This document is a Building Commissioning Checklist for the OFTC Stewart Building Renovation project, a state contract opportunity located in Dublin, Georgia. The checklist identifies required and optional mechanical, HVAC controls, plumbing, electrical, laboratory, renewable energy, and building envelope systems to be commissioned as part of the project scope. The required items include components such as thermometers, vibration isolation, hot water heating, chillers, air terminal units, lighting controls, and fume hoods. The optional items provide additional systems that may be selected for commissioning based on project needs, including emergency power, exterior lighting, security systems, and building envelope testing. No information is provided on response dates, due dates, site visits, bidder's meetings, award dates, or contract term.
The document does not contain details on pricing, set asides, incumbents, funding requirements, or other commercial terms. It is focused solely on outlining the commissioning requirements and systems that may be included in the project scope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TCSG_404_Cx ONE STEP RFQ.pdf | ||
| Highest Ranked Firm TCSG_404_CX.pdf | ||
| Selected Firm TCSG_404_CxA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 11/28/16
GSFIC
BUILDING COMMISSIONING CHECK LIST
PROJECT NUMBER: TCSG-404; 2023-227
PROJECT NAME: OFTC Stewart Building Renovation
LOCATION: Dublin, Georgia 31021
PREPARED BY: Wayne Wellington, CROFT & Associates
INSTRUCTIONS: Design Professional is to fill out the commissioning checklist prior to advertisement for the Commissioning Agent’s selection.
• Design Professional should check only those Required Items that are in the project scope
• The Project Team should determine which Optional Items to select for commissioning based on specific project needs; Design Professional is to lead this coordination effort
Table 5.1 – Mechanical Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Thermometers and gauges
2. Vibration isolation
3. Steam condensate system
4. Hot water heating systems
5. Computer room HVAC systems
6. Chemical water treatment systems
7. Chillers
8. Cooling towers
9. Condenser water system
10. Air terminal units
11. Humidifiers and controls
12. Duct silencers (physical observation of unit)
13. Dampers
14. Variable frequency drives and motors
15. Air distribution systems
16. Exhaust air systems and building pressurization controls
17. Test and Balance verification
18. Refrigeration equipment and controls
19. Chilled water system
20. Variable Refrigerant Flow system Notes:
2 11/28/16
Table 5.2 – HVAC Controls Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Component FPT and calibration
2. Control air supply
3. Air terminal units (non-lab)
Sequence controls to include:
4. Air handling units
5. Fans (e.g. exhaust air fans)
6. Differential bypass valve
7. Air terminal units
8. Heat exchanger
9. Variable speed pumps
10. Heaters (e.g. cabinet unit heaters)
11. Condenser water system
12. Humidifiers
13. Water heaters
14. Heating coils / radiant panels
15. Labs with VAV fume hoods
16. Steam generator
17. Building pressurization
18. Air conditions systems (e.g. VRF, WSHP)
19. Graphic display
20. Trend logs
21. Status review screens, checks and alarming
22. Network communication
OPTIONAL ITEMS
No. Main Items Included in Scope Check if in project scope
Check if scope to be commissioned Sequence controls to include:
1. Smoke controls
2. Energy Analysis 3.
4.
5.
3 11/28/16
Table 5.3 – Plumbing Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Domestic hot water systems
2. Tempered water systems
3. Fuel oil / gas systems project scope
Check if scope to be commissioned
1. Vibration isolation
2. High purity water system
3. De-ionized water system
4. Thermometers and gauges
5. Water filtration (general use)
6. Fuel oil / gas systems
7. Potable water and booster pump systems
8. Sump pumps and electors
9. Compressed air systems (non-lab use) 10.
11.
12.
4 11/28/16
Table 5.4 – Electrical Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Lighting controls (scheduled activators and occupancy sensors, etc.)
2. Daylight dimming controls
No. Main Items Included in Scope Check if in project scope Check if scope to be commissioned
1. Service switchgear
2. Emergency power system
3. Generators / auto transfer switches
4. Lighting - exterior
5. Switchboards
6. Distribution panel boards
7. Motor control centers
8. Transient voltage surge suppressors
9. Variable frequency and speed drives
10. Grounding and ground fault systems
11. Over-current protective devices
12. Thermo graphic survey
13. White noise system
14. Paging system and security
15. Fire alarm and smoke detectors
16. Standby and emergency power systems
17. Emergency lighting
18. Security systems
19. Transformers
20. Power monitoring and metering 21.
22.
23.
5 11/28/16
Table 5.5 – Laboratory Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Fume hoods
2. Lab waste neutralization
3. Special gas manifolds
4. Vacuum air system
5. Compressed air system (lab use)
6. Electronic calendaring or directory project scope
Check if scope to be commissioned
1. Emergency shower / eyewash
2. Biosafety pressure controls 3.
4.
5.
Table 5.6 – Renewable Energy Systems
REQUIRED ITEMS
No. Main Items Included in Scope Check if in project scope
1. Heat recovery systems
2. Controls and thermostats
3. Photovoltaic cell panels (solar power systems)
4. Solar hot water systems
5. Geothermal systems
6 11/28/16
Table 5.7 – Building Envelope
OPTIONAL ITEMS
No. Main Items Included in Scope Check if in project scope
Check if scope to be commissioned
1.
Roofing system – water-proofing, insulation, roof membrane, rain and ice shield, pitch, coping, flashing, curbs for mechanical equipment, downspouts, drains, scuppers
2.
Exterior skin – curtain wall, storefront, masonry, brick / stone veneers, precast panels, metal panels, stucco / EIFS, siding
3. Walls – vapor barriers, insulation, mortar nets, weeps, joints, sealants, masonry ties
4. Slab on grade – vapor barriers, water-proofing, drainage, foundation drains
5. Doors and windows – sealants, mechanical operation, sills, flashing, end dams, hardware
6. Water tests, mockups, wind loads, thermal infiltration Indicate if testing is to be
Performed by CxA, or Observed by CxA?
7. Special design features – dome, cornice, canopy, skylight, etc.
8. Envelope thermographic test
9. Pre-engineered Metal Building (PEMB) 10.
11.
7 11/28/16
Table 5.8 – Retro-Commissioning
OPTIONAL ITEMS
No. Main Items Included in Scope Check if in project scope
Check if scope to be commissioned
1. Compressed air system
2. Steam condensate system
3. Hot water heating system
4. Computer room HVAC system
5. Chemical water treatment system
6. Chillers
7. Cooling towers
8. Air terminal units
9. Humidifiers and controls
10. Dampers
11. Variable frequency drives and motors
12. Air handling units & distribution systems
13. Exhaust air systems and building pressurization controls
14. Building automation systems, including controlled devices, sensors, control loops, and logic
15. Lighting controls (scheduled activators and occupancy sensors)
16. HVAC DX systems
17. Domestic hot water systems
18. Natural gas / fuel systems
19. Other HVAC systems
20. Standby and emergency power system
21. Generators / auto transfer switches 22.
| Table 5.1 – Mechanical Systems |
| REQUIRED ITEMS |
| Table 5.2 – HVAC Controls Systems |
| REQUIRED ITEMS |
| Table 5.3 – Plumbing Systems |
| REQUIRED ITEMS |
| REQUIRED ITEMS |
| Table 5.5 – Laboratory Systems |
| REQUIRED ITEMS |
| OPTIONAL ITEMS |
| Table 5.6 – Renewable Energy Systems |
| REQUIRED ITEMS |
| Table 5.7 – Building Envelope |
| OPTIONAL ITEMS |
| Table 5.8 – Retro-Commissioning |
File details come from the government source that posted it. Updated .