TCLF_MSW_Unit_4_Cell_5_Landfill_Earthwork_Drawings.pdf

PDF 14 MB Posted

Attached to
Twin Chimneys MSW Unit 4 Cell 5 Landfill Earthwork
Solicitation number
RFP #26098
Issued by
Greenville County, South Carolina

About this file

Twin Chimneys Landfill Earthwork Summary

This document set comprises contract drawings for a landfill earthwork project in Greenville County, South Carolina, prepared by HDR Engineering, Inc. The County of Greenville is seeking proposals for the excavation and grading of Unit 4 Cell 5 at the Twin Chimneys Landfill, located on Augusta Road. The project involves the excavation of approximately 160,000 cubic yards of material, consisting of soil and rock, to establish the future landfill cell. Excavated materials not used in the work must be stockpiled in designated areas: clay soils in the existing clay stockpile north of Cell 4, rock in the Cell Tower Stockpile, and miscellaneous soils in Unit 7. The project scope includes site clearing and debris removal, stormwater management, temporary sediment basin modifications, blasting operations for rock removal where necessary, and final grading to specified elevations. The drawings indicate the project is re-issued for proposals as of March 23, 2026, and include existing topographic surveys dated July 2021 and July 2025.

The contract drawings specify critical technical requirements for site operations and construction sequencing. Access to the site is via the existing Augusta Road construction entrance into Unit 4, with restricted access to Bridge Road requiring coordination with landfill operations and flaggers during operating hours. The contractor is responsible for maintaining both access routes and all existing erosion and stormwater control measures. The work includes provisions for pre-construction and as-built surveys prepared by a licensed land surveyor to establish baseline and final earthwork quantities. Rock encountered during excavation exceeding 3 cubic yards must be reduced before stockpiling, and rock larger than 6 inches on exterior slope faces must not be covered with soil or seeded. The contractor is responsible for protecting all existing wells, structures, and utilities, with any damages requiring replacement or repair at the contractor's expense. All excavation, fill, and stockpile areas except the 3:1 slope face require seeding prior to project completion.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Twin Chimneys Landfill

Cell 5 Earthwork Civil

Project No.

11075 Augusta Road

C o n t r a c t D r a w i n g s F o r

10174879

March 2026

I N D E X O F D R A W I N G S

GENERAL

14G-00 COVER SHEET

14G-01 OVERALL SITE PLAN

CIVIL

14C-01 EXISTING CONDITIONS

14C-02 UNIT 4 CELL 5 EXCAVATION PLAN

14C-03 UNIT 4 CELL 5 STOCKPILE

14C-04 STORMWATER DETAILS

14C-05 UNIT 7 STOCKPILE

Re-Issued for Proposals

MSW Unit 4

Greenville County, South Carolina

HDR Engineering, Inc.

of the Carolinas 440 S. Church St., Suite 1200 Charlotte, NC 28202-2075 704.338.6700

03/23/26

BU

IL

DI

NG

BU

IL

DI

NG

SC

AL

E

SC

AL

E

SC

AL

E

C O N C R E T E

P A D

C O N C R E T E

P A D

B U I L D I N G

T A N K

T A N K

B U I L D I N G

C O N C R E T E

P A D

B U I L D I N G

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

DE

NS

E

BR

US

H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

C O N C R E T E

P A D

B R U S H

B R U S H

B R U S H

B R U S H

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

C L

D I T C H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/L

DITC

H

C/L

DI

TCH

DITCH

C/L DI

TCH

DITCH

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DIT

CH

DITCH

DIT

CH

C/L DITCH

C/L DI

TCH

C/L D

ITCH

C/L DI

TCH

C/L DI

TCH

DITCH

D I T C H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C E L L

P H O N E

T O W E R

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DITCH

DITCH

DITCH

DITCH

DIT

CH

DITC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DIT

CH

DITC

H

D E N S E

B R U S H

D E N S E

B R U S H

DITC

H

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G B U I L D I N G

B U I L D I N G

B U R N

S T A T I O N

B U R N

S T A T I O N

P O N D

P O N D

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

R I P

R A P

B R U S H

B R U S H

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

B R U S H

B R U S H

B R U S H

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

760 770

0 790

760 77

780 790

0 770

770780

790 790

760 76

780 790 800 810

810820830

700710

72073

0 76

0 75

0 770 780

760750 740730 720710

760 750 740 730

760 750

740 730

730740750760

730740

860 87 0 88

0 89

730740750760

770780790

740 740 740 730

770780

0 82

750 740

0 78

740 745 75

740 73 5 73

0 72 5 72

0 71

660 660

5 76

715 720 725

735 730

725 720

800 805

5 79

0 77

C&D A

CCES

S

ROAD

AC

CE

SS

R

OA

D

VA

UL

T

G W -3

G W -3

G W -3

G W -3 1G W -3

G W -2

G W -1

C S -1

C S -2

VA

UL

T

UGE

UGE

EB

UGE

UGEUGE

UGE

MB

OHW

O

HW

O

HW

LEACHATE

VAULT #1

LP

LP

LP

LP

LP

LP

36"RCP

INV:725.45

"x

"C

M P

INV:728.84

INV:730.90INV:733.21

INV:734.45

GR

GR

x 724.39 TP x 724.90 TP x 7

.0 8 T

P x 7

.4 9 T

P

TP 724.29 x

TP 722.02 x

TP 719.23 x

TP 717.04 x

EB

OUTPARCEL

OUTPARCEL

OUTPARCEL

790790790

780780

710 720 730 740 750

780790

750 740 730

MM-1

MM-2

MM-3

MM-4

MM-5 MM-6

MM-7

MM-28MM-29

MM-30

MM-31

MM-32

MM-33

MW-24

M W

-1

M W

-1 8 M

W -1

OW-104

OW-105

MW-1

MW-2

MW-3

OW-102

OW-110

OW-109 MW-52

MW-6

MW-7

MW-51

MW-41

MW-12

MW-8

MW-50

MW-11

MW-10

MW-9

OW-101

MW-20

PZ-13s PZ-13d

PZ-44

PZ-7s

PZ-50

PZ-2d PZ-2s

PZ-4a

PZ-76

PZ-53

PZ-54

PZ-56

PZ-5da PZ-5d

PZ-77

PZ-14

PZ-43

PZ-19

PZ-52sPZ-52d

PZ-7s

PZ-4

PZ-39s PZ-39d

PZ-26d PZ-26s

PZ-23d PZ-23s

PZ-75

PZ-51

PZ-10ra

PZ-41

PZ-57s

PZ-57d

PZ-78

PZ-73

PZ-30

PZ-25 PZ-25d

PZ-20

PZ-64

PZ-29

PZ-79

PZ-55

PZ-67

PZ-66s PZ-66d

PZ-12

PZ-74

PZ-65

PZ-9s

PZ-35d

PZ-35

PZ-62s PZ-62d

PZ-28

PZ-40

PZ-48

OW-105-R1

MW-10R

MW-21

MW-23

MW-22

MW-42

MW-43

MW-44

MW-49

MW-25

SEDIMENT

BASIN B

SEDIMENT

BASIN C

E-WASTE

METALS

PAD

YARD

WASTE

PAD

SEDIMENT

BASIN A

ROCK

STOCKPILE

COMPOST AREA

EXISTING

SOIL STOCKPILE

UNIT 1 MSW

CELL 1

CELL 2

FUTURE

UNIT 7

FUTURE

UNIT 5

CELL 3

CELL 4 CELL 5

ACTIVE

UNIT 4 MSW

EXISTING

CLAY

STOCKPILE

UNIT 2

C&D

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 03/2026 RE-ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

OVERALL SITE PLAN

14G-01.dwg

1" = 300' 14G-01

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,FREELAND

& ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND DRONE

SURVEY IN UNIT 4 AREA BY RP &ASSOCIATES DATED JULY 09, 2025.

2. CONTRACTOR'S PRIMARY ACCESS TO THE SITE SHALL BE VIA THE

EXISTING AUGUSTA ROAD (HIGHWAY 25) CONSTRUCTION ENTRANCE

THAT LEADS DIRECTLY INTO UNIT 4. MAINTAIN BOTH IN GOOD

CONDITION AT ALL TIMES AND IMPROVE AS NECESSARY TO

COMPLETE THE WORK.

3. ACCESS TO THE BRIDGE ROAD IS RESTRICTED DUE TO LANDFILL

OPERATIONS. COORDINATE WITH OWNER A SCHEDULE FOR

TRAVERSING THE BRIDGE. SUPPLY FLAGGERS DURING LANDFILL

OPERATING HOURS TO COORDINATE CONTRACTORS TRAFFIC AND

LANDFILL TRAFFIC ON BRIDGE ROAD. GARBAGE TRUCKS AND OTHER

COUNTY VEHICLES SHALL ALWAYS HAVE PRIORITY.

4. CONTRACTOR RESPONSIBLE FOR SECURITY OF ALL TOOLS,

MATERIALS AND EQUIPMENT LEFT ON SITE. CONTRACTOR TO

SECURE ACCESS POINTS TO THE WORK SITE AS NECESSARY.

5. THE CONTRACTOR SHALL PROTECT ALL EXISTING WELLS,

STRUCTURES AND UTILITIES. ANY WELLS, STRUCTURES OR UTILITIES

THAT ARE DAMAGED SHALL BE REPLACED OR REPAIRED (AS

DIRECTED BY OWNER).

6. EROSION AND STORMWATER CONTROL MEASURES ARE INSTALLED

AND OPERATIONAL FOR THE DESIGNATED WORK AREAS.

CONTRACTOR TO MAINTAIN AND PROTECT THE STRUCTURES FROM

DAMAGE.

7. SITE BENCHMARK CONTROL IS LOCATED NEAR THE CELLULAR

TOWER.

8. CONTRACTOR TO MAINTAIN THE ACCESS ROAD TO UNIT 7 AND THE

EXISTING EROSION AND SEDIMENT CONTROL MEASURES ALONG THE

ACCESS ROAD. SEE SHEET 14C-05 FOR THE STOCKPILE IN UNIT 7.

REFER TO THE PROPOSAL FORM.

CONSTRUCTION AREA

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

EXISTING 2021 & 2023 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

PZ-# PZ-#

B-#B-#

MM-#

MW-A

SEDIMENT BASIN #T2SEDIMENT

BASIN #T5

SEDIMENT

BASIN #T3

SEDIMENT BASIN #9

WETLANDS

SEDIMENT BASIN #10

DI #9

LEACHATE

TANKS

SCALE

HOUSE

ADMINISTRATION

BUILDING

EDUCATION

BUILDING

CELLULAR

TOWER

SEDIMENT

TRAP A

SEDIMENT

BASIN #T4

EXISTING CONSTRUCTION ENTRANCE

AUGUSTA RD - HWY 25

AUGUSTA RD

BRIDGE ROAD

SEDIMENT BASIN #11

100 YEAR FLOODPLAIN

LEACHATE

EVAPORATOR

CONCRETE

MONUMENT

N 987685.471 E 1604817.497

EL. 809.25

STOCKPILE ACCESS ROAD

TEMPORARY

SEDIMENT BASIN A

SEDIMENT TRAP

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DE

NS

E

BR

US

H

DENSE BRUSH

DIRT DRIVE DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DI

RT

D

RI

VE

BRUSH

BRUSH

BRUSH

BRUSH

DIRT DRIVE DIRT DRIVE

D I R T

D R I V E

DIRT DRIVE

DIRT DRIVE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

BRUSH

BRUSH

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

BRUSH

BRUSH

BRUSH

770760

73074

750750

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DE

NS

E

BR

US

H

DENSE BRUSH

DIRT DRIVE DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DI

RT

D

RI

VE

BRUSH

BRUSH

BRUSH

BRUSH

DIRT DRIVE DIRT DRIVE

D I R T

D R I V E

DIRT DRIVE

DIRT DRIVE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

BRUSH

BRUSH

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

BRUSH

BRUSH

BRUSH

770760

73074

750750

690685

ACTIVE

UNIT 4 MSW

0785 77

5750755

745745

78078078

78578

720 72

730730730

735740

720725

725730740

CELL 1

17.0 ACRES

10.3 ACRES

8.5 ACRES

CELL 2

8.6 ACRES

CELL 3

CELL 4

PROPOSED CELL 5

EARTHWORK

8.6 ACRES

MW-24

OW-103

MW-18

MW-20

PZ-4a

PZ-76

PZ-6d PZ-53

PZ-54

PZ-56

PZ-6s

PZ-77

PZ-78

MW-21

MW-25

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 03/2026 RE-ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

EXISTING CONDITIONS

14C-01.dwg

1" = 200' 14C-01

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,FREELAND

& ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND DRONE

SURVEY IN UNIT 4 AREA BY RP & ASSOCIATES DATED JULY 09, 2025.

2. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE

WORK, IN THE FOLLOWING DESIGNATED AREAS.

· CLAY: EXISTING CLAY STOCKPILE NORTH OF CELL 4.

· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.

· MISCELLANEOUS SOILS: UNIT 7 SEE 14C-05.

BORINGS (SB & B)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

EXISTING 2021 & 2023 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

EXISTING TREELINE

MW-A

B-# B-#

PZ-#PZ-#

EXISTING STOCKPILE

TEMPORARY

SEDIMENT BASIN A

EXISTING CLAY

STOCKPILE

PROPOSED MSW PERMIT BOUNDARY

CURRENT MSW PERMIT BOUNDARY

SEDIMENT

BASIN #T4

DI #9

WETLANDS

STOCKPILE HAUL ROAD

EXISTING DROP INLET

AND PIPE (TYP. OF 6)

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

DI

RT

D

RI

VE

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

71071

73073

730730

4.0%

70070

PZ-77

MW-24

PZ-6d

PZ-6s

PZ-56

PZ-54

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 03/2026 RE-ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 4 CELL 5

EXCAVATION PLAN

14C-02.dwg

1" = 60' 14C-02

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS:

● WITHIN THE LIMITS OF UNIT 1, 2, AND 4: RP & ASSOCIATES DATED JULY 09, 2025.

● OUTSIDE THE LIMITS OF UNIT 1, 2, AND 4: FREELAND & ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021.

2. THE DEBRIS (ROCK, VEGETATION, TREES) WITHIN THE WORK AREA SHALL BE STOCKPILED WITHIN THE UNIT 4 AREA AND

OUTSIDE OF THE EXCAVATION AREA.

3. CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION SURVEY (ELECTRONIC AND SIGNED AND SEALED BY A LAND SURVEYOR) OF THE WORK AREAS (AFTER THE DEBRIS IS STOCKPILED). THIS SURVEY SHALL ESTABLISH THE BASELINE

FOR FOR EARTHWORK QUANTITIES.

4. FOLLOWING COMPLETION OF THE WORK, CONTRACTOR SHALL PROVIDE AN AS BUILT SURVEY (ELECTRONIC AND SIGNED AND SEALED BY A LAND SURVEYOR) TO SERVE AS THE BASIS FOR FINAL PAYMENT OF EARTHWORK QUANTITIES.

STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE WORK, IN THE DESIGNATED AREAS.

· CLAY: EXISTING CLAY STOCKPILE NORTH OF CELL 4.

· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.

· MISCELLANEOUS SOILS: UNIT 7 SEE 14C-05.

BORINGS (SB & B)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

PL

LEGEND

EXISTING 2021 & 2025 MAJOR CONTOURS

EXISTING 2021 & 2025 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

EXCAVATION / GRADING AREA

GENERAL CONSTRUCTION SEQUENCE:

1. ESTABLISH LIMITS OF CONSTRUCTION.

2. REMOVE AND STOCKPILE TREE DEBRIS IN THE WORK AREA. ROCK PILES WITHIN THE WORK AREA SHALL BE HAULED

TO THE STOCKPILE NEAR THE CELL TOWER. ROCKS WITHIN THE WORK AREA MAY NEED TO BE REDUCED TO A

MANAGEABLE SIZE TO LOAD AND HAUL.

3. PERFORM INITIAL SURVEY OF THE CELL 5 AREA AND THE AREA IN UNIT 7 OF THE PROPOSED GRADES.

4. REDIRECT STORMWATER FROM SEDIMENT BASIN A.

5. BEGIN EXCAVATION OF CELL 5. STOCKPILE EXCAVATED MATERIALS IN THE DESIGNATED STOCKPILES. USE EXCAVATED

MATERIAL FOR STRUCTURAL FILL.

6. REMOVE THE RISER/BARREL/SKIMMER IN THE TEMPORARY SEDIMENT BASIN A AND GROUT THE BARREL

7. UPON COMPLETION OF CELL 5 EXCAVATION, PERFORM ASBUILT SURVEY OF CELL 5 AND THE AREA IN UNIT 7 OF

EXCAVATED SOIL FROM CELL 5.

OVERALL PROJECT SCOPE:

THE COUNTY IS CURRENTLY GRADING THE AREA SOUTH OF CELL 5. THIS PROJECT IS TO EXCAVATE THE CELL 5 AREA TO THE GRADES SHOWN IN THESE DRAWINGS. THE TEMPORARY SEDIMENT BASIN A COLLECTS STORMWATER FROM CELLS 2, 3, AND 4 AS WELL AS FLOW FROM THE AREA WEST OF CELL 5. CONTRACTOR TO MAKE PROVISIONS TO REDIRECT FLOW OUT OF THE WORK

AREA. IT IS ANTICIPATED THERE WILL BE 3 TYPES OF MATERIAL EXCAVATED.

MW-A

B-# B-#

PZ-#PZ-#ACTIVE CELL 3

8.5 ACRES

ACTIVE CELL 4

10.3 ACRES

STORMWATER

CHANNEL (TYP)

PROPOSED

CONSTRUCTION

BASELINE FOR LINER

PROJECT 8.6 ACRES

14C-04

A14C-04

B

C -0

C

C-

PROPOSED CELL 5

EARTHWORK

8.6 ACRES

ACTIVE CELL 2

8.6 ACRES

ROCK:

1. ROCK IS ANTICIPATED WITHIN THE UNIT 4 CELL 5 EXCAVATION. THE CONTRACTOR IS ALLOWED TO BLAST THE ROCK

FOR REMOVAL. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL PERSONNEL AND EQUIPMENT FROM DAMAGE RESULTING FROM BLASTING. CONTRACTOR TO BACKFILL WITH SOIL FROM THE SURROUNDING EXCAVATION. THE

BACKFILL SHALL BE COMPACTED AS STRUCTURAL FILL.

2. WHERE BLASTING IS PERFORMED, BLASTING SHALL BE DESIGNED TO FRACTURE ROCK TO ELEVATION AT LEAST 5

FEET BELOW DESIGN GRADES.

3. ENGINEER OR CQA SHALL BE ON SITE TO VERIFY & CONFIRM AREA AND DEPTH PRIOR TO BLASTING.

4. ROCK LARGER THAN 3 CY, SHALL BE REDUCED TO LESS THAN 3 CY BEFORE STOCKPILING. ROCK SMALLER THAN 3CY

SHALL BE STOCKPILED IN THE DESIGNATED LOCATIONS.

5. NOTIFY THE ENGINEER IMMEDIATELY AND STOP WORK IN THE VICINITY, IF THE CONTRACTOR ENCOUNTERS A SPRING

OR OTHER NON PERCH SOURCE OF WATER.

6. CONTROL STORMWATER RUNOFF AT ALL TIMES DURING THE WORK. PREVENT STORMWATER FROM RUNNING OFF THE

WORK AND INTO AREAS THAT DON'T DIRECTLY LEAD TO SEDIMENT BASINS. CONTRACTOR SHALL TAKE IMMEDIATE

ACTION TO PREVENT STORMWATER FROM ENTERING CELLS 1, 2 AND 3.

7. ROCK ENCOUNTERED ON THE 3:1 SLOPE FACE SHALL NOT BE COVERED WITH SOILS NOR SEEDED. ALL OTHER EXCAVATION, FILL AND STOCKPILE AREAS ARE REQUIRED TO BE SEEDED PRIOR TO COMPLETION OF THE WORK.

8. ANY BOULDERS ENCOUNTERED DURING THE WORK SHALL BE REMOVED AND PLACED IN THE STOCKPILE NEAR THE

CELL TOWER.

TEMPORARY

SEDIMENT BASIN A

14C-04

TEMPORARY

SB A BARREL

THIS 1.3 ACRE AREA HAS TREE SAPLINGS

LESS THAN 6" DIAMETER. CONTRACTOR

TO CLEAR/GRUB THE SAPLINGS AND

STOCKPILE AS SHOWN ON 14C-03.

PERIMETER BERM 1

14C-04

SEE NOTE 2 FOR THIS

AREA

CLEAR/GRUB

SAPLINGS AND

TREE DEBRIS

STOCKPILE

EARTHWORK QUANTITY: 185,000 CU/YDS - CUT; 7,500 CU/YDS - FILL

EXISTING DROP INLET

AND PIPE (TYP. OF 6)

MW-24

MW-18

MW-20

PZ-76

PZ-53

PZ-54

PZ-56

PZ-77

PZ-78

MW-21

MW-23

MW-22

MW-25

CELL 1

71071

73073

730730

5.0%

5.0%

2.9%

4.4%

5.0%

5.0% 4.0%

4.0%

3:1

3:1

3:1

3:1

CELL 2

CELL 3

CELL 4

CELL 5

17.0 ACRES

10.3 ACRES

8.6 ACRES

8.5 ACRES

8.6 ACRES

3:1

3:1

3:1

3:1

2.0

2.0%

2.0

2.0%

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 03/2026 RE-ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 4 CELL 5 STOCKPILE

14C-03A.dwg

1" = 100' 14C-03

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM DRONE SURVEY IN UNIT 1,2 & 4 AREA

BY RP & ASSOCIATES DATED JULY 09, 2025.

2. AERIAL PHOTOGRAPHY MAY 2025

3. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE

WORK, IN THE DESIGNATED AREA INDICATED ON THE PLAN.

· CLAY SOILS: EXISTING CLAY STOCKPILE NORTH OF CELL 4.

· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.

· MISCELLANEOUS SOILS: UNIT 7 SEE 14C-05.

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

EXISTING 2021 & 2023 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

MW-A

MM-#

B-# B-#

PZ-#PZ-#

STOCKPILE HAUL ROAD

EXISTING CLAY STOCKPILE

EXISTING STOCKPILE

ACCESS ROAD TO UNIT 7

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00

ROUGH GRADE

(SHOWN ON 14C-02)

PERMITTED SUBGRADE

EXISTING GRADE

FUTURE CELL 5

CONSTRUCTION BASELINE

0+00 0+50 1+00

ROUGH GRADE

(SHOWN ON 14C-02)

CONSTRUCTION

BASELINE

EXISTING GRADE

- PERIMETER BERM

-0+50 0+00 0+50 1+00

CONSTRUCTION BASELINEEXISTING GRADE

PERMITTED SUBGRADE

ROUGH GRADE

(SHOWN ON 14C-02)

EXISTING CELL 4FUTURE CELL 5

CELL 4 TOP OF CLAY

SUBGRADE

C

1/8"/FT. 1/8"/FT.

22.0' 6.0' 2.0' 6.0' 30.0' 22.0' 12.0' 22.0' 12.0'

PERIMETER DITCHPERIMETER BERM

L PERIMETER ROAD EXTERIOR

CHANNEL

ACCESS

ROADLANDFILL

PROPOSED GRADING

12" CRUSHED STONE (COMPACTED)

GEOTEXTILE

EROSION CONTROL

MATTING

2.

0'

TRASH GUARD

RISER

SKIMMER

NOTES:

1. CONTRACTOR TO CAREFULLY REMOVE THE SKIMMER, RISER, AND TRASH GUARD

AND PROVIDE TO THE OWNER.

2. EXCAVATE INTO THE BERM TO THE REMOVE A PORTION OF THE BARREL AS SHOWN.

3. GROUT THE REMAINING BARREL.

4. PLACE COMPACTED FILL OVER THE EXCAVATED AREA.

36" CPP 150 - FT LONG4'

BARREL

REMOVE THIS

PORTION OF THE

BARREL

3 3

2.

0'EROSION

CONTROL MATTING

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 03/2026 RE-ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

STORMWATER DETAILS

14C-08

AS SHOWN 14C-04

PERIMETER BERM

1" = 10'

14C-02

SECTION - "A"

NTS

A 14C-02

SECTION - "B"

NTS

B 14C-02

SECTION - "C"

NTS

C 14C-02

STORMWATER CHANNEL

NTS

14C-02

TEMPORARY SEDIMENT BASIN A

NTS

14C-02

0 82

0 80

0 810

0 770

0 74

5 72

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

FUTURE UNIT 7

PZ-5da PZ-5d

PZ-55

PZ-67

3.0:1

3.0:1

3.0:1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 03/2026 RE-ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 7 STOCKPILE

14C-05.dwg

1" = 200' 14C-05

LEGEND

PL

EXISTING MAJOR CONTOURS

EXISTING MINOR CONTOURS

WETLANDS

PROPERTY LINE

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

2024 AERIAL LIMITS

BORINGS (SB & B)

PIEZOMETER (PZ)

MONITORING AND

OBSERVATION WELL

(MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

PZ-# PZ-#

B-#B-#

MW-A

Cut/Fill Summary Name

Stockpile West Airspace

2d Area

248668.94 Sq. Ft.

Cut

77.03 Cu. Yd.

Fill

167080.43 Cu. Yd.

Net

167003.40 Cu. Yd.<Fill>

ACCESS ROAD SEE 14G-01 FOR CONTINUATION

SF

SF

SF

SF

SF

SF

SF

SF

SF

SILT FENCE

03/2026

NOTES

1. SITE TOPOGRAPHY CONSISTS OF TWO AERIAL SURVEYS. AREA INSIDE OF UNIT 7

STOCKPILE AREA PERFORMED NOV. 2024 AND AREA OUTSIDE OF UNIT 7 STOCKPILE

PERFORMED JULY 2021.

2. CONTRACTOR TO INSTALL SILT FENCE ALONG ACCESS ROAD.