This document is a Request for Qualifications (RFQ) issued by the Georgia State Financing and Investment Commission (GSFIC) on behalf of the Technical College System of Georgia (TCSG) to provide building commissioning services for Project No. TCSG-404 Stewart Building Renovation at the Oconee Fall Line Technical College in Dublin, Georgia. The project involves renovating approximately 60,000 square feet of the 93,248 square foot facility and adding a 3,300 square foot pre-engineered metal building. The renovation aims to modernize the building, enhance student experience, and accommodate growth in strategic workforce programs. The RFQ outlines the scope of commissioning services required, including developing the Owner's Project Requirements, reviewing the Basis of Design, and conducting commissioning tasks during design, construction, and occupancy phases. Statements of qualifications are due on May 2, 2024, and the selected commissioning agent's services are anticipated to commence upon contract execution.
The RFQ provides details on the minimum qualifications, evaluation criteria, and required contents for the statements of qualifications. It also includes exhibits for required forms and a commissioning item checklist. The project has a preliminary stated cost limitation of $11,250,000 and will employ a construction manager at-risk delivery method. The RFQ specifies that the GSFIC Building Commissioning Services Agreement will be used, and no modifications to the contract terms will be accepted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TCSG_404_Commissioning Item Checklist.pdf | ||
| Highest Ranked Firm TCSG_404_CX.pdf | ||
| Selected Firm TCSG_404_CxA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Georgia State Financing & Investment Commission
Request for Qualifications
RFQ No. CSG-404-Cx (Step I)
To Provide Building Commissioning Services for
Project No. TCSG-404 Stewart Building Renovation
Oconee Fall Line Technical College Dublin, Georgia
TABLE OF CONTENTS
I. PROJECT FACT SHEET
II. RFQ OVERVIEW
1. GENERAL PROJECT INFORMATION
2. PROCUREMENT PROCESS
3. TERMS
III. REQUEST FOR QUALIFICATIONS (RFQ)
1. SCHEDULE OF EVENTS
2. QUESTIONS
3. MINIMUM QUALIFICATIONS
4. EVALUATION CRITERIA
5. COMMISSIONING AGENT TASKS
5.1 PHASE ONE TASKS
5.2 PHASE TWO TASKS
5.3 SYSTEMS TO COMMISSION
5.4 OWNER’S DOCUMENTATION
6. STATEMENT OF QUALIFICATIONS CONTENTS
7. SUBMITTAL OF STATEMENTS OF QUALIFICATIONS
8. FINALIST NOTIFICATION
IV. EXHIBITS
1. Exhibit A – Certification Form
2. Exhibit B – Contractor Affidavit Under O.C.G.A §13-10-91(b)(1)
3. Exhibit C – Disclosure Statement
4. Exhibit D – Commissioning Item Checklist
I. PROJECT FACT SHEET
For Stewart Building Renovation
Oconee Fall Line Technical College/Dublin, Georgia
The following Schedule of Events represents the Owner’s best estimate of the schedule that will be followed. All times indicated are prevailing times in Atlanta. The Owner reserves the right to adjust the schedule as the Owner deems necessary.
STEP I
Date Time Activity April 15, 2024 --- RFQ issued
April 24, 2024 2:00 PM Deadline for written questions
May 2, 2024 2:00 PM Statement of Qualifications Due
May 8, 2024 TBD Evaluation of Qualifications
Jeff Lacks e-mail: jeff.lacks@gsfic.ga.gov 770-550-3774
Upload one (1) electronic copy of the complete package in .pdf format onto the GSFIC / Egnyte ftp site by selecting this link: https://gsfic.egnyte.com/ul/pNZmp64ims and following the upload instructions provided below.
Click on the provided link above, when the page opens, enter name, email address, and company name, click “Continue.”
Drag and drop your file or click the “Browse” button to select a document from your computer. You should see an upload progress bar and when it gets to 100% the upload is complete.
SCHEDULE OF EVENTS
PROCUREMENT CONTACT
EGNYTE UPLOAD
LINK
https://gsfic.egnyte.com/ul/pNZmp64ims
II. RFQ OVERVIEW
The Georgia State Financing and Investment Commission (GSFIC), as “Owner”, on behalf the Technical College System of Georgia (“Using Agency” or ''TCSG''), is seeking firms interested in providing building commissioning services for a project known as Project No. TCSG-404 Stewart Building Renovation.
1. GENERAL PROJECT INFORMATION
Project Background:
Oconee Fall Line Technical College’s (OFTC) W.R. Stewart Building is an approximately 93,248 square foot facility constructed in 1983. The building houses trades, industrial, and transportation programs, adult education, administrative services, and student affairs services for the OFTC Dublin Campus.
The campus is adjacent to Interstate 16 midway between Macon and Savannah, Georgia. The expansion of the Savannah port is expected to spur economic opportunities in Southeast Georgia as evidenced by the new Hyundai plant. OFTC is positioned to provide the workforce to meet its 11 county service area’s needs.
Expanding the capacity of the existing trades and industrial labs will allow for an enrollment increase and program expansion in Georgia’s strategic workforce initiative programs.
Project Description The Oconee Fall Line Technical College anticipates being able to renovate approximately 60,000 square feet of the 93,000 square feet of existing space within the W.R. Stewart Building, as well as add an approximately 3,300 square foot pre-engineered metal building to existing lab space in support of the Diesel Equipment Technology program.
The current facility is not welcoming, not easily accessible., and is confusing to students. The renovation is intended to take into consideration the student experience by creating a “One-Stop Center where students can access all student affairs services in one area and move through the enrollment process quickly. The current labs do not provide real-world job training experiences. For example, the current diesel equipment technology lab does not accommodate modern commercial tractor-trailer trucks. The labs are not climate-controlled which is not conducive to a modern training environment that contains technology, trainers, and simulators that are heat-intolerant.
The objective of the renovation and addition is to maximize existing space while allowing the college to grow enrollment in strategic high demand areas such as the following:
1. Diesel Equipment Technology & Automotive Technology Programs – the College intends to combine and expand these two existing labs to create a single lab space shared by both programs. The addition of the pre-engineered metal building will create a drive-through bay capable of accommodating commercial tractor trucks. Peterbilt has recently located a new truck sales and services center in Dublin, Georgia, and are partnering with the Technical College on an apprenticeship program.
2. Mechatronics, Electronics, & Industrial Maintenance Programs – the lab space is currently being shared by the three programs and is over-crowded. The programs are in high demand and the college currently works with Warner Robins Airforce Base to provide cooperative education.
The college has one robotic trainer. There is a need to increase robotics trainers, but the current space will not accommodate additional equipment. Ultimately the goal is to carve out new lab space to accommodate these three programs by repurposing space in another area of the building enabling the college to significantly increase enrollment in these programs.
3. Welding and Joining Technology Programs – Current lab space is inadequate to meet the needs of enrollment growth. The college is looking to double the lab space to accommodate this growing program.
4. Air Conditioning Technology – It is envisioned this program will move to a new location within the facility to allow for the welding and joining program expansion. The college anticipates enrollment in this program to increase significantly.
5. Construction Management Programs – Create lab and classroom space to accommodate a new Construction Management program that key stakeholders have long requested. Dublin High Schools and Lauren County High Schools have robust construction programs, and the college is partnering with the schools on articulation and dual enrollment opportunities. The college anticipates initial enrollment to be 30 students with 100% growth expected over a five-year period.
6. Commercial Truck Driving Program – Renovate the offices and classrooms to enhance the commercial truck-driving program and to complement the new CDL range the current under construction on property located across the street from the W.R. Steward building (the new CDL range is not included in the scope of work for this project).
7. Precision Machining and Manufacturing Programs – The current lab is at capacity and does not allow the college to add vital-state-of-the-art CHC machinery. The intention is to double the current lab space to accommodate this high demand program and to support a pipeline to access job openings with the Delta Airlines TechOps team.
The renovation and addition will allow the college to modernize the current facility and optimize existing spaces, enhance the student experience by increasing the quality of the trades and industrial labs, provide ease of access and use of the facility, and accommodate growing demand for these programs for the foreseeable future.
It is important to note the building will be occupied and will need to remain operational during the renovation. The CM/GC will be expected to work closely with the design team and technical college to develop the overall project schedule. It is envisioned the schedule would include an early package enabling the CM/GC to commence construction while allowing instructional labs to continue to be utilized.
The desire would be to complete portions of the most intrusive work during the summer semester or some other sequencing of the work that would move the project forward while minimizing the impact on the College’s ability to conduct classes.
Project Delivery Method:
The delivery method for this Project will be construction manager at-risk (CM/GC), and, at a minimum, will employ the services of a Design Professional and a Commissioning Agent, in addition to the services of a
CM/GC.
Project Budget The preliminary Stated Cost Limitation (SCL) or construction cost of the Project is estimated at $11,250,000.
The final SCL may be revised by the Owner due to final programmatic requirements, funding availability or other circumstances.
Project Schedule The CxA’s services are anticipated to commence at contract execution. (Note: All of the dates indicated in this section are estimates and as such are subject to change.)
Sustainable Approach The project will incorporate the requirements of the Energy Efficiency & Sustainable Construction Act of 2008 (O.C.G.A. 50-8-18) and it is the desire of the Owner to incorporate sustainable design and construction concepts in the project where feasible to do so. Further, Georgia Peach certification is required with commissioning.
Owner’s Project Management Program (e-Builder) CxA shall be required to use the Owner’s free Project Management Program, E-Builder, for contract administration processes including, but not limited to, Requests for Information, Change Orders, Payment Applications, Notices of Non-Compliance and Incumberance Records.
Contract Information The contract for Building Commissioning Services will be the GSFIC Building Commissioning Services Agreement. The agreement can be located on the Georgia State Financing and Investment Commission’s website:
https://gsfic.georgia.gov/doing-business-gsfic/construction-agreements-agency-request-form
Firms are encouraged to review and become familiar with the terms and conditions of this agreement.
Firms participating in this procurement process agree to execute the GSFIC contract form without modification.
2. PROCUREMENT PROCESS
Selection of the Commissioning Agent will be a one-step process based upon the CxA’s qualifications, as determined by a Selection Committee.
Request for Qualifications The selection process starts with the Request for Qualifications (“RFQ”). Interested firms shall submit Statements of Qualifications. Firms meeting the Minimum Qualifications outlined in the RFQ will have their Statements of Qualifications reviewed by Selection Committee consisting of representatives of the Using Agency, GSFIC, and possibly a third-party representative (i.e., another state representative, program manager, etc.). The Selection Committee shall score each Statement of Qualifications to determine the top ranked firm.
3. TERMS
All respondents to this RFQ are subject to instructions communicated in this document and additional terms and conditions contained herein.
Restriction of Communications From the issue date of this (RFQ) solicitation until the final selection is announced, proposers are not allowed to communicate FOR ANY REASON regarding this project with any members of the Selection Committee except communications allowed or required during the solicitation process. Proposers are further prohibited from communicating with GSFIC, the Using Agency, the End-User, or the Architect, REGARDING THIS RFQ OR THIS PROJECT except for communications with the GSFIC Procurement Representative. All questions regarding this RFQ should be directed to the Procurement Representative.
For violation of this provision, the Owner reserves the right to reject the qualifications/proposal of the offending proposer.
Submittal Costs and Confidentiality All expenses for preparing and submitting responses are the sole cost of the party submitting the response.
The Owner is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of the Owner. Labeling information provided in submittals “proprietary” or “confidential,” or any https://gsfic.georgia.gov/doing-business-gsfic/construction-agreements-agency-request-form other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until the final award.
Award Conditions This request is not an offer to contract or a solicitation of bids. This request and any proposal submitted in response, regardless of whether the proposal is determined to be the best proposal, is not binding upon GSFIC and does not obligate GSFIC to procure or contract for any services. Neither GSFIC nor any party submitting a response will be bound unless and until a written contract mutually accepted by both parties is negotiated as to its terms and conditions and is signed by GSFIC and a party containing such terms and conditions as are negotiated between those parties. The Owner reserves the right to waive non-compliance with any requirements of this RFQ and to reject any or all Statements of Qualifications submitted in response. Upon receipt and review of responses, the Owner will determine the party(s) and proposal that in the sole judgment of the Owner is in the best interest of the Owner (if any is so determined), with respect to the evaluation criteria stated herein. The Owner then intends to conduct negotiations with such party(s) to determine if a mutually acceptable contract may be reached and in the course of doing so may use ideas expressed in any proposal.
Evaluation of Submittals and Qualifications Evaluation of the Statements of Qualifications will be conducted by a Selection Committee consisting of various project stakeholders. Based upon the predetermined rating criteria contained in the RFQ, the committee will assign a composite rating to each firm. Proposers understand and accept that by responding to this solicitation they are willingly participating in a process that consists to some degree of subjectivity on the part of selection committee members in determining the firm(s) capable of providing the best overall solution.
Reciprocal Preference Law For the purposes of evaluation only, a proposer that resides in the State of Georgia will be granted the same preference over proposers that reside in another State in the same manner, on the same basis, and to the same extent that preference is granted in awarding bids for the same goods or services by such other State to proposers that reside therein. For the purposes of this law, the definition of a resident proposer is one who maintains a place of business with at least one employee inside the State of Georgia. A P.O. Box address will not satisfy this requirement.
Joint-Venture Proposals GSFIC does not generally desire to enter into “joint-venture” agreements with multiple Commissioning Agent firms. In the event two or more firms desire to “joint-venture,” it is strongly recommended that one incorporated firm propose and maintain status as the Commissioning Firm with the remaining firms participating as major consultants.
Small and Minority Business Enterprise It is the policy of the state of Georgia that minority-owned business enterprises (MBE), woman-owned business enterprises (WBE) and small business enterprises (SBE), have a fair and equal opportunity to participate in the state purchasing process. Therefore, the Owner encourages all MBE, WBE and SBE to compete for contracts to provide goods, services, and construction, and encourages contractors to solicit MBE, WBE and SBE in procuring subcontractors and suppliers. This desire on the part of the Owner is not intended to restrict or limit competitive bidding or to increase the cost of the work. The Owner supports a healthy free market system that seeks to include responsible businesses and provides ample opportunity for business growth and development.
Contractors and subcontractors who utilize qualified minority subcontractors may qualify for a Georgia state income tax credits for qualified payments made to minority subcontractors. In accordance with O.C.G.A.
48-7-38, when computing taxable net income of a Georgia based corporation, partnership, or individual, there shall be subtracted from federal taxable income or federal adjusted gross income 10 percent of the amount of qualified payments to certified minority subcontractors for state-agency-related construction projects. For more information on filing only, contact the Georgia Department of Revenue at 404-417-2399.
A company cannot receive an MBE Certification with the state of Georgia government without first receiving the DBE certification. To obtain information on the DBE/MBE Certification contact:
Georgia Department of Transportation One Georgia Center 600 West Peachtree NW Atlanta, Georgia 30308 404-631-1990
Statement of Agreement With submission of a proposal, the Proposer agrees that he/she has carefully examined the Request for Proposal, and the Proposer agrees that it is the Proposer’s responsibility to request clarification on any issue(s) in any section of the Request for Proposal with which the Proposer disagrees or needs clarified.
The Proposer also understands that failure to mention these items in the proposal will be interpreted to mean that the Proposer is in full agreement with the terms, conditions, specifications and requirements in the therein. With submission of a proposal, the Proposer hereby certifies: (a) that this proposal is genuine and is not made in the interest or on behalf of any undisclosed person, firm, or corporation; (b) that Proposer has not directly or indirectly included or solicited any other Proposer to put in a false or insincere proposal;
(c) that Proposer has not solicited or induced any person, firm, or corporation to refrain from sending a proposal.
Debarred, Suspended or Ineligible Firms Contracts will not be executed and bids or proposals will not be solicited or considered from debarred, suspended or ineligible persons or firms during the period of debarment. The list of debarred, suspended or ineligible firms can be located on the Georgia State Financing and Investment Commission’s website at http://www.gsfic.georgia.gov. Once on the website, select the “Doing Business with GSFIC” tab, then select “Procurement Services,” then click on the “Debarred, Suspended or Ineligible Entities” tab for access to the list of those firms currently considered debarred, suspended or ineligible to compete, contract or subcontract for work on projects administered by the Georgia State Financing and Investment Commission.
DOAS Supplier Relations 200 Piedmont Avenue, S.E.
Suite 1308, West Tower Atlanta, Georgia 30334-9010 404-657-6000
III REQUEST FOR QUALIFICATIONS
All firms interested in performing Commissioning Services shall submit a Statement of Qualifications in accordance with the terms below.
1. SCHEDULE OF EVENTS
Refer to the Project Fact Sheet for Schedule of Events.
2. QUESTIONS
The deadline for submission of questions relating to the RFQ is the time and date shown in the Schedule of Events shown above. All relevant and significant questions that have been submitted in writing prior to the deadline will be compiled, and answers will be posted to the project information on the Georgia Procurement Registry at http://ssl.doas.state.ga.us/PRSapp/ . Questions from Commissioning Firms about any aspect of the RFQ, or the project, shall be submitted in writing (e-mail is preferable) to the Point of Contact on the Project Fact Sheet.
3. MINIMUM QUALIFICATIONS
Firms must meet the following Minimum Qualifications in order to have their Statement of Qualifications reviewed and scored by the Selection Committee.
The firm or its principals are not currently ineligible, debarred, suspended, or otherwise excluded from bidding or contracting by any state or federal agency, department, or authority.
The firm or its principals have not been terminated for cause or be currently in default on any public works contract.
The firm must have current Commercial General Liability Insurance coverage with minimum limits of $1,000,000 per occurrence. Firm must also have current professional a liability coverage in the amount of at least $1,000,000 per occurrence. (The Owner reserves the right to require additional limits and/or coverage for actual contract.)
4. EVALUATION CRITERIA
The Selection Committee will evaluate the Statements of Qualifications which have met the above minimum qualifications according to the Criteria for the evaluation are listed below:
25% - Stability
Stability of the firm, including the firm’s corporate history, growth, resources, form of ownership, litigation history, financials, and other evidence of stability.
45% - Experience & Qualifications
Firm’s relevant project experience and qualifications, including the demonstrated ability of firm in effective commissioning of facilities comparable in complexity, size, and function to the one contemplated hereby. Experience with Owners such as the State of Georgia or other similarly structured organizations. Proposed organization of the CxA Team for this project including individuals and their roles and responsibilities.
Proposed CxA Plan for the project including firm’s proposed overall role in this project, firms anticipated level of management responsibility and accountability for project concerns.
30% - Suitability
Firm’s apparent suitability to provide the required services for the Project, including but not necessarily limited to the firm’s apparent fit to the project type and/or needs of the Owner. Any special or unique company or personnel qualifications, current and projected workloads with the Owner, the proximity of office or lead staff to Project location, and services offered by the firm that they are best suited for the anticipated scope of the project. Firms process for efficiently addressing and reporting discrepancies as well as your follow-up procedures. Proposed timeline covering the commissioning milestones throughout the commissioning process. O&M Documentation and training process.
5. COMMISSIONING AGENT TASKS
The Owner desires commissioning for the project to ensure that all systems including the building envelope are complete and will function properly when installed or constructed and that the facility staff has adequate system documentation and training.
Specific requirements of the Commissioning process and responsibilities, duties, and obligations of the Commissioning Authority (CxA) team are described herein, Commissioning Tasks. To accomplish these tasks, the CxA shall be required to coordinate their activities with other entities.
The Commissioning process does not take away from or reduce the responsibility of the Design Professional to provide a finished and fully functioning product. It is noted that the services of the Design Professional or Construction Professional and various subcontractors are NOT provided for under this Scope of Work and the CxA is not responsible for providing their services.
The CxA will not be responsible for design concept, design criteria, compliance with codes, design, or general construction scheduling, cost estimating, construction management, or construction supervision.
The CxA may assist the Design Professional with design issues or problem solving, but ultimate responsibility for meeting the project objectives and requirements resides with the Design Professional.
For the purposes of this RFQ, commissioning tasks are separated into two phases. The first phase shall consist of the development of the Owner’s Project Requirements document by the CxA and Review of the DP’s Basis of Design information to ensure consistency with the OPR. The second phase services shall consist of all tasks identified beyond the OPR and BOD documents. Typically, the Owner will contract with the CxA for the first phase and then at the Owner’s sole discretion, will negotiate for phase two services and if agreeable, amend the CxA contract to include those additional services.
5.1 PHASE ONE TASKS
• Develop Owner’s Project Requirements (OPR) per the ASHRAE Standard 202-2018
• Review Owner’s Project Requirements for completeness and clarity
• Review the DP’s Basis of Design (BOD) information and ensure consistency with OPR.
The OPR should contain the following items: general project information (size and schedule), training operations and maintenance requirements, building space and occupancies summary, and building performance criteria (energy, materials and resources, and indoor air quality). Sample OPR Guidelines and Outline are provided with this RFQ, see Exhibits D and E.
The BOD information will be used to satisfy the OPR. The BOD should include an overview of building systems, summer and winter design conditions (interior and exterior), HVAC system selection, utilities, lighting, code and life safety requirements, budget and special systems (pure water, air, etc.)
5.2 PHASE TWO TASKS
The following tasks (for MEP Systems and Building Envelope) will be accomplished by the CxA to provide Commissioning during the following phases of the project: (All tasks listed are Georgia (Peach) Required).
DESIGN PHASE
• Conduct a Design Phase Cx kickoff meeting.
• Develop preliminary Commissioning Plan, provide DP with draft.
• Coordinate with the Design Professional to incorporate commissioning specifications/requirements into the construction documents.
• Conduct Cx design reviews of drawings and specs at phases determined by Owner.
• Create commissioning deficiencies / issues log to be updated throughout Cx.
• Complete checklist verifying that CxA has received the latest version of design documents.
CONSTRUCTION PHASE
• Conduct a Construction Phase Cx kickoff meeting.
• Update commissioning plan as necessary
• Review contractor submittals applicable to systems being commissioned.
• Develop Construction checklists for equipment and systems to be commissioned.
• Develop functional test procedures and documentation formats for all commissioned equipment and systems.
• Develop and maintain site observation reports.
• Prepare Cx progress reports.
• Hold construction phase Cx meetings in conjunction with construction progress meetings (OAC meetings)
• Maintain Cx deficiencies / issues log.
• Verify Cx deficiency corrections.
• Review Requests for Information (RFI’s) and changes for impacts on Cx
• Review completed copies of factory or contractor provided pre-start up and start up test forms.
• Perform on-site validation of successful completion of Functional Performance Test (FPT)
• Maintain record of functional testing
• Witness the Test and Balance (TAB) testing for completeness and accuracy.
• Review TAB report
• Review Operation & Maintenance (O&M) manuals, as-built documentation, and training documentation
• Perform installation and walk-thru and prepare observation reports.
• Review equipment warranties
• Review and participate in contractor provided training program for agency maintenance personnel.
• Verify that requirements for staff training are complete.
• Develop a system manual for commissioned systems.
• For Envelope Cx the following activities will apply:
Review of building envelope mock-ups (roof, skin, windows, etc) Observe or conduct envelope tests (water, sealant tests, wind load, etc.)
Attending installation meetings as needed (pre-roof, curtain wall, exterior skin, etc.)
Conduct envelope inspections and prepare observation reports during installation.
OCCUPANCY AND WARRANTY
• Complete final Cx issues log that includes resolved and unresolved issues.
• Address concerns with operating facility and staff
• Verify the installation and performance of all commissioned systems no later than 10 months after material completion of the project (Complete and submit checklist form, click link below for sample form) http://web01.spo.ga.gov/construction/CommissioningGuidelines/ChecklistForm.pdf
• Complete final Cx Report (Final Commissioning Report to contain all relevant information, correspondence, tests, data, findings, and summary for the entire project. Typical reports include an executive summary, Cx plan, Cx specifications, issues log and other logs, updates, design reviews, submittal reviews, site observations, TAB reports, history of training, and reports for each commissioned system.) (Sample executive summary provided in the GSFIC Commissioning Guide.)
• Coordinate or witness deferred and seasonal testing and balancing (typically two seasons)
5.3 SYSTEMS TO COMMISSION
Those systems and equipment to be including the commissioning providers scope are reflected in the GSFIC COMMISSIONING ITEM CHECKLIST, attached as Exhibit F to this RFQ.
5.4 OWNER’S DOCUMENTATION
The documentation (reports) submitted to the Owner shall be in electronic form and paper form.
Documentation refers to all correspondence (letters, memos, observations, etc.) all test reports and all Test and Balance Reports.
The actual scope of services could vary from the tasks listed above and communicated to eligible firm(s) prior to actual agreement. The Owner will provide additional details and a list of general duties required in Commissioning Services for this Project to eligible finalists.
6. STATEMENTS OF QUALIFICATIONS CONTENTS
Statements of Qualifications shall include the following information and required forms.
REQUIRED CONTENTS FOR ALL STATEMENTS OF QUALIFICATIONS
A
DESCRIPTION AND RESOURCES OF FIRM
A-1 Provide basic company information: Company name, address, name of primary contact, the year the company was established, telephone number, fax number, e-mail address, and company website (if available). If the firm has multiple offices, the qualification statement shall include information about the parent company and branch office separately. Identify office from which the project will be managed, its proximity to the project site. Provide form of ownership, including state of residency or incorporation, and number of years in business. Is the offeror a sole proprietorship, partnership, corporation, Limited Liability Corporation (LLC), joint venture, or other structure?
A-2 Briefly describe the history and growth of your firm(s). Provide general information about the firm's personnel resources, including disciplines and numbers and classifications of employees, and locations and staffing of offices.
A-3 Has the firm been involved in any litigation in the past five (5) years? Describe your experience with litigation with Owners, Architects and/or Contractors. List any active or pending litigation and explain.
A-4 Provide name of insurance carrier, types and levels of coverage, and deductible amounts per claim.
A-5 List the firm’s annual revenue for the past 5 years.
A-6 Provide the firm’s federal employer identification number (FEIN).
A-7 Has the firm ever been removed from a Commissioning contract, had a contract terminated for default, or failed to complete a contract as assigned?
A-8 Complete the Certification Form (Exhibit “A” enclosed with RFQ) and provide a scanned notarized copy with response as section “A8” of the firm’s Statement of Qualifications. Failure to submit this form with Statement of Qualifications will result in the firm being eliminated from consideration for this project
A-9 Complete and submit a “CONTRACTOR AFFIDAVIT UNDER O.C.G.A. § 13-10-91(b)(1)” (Exhibit “B”) with response as Section “A9” of the firm’s Statement of Qualifications. Failure to submit this form with Statement of Qualifications will result in the firm being eliminated from consideration for this project
A-10 Complete and submit the “Disclosure Statement” (Exhibit “C”) with response as Section “A10” of the firm’s Statement of Qualifications.
B
EXPERIENCE AND QUALIFICATIONS
B-1 Describe your firm's proposed commissioning services team, including consultants, and include an organizational chart of the team. Identify the primary point of contact on the chart. Please designate the specific individuals who will fill the key roles on your team and provide a resume for each of the team members highlighting relevant project experience, qualifications, and any applicable professional certifications.
B-2 Provide information on the firm’s commissioning experience on projects of similar type, size, function, and complexity. Describe no more than seven (7) and no less than three (3) projects, in order of most relevant to least relevant, which demonstrate the firm's capabilities to perform the project at hand. For each project, the following information should be provided:
a. Project name, location and dates during which services were performed.
b. Brief description of project and physical description (buildings, square footage, number of stories, site areas, systems commissioned).
c. Services performed by your firm.
d. Owner’s stated satisfaction level in the Commissioning and/or overall service of your firm.
e. Owner contact information.
f. Contractor and/or Architect contact information.
C PROJECT SUITABILITY
C-1 Provide any information that may serve to differentiate the firm from other firms in suitability for the project. Suitability may include, but is not limited to, the firm’s fit to the project and/or needs of the Owner, any special or unique qualifications for the project, current and projected workloads, the proximity of office to project location, and any services offered by the firm that may be particularly suitable for this project.
C-2 Describe your anticipated level of management responsibility and accountability for project concerns; your project reporting process and process for efficiently addressing and reporting discrepancies as well as your follow up procedures. Describe your approach to the design review phase.
C-3 Describe your proposed timeline covering the commissioning milestones throughout the commissioning process and describe your O&M Documentation and training process.
7. SUBMITTAL OF STATEMENTS OF QUALIFICATIONS
Firms shall submit/upload one (1) electronic copy in .pdf format of the complete qualifications package to a GSFIC ftp site. Submittals must be prepared in a manner that when printed would typically fit on standard (8 ½” x 11”) paper. (The entire response shall not exceed 50 pages. All pages count, no exceptions.)
Submittals that include qualifications of more than one firm shall not exceed the page limits. Emphasis should be on completeness, relevance, and clarity of content. To expedite the review of submittals, it is essential that respondents follow the format and instructions outlined below:
Submit one (1) electronic copy of the complete package in .pdf format onto the GSFIC / Egnyte ftp site.
Uploaded responses (file names) must reference the RFQ No.-CxA, the firm’s name, and the word
“QUALIFICATIONS.”
The entire submittal should be submitted as ONE (1) file. Please do not submit individual documents or sections separately.
(File Name Example: RFQ No.-CxA, ABC Company, Qualifications)
UPLOAD INSTRUCTIONS
Upload one (1) electronic copy of the complete package in .pdf format onto the GSFIC / Egnyte ftp site by selecting the link listed on the Project Fact Sheet and following the upload instructions provided below.
Click on the provided link above, when the page opens, enter name, email address, and company name, click “Continue.”
Drag and drop your file or click the “Browse” button to select a document from your computer. You should see an upload progress bar and when it gets to 100% the upload is complete.
Proposers are reminded that failure to comply with the following could result in your submission being deemed non-responsive. Non-responsive submittals will not be considered by the selection committee:
• The total page count of the submittal must not exceed 50 pages. All pages count regardless of content - including the cover and any blanks.
• No links to external electronic documents are permitted.
• Be sure to include the following completed exhibits in your submission. (Forms located at the end of this document):
o Exhibit A – Certification Form o Exhibit B – Contractor Affidavit under O.C.G.A. § 13-10-91(b)(l) o Exhibit C – Disclosure Statement
• Statements of Qualifications must be electronically received by the Owner prior to the deadline indicated in the Schedule of Events (refer to the Project Fact Sheet).
• Printed copies will not be accepted.
• Firms are encouraged to verify with GSFIC that their submittal was received and should do so on the date they are due. Contact the point of contact on the Project Fact Sheet, or the main GSFIC procurement number 404-463-5600, for assistance or confirmation that the file was received.
(Experience with the ftp site indicates that uploads do not always receive the confirmation statement that the file was “successfully uploaded.” Typically, for files ranging in size from 5 – 10 Mb, it should not take more than one or two minutes to complete the upload.)
8. FINALIST NOTIFICATION
The Owner anticipates that firms will be evaluated and ranked based on the qualifications submitted. The highest ranked firm will be notified, and the results of the selection will be posted on the Georgia Procurement Registry.
The Owner will enter into contract negotiations with the highest ranked firm. In the event a satisfactory fee agreement cannot be reached with the highest ranked firm, the Owner will formally terminate the negotiations in writing and enter into negotiations in turn with the second highest ranking firm, and so on until a mutual agreement is established and the Owner awards a Commissioning Services contract. The actual Form of Contract shall be developed by the Owner.
End of Section
IV. LIST OF EXHIBITS
Exhibit A - Certification Form Exhibit B - Contractor Affidavit under O.C.G.A. § 13-10-91(b)(l) Exhibit C - Disclosure Statement Exhibit D – Commissioning Item Checklist
(Exhibit A)
CERTIFICATION FORM
I, _, being duly sworn, state that I am_______________(title) of _____________________(firm) and hereby duly certify that I have read and understand the information presented in the attached proposal and any enclosure and exhibits thereto.
I further certify that to the best of my knowledge the information given in response to the request for proposals is full, complete and truthful.
I further certify that the proposer and any principal employee of the proposer has not, in the immediately preceding five years, been convicted of any crime of moral turpitude or any felony offense, nor has had their professional license suspended, revoked or been subjected to disciplinary proceedings.
I further certify that the proposer has not, in the immediately preceding five years, been suspended, debarred, or otherwise excluded or ineligible from contracting with any federal, state or local government agency, and further, that the proposer is not now under consideration for suspension or debarment from any such agency.
I further certify that the proposer has not in the immediately preceding five years been defaulted or terminated for cause in any federal, state, or local government agency contract and further, that the proposer is not now under any notice of intent to default on any such contract.
I acknowledge, agree and authorize, and certify that the proposer acknowledges, agrees and authorizes, that the Owner and/or GSFIC may, by means that either deems appropriate, determine the accuracy and truth of the information provided by the proposer and that the Owner and/or GSFIC may contact any individual or entity named in the Statement of Qualifications for the purpose of verifying the information supplied therein.
I acknowledge and understand the successful Proposer will be required to certify compliance with the Immigration Reform Act of 1986 (IRCA), D.L. 99-603 and the Georgia Security and Immigration Compliance Act OCGA 13-10-90 et.seq., by meeting or having complied with the provisions in the Act and by executing any affidavits required by the rules and regulations issued by the Georgia Department of Labor set forth at Rule 300- 10-1-.01: Contractor will also be required to warrant that Contractor has included a similar provision in all written agreements with any subcontractors engaged to perform services under this Contract.
I acknowledge and agree that all of the information contained in the Statement of Qualifications is submitted for the express purpose of inducing the Owner to award a contract.
A material false statement or omission made in conjunction with this proposal is sufficient cause for suspension or debarment from further contracts, or denial of rescission of any contract entered into based upon this proposal thereby precluding the firm from doing business with, or performing work for, the State of Georgia. In addition, such false statement or omission may subject the person and entity making the proposal to criminal prosecution under the laws of the State of Georgia of the United States, including but not limited to O.C.G.A. §16-10-20, 18 U.S.C. §§1001 or 1341.
Signature Sworn and subscribed before me This day of , 20 .
NOTARY PUBLIC NOTARY SEAL
My Commission Expires:
(Exhibit B)
Contractor Affidavit under O.C.G.A. § 13-10-91(b)(l) The undersigned contractor ("Contractor") executes this Affidavit to comply with O.C.G.A § 13-10-91 related to any Contract to which Contractor is a party that is subject to O.C.G.A. § 13-10-91 and hereby verifies its compliance with O.C.G.A. § 13-10-91, attesting as follows:
a) The Contractor has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program;
b) The Contractor will continue to use the federal work authorization program throughout the contract period, including any renewal or extension thereof;
c) The Contractor will notify the public employer in the event the Contractor ceases to utilize the federal work authorization program during the contract period, including renewals or extensions thereof;
d) The Contractor understands that ceasing to utilize the federal work authorization program constitutes a material breach of Contract;
e) The Contractor will contract for the performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the Contractor with the information required by O.C.G.A. § 13-10-91(a), (b), and (c);
f) The Contractor acknowledges and agrees that this Affidavit shall be incorporated into any contract(s) subject to the provisions of O.C.G.A. § 13-10- 91 for the project listed below to which Contractor is a party after the date hereof without further action or consent by Contractor;
and
g) Contractor acknowledges its responsibility to submit copies of any affidavits, drivers' licenses, and identification cards required pursuant to O.C.G.A. § 13-10-91 to the public employer within five business days of receipt.
Federal Work Authorization User Identification Number Date of Authorization
Name of Contractor Name of Project
Georgia State Financing and Investment Commission Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on , 20 in (city), (state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE DAY OF , 20 ,
NOTARY PUBLIC
My Commission Expires:
Exhibit C
DISCLOSURE STATEMENT
All proposers should be aware that the project you are submitting a proposal on is a public project, and the Owner (GSFIC) is a public agency. Pursuant to the laws, rules and Executive Orders of the State of Georgia, GSFIC shall make every effort to avoid even the appearance of a conflict of interest or any impropriety in both the selection process for this project and the negotiation and performance of any resulting contract. As part of any submittal you intend to make for this project, you must include this Disclosure Statement with your submittal that answers or addresses the following specific statements:
1. Describe any business transactions occurring within the prior two years between your firm and GSFIC, the Using Agency, or the ultimate end-user of the proposed project.
2. Describe any gift, hospitality, or benefit of any sort that your firm has provided to GSFIC, the Using Agency, or the end-user of the proposed project within the prior one-year period.
3. A conflict of interest or potential conflict of interest is defined as any action, decision, or recommendation by a person acting in a capacity as a public official, the effect of which is or could be to the private monetary or financial benefit or detriment of the person, the person’s relative, or any business with which the person or a relative of the person is associated. The potential conflict of interest is viewed from the perspective of a reasonable person who has knowledge of the relevant facts. Based upon this definition, describe any conflict of interest or potential conflict of interest that your firm has with GSFIC, the Using Agency, or the end-user of this project.
This Disclosure Statement should be dated and signed by an authorized signatory for the Proposer and submitted with the Proposer’s Submittal as a deliverable.
Name of Firm
Authorized Signature Date
Exhibit D
COMMISSING ITEM CHECKLIST
(See the Commissioning Item Checklist beginning on the next page)
1 11/28/16
GSFIC
BUILDING COMMISSIONING CHECK LIST
PROJECT NUMBER: TCSG-404; 2023-227
PROJECT NAME: OFTC Stewart Building Renovation
LOCATION: Dublin, Georgia 31021
PREPARED BY: Wayne Wellington, CROFT & Associates
INSTRUCTIONS: Design Professional is to fill out the commissioning checklist prior to advertisement for the Commissioning Agent’s selection.
• Design Professional should check only those Required Items that are in the project scope
• The Project Team should determine which Optional Items to select for commissioning based on specific project needs; Design Professional is to lead this coordination effort
Table 5.1 – Mechanical Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Thermometers and gauges
2. Vibration isolation
3. Steam condensate system
4. Hot water heating systems
5. Computer room HVAC systems
6. Chemical water treatment systems
7. Chillers
8. Cooling towers
9. Condenser water system
10. Air terminal units
11. Humidifiers and controls
12. Duct silencers (physical observation of unit)
13. Dampers
14. Variable frequency drives and motors
15. Air distribution systems
16. Exhaust air systems and building pressurization controls
17. Test and Balance verification
18. Refrigeration equipment and controls
19. Chilled water system
20. Variable Refrigerant Flow system Notes:
2 11/28/16
Table 5.2 – HVAC Controls Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Component FPT and calibration
2. Control air supply
3. Air terminal units (non-lab)
Sequence controls to include:
4. Air handling units
5. Fans (e.g. exhaust air fans)
6. Differential bypass valve
7. Air terminal units
8. Heat exchanger
9. Variable speed pumps
10. Heaters (e.g. cabinet unit heaters)
11. Condenser water system
12. Humidifiers
13. Water heaters
14. Heating coils / radiant panels
15. Labs with VAV fume hoods
16. Steam generator
17. Building pressurization
18. Air conditions systems (e.g. VRF, WSHP)
19. Graphic display
20. Trend logs
21. Status review screens, checks and alarming
22. Network communication
OPTIONAL ITEMS
No. Main Items Included in Scope Check if in project scope
Check if scope to be commissioned Sequence controls to include:
1. Smoke controls
2. Energy Analysis 3.
4.
5.
3 11/28/16
Table 5.3 – Plumbing Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Domestic hot water systems
2. Tempered water systems
3. Fuel oil / gas systems project scope
Check if scope to be commissioned
1. Vibration isolation
2. High purity water system
3. De-ionized water system
4. Thermometers and gauges
5. Water filtration (general use)
6. Fuel oil / gas systems
7. Potable water and booster pump systems
8. Sump pumps and electors
9. Compressed air systems (non-lab use) 10.
11.
12.
4 11/28/16
Table 5.4 – Electrical Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Lighting controls (scheduled activators and occupancy sensors, etc.)
2. Daylight dimming controls
No. Main Items Included in Scope Check if in project scope Check if scope to be commissioned
1. Service switchgear
2. Emergency power system
3. Generators / auto transfer switches
4. Lighting - exterior
5. Switchboards
6. Distribution panel boards
7. Motor control centers
8. Transient voltage surge suppressors
9. Variable frequency and speed drives
10. Grounding and ground fault systems
11. Over-current protective devices
12. Thermo graphic survey
13. White noise system
14. Paging system and security
15. Fire alarm and smoke detectors
16. Standby and emergency power systems
17. Emergency lighting
18. Security systems
19. Transformers
20. Power monitoring and metering 21.
22.
23.
5 11/28/16
Table 5.5 – Laboratory Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Fume hoods
2. Lab waste neutralization
3. Special gas manifolds
4. Vacuum air system
5. Compressed air system (lab use)
6. Electronic calendaring or directory project scope
Check if scope to be commissioned
1. Emergency shower / eyewash
2. Biosafety pressure controls 3.
4.
5.
Table 5.6 – Renewable Energy Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Heat recovery systems
2. Controls and thermostats
3. Photovoltaic cell panels (solar power systems)
4. Solar hot water systems
5. Geothermal systems
6 11/28/16
Table 5.7 – Building Envelope
OPTIONAL ITEMS
No. Main Items Included in Scope Check if in project scope
Check if scope to be commissioned
1.
Roofing system – water-proofing, insulation, roof membrane, rain and ice shield, pitch, coping, flashing, curbs for mechanical equipment, downspouts, drains, scuppers
2.
Exterior skin – curtain wall, storefront, masonry, brick / stone veneers, precast panels, metal panels, stucco / EIFS, siding
3. Walls – vapor barriers, insulation, mortar nets, weeps, joints, sealants, masonry ties
4. Slab on grade – vapor barriers, water-proofing, drainage, foundation drains
5. Doors and windows –…