.5 Storm Water Collection Main Repair. N/A
15.6 Catch Basins. N/A
15.7 Storm Sewers/System. N/A
16.0 Preventive Maintenance. N/A
16.1 Maintain the Storm Water Collection System. N/A
16.2 Schedule and Inspect Storm Water Collection System. N/A
16.3 Storm Sewers. N/A
16.4 Notice of Storm Drainage Service Disruption. N/A
16.5 Compliance. N/A
16.6 The Contractor shall perform the work IAW the following: N/A
17.0 Reporting Requirements.
17.1 Current Storm Water Management Plan. N/A
17.2 Installation Storm Water Management Plan (SWMP). N/A
17.3 Storm Water Management System Maintenance Plan (SWMSMP). N/A
17.4 Storm Water Management System Maintenance Inspection Form. N/A
17.5 Integrated Contingency Plan (ICP) for Spill Control and Response. N/A
17.6 Safeguard the Wastewater and Storm Water Systems. N/A
17.7 Certified Plant Operator. N/A.
17.8 Cleaning and Inspection Logs. N/A
18.0 Training
18.1 Anti-Terrorism (AT) Level I Training.
IAW AR 525-13, Antiterrorism, all Contractor employees, including sub-contractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Antiterrorism (AT) Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of the requirement into the contract, whichever applies. The Contractor shall submit certificates of completion for each affected contract employee and subcontractor employee to the KO or designated
Government Representative/COR within 30 calendar days after completion of training by all employees and subcontractor personnel on a recurring annual basis. AT Level I awareness training is available at the following site: http://jko.jten.mil.
18.2 iWATCH Training.
The Contractor shall brief the local iWATCH program (training standards provided by the Rock Island’s ATO) to all of Contractor’s employees and associated subcontractors.
This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Fort Lee, Police Department and the COR. The Contractor shall complete the training within 30 calendar days after contract award and within 30 calendar days of new employees commencing performance and send to the KO or designated Government representative/COR via both electronic and paper copy within 30 calendar days of completion.
18.3 Operational Security (OPSEC) Awareness Training.
IAW AR 530-1, Operations Security, Contractor employees shall complete Level I OPSEC Awareness training within 30 calendar days after contract award and within five
(5) calendar days of new employees commencing performance. Completion certificates will be made available to Government within ten (10) business of completion or upon request from the Government. All Contractor personnel shall complete Level I OPSEC Awareness training annually. Level I OPSEC training is available at the following website: http://cdse.edu/catalog/elearning/GS130.html.
19.0 Certification. The Contractor shall furnish, in writing to the Contracting Officer (KO), evidence of qualifications for each of his maintenance and service employees prior to commencing work under this contract. Mechanic and electrician’s qualifications shall consist of two (2) years of experience as a repair mechanic or electrician with an established company that has repaired and installed equipment of similar type as that covered under this contract. All employees assigned by the Contractor to perform work under this contract shall be physically able to do the assigned work. The Contractor shall, at contract start, provide the KO with a list of all Contractor’s employees who will perform work under this contract. This list shall include the full name and position to be held by each Contractor employee. The Contractor shall update this list within 10 days as changes occur for the duration of the contract.
20.0 Other Utility Systems. N/A
21.0 Fuel Storage and Distribution Systems. N/A
21.1 Monthly and Annual Inspections on Above Ground Tanks. N/A
22.0 Fuel-Powered Pump Maintenance. N/A
23.0 Emergency/Backup Generators (not attached to building). N/A.
24.0 Other Water Distribution Systems. N/A
25.0 Water Standpipes. N/A
26.0 Other Sanitary Wastewater Collection Systems. N/A
27.0 Fireloop System Hydrants. N/A
27.1 Flow Testing. N/A.
27.2 Backflow Preventers. N/A
28.0 Training of Personnel. N/A
28.1 Licenses.
28.2 Water Stop Boxes. N/A
28.3 Water Testing and Disinfecting. N/A
29.0 Monitoring Systems. N/A
30.0 Golf Courses. N/A
31.0 Athletic Fields. N/A