These are contract drawings prepared by HDR Engineering, Inc. for Greenville County, South Carolina's Twin Chimneys Landfill earthwork project at Unit 4 Cell 5. The drawings establish the civil design and construction baseline for excavation of approximately 185,000 cubic yards of cut material with 7,500 cubic yards of fill placement across an 8.6-acre cell area. The project scope includes site clearing and grubbing of 1.3 acres of tree saplings, excavation of three material types (miscellaneous soil, clay, and rock), stockpiling of excavated materials in designated on-site locations, construction of a perimeter berm and access roads with geotextile and compacted stone, installation of erosion control matting, stormwater channel modifications, and decommissioning of Temporary Sediment Basin A through removal and grouting of the existing barrel. The drawings specify construction baseline grades, slope ratios of 3:1 for excavation faces, stormwater management details including drop inlets and drainage pipes, and a pre-construction survey requirement followed by an as-built survey to establish final earthwork quantities. Access to the site is via existing Augusta Road (Highway 25) with coordinated traffic management required on Bridge Road during county landfill operating hours, and contractor responsibility for protection of all existing wells, structures, utilities, and monitoring/observation wells shown on the overall site plan.
The contract documents indicate a firm fixed-price award structure with unit pricing for excavation and material placement items and lump sum pricing for mobilization, demobilization, quality control testing, surveying, clearing and grubbing, erosion and sediment control, and temporary basin removal. The project schedule requires substantial completion within 150 calendar days from Notice to Proceed (anticipated May 1, 2026) with final completion within 180 calendar days, subject to liquidated damages of $1,000 per day for failure to achieve substantial completion and $500 per day for final completion delays. Contractor qualifications require completion of at least two similar projects within the past five years and comprehensive insurance coverage including $1,000,000 general liability per occurrence, $1,000,000 automobile liability, workers' compensation, $1,000,000 umbrella/excess liability, and $1,000,000 professional errors and omissions coverage. A bid bond equal to 5 percent of the bid price is required at proposal submission, with performance and payment bonds equal to the total bid price due within 15 working days of award. Proposal questions must be submitted by April 1, 2026 at 12:00 p.m., with proposals due April 10, 2026 at 3:00 p.m., and evaluation based on seven equally weighted criteria: responsiveness, experience and past performance, proposed schedule, methodology and project understanding, references, cost, and equipment list.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Twin Chimneys Landfill
Cell 5 Earthwork Civil
Project No.
11075 Augusta Road
C o n t r a c t D r a w i n g s F o r
10174879
March 2026
I N D E X O F D R A W I N G S
GENERAL
14G-00 COVER SHEET
14G-01 OVERALL SITE PLAN
CIVIL
14C-01 EXISTING CONDITIONS
14C-02 UNIT 4 CELL 5 EXCAVATION PLAN
14C-03 UNIT 4 CELL 5 STOCKPILE
14C-04 STORMWATER DETAILS
14C-05 UNIT 7 STOCKPILE
Re-Issued for Proposals
MSW Unit 4
Greenville County, South Carolina
HDR Engineering, Inc.
of the Carolinas 440 S. Church St., Suite 1200 Charlotte, NC 28202-2075 704.338.6700
03/23/26
BU
IL
DI
NG
BU
IL
DI
NG
SC
AL
E
SC
AL
E
SC
AL
E
C O N C R E T E
P A D
C O N C R E T E
P A D
B U I L D I N G
T A N K
T A N K
B U I L D I N G
C O N C R E T E
P A D
B U I L D I N G
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
DE
NS
E
BR
US
H
D E N S E
B R U S H
D E N S E
B R U S H
D E N S E
B R U S H
C O N C R E T E
P A D
B R U S H
B R U S H
B R U S H
B R U S H
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
C L
D I T C H
C/ L
DI
TC
H
C/ L
DI
TC
H
C/ L
DI
TC
H
C/ L
DI
TC
H
C/ L
DI
TC
H
C/L
DITC
H
C/L
DI
TCH
DITCH
C/L DI
TCH
DITCH
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DIT
CH
DITCH
DIT
CH
C/L DITCH
C/L DI
TCH
C/L D
ITCH
C/L DI
TCH
C/L DI
TCH
DITCH
D I T C H
C/ L
DI
TC
H
C/ L
DI
TC
H
C/ L
DI
TC
H
C/ L
DI
TC
H
C E L L
P H O N E
T O W E R
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DITCH
DITCH
DITCH
DITCH
DIT
CH
DITC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DI
TC
H
DIT
CH
DITC
H
D E N S E
B R U S H
D E N S E
B R U S H
DITC
H
B U I L D I N G
B U I L D I N G
B U I L D I N G
B U I L D I N G
B U I L D I N G
B U I L D I N G B U I L D I N G
B U I L D I N G
B U R N
S T A T I O N
B U R N
S T A T I O N
P O N D
P O N D
C/ L
DI
TC
H
C/ L
DI
TC
H
C/ L
DI
TC
H
C/ L
DI
TC
H
R I P
R A P
B R U S H
B R U S H
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
R I P
R A P
B R U S H
B R U S H
B R U S H
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
L I M I T S
O F
S U R V E Y
760 770
0 790
760 77
780 790
0 770
770780
790 790
760 76
780 790 800 810
810820830
700710
72073
0 76
0 75
0 770 780
760750 740730 720710
760 750 740 730
760 750
740 730
730740750760
730740
860 87 0 88
0 89
730740750760
770780790
740 740 740 730
770780
0 82
750 740
0 78
740 745 75
740 73 5 73
0 72 5 72
0 71
660 660
5 76
715 720 725
735 730
725 720
800 805
5 79
0 77
C&D A
CCES
S
ROAD
AC
CE
SS
R
OA
D
VA
UL
T
G W -3
G W -3
G W -3
G W -3 1G W -3
G W -2
G W -1
C S -1
C S -2
VA
UL
T
UGE
UGE
EB
UGE
UGEUGE
UGE
MB
OHW
O
HW
O
HW
LEACHATE
VAULT #1
LP
LP
LP
LP
LP
LP
36"RCP
INV:725.45
"x
"C
M P
INV:728.84
INV:730.90INV:733.21
INV:734.45
GR
GR
x 724.39 TP x 724.90 TP x 7
.0 8 T
P x 7
.4 9 T
P
TP 724.29 x
TP 722.02 x
TP 719.23 x
TP 717.04 x
EB
OUTPARCEL
OUTPARCEL
OUTPARCEL
790790790
780780
710 720 730 740 750
780790
750 740 730
MM-1
MM-2
MM-3
MM-4
MM-5 MM-6
MM-7
MM-28MM-29
MM-30
MM-31
MM-32
MM-33
MW-24
M W
-1
M W
-1 8 M
W -1
OW-104
OW-105
MW-1
MW-2
MW-3
OW-102
OW-110
OW-109 MW-52
MW-6
MW-7
MW-51
MW-41
MW-12
MW-8
MW-50
MW-11
MW-10
MW-9
OW-101
MW-20
PZ-13s PZ-13d
PZ-44
PZ-7s
PZ-50
PZ-2d PZ-2s
PZ-4a
PZ-76
PZ-53
PZ-54
PZ-56
PZ-5da PZ-5d
PZ-77
PZ-14
PZ-43
PZ-19
PZ-52sPZ-52d
PZ-7s
PZ-4
PZ-39s PZ-39d
PZ-26d PZ-26s
PZ-23d PZ-23s
PZ-75
PZ-51
PZ-10ra
PZ-41
PZ-57s
PZ-57d
PZ-78
PZ-73
PZ-30
PZ-25 PZ-25d
PZ-20
PZ-64
PZ-29
PZ-79
PZ-55
PZ-67
PZ-66s PZ-66d
PZ-12
PZ-74
PZ-65
PZ-9s
PZ-35d
PZ-35
PZ-62s PZ-62d
PZ-28
PZ-40
PZ-48
OW-105-R1
MW-10R
MW-21
MW-23
MW-22
MW-42
MW-43
MW-44
MW-49
MW-25
SEDIMENT
BASIN B
SEDIMENT
BASIN C
E-WASTE
METALS
PAD
YARD
WASTE
PAD
SEDIMENT
BASIN A
ROCK
STOCKPILE
COMPOST AREA
EXISTING
SOIL STOCKPILE
UNIT 1 MSW
CELL 1
CELL 2
FUTURE
UNIT 7
FUTURE
UNIT 5
CELL 3
CELL 4 CELL 5
ACTIVE
UNIT 4 MSW
EXISTING
CLAY
STOCKPILE
UNIT 2
C&D
A
B
C
2 3 4 5 6 7 8
D
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
UNIT 4 CELL 5 EARTHWORK
Greenville County South Carolina10404585
P. WESTMORELAND, P.E.
0 03/2026 RE-ISSUED FOR PROPOSALS
HDR Engineering Inc.
440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas
PROJECT ENGINEER
DRAWN BY
OVERALL SITE PLAN
14G-01.dwg
1" = 300' 14G-01
GENERAL NOTES:
1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,FREELAND
& ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND DRONE
SURVEY IN UNIT 4 AREA BY RP &ASSOCIATES DATED JULY 09, 2025.
2. CONTRACTOR'S PRIMARY ACCESS TO THE SITE SHALL BE VIA THE
EXISTING AUGUSTA ROAD (HIGHWAY 25) CONSTRUCTION ENTRANCE
THAT LEADS DIRECTLY INTO UNIT 4. MAINTAIN BOTH IN GOOD
CONDITION AT ALL TIMES AND IMPROVE AS NECESSARY TO
COMPLETE THE WORK.
3. ACCESS TO THE BRIDGE ROAD IS RESTRICTED DUE TO LANDFILL
OPERATIONS. COORDINATE WITH OWNER A SCHEDULE FOR
TRAVERSING THE BRIDGE. SUPPLY FLAGGERS DURING LANDFILL
OPERATING HOURS TO COORDINATE CONTRACTORS TRAFFIC AND
LANDFILL TRAFFIC ON BRIDGE ROAD. GARBAGE TRUCKS AND OTHER
COUNTY VEHICLES SHALL ALWAYS HAVE PRIORITY.
4. CONTRACTOR RESPONSIBLE FOR SECURITY OF ALL TOOLS,
MATERIALS AND EQUIPMENT LEFT ON SITE. CONTRACTOR TO
SECURE ACCESS POINTS TO THE WORK SITE AS NECESSARY.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING WELLS,
STRUCTURES AND UTILITIES. ANY WELLS, STRUCTURES OR UTILITIES
THAT ARE DAMAGED SHALL BE REPLACED OR REPAIRED (AS
DIRECTED BY OWNER).
6. EROSION AND STORMWATER CONTROL MEASURES ARE INSTALLED
AND OPERATIONAL FOR THE DESIGNATED WORK AREAS.
CONTRACTOR TO MAINTAIN AND PROTECT THE STRUCTURES FROM
DAMAGE.
7. SITE BENCHMARK CONTROL IS LOCATED NEAR THE CELLULAR
TOWER.
8. CONTRACTOR TO MAINTAIN THE ACCESS ROAD TO UNIT 7 AND THE
EXISTING EROSION AND SEDIMENT CONTROL MEASURES ALONG THE
ACCESS ROAD. SEE SHEET 14C-05 FOR THE STOCKPILE IN UNIT 7.
REFER TO THE PROPOSAL FORM.
CONSTRUCTION AREA
BORINGS (SB & B)
METHANE MONITORING (MM)
PIEZOMETER (PZ)
MONITORING AND OBSERVATION
WELL (MW,OW)
PROPOSED EXISTING ABANDONED
MW-P
MM-P
PL
LEGEND
EXISTING 2021 & 2023 MAJOR CONTOURS
EXISTING 2021 & 2023 MINOR CONTOURS
WETLANDS
UNIT AND CELL BASELINES
PROPERTY LINE
EXISTING TREELINE
PZ-# PZ-#
B-#B-#
MM-#
MW-A
SEDIMENT BASIN #T2SEDIMENT
BASIN #T5
SEDIMENT
BASIN #T3
SEDIMENT BASIN #9
WETLANDS
SEDIMENT BASIN #10
DI #9
LEACHATE
TANKS
SCALE
HOUSE
ADMINISTRATION
BUILDING
EDUCATION
BUILDING
CELLULAR
TOWER
SEDIMENT
TRAP A
SEDIMENT
BASIN #T4
EXISTING CONSTRUCTION ENTRANCE
AUGUSTA RD - HWY 25
AUGUSTA RD
BRIDGE ROAD
SEDIMENT BASIN #11
100 YEAR FLOODPLAIN
LEACHATE
EVAPORATOR
CONCRETE
MONUMENT
N 987685.471 E 1604817.497
EL. 809.25
STOCKPILE ACCESS ROAD
TEMPORARY
SEDIMENT BASIN A
SEDIMENT TRAP
DENSE BRUSH
DENSE BRUSH
DENSE BRUSH
DENSE BRUSH
DE
NS
E
BR
US
H
DENSE BRUSH
DIRT DRIVE DIRT DRIVE
DIRT DRIVE
DIRT DRIVE
DIRT DRIVE
DIRT DRIVE
DI
RT
D
RI
VE
BRUSH
BRUSH
BRUSH
BRUSH
DIRT DRIVE DIRT DRIVE
D I R T
D R I V E
DIRT DRIVE
DIRT DRIVE
D I R T
D R I V E
DI
RT
D
RI
VE
DI
RT
D
RI
VE
DI
RT
D
RI
VE
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
C/L DITCH
C/L DITCH
C/L DITCH
C/L DITCH
DENSE TREES
DENSE TREES
DENSE TREES
DENSE TREES
C/L DITCH
C/L DITCH
C/L DITCH
C/L DITCH
BRUSH
BRUSH
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
BRUSH
BRUSH
BRUSH
770760
73074
750750
DENSE BRUSH
DENSE BRUSH
DENSE BRUSH
DENSE BRUSH
DE
NS
E
BR
US
H
DENSE BRUSH
DIRT DRIVE DIRT DRIVE
DIRT DRIVE
DIRT DRIVE
DIRT DRIVE
DIRT DRIVE
DI
RT
D
RI
VE
BRUSH
BRUSH
BRUSH
BRUSH
DIRT DRIVE DIRT DRIVE
D I R T
D R I V E
DIRT DRIVE
DIRT DRIVE
D I R T
D R I V E
DI
RT
D
RI
VE
DI
RT
D
RI
VE
DI
RT
D
RI
VE
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
C/L DITCH
C/L DITCH
C/L DITCH
C/L DITCH
DENSE TREES
DENSE TREES
DENSE TREES
DENSE TREES
C/L DITCH
C/L DITCH
C/L DITCH
C/L DITCH
BRUSH
BRUSH
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
BRUSH
BRUSH
BRUSH
770760
73074
750750
690685
ACTIVE
UNIT 4 MSW
0785 77
5750755
745745
78078078
78578
720 72
730730730
735740
720725
725730740
CELL 1
17.0 ACRES
10.3 ACRES
8.5 ACRES
CELL 2
8.6 ACRES
CELL 3
CELL 4
PROPOSED CELL 5
EARTHWORK
8.6 ACRES
MW-24
OW-103
MW-18
MW-20
PZ-4a
PZ-76
PZ-6d PZ-53
PZ-54
PZ-56
PZ-6s
PZ-77
PZ-78
MW-21
MW-25
A
B
C
2 3 4 5 6 7 8
D
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
UNIT 4 CELL 5 EARTHWORK
Greenville County South Carolina10404585
P. WESTMORELAND, P.E.
0 03/2026 RE-ISSUED FOR PROPOSALS
HDR Engineering Inc.
440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas
PROJECT ENGINEER
DRAWN BY
EXISTING CONDITIONS
14C-01.dwg
1" = 200' 14C-01
GENERAL NOTES:
1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,FREELAND
& ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND DRONE
SURVEY IN UNIT 4 AREA BY RP & ASSOCIATES DATED JULY 09, 2025.
2. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE
WORK, IN THE FOLLOWING DESIGNATED AREAS.
· CLAY: EXISTING CLAY STOCKPILE NORTH OF CELL 4.
· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.
· MISCELLANEOUS SOILS: UNIT 7 SEE 14C-05.
BORINGS (SB & B)
PIEZOMETER (PZ)
MONITORING AND OBSERVATION
WELL (MW,OW)
PROPOSED EXISTING ABANDONED
MW-P
LEGEND
EXISTING 2021 & 2023 MAJOR CONTOURS
EXISTING 2021 & 2023 MINOR CONTOURS
WETLANDS
UNIT AND CELL BASELINES
EXISTING TREELINE
MW-A
B-# B-#
PZ-#PZ-#
EXISTING STOCKPILE
TEMPORARY
SEDIMENT BASIN A
EXISTING CLAY
STOCKPILE
PROPOSED MSW PERMIT BOUNDARY
CURRENT MSW PERMIT BOUNDARY
SEDIMENT
BASIN #T4
DI #9
WETLANDS
STOCKPILE HAUL ROAD
EXISTING DROP INLET
AND PIPE (TYP. OF 6)
LIMITS OF SURVEY
LIMITS OF SURVEY
LIMITS OF SURVEY
DI
RT
D
RI
VE
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
RIP RAP
71071
73073
730730
4.0%
70070
PZ-77
MW-24
PZ-6d
PZ-6s
PZ-56
PZ-54
A
B
C
2 3 4 5 6 7 8
D
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
UNIT 4 CELL 5 EARTHWORK
Greenville County South Carolina10404585
P. WESTMORELAND, P.E.
0 03/2026 RE-ISSUED FOR PROPOSALS
HDR Engineering Inc.
440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas
PROJECT ENGINEER
DRAWN BY
UNIT 4 CELL 5
EXCAVATION PLAN
14C-02.dwg
1" = 60' 14C-02
GENERAL NOTES:
1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS:
● WITHIN THE LIMITS OF UNIT 1, 2, AND 4: RP & ASSOCIATES DATED JULY 09, 2025.
● OUTSIDE THE LIMITS OF UNIT 1, 2, AND 4: FREELAND & ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021.
2. THE DEBRIS (ROCK, VEGETATION, TREES) WITHIN THE WORK AREA SHALL BE STOCKPILED WITHIN THE UNIT 4 AREA AND
OUTSIDE OF THE EXCAVATION AREA.
3. CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION SURVEY (ELECTRONIC AND SIGNED AND SEALED BY A LAND SURVEYOR) OF THE WORK AREAS (AFTER THE DEBRIS IS STOCKPILED). THIS SURVEY SHALL ESTABLISH THE BASELINE
FOR FOR EARTHWORK QUANTITIES.
4. FOLLOWING COMPLETION OF THE WORK, CONTRACTOR SHALL PROVIDE AN AS BUILT SURVEY (ELECTRONIC AND SIGNED AND SEALED BY A LAND SURVEYOR) TO SERVE AS THE BASIS FOR FINAL PAYMENT OF EARTHWORK QUANTITIES.
STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE WORK, IN THE DESIGNATED AREAS.
· CLAY: EXISTING CLAY STOCKPILE NORTH OF CELL 4.
· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.
· MISCELLANEOUS SOILS: UNIT 7 SEE 14C-05.
BORINGS (SB & B)
PIEZOMETER (PZ)
MONITORING AND OBSERVATION
WELL (MW,OW)
PROPOSED EXISTING ABANDONED
MW-P
PL
LEGEND
EXISTING 2021 & 2025 MAJOR CONTOURS
EXISTING 2021 & 2025 MINOR CONTOURS
WETLANDS
UNIT AND CELL BASELINES
PROPERTY LINE
EXISTING TREELINE
EXCAVATION / GRADING AREA
GENERAL CONSTRUCTION SEQUENCE:
1. ESTABLISH LIMITS OF CONSTRUCTION.
2. REMOVE AND STOCKPILE TREE DEBRIS IN THE WORK AREA. ROCK PILES WITHIN THE WORK AREA SHALL BE HAULED
TO THE STOCKPILE NEAR THE CELL TOWER. ROCKS WITHIN THE WORK AREA MAY NEED TO BE REDUCED TO A
MANAGEABLE SIZE TO LOAD AND HAUL.
3. PERFORM INITIAL SURVEY OF THE CELL 5 AREA AND THE AREA IN UNIT 7 OF THE PROPOSED GRADES.
4. REDIRECT STORMWATER FROM SEDIMENT BASIN A.
5. BEGIN EXCAVATION OF CELL 5. STOCKPILE EXCAVATED MATERIALS IN THE DESIGNATED STOCKPILES. USE EXCAVATED
MATERIAL FOR STRUCTURAL FILL.
6. REMOVE THE RISER/BARREL/SKIMMER IN THE TEMPORARY SEDIMENT BASIN A AND GROUT THE BARREL
7. UPON COMPLETION OF CELL 5 EXCAVATION, PERFORM ASBUILT SURVEY OF CELL 5 AND THE AREA IN UNIT 7 OF
EXCAVATED SOIL FROM CELL 5.
OVERALL PROJECT SCOPE:
THE COUNTY IS CURRENTLY GRADING THE AREA SOUTH OF CELL 5. THIS PROJECT IS TO EXCAVATE THE CELL 5 AREA TO THE GRADES SHOWN IN THESE DRAWINGS. THE TEMPORARY SEDIMENT BASIN A COLLECTS STORMWATER FROM CELLS 2, 3, AND 4 AS WELL AS FLOW FROM THE AREA WEST OF CELL 5. CONTRACTOR TO MAKE PROVISIONS TO REDIRECT FLOW OUT OF THE WORK
AREA. IT IS ANTICIPATED THERE WILL BE 3 TYPES OF MATERIAL EXCAVATED.
MW-A
B-# B-#
PZ-#PZ-#ACTIVE CELL 3
8.5 ACRES
ACTIVE CELL 4
10.3 ACRES
STORMWATER
CHANNEL (TYP)
PROPOSED
CONSTRUCTION
BASELINE FOR LINER
PROJECT 8.6 ACRES
14C-04
A14C-04
B
C -0
C
C-
PROPOSED CELL 5
EARTHWORK
8.6 ACRES
ACTIVE CELL 2
8.6 ACRES
ROCK:
1. ROCK IS ANTICIPATED WITHIN THE UNIT 4 CELL 5 EXCAVATION. THE CONTRACTOR IS ALLOWED TO BLAST THE ROCK
FOR REMOVAL. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL PERSONNEL AND EQUIPMENT FROM DAMAGE RESULTING FROM BLASTING. CONTRACTOR TO BACKFILL WITH SOIL FROM THE SURROUNDING EXCAVATION. THE
BACKFILL SHALL BE COMPACTED AS STRUCTURAL FILL.
2. WHERE BLASTING IS PERFORMED, BLASTING SHALL BE DESIGNED TO FRACTURE ROCK TO ELEVATION AT LEAST 5
FEET BELOW DESIGN GRADES.
3. ENGINEER OR CQA SHALL BE ON SITE TO VERIFY & CONFIRM AREA AND DEPTH PRIOR TO BLASTING.
4. ROCK LARGER THAN 3 CY, SHALL BE REDUCED TO LESS THAN 3 CY BEFORE STOCKPILING. ROCK SMALLER THAN 3CY
SHALL BE STOCKPILED IN THE DESIGNATED LOCATIONS.
5. NOTIFY THE ENGINEER IMMEDIATELY AND STOP WORK IN THE VICINITY, IF THE CONTRACTOR ENCOUNTERS A SPRING
OR OTHER NON PERCH SOURCE OF WATER.
6. CONTROL STORMWATER RUNOFF AT ALL TIMES DURING THE WORK. PREVENT STORMWATER FROM RUNNING OFF THE
WORK AND INTO AREAS THAT DON'T DIRECTLY LEAD TO SEDIMENT BASINS. CONTRACTOR SHALL TAKE IMMEDIATE
ACTION TO PREVENT STORMWATER FROM ENTERING CELLS 1, 2 AND 3.
7. ROCK ENCOUNTERED ON THE 3:1 SLOPE FACE SHALL NOT BE COVERED WITH SOILS NOR SEEDED. ALL OTHER EXCAVATION, FILL AND STOCKPILE AREAS ARE REQUIRED TO BE SEEDED PRIOR TO COMPLETION OF THE WORK.
8. ANY BOULDERS ENCOUNTERED DURING THE WORK SHALL BE REMOVED AND PLACED IN THE STOCKPILE NEAR THE
CELL TOWER.
TEMPORARY
SEDIMENT BASIN A
14C-04
TEMPORARY
SB A BARREL
THIS 1.3 ACRE AREA HAS TREE SAPLINGS
LESS THAN 6" DIAMETER. CONTRACTOR
TO CLEAR/GRUB THE SAPLINGS AND
STOCKPILE AS SHOWN ON 14C-03.
PERIMETER BERM 1
14C-04
SEE NOTE 2 FOR THIS
AREA
CLEAR/GRUB
SAPLINGS AND
TREE DEBRIS
STOCKPILE
EARTHWORK QUANTITY: 185,000 CU/YDS - CUT; 7,500 CU/YDS - FILL
EXISTING DROP INLET
AND PIPE (TYP. OF 6)
MW-24
MW-18
MW-20
PZ-76
PZ-53
PZ-54
PZ-56
PZ-77
PZ-78
MW-21
MW-23
MW-22
MW-25
CELL 1
71071
73073
730730
5.0%
5.0%
2.9%
4.4%
5.0%
5.0% 4.0%
4.0%
3:1
3:1
3:1
3:1
CELL 2
CELL 3
CELL 4
CELL 5
17.0 ACRES
10.3 ACRES
8.6 ACRES
8.5 ACRES
8.6 ACRES
3:1
3:1
3:1
3:1
2.0
2.0%
2.0
2.0%
A
B
C
2 3 4 5 6 7 8
D
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
UNIT 4 CELL 5 EARTHWORK
Greenville County South Carolina10404585
P. WESTMORELAND, P.E.
0 03/2026 RE-ISSUED FOR PROPOSALS
HDR Engineering Inc.
440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas
PROJECT ENGINEER
DRAWN BY
UNIT 4 CELL 5 STOCKPILE
14C-03A.dwg
1" = 100' 14C-03
GENERAL NOTES:
1. EXISTING TOPOGRAPHY FROM DRONE SURVEY IN UNIT 1,2 & 4 AREA
BY RP & ASSOCIATES DATED JULY 09, 2025.
2. AERIAL PHOTOGRAPHY MAY 2025
3. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE
WORK, IN THE DESIGNATED AREA INDICATED ON THE PLAN.
· CLAY SOILS: EXISTING CLAY STOCKPILE NORTH OF CELL 4.
· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.
· MISCELLANEOUS SOILS: UNIT 7 SEE 14C-05.
BORINGS (SB & B)
METHANE MONITORING (MM)
PIEZOMETER (PZ)
MONITORING AND OBSERVATION
WELL (MW,OW)
PROPOSED EXISTING ABANDONED
MW-P
MM-P
PL
LEGEND
EXISTING 2021 & 2023 MAJOR CONTOURS
EXISTING 2021 & 2023 MINOR CONTOURS
WETLANDS
UNIT AND CELL BASELINES
PROPERTY LINE
EXISTING TREELINE
MW-A
MM-#
B-# B-#
PZ-#PZ-#
STOCKPILE HAUL ROAD
EXISTING CLAY STOCKPILE
EXISTING STOCKPILE
ACCESS ROAD TO UNIT 7
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00
ROUGH GRADE
(SHOWN ON 14C-02)
PERMITTED SUBGRADE
EXISTING GRADE
FUTURE CELL 5
CONSTRUCTION BASELINE
0+00 0+50 1+00
ROUGH GRADE
(SHOWN ON 14C-02)
CONSTRUCTION
BASELINE
EXISTING GRADE
- PERIMETER BERM
-0+50 0+00 0+50 1+00
CONSTRUCTION BASELINEEXISTING GRADE
PERMITTED SUBGRADE
ROUGH GRADE
(SHOWN ON 14C-02)
EXISTING CELL 4FUTURE CELL 5
CELL 4 TOP OF CLAY
SUBGRADE
C
1/8"/FT. 1/8"/FT.
22.0' 6.0' 2.0' 6.0' 30.0' 22.0' 12.0' 22.0' 12.0'
PERIMETER DITCHPERIMETER BERM
L PERIMETER ROAD EXTERIOR
CHANNEL
ACCESS
ROADLANDFILL
PROPOSED GRADING
12" CRUSHED STONE (COMPACTED)
GEOTEXTILE
EROSION CONTROL
MATTING
2.
0'
TRASH GUARD
RISER
SKIMMER
NOTES:
1. CONTRACTOR TO CAREFULLY REMOVE THE SKIMMER, RISER, AND TRASH GUARD
AND PROVIDE TO THE OWNER.
2. EXCAVATE INTO THE BERM TO THE REMOVE A PORTION OF THE BARREL AS SHOWN.
3. GROUT THE REMAINING BARREL.
4. PLACE COMPACTED FILL OVER THE EXCAVATED AREA.
36" CPP 150 - FT LONG4'
BARREL
REMOVE THIS
PORTION OF THE
BARREL
3 3
2.
0'EROSION
CONTROL MATTING
A
B
C
2 3 4 5 6 7 8
D
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
UNIT 4 CELL 5 EARTHWORK
Greenville County South Carolina10404585
P. WESTMORELAND, P.E.
0 03/2026 RE-ISSUED FOR PROPOSALS
HDR Engineering Inc.
440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas
PROJECT ENGINEER
DRAWN BY
STORMWATER DETAILS
14C-08
AS SHOWN 14C-04
PERIMETER BERM
1" = 10'
14C-02
SECTION - "A"
NTS
A 14C-02
SECTION - "B"
NTS
B 14C-02
SECTION - "C"
NTS
C 14C-02
STORMWATER CHANNEL
NTS
14C-02
TEMPORARY SEDIMENT BASIN A
NTS
14C-02
0 82
0 80
0 810
0 770
0 74
5 72
DE
NS
E
TR
EE
S
DE
NS
E
TR
EE
S
DE
NS
E
TR
EE
S
DE
NS
E
TR
EE
S
DE
NS
E
TR
EE
S
DE
NS
E
TR
EE
S
FUTURE UNIT 7
PZ-5da PZ-5d
PZ-55
PZ-67
3.0:1
3.0:1
3.0:1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
UNIT 4 CELL 5 EARTHWORK
Greenville County South Carolina10404585
P. WESTMORELAND, P.E.
0 03/2026 RE-ISSUED FOR PROPOSALS
HDR Engineering Inc.
440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas
PROJECT ENGINEER
DRAWN BY
UNIT 7 STOCKPILE
14C-05.dwg
1" = 200' 14C-05
LEGEND
PL
EXISTING MAJOR CONTOURS
EXISTING MINOR CONTOURS
WETLANDS
PROPERTY LINE
PROPOSED MAJOR CONTOURS
PROPOSED MINOR CONTOURS
2024 AERIAL LIMITS
BORINGS (SB & B)
PIEZOMETER (PZ)
MONITORING AND
OBSERVATION WELL
(MW,OW)
PROPOSED EXISTING ABANDONED
MW-P
PZ-# PZ-#
B-#B-#
MW-A
Cut/Fill Summary Name
Stockpile West Airspace
2d Area
248668.94 Sq. Ft.
Cut
77.03 Cu. Yd.
Fill
167080.43 Cu. Yd.
Net
167003.40 Cu. Yd.<Fill>
ACCESS ROAD SEE 14G-01 FOR CONTINUATION
SF
SF
SF
SF
SF
SF
SF
SF
SF
SILT FENCE
03/2026
NOTES
1. SITE TOPOGRAPHY CONSISTS OF TWO AERIAL SURVEYS. AREA INSIDE OF UNIT 7
STOCKPILE AREA PERFORMED NOV. 2024 AND AREA OUTSIDE OF UNIT 7 STOCKPILE
PERFORMED JULY 2021.
2. CONTRACTOR TO INSTALL SILT FENCE ALONG ACCESS ROAD.