About this file
This document is a Request for Quotation (RFQ) issued by the Tiffin Developmental Center (TDC), an Intermediate Care Facility for Individuals with Intellectual Disabilities (ICF/IID) operated by the Ohio Department of Developmental Disabilities (DODD). The RFQ is for the required replacement of two (2) Automatic Sliding door assemblies at the TDC facility located in Tiffin, Ohio. The RFQ schedule includes an issuance date of 11/06/2024, an inquiry period from 11/06/2024 to 11/26/2024, a mandatory site visit on 11/14/2024, and a quote due date of 12/02/2024. The initial awarded contract is estimated to become effective on 12/02/2024 and remain in effect through 06/30/2025. Bidders must be certified in Automatic Sliding door installation and use trained and qualified personnel directly employed and supervised by the contractor.
The RFQ provides detailed specifications for the two Automatic Sliding door assemblies, including dimensions and required features. Bidders must complete the provided Item Grid and attach an electronic copy of their proposal within the Ohio Buys solicitation system. The cost proposal must include all parts and labor to install the two Automatic Sliding Door assemblies. Bids will be evaluated, and the contract will be awarded to the lowest responsive and responsible bidder as determined by the agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tiffin Developmental Center (TDC) – Automatic Sliding Door Replacement
Solicitation: SRC 00000025813
Purpose: This request is for the required replacement of two (2) Automatic Sliding door assemblies at Tiffin Developmental Center (TDC).
RFQ Schedule:
· RFQ Issued: 11/06/2024
· Inquiry Period Begins: 11/06/2024
· Site Visit: 11/14/2024 at 9:00am
· Inquiry Period Ends: 11/26/2024 at 3:00pm
· Quotes Due: 12/02/2024 by 3:00pm.
Site Information:
Tiffin Developmental Center (TDC) consists of 17 buildings on the main campus
Tiffin Developmental Center 600 North River Road Tiffin, Ohio 44883
Primary Contact:
Bryan Spero, Maintenance Superintendent Email: bryan.spero@dodd.ohio.gov Phone: 419-443-3163
Site Visit:
A site visit is required to view the exact scope of work, at which time potential bidders may review the current Automatic Sliding Doors and develop their scope of work for each door assembly.
The site visit will be conducted at the Tiffin Developmental Center Site Visit Date: 11/14/2024 Site Visit Time: 9:00am Potential Bidders for the site visit shall check in at the Administration Building upon arrival and ask for Bryan Spero.
Specifications:
Contractor must be certified in Automatic Sliding door installation.
This request is for the required replacement of two (2) Automatic Sliding door assemblies at Tiffin Developmental Center (TDC).
OUTSIDE AUTOMATIC SLIDING DOOR
· Full width= 9’-4’’
· Height= 7’-1.5’’
· Door opening= 3’-4’’
INSIDE AUTOMATIC SLIDING DOOR
· Full width= 8’-9’’
· Height= 9’-2.5’’
· Door opening= 3’-4’’
OTHER DETAILS (both doors are identical except for sizes)
· Currently Invisible Dor-Man, model 8442-900
· Currently ASTRO-SLIDE II
· All Glass enclosure currently. (wanting as close to original as possible)
· Doors must be able to lock from outside but open automatically for exit, with keyed access from exterior.
· Push bar to open in case of fire.
Requirements:
No work on the equipment covered herein shall be done by subcontractors unless prior approval is obtained from Tiffin Developmental Center. Contractor must use trained and qualified personnel directly employed and supervised by him/her, preferably the same technician for each time of service. The bidder shall be regularly engaged in the business of Automatic Sliding Door equipment installation.
The contractor shall maintain all necessary licenses, certifications, and registrations throughout the term of the awarded contract. Contractor shall perform all services with reasonable care, skill and diligence as would normally be provided by an experienced consultant and in accordance with industry standards.
Tiffin Developmental Center is a Medicaid-certified Intermediate Care Facility for Individuals with Intellectual Disabilities (ICF/IID), operated by the Ohio Department of Developmental Disabilities (DODD), serving individuals with developmental and other disabilities. All individuals to be providing services on the grounds of any DODD Developmental Center shall have not been found guilty of, or pleaded guilty to, any offense set forth in Section 5123.08(1), (2), or (3) of the Ohio Revised Code; nor employ any person to provide services under this RFP who has been found guilty of, or pleaded guilty to any offense set forth in Section 5123.081(1), (2), or (3) of the Ohio Revised Code. The person(s) providing services under this contract will be subject to a criminal background check prior to performing any services at any DODD Developmental Center.
Awarded Contractor shall certify that all its employees, while working at any DODD Developmental Center, will not purchase, transfer, use, be under the influence of, or possess illegal drugs or alcohol, or abuse prescription drugs in any way. Contractor shall comply with all applicable provisions of the Rehabilitation Act of 1973 and the Americans with Disabilities Act (ADA), both in the provision of specified services and in its employment practices.
Contractor shall not be subject to an “unresolved” finding for recovery under Section 9.24 of the Ohio Revised Code. If there is a finding for recover, the Contractor’s proposal will be rejected.
All contract work must be completed during the hours of 7:00 A.M. and 3:30 P.M., Monday through Friday, unless prior arrangements are made with the Developmental Center contact person. Contractor shall complete work for each specific job/task on consecutive days, this includes installation work.
The contractor must always keep the work area safe and must provide and use OSHA-approved barricades for any work that is exposed to the public. Contractor must always secure his tools and materials. Contractor must clean his work area of all refuse and scrap materials at the end of each workday.
Inquiries:
From the issuance date of this solicitation, until a contract is awarded to an offeror, there may not be communications concerning the RFQ between any supplier who expects to submit a quote, and any employee of DODD involved in the issuing of the RFQ. The only exception is provided through the submission of written requests for clarification/interpretation via the RFQ through the Ohio Buys website during the inquiry period.
Prospective offerors may make inquiries or seek clarifications regarding this RFQ any time during the inquiry period listed in the solicitation Calendar of Events. To make an inquiry, prospective offerors must use the Inquiry tab on the solicitation in Ohio Buys to submit all inquiries or seek clarification.
Prospective offerors submitting inquiries will receive an immediate acknowledgement by e-mail that their inquiry has been received. The prospective offeror who submitted the inquiry will not receive an e-mail response to the question but will need to view the response on the Ohio Buys website where it will be posted for viewing by all prospective offerors.
Attachments to an inquiry are not visible to DODD, so please include all questions in the inquiry description field.
DODD will try to respond to all properly posed inquiries within 48 hours, excluding weekends and state holidays. DODD will not respond to any inquiries received after the date and time indicated on the RFQ. Prospective offerors who attempt to seek information or clarifications verbally will be directed to reduce their questions to writing in accordance with the terms of this RFQ and state purchasing policy. No other form of communication is acceptable, and use of any other form of communication or any attempt to communicate with DODD staff or any other agency of the State to discuss this RFQ may result in the offeror being deemed ineligible.
Proposal Submittal: Bidders must complete the “Item Grid” and attach an electronic copy of their proposal within the solicitation in Ohio Buys. The cost proposal must include all parts and labor to install two (2) Automatic Sliding Door assemblies.
| Description |
| Unit of Measure |
| Total Proposed Cost |
| All Parts & Labor |
| Total Amount |
| $ |
Time of Performance:
The initial awarded contract is estimated to become effective on December 2, 2024, and remain effective through June 30, 2025, or until terminated as provided in the contract.
Evaluation / Award: Bids will be evaluated, and the contract will be awarded to the lowest responsive and responsible bidder as determined by the agency.
Attachments:
The following attachments must be completed and submitted as part of the supplier’s quote in Ohio Buys in order to be considered for award.
· Standard Affirmation and Disclosure Form The Standard Affirmation and Disclosure Form attached to the RFQ must be completed, signed by an authorized official of the offeror’s organization, and submitted with any proposal to be considered.
· Contractor Information Form The Contractor Information Form attached to the RFQ must be completed and submitted with any proposal to be considered.
Solicitation Process:
· A site visit is required to view the exact scope of work, at which time potential bidders may review the current condition of the Automatic Sliding Doors doors and develop their scope of work for each door. Site Visit Date: 11/14/2024
· Bidder is required to complete the solicitation Item Grid and attach an electronic copy of their quote in Ohio Buys, quotes must be valid for a minimum of 60 days.
· Bids will be evaluated, and the contract for services will be awarded to the lowest responsive and responsible bidder as determined by the agency.
Solicitation Summary: This request is for the required replacement of two (2) Automatic Sliding door assemblies at Tiffin Developmental Center (TDC).