TCC-VB 260-B4260-112-c (M26TC127) Project Drawings 2026-09-25.pdf
PDF 8 MB Posted
- Solicitation number
- DBB-129593
- Issued by
- Virginia Beach City, Virginia
About this file
This file comprises project drawings for the Tidewater Community College Virginia Beach Campus chilled water central plant replacement project (State Project No. 260-B4260-112, M26TC127), submitted by the Virginia Community College System. The project involves replacement of the existing chilled water plant infrastructure, including two water-cooled chillers (54.8-ton capacity units utilizing R513A refrigerant), two cooling towers (95.0 GPM capacity), two condenser water pumps, four chilled water pumps, and associated hydronic accessories and piping throughout the mechanical room and courtyard. The drawings, dated September 25, 2026, include title sheets, site plans, mechanical room details, piping diagrams for both demolition and new work, electrical plans, and automatic temperature control specifications. A pre-bid conference is scheduled for 9:00 A.M. on Tuesday, October 13, 2026, at the college campus. Sealed bids are due by 3:00 P.M. on Thursday, November 19, 2026, with public opening and reading scheduled for 3:00 P.M. on Friday, November 20, 2026. Contractors must visit the jobsite to determine the extent of work prior to bidding and shall maintain access Monday through Friday from 7:00 A.M. to 4:00 P.M. during construction.
The project mandates compliance with the 2021 Virginia Statewide Fire Prevention Code, NFPA 70, the Virginia Uniform Statewide Building Code (2021 Edition), and ASHRAE 90.1-2019 energy standards. Construction will occur at an existing facility (132,681 square feet, Type II-B noncombustible/unprotected construction completed in 2002) classified as educational occupancy. All contractors must register as vendors in eVA for bid submission and shall utilize the Owner's e-Builder web-based project management software for pay applications and invoices at no cost. A Standard Commonwealth Bid Bond (form CO-10.2) and contract security are required regardless of bid amount. The contractor assumes responsibility for all damage to site conditions and must coordinate power outages to weekend hours only with seven days' prior notice to the Owner. Fire watch protocols, active sprinkler and fire alarm systems, and adherence to Virginia Occupational Safety and Health regulations are mandatory throughout construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T001
T
IT
L E
S H
E E
T
BDC
JAR
KDA
NOTE:
1. THE CONTRACTOR SHALL COMPLY WITH THE 2021 VIRGINIA STATEWIDE FIRE PREVENTION CODE
AND NFPA 70. THE CONTRACTOR SHALL MAINTAIN A COPY OF EACH DOCUMENT ONSITE
THROUGHOUT THE CONSTRUCTION PROCESS. CONTRACTOR SHALL POST A FIRE WATCH DURING
ANY WELDING, BRAZING, AND OTHER HOT WORK. CONTRACTOR SHALL MAINTAIN THE SPRINKLER
AND THE FIRE ALARM TO BE ACTIVE AT ALL TIMES DURING CONSTRUCTION.
TIDEWATER COMMUNITY COLLEGE -
VIRGINIA BEACH CAMPUS
VIRGINIA COMMUNITY COLLEGE SYSTEM
TITLESHEET NO.
TITLE SHEETT001
STATE PROJECT NO: 260-B4260-112 (M26TC127)
SEPTEMBER 25, 2026
MJT# 24-110
INDEX OF DRAWINGS
AREA MAP VICINITY MAP PLAN
NORTH
GENERAL CODE DATA:VECC COMPLIANCE STATEMENT
IN ACCORD WITH THE VIRGINIA ENERGY CONSERVATION CODE (VECC), THE BUILDING
SHALL COMPLY WITH ASHRAE 90.1-2019 SECTIONS 5, 6, 7, 8, 9, & 10. SECTION 5
BUILDING ENVELOPE WILL BE VIA SECTION 5.5 - PRESCRIPTIVE BUILDING ENVELOPE
OPTION. SECTION 6 COMPLIANCE WILL BE VIA SECTIONS 6.4 - MANDATORY
PROVISIONS AND 6.5 - PRESCRIPTIVE PATH.
LEAD MATERIALS DISCLOSURE STATEMENT
AN INSPECTION TO IDENTIFY LEAD CONTAINING OR COATED BUILDING COMPONENTS
HAS NOT BEEN CONDUCTED BECAUSE THE BUILDING WAS CONSTRUCTED AFTER
JANUARY 1, 1985 AND THE OWNER HAS NO KNOWLEDGE OF LEAD CONTAINING OR
COATED BUILDING COMPONENTS IN THE BUILDING. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO COMPLY WITH ALL VIRGINIA OCCUPATIONAL SAFETY AND
HEALTH (VOSH) REGULATIONS AS THEY PERTAIN TO EMPLOYEE EXPOSURES TO
LEAD. ALL LEAD AND LEAD-COATED BUILDING COMPONENTS SHALL BE RECYCLED
TO THE EXTENT POSSIBLE.
ASBESTOS DISCLOSURE STATEMENT
AN ASBESTOS INSPECTION WAS NOT PERFORMED BECAUSE ALL PORTIONS OF THE
EXISTING BUILDING THAT MAY BE AFFECTED BY THE WORK WERE ORIGINALLY
CONSTRUCTED AFTER JANUARY 1, 1985.
HPBA COMPLIANCE STATEMENT
IN ACCORD WITH THE HIGH PERFORMANCE BUILDINGS ACT, THE BUILDING IS
EXEMPT FROM COMPLIANCE BECAUSE THE COST OF THE RENOVATIONS DOES NOT
EXCEED 50% OF THE VALUE OF THE BUILDING.
M001 GENERAL NOTES, LEGEND, ABBREVIATIONS, AND SCHEDULES
APPLICABLE CODES: VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VUSBC) 2021 EDITION,
EFFECTIVE JANUARY 18, 2024
VIRGINIA EXISTING BUILDING CODE (VEBC), 2021 EDITION: LEVEL 2 ALTERATION
VIRGINIA CONSTRUCTION CODE (VCC), 2021 - VUSBC PART 1
VIRGINIA ENERGY CONSERVATION CODE, 2021
VIRGINIA MECHANICAL CODE, 2021
VIRGINIA PLUMBING CODE, 2021
NATIONAL ELECTRICAL CODE - NFPA 70, 2020
VIRGINIA STATEWIDE FIRE PREVENTION CODE, 2021
INTERNATIONAL FIRE CODE, 2021
CONSTRUCTION AND PROFESSIONAL SERVICES MANUAL (CPSM) 2026 REV 0 DATED JULY 31, 2026
BUILDING PURPOSE/OCCUPANCY: EDUCATIONAL OCCUPANCY FOR STUDENTS ABOVE 12TH GRADE
USE GROUP: GROUP B - BUSINESS
TYPE OF CONSTRUCTION: VCC TYPE II-B - NONCOMBUSTIBLE/UNPROTECTED
ORIGINAL CONSTRUCTION YEAR: COMPLETED IN 2002, UNDER THE VIRGINIA UNIFORM STATEWIDE
BUILDING CODE (VUSBC) 1996 EDITION, EFFECTIVE AUGUST 20, 1997.
FIRE ALARM SYSTEM: EXISTING
FIRE SUPPRESSION SYSTEM: AUTOMATIC FIRE SUPPRESSION SYSTEM (SPRINKLER) PROVIDED
THROUGHOUT BUILDING
NO PROPOSED CHANGES IN OCCUPANCY LOADS OR MEANS OF EGRESS
BUILDING AREA: APPROX. 132,681 SF
MD101 ENLARGED MECHANICAL ROOM AND YARD PLAN - DEMOLITION
M101 ENLARGED MECHANICAL ROOM AND YARD PLAN - NEW WORK
E001 GENERAL NOTES, LEGEND AND ABBREVIATIONS
ED101 ENLARGED MECHANICAL ROOM AND YARD PLAN - ELECTRICAL - DEMOLITION
PROJECT LOCATION
E101 ENLARGED MECHANICAL ROOM AND YARD PLAN - ELECTRICAL - NEW WORK
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD VA BEACH, VA 23452
V
IR
G
IN
IA
B
E A
C H
V
IR
G
IN
IA
A T
C R
E P
L A
C E
C H
IL
L
E D
W A
T E
R P
L A
N T
T
ID
E W
A T
E R
C O
M M
U N
IT
Y
C O
L L
E G
E
V
IR
G
IN
IA
B
E A
C H
C A
M P
U S
S T
A T
E P
R O
J E
C T
N O
-B
-1
M
T
C
09-25-2026
1700 COLLEGE CRES,
VIRGINIA BEACH, VA 23453
VIRGINIA COMMUNITY COLLEGE SYSTEM
PM: SHELLEY BAINS, VCCO
CAPITAL OUTLAY PROGRAM MANAGER
ARBORETUM III, 300 ARBORETUM PLACE,
2ND FLOOR, SUITE 390
RICHMOND, VA 23236
(804) 683-5777
M201 CHILLED AND CONDENSER WATER PIPING DIAGRAMS - DEMOLITION
M301 MECHANICAL DETAILS
M401 AUTOMATIC TEMPERATURE CONTROLS
GENERAL SITE PLANG001
M402 AUTOMATIC TEMPERATURE CONTROLS
GENERAL NOTES, CHILLER TOWER PAD PLAN, AND SECTIONS101
M202 CHILLED AND CONDENSER WATER PIPING DIAGRAMS - NEW WORK
DIG NOTICE
CONTACT VIRGINIA 811 AT 811, 1-800-552-7001, OR https://www.va811.com NO LESS
THAN 72 HOURS PRIOR TO EXCAVATION AND DO NOT DISTURB THE SOIL UNTIL DIG
TICKET HAS BEEN PROCESSED.
DELEGATED DESIGN
THIS PROJECT DOES NOT UTILIZE ANY SYSTEMS OR PRODUCTS THAT FALL UNDER
THE DEB REQUIREMENTS FOR DELEGATED DESIGN.
G001
G E
N E
R A
L S
IT
E
P L
A N
BDC
MAR
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD VA BEACH, VA 23452
V
IR
G
IN
IA
B
E A
C H
V
IR
G
IN
IA
A T
C R
E P
L A
C E
C H
IL
L
E D
W A
T E
R P
L A
N T
T
ID
E W
A T
E R
C O
M M
U N
IT
Y
C O
L L
E G
E
V
IR
G
IN
IA
B
E A
C H
C A
M P
U S
S T
A T
E P
R O
J E
C T
N O
-B
-1
M
T
C
09-25-2026
GENERAL SITE PLAN
NOT TO SCALE
REFER TO THE PROJECT MANUAL SPECIFICATION
SECTION 011400 "CONTRACTOR'S USE OF THE
PREMISES" FOR ADMINISTRATIVE AND PROCEDURAL
REQUIREMENTS WHILE WORKING ON COLLEGE
PREMISES. REFER TO OTHER PROJECT MANUAL
SPECIFICATION SECTIONS FOR ADDITIONAL
REQUIREMENTS.
RECOMMENDED CRANE LOCATION. CONTRACTOR
SHALL COORDINATE ACTUAL CRANE LOCATION WITH
WORK REQUIRED. CONTRACTOR SHALL BE
RESPONSIBLE TO ALL DAMAGE TO SOD AND ASPHALT,
AND REPAIR SITE TO PRE-CONSTRUCTION CONDITIONS.
SITE PLAN NOTES (THIS SHEET ONLY)
DESCRIPTIONNO.
ANY POWER OUTAGES AFFECTING THIS AREA SHALL
ONLY TAKE PLACE DURING WEEKEND HOURS AND
MUST BE COORDINATED WITH OWNER AT LEAST 7 DAYS
PRIOR TO SCHEDULED OUTAGE.
CONTRACTOR SHALL USE AREA AS INDICATED FOR
PARKING AND STAGING OF EQUIPMENT/MATERIALS. ALL
OTHER PARKING AREAS SHALL NOT BE USED WITHOUT
OWNER'S PRIOR APPROVAL.
SITE PLAN NOTES (THIS SHEET ONLY)
DESCRIPTIONNO.
3 (TYP.)
1 4 6
5 7 2
3 (TYP.)
3 (TYP.)
CONTRACTOR SHALL BE GRANTED ACCESS TO THE
LIMITS OF CONSTRUCTION MONDAY THROUGH FRIDAY
7:00 AM TO 4:00 PM DURING THE CONSTRUCTION
PERIOD. ACCESS TO THE BUILDING AFTER NORMAL
WORKING HOURS SHALL BE ALLOWED WITH OWNER'S
(VCCS) PRIOR APPROVAL AND COORDINATION.
STAFF PARKING, NO CONTRACTOR PARKING
PERMITTED OUTSIDE DESIGNATED AREA.
KEEP DRIVEWAYS AND ENTRANCES SERVING THE
PREMISES CLEAR AND AVAILABLE TO THE OWNER, THE
OWNER'S EMPLOYEES, INSTRUCTORS, STAFF, AND
EMERGENCY VEHICLES AT ALL TIMES.
SITE PLAN NOTES (THIS SHEET ONLY)
DESCRIPTIONNO.
M001
G E
N E
R A
L N
O T
E S
L
E G
E N
D A
B B
R E
V
IA
T
IO
N S
A N
D E
Q U
IP
M
E N
T S
C H
E D
U L
E S
BDC
MAR
KDA
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD VA BEACH, VA 23452
V
IR
G
IN
IA
B
E A
C H
V
IR
G
IN
IA
A T
C R
E P
L A
C E
C H
IL
L
E D
W A
T E
R P
L A
N T
T
ID
E W
A T
E R
C O
M M
U N
IT
Y
C O
L L
E G
E
V
IR
G
IN
IA
B
E A
C H
C A
M P
U S
S T
A T
E P
R O
J E
C T
N O
-B
-1
M
T
C
09-25-2026
1. WHERE EQUIPMENT IS INDICATED TO BE REMOVED, IT SHALL MEAN COMPLETE REMOVAL
OF EQUIPMENT, INCLUDING ANCHORS, BRACKETS, CONTROLS AND INCIDENTAL ITEMS
CONNECTED OR FASTENED TO EQUIPMENT. OWNER MAINTAINS THE OWNERSHIP OF ALL
ITEMS TAGGED OR IDENTIFIED.
2. WHERE PIPING IS INDICATED TO BE REMOVED, IT SHALL MEAN COMPLETE REMOVAL OF
PIPING, INCLUDING VALVES, FITTINGS, INSULATION, SUPPORTS, HANGERS, BRACKETS,
CONTROLS AND INCIDENTAL ITEMS CONNECTED OR FASTENED TO THE PIPING. PIPING IS
DIAGRAMMATIC AND INDICATES THE GENERAL EXTENT OF WORK. NO ATTEMPT IS MADE
TO SHOW EVERY ELL, TEE, OFFSET, FITTING AND VALVE. REMOVE PIPING AS INDICATED
AND SPECIFIED.
3. CONTRACTOR SHALL RECLAIM AND DISPOSE OF ALL REFRIGERANT IN ACCORDANCE
WITH ALL STATE AND LOCAL CODES PRIOR TO REMOVING THE EXISTING UNIT. OWNER
SHALL MAINTAIN FIRST RIGHT OF REFUSAL FOR ALL RECLAIMED REFRIGERANT PRIOR
TO DISPOSAL BY CONTRACTOR.
GENERAL DEMOLITION NOTES
1. CONTRACTOR SHALL VISIT JOB SITE TO DETERMINE EXTENT OF WORK INVOLVED PRIOR
TO BIDDING THE PROJECT.
2. THE MECHANICAL SYSTEM HAS BEEN DESIGNED IN ACCORDANCE WITH THE 2021
VIRGINIA UNIFORM STATEWIDE BUILDING CODE.
3. COORDINATE LOCATION OF ALL DUCTWORK, EXHAUST FANS, THERMOSTATS AND
OTHER WALL MOUNTED EQUIPMENT WITH LIGHT FIXTURES, SPRINKLER SYSTEMS AND
ACCESSORIES INSTALLED BY OTHER TRADES SO AS TO PRESENT A NEAT AND
ATTRACTIVE INSTALLATION.
4. PIPING ARRANGEMENTS ARE DIAGRAMMATIC.
5. ARRANGE PIPING AS REQUIRED TO CLEAR STRUCTURE, CONDUIT, LIGHTS, ETC.,
ALLOWING SPACE FOR HANGERS, INSULATION, ETC.
6. MAINTAIN PROPER CLEARANCES PER ELECTRICAL CODE ON ALL EQUIPMENT.
COORDINATE WITH ALL TRADES TO ENSURE CLEARANCES ARE NOT OBSTRUCTED.
7. INSTALL ALL WALL MOUNTED NON-ADJUSTABLE SENSORS AT 5'-0" FROM FINISHED
FLOOR TO TOP OF SENSOR. ADJUSTABLE DEVICES SHALL BE INSTALLED AT 4'-0" FROM
FINISHED FLOOR TO TOP OF SENSOR.
8. CONTRACTOR SHALL ONLY USE DESIGNATED AREAS WITHIN THE EQUIPMENT FOR
PENETRATIONS OF ELECTRICAL CONDUITS AND CONTROL CONDUITS. THESE
PENETRATIONS MUST BE WEATHERTIGHT. IF A CONTRACTOR PENETRATES ANY AREA IN
THE EQUIPMENT THAT IS NOT DESIGNATED BY THE MANUFACTURER FOR
PENETRATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REPAIRS TO THE
EQUIPMENT, TO ENSURE IT IS WEATHERTIGHT. IF EQUIPMENT CANNOT BE MADE
WEATHERTIGHT, THE CONTRACTOR SHALL BE REQUIRED TO REPLACE EQUIPMENT AT
HIS OWN EXPENSE.
9. PROVIDE NEMA 4XSS STAINLESS STEEL ENCLOSURES FOR ALL EXTERIOR FIELD
INSTALLED CONTROLS, ACCESSORIES AND ELECTRICAL COMPONENTS WHETHER
INDICATED OR NOT.
GENERAL NOTES
ABBREVIATIONS
% PERCENT
ø DIAMETER
A AMP
ADS AIR/DIRT SEPARATOR
B-x (EXISTING) BOILER DESIGNATION
C-x CHILLER DESIGNATION
CF CHEMICAL FEEDER
CFM CUBIC FEET PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CT-x COOLING TOWER DESIGNATION
CW DOMESTIC COLD WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DDC DIRECT DIGITAL CONTROL
DI-x (EXISTING) DRAFT INDUCER DESIGNATION
DN DOWN
EAT ENTERING AIR TEMPERATURE
EC ELECTRONICALLY COMMUTATED
EF-x EXHAUST FAN DESIGNATION
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
°F DEGREES FAHRENHEIT
FD FLOOR DRAIN
FPM FEET PER MINUTE
FT FEET
GPM GALLONS PER MINUTE
H HEIGHT
HP HORSEPOWER
HTC-x HEAT TRACE CONTROLLER DESIGNATION
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
IN INCH/INCHES
IPLV INTEGRATED PART LOAD VALUE
kA KILO AMPS
KW KILOWATTS
L LENGTH
LBS POUNDS
LF LINEAR FEET
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MCA MINIMUM CIRCUIT AMPS
MOCP MAXIMUM OVER CURRENT PROTECTION
NO NUMBER
NPLV NON-INTEGRATED PART LOAD VALUE
ODP OPEN DRIP PROOF
P-x PUMP DESIGNATION
PH PHASE
PLEV PART LOAD EFFICIENCY VALUE
QTY QUANTITY
RPM REVOLUTIONS PER MINUTE
RLA RUN LOAD AMPS
SCCR SHORT CIRCUIT CURRENT RATING
SF-x (EXISTING) SUPPLY FAN DESIGNATION
TYP TYPICAL
UH-x (EXISTING) UNIT HEATER DESIGNATION
V VOLTS
VFD VARIABLE FREQUENCY DRIVE
W WATTS
W WIDTH
WB WET BULB
WC WATER COLUMN
WH-x (EXISTING) WATER HEATER DESIGNATION
WPD WATER PRESSURE DROP
(XXX) EXISTING EQUIPMENT DESIGNATION
LEGEND
(X"/X")
THERMOSTAT OR TEMPERATURE SENSOR,
CONTROLLING UNIT AS INDICATED
CONTROL DAMPER
90° DUCT ELBOW - TURNED DOWN
DUCT ELBOW WITH TURNING VANES
DUCT TRANSITION
VARIABLE FREQUENCY DRIVE PANEL
DIRECTION OF AIRFLOW
POINT OF CONNECTION FOR NEW WORK
REMOVE EXISTING TO THIS POINT
DEMOLITION NOTE
EXISTING SIZES AS INDICATED
NEW WORK NOTE
EXISTING TO REMAIN
NEW WORK
EXISTING TO BE REMOVED
FLANGE CONNECTION
PRESSURE GAUGE
PRESSURE GAUGE WITH VALVE
PRESSURE/TEMPERATURE TEST PORT
RUBBER FLEXIBLE CONNECTION
Y-STRAINER
THERMOMETER
THREADED UNION
DIRECTION OF FLOW IN PIPE
CWS
CWR
CHWS
CHWR
D
PIPING TO BE REMOVED
HEAT TRACE TAPE
PIPE DOWN
PIPE TEE DOWN
TWO-WAY CONTROL VALVE
AUTOMATIC AIR VENT
BALL VALVE
BACKFLOW PREVENTER
BUTTERFLY VALVE
CHECK VALVE, HORIZONTAL SWING
PIPE TEE UP
PIPE UP
CHILLED WATER RETURN PIPING
CHILLED WATER SUPPLY PIPING
CONDENSER WATER RETURN PIPING
CONDENSER WATER SUPPLY PIPING
DRAIN PIPING
EXISTING PIPING BELOW OR HIDDEN
GATE VALVE
PRESSURE RELIEF AND PRESSURE REDUCING VALVE
DIFFERENTIAL PRESSURE SENSOR
VENTURI FLOWSTATION
DOMESTIC WATER PIPING (CW)
EXISTING PIPING TO REMAIN
CW
D1
T
PHOTO: NUMBER "PX" ON DRAWING MXX
WATER COOLED CHILLER SCHEDULE
DESCRIPTION
GPM
EVAPORATOR
TOTAL KW
COMPRESSOR DATACONDENSER
GPM QTY
ELECTRICAL
MOCPMCA
REMARKS
C-1 210.0 466 2.4 44.0 607 10.2 1 233 400
EWT
(°F)
WPD
(FT)
LWT
(°F)
EWT
(°F)
WPD
(FT)
UNIT
NO.
REMARKS: 1 PROVIDE WITH 65KA SCCR.
PROVIDE WITH FACTORY-INSTALLED THERMAL DISPERSION TYPE FLOW SWITCHES
RATED
CAPACITY
(TONS)
54.8 95.0
LWT
(°F)
R513A
REFRIGERANT
TYPE
RTHD
SELECTION BASED
ON "TRANE"V PH
460 3
COOLING EFFICIENCY
(KW/TON)
0.6452
RATED COOLING
EFFICIENCY (KW/TON)
0.6366
IPLV
(KW/TON)
0.4163135.5
WIDTH
(IN.)
LENGTH
(IN.)
WEIGHT
(LBS)
16,801
HEIGHT
(IN.)
DIMENSIONAL DATA
85.0
DESCRIPTION
CT-1 95.0607 85.0 78.0
EAT
WB(°F)
COOLING TOWER SCHEDULE
MOTOR DATA
43,0001 1 15
TOTAL CFM
FAN DATA
QUANTITY QUANTITY HP
1 6 460 3
SUMP HEATERS
QUANTITY KW PH
ELECTRICAL
V
REMARKS
AT 19-4J86600
UNIT
NO.
FLOW
(GPM)
EWT
(°F)
LWT
(°F)
SELECTION
BASED ON
"EVAPCO"
REMARKS: 1 PROVIDE NEMA 4XSS PANEL WITH INTEGRAL VFD FOR TOWER FAN AND CONTROLS
FOR SUMP HEATERS. CONTROL PANEL SHALL BE PROVIDED WITH 5kA SCCR.
PROVIDE WITH 304 STAINLESS STEEL COLD WATER BASIN AND UPPER SECTION.
PROVIDE WITH MOTOR DAVIT WITH BASE AND ALUMINUM LADDER WITH
EXTENSION.
PROVIDE WITH ELECTRONIC WATER LEVEL CONTROL PACKAGE BY TOWER
MANUFACTURER.
5 PROVIDE SEPARATE 120V CONNECTION FOR FAN MOTOR SPACE HEATERS.
APPROXIMATE DRAW IS <2 AMPS. COORDINATE CONNECTION DETAILS WITH DIV
26.
THE EQUIPMENT SCHEDULE SHOWN IS BASED ON EVACPO "AT" EQUIPMENT AND IS
INTENDED ONLY TO SHOW THE GENERAL SIZE, CONFIGURATION, LOCATION,
CONNECTIONS, AND SUPPORT FOR EQUIPMENT OR SYSTEMS SPECIFIED WITH
RELATION TO THE OTHER BUILDING SYSTEMS. SEE SPECIFICATION SECTION
230500 FOR TECHNICAL REQUIREMENTS PERTAINING TO THE EQUIPMENT.
INDUCED DRAFT, COUNTERFLOW 6
WEIGHT
(LBS.)
CT-2 607 1 2 3 4INDUCED DRAFT, COUNTERFLOW 5 6
MOTOR DATA
PHVRPMHP
SYSTEMTYPE
PUMP SCHEDULE
REMARKS
P-1 607 50 10 1800 460 3 E-1510 4BD
BASE MOUNTED
END SUCTION
UNIT
NO.
SELECTION
BASED ON
"BELL & GOSSETT"
REMARKS: 1 PROVIDE WITH MATCHED SUCTION DIFFUSER BY PUMP MANUFACTURER.
PROVIDE WITH VARIABLE FREQUENCY DRIVE MATCHED TO MOTOR HP.
PROVIDE PREMIUM EFFICIENCY INVERTER DUTY MOTOR WITH AEGIS
GROUNDING RING.
ENCLOSURE TYPE
ODP80.6
CONDENSER
WATER (LEAD)
REMARKSWHEELTYPE ARRANGEMENT
EXHAUST FAN SCHEDULE
MOTOR DATA
DRIVE
HP V PH
EF-2 INLINE CABINET HORIZONTAL DIRECT 3460 0.375 6137 1 115 1 DDC 11.4 SQ-16-M2-VG1172
UNIT
NO.
ESP
(IN. WC)
MAX.
TIP SPEED
(FPM)
CONTROL
METHOD
MAX.
SONES
SELECTION
BASED ON
"GREENHECK"
MIXED FLOW
FAN
(RPM)
REMARKS: 1 PROVIDE WITH FACTORY MOUNTED AND
WIRED DISCONNECT SWITCH.
PROVIDE WITH EC MOTOR.
OUTLET
VELOCITY
FPM
HELICAL-ROTARY
SCREW CHILLER
REFRIGERANT
CHARGE (LBS)
RLA
1 2 3 4 5
1 2 3 4 5
C-2 210.0 466 2.4 44.0 607 10.2 1 233 40054.8 95.0 R513ARTHD460 30.64520.6366 0.4163135.5 75143 16,8017885.0HELICAL-ROTARY
SCREW CHILLER
525186 1 2 3 4 5
A SEPARATE 115V, 15A CIRCUIT IS REQUIRED FOR CHILLER CONTROLS. MECHANICAL
CONTRACTOR SHALL COORDINATE ALL ELECTRICAL REQUIREMENTS WITH ELECTRICAL
CONTRACTOR PRIOR TO BID.
ALL EFFICIENCY DATA SHALL BE CERTIFIED IN ACCORDANCE WITH AHRI 550/590 AND 551/591.
5 THE EQUIPMENT SCHEDULE SHOWN IS BASED ON TRANE "RTHD" EQUIPMENT AND IS
INTENDED ONLY TO SHOW THE GENERAL SIZE, CONFIGURATION, LOCATION, CONNECTIONS,
AND SUPPORT FOR EQUIPMENT OR SYSTEMS SPECIFIED WITH RELATION TO THE OTHER
BUILDING SYSTEMS. SEE SPECIFICATION SECTION 230500 FOR TECHNICAL REQUIREMENTS
PERTAINING TO THE EQUIPMENT.4
95.0 85.0 78.0 43,0001 1 15 1 6 460 3 AT 19-4J86600
FLOW
(GPM)
HEAD
(FT)
EFFICIENCY
(PLEV %)
P-2 607 50 10 1800 460 3 E-1510 4BD
BASE MOUNTED
END SUCTION 1ODP80.6
CONDENSER
WATER (STAND-BY)
P-3 466 60 10 1800 460 3 E-1510 3BD
BASE MOUNTED
END SUCTION 1ODP82.4
PRIMARY CHILLED
WATER (LEAD)
P-4 466 60 10 1800 460 3 E-1510 3BD
BASE MOUNTED
END SUCTION 1ODP82.4
PRIMARY CHILLED
WATER (STAND-BY)
P-5 932 90 30 1800 460 3 E-1510 5EB
BASE MOUNTED
END SUCTION 1ODP85.4
SECONDARY CHILLED
WATER (LEAD)
P-6 932 90 30 1800 460 3 E-1510 5EB
BASE MOUNTED
END SUCTION 1ODP85.4
SECONDARY CHILLED
WATER (STAND-BY)
4 THE EQUIPMENT SCHEDULE SHOWN IS BASED ON BELL & GOSSETT
"E-1510" EQUIPMENT AND IS INTENDED ONLY TO SHOW THE GENERAL
SIZE, CONFIGURATION, LOCATION, CONNECTIONS, AND SUPPORT FOR
EQUIPMENT OR SYSTEMS SPECIFIED WITH RELATION TO THE OTHER
BUILDING SYSTEMS. SEE SPECIFICATION SECTION 230500 FOR
TECHNICAL REQUIREMENTS PERTAINING TO THE EQUIPMENT.
2 3
2 3
2 3
2 3
2 3
2 3
HEAT TRACE SCHEDULE
EQUIPMENT SERVED
YES DOUBLE
SINGLE OR
DOUBLE TRACED
V
16 120
REMARKS:
SINGLE 8 120
SINGLE 8 120
REMARKS
1 FIELD VERIFY TOTAL LENGTH OF HEAT TRACE REQUIRED. PROVIDE CONTRACTOR
PLANNED PIPING INSTALLATION OR CONSTRUCTED PIPE ROUTING TO HEAT TRACE
CABLE MANUFACTURER TO DETERMINE THE LENGTH REQUIRED. THE CONTRACTOR
IS RESPONSIBLE FOR PROVIDING A SECOND CIRCUIT AND CONTROLLER IF THE
HEAT TRACE CABLE MUST EXCEED THE CIRCUIT MAXIMUM.
REFER TO HEAT TRACE CABLE ORIENTATION DETAIL AND TYPICAL HEAT TRACE
FITTINGS DETAIL ON M301 FOR ADDITIONAL INFORMATION.
EMERGENCY
POWERED
PH
METHOD OF
CONTROL
3 NUMBER OF CIRCUITS SHALL BE EQUAL TO THE NUMBER OF TERMINAL CONTROLLERS
USED PER PIPE UNLESS OTHERWISE NOTED. TERMINAL CONTROLLER "POWERTRACE
ETC-1" OR APPROVED EQUAL. TERMINAL CONTROLLER SHALL HAVE INTEGRAL
GROUND FAULT PROTECTION AND A BAS MONITORING POINT.
THE EQUIPMENT SCHEDULE SHOWN IS BASED ON HEAT TRACE PRODUCTS "2700
SERIES" EQUIPMENT AND IS INTENDED ONLY TO SHOW THE GENERAL SIZE,
CONFIGURATION, LOCATION, CONNECTIONS, AND SUPPORT FOR EQUIPMENT OR
SYSTEMS SPECIFIED WITH RELATION TO THE OTHER BUILDING SYSTEMS. SEE
SPECIFICATION SECTION 230500 FOR TECHNICAL REQUIREMENTS PERTAINING TO THE
EQUIPMENT.
MAXIMUM
LENGTH (LF)
ESTIMATED
LENGTH (LF)
THERMOSTAT
CONTROLLER
YES
YES
NO. OF CIRCUITS
PER PIPE
THERMOSTAT
CONTROLLER
THERMOSTAT
CONTROLLER
THERMOSTAT
CONTROLLER
THERMOSTAT
CONTROLLER
8" CT-1 CWS PIPING
8" CT-1 CWR PIPING
8" CT-2 CWS PIPING
8" CT-2 CWR PIPING
2" CT-2 CW MAKE UP PIPING
THERMOSTAT
CONTROLLER
TOTAL
W/LF
YES DOUBLE 16 120 12
YES DOUBLE 16 120 12
YES DOUBLE 16 120 12
4" CT EQUALIZER PIPING
2 3
4 THE EQUIPMENT SCHEDULE SHOWN IS BASED ON GREENHECK "SQ" EQUIPMENT AND IS INTENDED
ONLY TO SHOW THE GENERAL SIZE, CONFIGURATION, LOCATION, CONNECTIONS, AND SUPPORT FOR
EQUIPMENT OR SYSTEMS SPECIFIED WITH RELATION TO THE OTHER BUILDING SYSTEMS. SEE
SPECIFICATION SECTION 230500 FOR TECHNICAL REQUIREMENTS PERTAINING TO THE EQUIPMENT.
3 FAN SHALL BE CONTROLLED THROUGH BAS
IN RESPONSE TO ROOM TEMPERATURE
AND REFRIGERANT MONITOR. REFER TO
M402 FOR ADDITIONAL INFORMATION.
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
THREE-WAY CONTROL VALVE
MAX
CFM
CONTROLLER
DESIGNATION
SINGLE 8 120 1 6525YES 1
THERMOSTAT
CONTROLLER
2" CT-1 CW MAKE UP PIPING 1 2 3 4
HTC-1
HTC-3
HTC-2
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY COOLING EQUIPMENT TO MAINTAIN THE SPACE TEMPERATURE
AND HUMIDITY BELOW THE MAXIMUM LIMITS OF 76°F DB AND 60% RH.
2. TEMPORARY COOLING/DEHUMIDIFICATION EQUIPMENT SHALL BE PROVIDED FOR THE ENTIRE BUILDING IN THE FORM OF A
TEMPORARY RENTAL CHILLER. CHILLER SHALL HAVE 425-TON NET CAPACITY TO MATCH EXISTING CHILLER CAPACITY. RENTAL
CHILLER SHALL BE PROVIDED WITH INTEGRAL ONBOARD PUMPS TO CIRCULATE CHILLED WATER THROUGHOUT THE EXISTING
BUILDING.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY PIPING, VALVES, PIPING CONNECTIONS, AND ELECTRICAL
CONNECTIONS TO PROVIDE A COMPLETE TEMPORARY CHILLED WATER SYSTEM DURING THE DOWNTIME OF THE EXISTING
CHILLERS.
4. WHEN THE NEW CHILLERS ARE READY FOR CONNECTION TO THE SYSTEM, THE CONTRACTOR SHALL COORDINATE A TIME WITH
THE OWNER THAT THE CHILLED WATER SYSTEM MAY BE TAKEN OFFLINE FOR A MAXIMUM OF 7 DAYS. DURING THIS 7-DAY
DOWNTIME, CONTRACTOR SHALL MAKE FINAL SYSTEM PIPING CONNECTIONS TO NEW CHILLED WATER PIPING IN MECHANICAL
ROOM, AS WELL AS ELECTRICAL CONNECTIONS TO THE NEW CHILLERS.
TEMPORARY CONDITIONING NOTE
PX
M
XX
M
XX
MD101
E N
L A
R G
E D
M E
C H
A N
IC
A
L R
O O
M A
N D
Y A
R D
P L A
N
D E
M O
L
IT
IO
N
BDC
MAR
KDA
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD VA BEACH, VA 23452
KEY PLAN
NOT TO SCALE
SCALE FEET
5' 20'15'10'5'0 1/8" = 1'-0"
FEET
10'8'6'4'2'0
SCALE
2' 1/4" = 1'-0"
AREA OF WORK
V
IR
G
IN
IA
B
E A
C H
V
IR
G
IN
IA
A T
C R
E P
L A
C E
C H
IL
L
E D
W A
T E
R P
L A
N T
T
ID
E W
A T
E R
C O
M M
U N
IT
Y
C O
L L
E G
E
V
IR
G
IN
IA
B
E A
C H
C A
M P
U S
S T
A T
E P
R O
J E
C T
N O
-B
-1
M
T
C
09-25-2026
ENLARGED MECHANICAL ROOM AND YARD PLAN - DEMOLITION
SCALE: 1/4" = 1'-0"
CT-1 D5
AREA DRAIN (TYP.)
D4
8"
(8")
(8" CONCRETE PAD)
EXISTING CONCRETE PIER TO REMAIN,
REFER TO STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION (TYP.)
(PRE-INSULATED
UNDERGROUND
PIPE)
(10")
(72"/30")
TRANSOM
LOUVER
8"
(PRE-INSULATED
UNDERGROUND
PIPE)
C W
R
C W
S
(SCREEN WALL)
D2
(UH-1)
D4 P-1D7
P-2D7
P-3D7
P-4
D7
C-1D1
C-2D1
C S
D2
CHWR
6"
6"
10"
8"
CWR
D3
D3
8" ADS
D4
(B-1)
(B-2)
(ET)
(ET)
ET
P-5
P-6
(P-9)
(P-10)
(ADS)
CHEMICAL
SHOT
FEEDER
D9
(CHEMICAL
SHOT
FEEDER)
(HWS)
(4")
(2")
(4")
(6")
(3")
8"
3"
(6")
(P-8)
(P-7)
(HW)
(ET)
(DI-1)
(4"ø FLUE)
EF-2(20"/20")
(30"/14" DN
TO FLOOR) D2 D6
D6
(4") HWS UP
(4") HWR UP (8") CHWR UP
(P-10 VFD)
(P-9 VFD)
(8") CHWS UP D4
D4
(4")
(HWR)
(HWS)
(CHWR)
(CHWS)
(SF-1)
(72"/30")
TRANSOM
LOUVER
(72"/30")
TRANSOM
LOUVER
(DHC-1)
(30"/30")
(30"/14")
CWS CS
(H W
S
(H W
R
(HWR)
(EF-1)
(6")
CHWR
8"
8"
8"
8"
C H
W R
10"(10") D4
D4
T
CHWS
CHWS
(DDC PANEL)
P-6 VFD
P-5 VFDD8
D8
REMOVE CENTRIFUGAL CHILLER COMPLETE INCLUDING
ALL CONTROLS AND ACCESSORIES. RELIEF PIPING TO
REMAIN.
DISCONNECT AND REMOVE REFRIGERANT MONITOR
AND ALL ASSOCIATED SENSORS, STROBES, AND HORNS
COMPLETE.
DISCONNECT AND REMOVE 72"/30" CONTROL DAMPER
COMPLETE.
REMOVE CONDENSER/CHILLED WATER PIPING
COMPLETE TO POINT INDICATED. POINT OF
DISCONNECTION SHALL BE AT FLANGE CLOSEST TO
FINISHED GRADE. CAREFULLY REMOVE EXISTING
EXTERIOR PIPE SUPPORTS AS NECESSARY TO
ACCOMMODATE NEW PIPING INSTALLATION. RETAIN
PIPE SUPPORTS FOR REINSTALLATION.
DISCONNECT AND REMOVE COOLING TOWER
COMPLETE INCLUDING ALL CONTROLS AND
ACCESSORIES. STRUCTURAL SUPPORTS TO REMAIN.
REMOVE EXHAUST FAN AND ASSOCIATED DUCT
TRANSITIONS COMPLETE AND DISCONNECT AT POINTS
INDICATED.
DISCONNECT AND REMOVE BASE MOUNTED PUMP
COMPLETE.
DISCONNECT AND REMOVE PUMP VFD COMPLETE.
REMOVE CHEMICAL SHOT FEEDER COMPLETE.
REMOVE CHILLED WATER EXPANSION TANK COMPLETE
INCLUDING HANGERS AND ACCESSORIES.
REMOVE CHILLED WATER AIR SEPARATOR COMPLETE.
REMOVE COOLING TOWER DRAIN PIPING COMPLETE.
REMOVE DOMESTIC COLD WATER PIPING TO POINT
INDICATED. POINT OF DISCONNECTION SHALL BE AT
FLANGE CLOSEST TO FINISHED GRADE.
REMOVE CHILLER CONCRETE PAD COMPLETE.
DEMOLITION NOTES
DESCRIPTIONNO.
D1
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
(M
(M
CT-2 D5
(GENERATOR)
(TRANSFORMER)
(DUMSTER)
(DUMSTER)
D7
D7
CD
CD
D13
D14
AREA DRAIN (TYP.)
(8" CONCRETE PAD)
P1
D4
D4
D4
D5
CT-1 D5
CWS
C W
R
C W
R
C W
S (72"/30")
TRANSOM
LOUVER
COOLING TOWER DEMOLITION PHOTO
4" EQUALIZER PIPE
D2
(20"/20" EXHAUST DUCT
CONTINUED UP TO
TERMINATION ON ROOF)
8"
D2
NOTE: EXISTING CONDITIONS ILLUSTRATED HAVE BEEN
DETERMINED FROM ORIGINAL CONSTRUCTION DOCUMENTS AND
LIMITED NON-INVASIVE FIELD INVESTIGATION. THE CONTRACTOR
SHALL INVESTIGATE FIELD CONDITIONS PRIOR TO COMMENCEMENT
OF WORK, COORDINATE AND MAKE ADJUSTMENTS AS NECESSARY.
(SCREEN WALL)
CT-2
ELECTRICAL
A100B
RECEIVING
A101
CORRIDOR
A104
MECHANICAL
A100
MECHANICAL
A100A
MD
MD
P1
MD
MD
M101
E N
L A
R G
E D
M E
C H
A N
IC
A
L R
O O
M A
N D
Y A
R D
P L A
N
N E
W W
O R
K
BDC
MAR
KDA
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD VA BEACH, VA 23452
KEY PLAN
NOT TO SCALE
SCALE FEET
5' 20'15'10'5'0 1/8" = 1'-0"
FEET
10'8'6'4'2'0
SCALE
2' 1/4" = 1'-0"
AREA OF WORK
V
IR
G
IN
IA
B
E A
C H
V
IR
G
IN
IA
A T
C R
E P
L A
C E
C H
IL
L
E D
W A
T E
R P
L A
N T
T
ID
E W
A T
E R
C O
M M
U N
IT
Y
C O
L L
E G
E
V
IR
G
IN
IA
B
E A
C H
C A
M P
U S
S T
A T
E P
R O
J E
C T
N O
-B
-1
M
T
C
09-25-2026
ENLARGED MECHANICAL ROOM AND YARD PLAN - NEW WORK
SCALE: 1/4" = 1'-0"
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD VA BEACH, VA 23452
KEY PLAN
NOT TO SCALE
SCALE FEET
5' 20'15'10'5'0 1/8" = 1'-0"
FEET
10'8'6'4'2'0
SCALE
2' 1/4" = 1'-0"
AREA OF WORK
V
IR
G
IN
IA
B
E A
C H
V
IR
G
IN
IA
A T
C R
E P
L A
C E
C H
IL
L
E D
W A
T E
R P
L A
N T
T
ID
E W
A T
E R
C O
M M
U N
IT
Y
C O
L L
E G
E
V
IR
G
IN
IA
B
E A
C H
C A
M P
U S
S T
A T
E P
R O
J E
C T
N O
-B
-1
M
T
C
09-25-2026
(8")
(8" CONCRETE PAD)
EXISTING CONCRETE PIER TO REMAIN,
REFER TO STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION (TYP.)
(PRE-INSULATED
UNDERGROUND
PIPE)
(10")
(72"/30")
TRANSOM
LOUVER
(PRE-INSULATED
UNDERGROUND
PIPE)
C W
R
C W
S
(SCREEN WALL)
(UH-1)
(B-1)
(B-2)
(ET)
(ET)
(P-9)
(P-10)
(ADS)
(HWS)
(4")
(2")
(4")
(6")
(3")
(6")
(P-8)
(P-7)
(HW)
(ET)
(DI-1)
(4"ø FLUE)
(20"/20")
(30"/14" DN
TO FLOOR)
(4") HWS UP
(4") HWR UP (8") CHWR UP
(P-10 VFD)
(P-9 VFD)
(8") CHWS UP (4")
(HWR)
(HWS)
(CHWR)
(CHWS)
(SF-1)
(72"/30")
TRANSOM
LOUVER
(72"/30")
TRANSOM
LOUVER
(DHC-1)
(30"/30")
(30"/14")
CWS
(H W
S
(H W
R
(HWR)
(EF-1)
(6")
(10")
T
(DDC PANEL)
(GENERATOR)
(TRANSFORMER)
(DUMSTER)
(DUMSTER)
(8" CONCRETE PAD)
(72"/30")
TRANSOM
LOUVER
(20"/20" EXHAUST DUCT
CONTINUED UP TO
TERMINATION ON ROOF)
ELECTRICAL
A100B
RECEIVING
A101
CORRIDOR
A104
MECHANICAL
A100
MECHANICAL
A100A
(M
(M
8"
2"
2 8
3 8
CT-11
T
7 4"
CWS
CWS
8"
6"
8"
6"
C W
S
8"
CWR
CWS
CHWR
8"
10"
C-1
T EF-1
8"
10"
9 11 P-4
9 11 P-3
9 11 P-2
9 11 P-1
V F
D
CHWS
CHWR
V F
D
V F
D
9 11 P-5
9 11 P-6
17 ET
16 ADS
22 CF
8"
8"
(CHEMICAL
SHOT
FEEDER)
8" DECOUPLER
EF-2
1 1/2"
8"
3"
CHWS
8"
8"
3"
2 8
2"
3"
3 8
MOUNT COOLING TOWER ON EXISTING STRUCTURAL
CONCRETE PIER. REFER TO STRUCTURAL DRAWINGS
FOR ADDITIONAL INFORMATION AND MOUNTING
DETAILS.
PROVIDE EXTERIOR CWS/CWR PIPING AND INSULATION
TO POINT INDICATED. REINSTALL EXISTING PIPE
SUPPORTS RETAINED FROM DEMOLITION.
PROVIDE DOMESTIC CW PIPING AND RECONNECT TO
EXISTING AT POINT INDICATED.
PROVIDE COOLING TOWER DRAIN PIPING AND ROUTE
TO EXISTING COURTYARD DRAIN. CONNECT TO
COOLING TOWER STANDARD DRAIN AND OVERFLOW
DRAIN PORTS.
NEMA 4X-SS CONTROL CABINET PROVIDED BY COOLING
TOWER MANUFACTURER. CABINET TO INCLUDE
COOLING TOWER BASIN HEATER CONTRACTOR,
VIBRATION SWITCH, AND ALL REQUIRED CONTROLS.
COORDINATE REQUIREMENTS WITH ELECTRICAL
CONTRACTOR.
PROVIDE 4" COOLING TOWER EQUALIZER PIPING,
INSULATION, AND SUPPORTS. ROUTE SUCH THAT TOP
OF FINISHED PIPING IS APPROXIMATELY 12" ABOVE
GRADE. PROVIDE MANUAL BUTTERFLY VALVE AND
HORIZONTAL CLEANOUT TEE WITH BLIND FLANGE.
LINE VOLTAGE THERMOSTAT FOR HEAT TRACE.
PROVIDE HEAT TRACE AND INSULATE ALL OUTDOOR
PIPING ABOVE GRADE. FINISH WITH ALUMINUM
JACKETING IN ACCORDANCE WITH SPECIFICATION
SECTION 230700.
MOUNT PUMP ON EXISTING CONCRETE PAD. REFER TO
"BASE MOUNTED END SUCTION PUMP PIPING DIAGRAM"
ON DRAWING M301 FOR ADDITIONAL INFORMATION.
PROVIDE LOW PRESSURE DROP 8" SYSTEM STRAINER
UPSTREAM OF CONDENSER WATER PUMP SUCTION
DIFFUSER.
MAINTAIN AT LEAST 36" OF SERVICE CLEARANCE ON AT
LEAST ONE SIDE OF PUMP AS INDICATED.
PROVIDE CHWS/CHWR PIPING, INSULATION,
ACCESSORIES, AND HANGERS AND RECONNECT TO
EXISTING AT POINT INDICATED.
PROVIDE CONDENSER WATER PIPING, ACCESSORIES,
AND HANGERS AND RECONNECT TO EXISTING AT POINT
INDICATED.
PROVIDE PUMP MOTOR VFD AND MOUNT ON UNISTRUT
RACK. REFER TO ELECTRICAL DRAWINGS AND 230500
2.9 FOR ADDITIONAL REQUIREMENTS.
PROVIDE NEW DUCTWORK AND TRANSITIONS AND
RECONNECT TO EXISTING AT POINT INDICATED TO
ACCOMMODATE NEW INLINE EXHAUST FAN. REFER TO
"INLINE EXHAUST FAN MOUNTING DETAIL" ON M301 FOR
ADDITIONAL REQUIREMENTS.
PROVIDE AIR DIRT SEPARATOR SPIROTHERM MODEL
VDN800 OR EQUAL.
PROVIDE 53-GALLON EXPANSION TANK, BELL &
GOSSETT MODEL B200 OR EQUAL. MOUNT ON NEW
CONCRETE PAD.
PROVIDE NEW 4" CONCRETE HOUSEKEEPING PAD.
REFER TO "CONCRETE HOUSEKEEPING PAD DETAIL" ON
DRAWING M301 FOR ADDITIONAL INFORMATION.
PROVIDE COMPLETE COOLING TOWER CHEMICAL
TREATMENT SYSTEM. REFER TO "CHEMICAL
TREATMENT PIPING DIAGRAM" ON DRAWING M301 FOR
ADDITIONAL INFORMATION.
DOMESTIC CW CONNECTION TO CHILLED WATER LOOP.
REFER TO CHILLED WATER PIPING DIAGRAM FOR
ADDITIONAL INFORMATION.
MOUNT CHILLER ON NEW 8" CONCRETE PAD SUCH THAT
PAD EXTENDS 6" BEYOND EDGE OF CHILLER BASE ON
ALL SIDES. REFER TO "CHILLER CONCRETE PAD
DETAIL" ON M301 FOR ADDITIONAL INFORMATION.
PROVIDE 5-GALLON CHEMICAL SHOT FEEDER WITH
FUNNEL, STAND, AND ISOLATION VALVES AND MOUNT
ON EXISTING CONCRETE PAD. REFER TO "5 GALLON
CHEMICAL FEED TANK DETAIL" ON M301 FOR
ADDITIONAL INFORMATION.
PROVIDE 72"/30" CONTROL DAMPER AND MOUNT IN
EXISTING DUCTWORK. DAMPER SHALL BE CONFIGURED
FOR 24V. REFER TO M402 FOR SEQUENCE OF
OPERATION.
PROVIDE WALL-MOUNTED ALARM HORN AND STROBE
FOR USE WITH REFRIGERANT DETECTION SYSTEM.
REFER TO M402 FOR ADDITIONAL REQUIREMENTS.
DESCRIPTIONNO.
NEW WORK NOTES
CT-2
8"
C-2
CD
CD
T
T 7
V F
D V
F D
V F
D
(TYP.
OF 4)
M201
C H
IL
L
E D
A N
D C
O N
D E
N S
E R
W A
T E
R P
IP
IN
G D
IA
G
R A
M S
D
E M
O L
IT
IO
N
BDC
MAR
KDA
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD VA BEACH, VA 23452
V
IR
G
IN
IA
B
E A
C H
V
IR
G
IN
IA
A T
C R
E P
L A
C E
C H
IL
L
E D
W A
T E
R P
L A
N T
T
ID
E W
A T
E R
C O
M M
U N
IT
Y
C O
L L
E G
E
V
IR
G
IN
IA
B
E A
C H
C A
M P
U S
S T
A T
E P
R O
J E
C T
N O
-B
-1
M
T
C
09-25-2026
3"DRAIN (TYP.)
3"OVERFLOW (TYP.)
FINISHED GRADE
(TYP.)
2"CW MAKEUP
DRAIN (TYP.)
4" OPEN HUB
VALVES
MODULATING
BY-PASS
STATION
CWR
CWS CWS
VALVES
MODULATING
BY-PASS FLOW
VENTURI
P-1
EXTERIOR INTERIOR
STATION
PAD (TYP.)
4" CONCRETE
(TYP.)
IN PUMP CHASE
C-1
(TYP.)
0-120°F
C-2
CWS
CWR
STATION
CWS
CWR
VENTURI FLOW
VENTURI FLOW
C-1
CHWR
C-2 P-3 P-4
CHWS
FROM BUILDING
BLADDER EXPANSION TANK
W/ FLOORSTAND
SHOT FEEDER
5 GAL. CHEMICALP-5 4" CONCRETE PAD (TYP.)P-6
2" RELIEF VALVE
0-120°F (TYP.)
100 PSI
CHWR
AUTOMATIC AIR VENT
HIGH CAPACITY
VENTURI FLOW
STATION
AIR SEPARATOR
AUTOMATIC AIR VENT
PG - 0 -
CHWS
D5 D5
CONDENSER WATER PIPING DIAGRAM - DEMOLITION
NOT TO SCALE
CHILLED WATER PIPING DIAGRAM - DEMOLITION
NOT TO SCALE
8" EQUALIZER
EXISTING CONCRETE PIER
TO REMAIN, REFER TO
STRUCTURAL DRAWINGS
FOR ADDITIONAL
INFORMATION (TYP.)
D4
8"
8"
D4 D4
D7 D7
D4
D1 D1
FINISHED CONCRETE SLAB
10"
8"
10"
8"
8"
8"
CT-1 CT-2
8"
8"
8"8"
8"
8"
3"
P-2
10"
8"
10"
8"
8"
8"
8" 8"8"8"
6"
6"
8" 6" 6"
8"
8"
6" 6" 6" 6" 6"
8"
8" 8"
8"
8" 8"
8"
8"
1" 6"
8" 8"
2"
1"
2" 2"
2"
2"
8"
8"
D1 D1 D7 D7 D7 D7
BFP
REMOVE CENTRIFUGAL CHILLER COMPLETE INCLUDING
ALL CONTROLS AND ACCESSORIES. RELIEF PIPING TO
REMAIN.
REMOVE CONDENSER/CHILLED WATER PIPING
COMPLETE TO POINT INDICATED. POINT OF
DISCONNECTION SHALL BE AT FLANGE CLOSEST TO
FINISHED GRADE. CAREFULLY REMOVE EXISTING
EXTERIOR PIPE SUPPORTS AS NECESSARY TO
ACCOMMODATE NEW PIPING INSTALLATION. RETAIN
PIPE SUPPORTS FOR REINSTALLATION.
DISCONNECT AND REMOVE COOLING TOWER
COMPLETE INCLUDING ALL CONTROLS AND
ACCESSORIES. STRUCTURAL SUPPORTS TO REMAIN.
DISCONNECT AND REMOVE BASE MOUNTED PUMP
COMPLETE.
DISCONNECT AND REMOVE PUMP VFD COMPLETE.
REMOVE CHEMICAL SHOT FEEDER COMPLETE.
REMOVE CHILLED WATER EXPANSION TANK COMPLETE
INCLUDING HANGERS AND ACCESSORIES.
REMOVE CHILLED WATER AIR SEPARATOR COMPLETE.
REMOVE COOLING TOWER DRAIN PIPING COMPLETE.
DEMOLITION NOTES
DESCRIPTIONNO.
D1
D4
D5
REMOVE DOMESTIC COLD WATER PIPING COMPLETE TO
POINT INDICATED. POINT OF DISCONNECTION SHALL BE
AT FLANGE CLOSEST TO FINISHED GRADE.
REMOVE CHILLER CONCRETE PAD COMPLETE.
REMOVE DOMESTIC COLD WATER PIPING TO
BACKFLOW PREVENTER, INCLUDING PRESSURE RELIEF
AND REDUCING VALVES, AND QUICK FILL BYPASS.
DISCONNECT AND REMOVE CHILLED WATER PIPING
COMPLETE TO POINT INDICATED.
DISCONNECT AND REMOVE EXISTING TWO-WAY
BYPASS VALVE LOCATED AT AHU-2 COIL CONNECTION
AND ASSOCIATED PIPING COMPLETE.
DISCONNECT AND REMOVE EXISTING DP SENSOR
LOCATED AT AHU-2 COIL CONNECTION AND
ASSOCIATED PIPING COMPLETE.
DEMOLITION NOTES
DESCRIPTIONNO.
D13
D14
D15
TO BUILDING
(8")
FROM
BUILDING
8"
3"
(3")
(8")
TO
BUILDING
8"
(3")
3"
TO
DOMESTIC CW
D16
D17
D18
D7
D8
D9
D10
D11
D12
PGPG
PGPG
PG PG
PGPG
PGPG
VENTURI
FLOW
STATION
VENTURI
FLOW
STATION
VENTURI
FLOW
STATION
VENTURI
FLOW
STATION
FINISHED CONCRETE SLAB
VFD
P-5
VFD
P-6
D8D8
D9
EXISTING
PRE-INSULATED
PIPING IN
CONDUIT (TYP.)
M202
C H
IL
L
E D
A N
D C
O N
D E
N S
E R
W A
T E
R P
IP
IN
G D
IA
G
R A
M S
N
E W
W O
R K
BDC
MAR
KDA
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD VA BEACH, VA 23452
V
IR
G
IN
IA
B
E A
C H
V
IR
G
IN
IA
A T
C R
E P
L A
C E
C H
IL
L
E D
W A
T E
R P
L A
N T
T
ID
E W
A T
E R
C O
M M
U N
IT
Y
C O
L L
E G
E
V
IR
G
IN
IA
B
E A
C H
C A
M P
U S
S T
A T
E P
R O
J E
C T
N O
-B
-1
M
T
C
09-25-2026
FINISHED GRADE
CWR
CWS CWS
EXTERIOR INTERIOR
PAD (TYP.)
4" CONCRETE
CWR
CHWR
CHWS
FROM BUILDING
TO BUILDING
CHWR
CHWS
CONDENSER WATER PIPING DIAGRAM - NEW WORK
NOT TO SCALE
CHILLED WATER PIPING DIAGRAM - NEW WORK
NOT TO SCALE
EXISTING CONCRETE PIER
TO REMAIN, REFER TO
STRUCTURAL DRAWINGS
FOR ADDITIONAL
INFORMATION (TYP.)
(8")
(8")
FINISHED FLOOR
(10")
(10")
(8")
(8")
10"
10"
8"
8"
6"
6"
8"
8"
6"
8"
8"
2"
8"
BFP
2 13 13
VFD
P-2
VFD
P-1
P-19 P-29
CT-1
CT-2
4" OPEN HUB
DRAIN (TYP.)
4 3" 4 3"
3" OVERFLOW (TYP.)
3" DRAIN (TYP.)
6 4"
T 7
T 7
8 8
CWS
CWR
CWS
21 C-1 21 C-2
COOLING
TOWER
CHEMICAL
TREATMENT
607 GPM 607 GPM3/4"
8" 8"
8" 8"
8" 8"
8"8"
8"8"
8" 8"
4"
2" 2"
23 23
MOUNT COOLING TOWER ON EXISTING STRUCTURAL
CONCRETE PIER. REFER TO STRUCTURAL DRAWINGS
FOR ADDITIONAL INFORMATION AND MOUNTING
DETAILS.
PROVIDE EXTERIOR CWS/CWR PIPING AND INSULATION
TO POINT INDICATED. REINSTALL EXISTING PIPE
SUPPORTS RETAINED FROM DEMOLITION.
PROVIDE DOMESTIC CW PIPING AND RECONNECT TO
EXISTING AT POINT INDICATED.
PROVIDE COOLING TOWER DRAIN PIPING AND ROUTE
TO EXISTING COURTYARD DRAIN. CONNECT TO
COOLING TOWER STANDARD DRAIN AND OVERFLOW
DRAIN PORTS.
PROVIDE 4" COOLING TOWER EQUALIZER PIPING,
INSULATION, AND SUPPORTS. ROUTE SUCH THAT TOP
OF FINISHED PIPING IS APPROXIMATELY 12" ABOVE
GRADE. PROVIDE MANUAL BUTTERFLY VALVE AND
HORIZONTAL CLEANOUT TEE WITH BLIND FLANGE.
LINE VOLTAGE THERMOSTAT FOR HEAT TRACE.
PROVIDE HEAT TRACE AND INSULATE ALL OUTDOOR
PIPING ABOVE GRADE. FINISH WITH ALUMINUM
JACKETING IN ACCORDANCE WITH SPECIFICATION
SECTION 230700.
MOUNT PUMP ON EXISTING CONCRETE PAD. REFER TO
"BASE MOUNTED END SUCTION PUMP PIPING DIAGRAM"
ON DRAWING M301 FOR ADDITIONAL INFORMATION.
PROVIDE LOW PRESSURE DROP 8" SYSTEM STRAINER
UPSTREAM OF CONDENSER WATER PUMP SUCTION
DIFFUSER.
PROVIDE CHWS/CHWR PIPING, INSULATION,
ACCESSORIES, AND HANGERS AND RECONNECT TO
EXISTING AT POINT INDICATED.
DESCRIPTIONNO.
NEW WORK NOTES
P-39 P-49 P-59 P-69
6"6"466 GPM 6"466 GPM 6"
6" 6" 6" 8" 8" 8" 8"
TO FD
CF
8"8"
8"
1" 1"
8" DECOUPLER
TO FD
ET
1"
AAV
AAV
ADS
3/4"
2"
2"
PRESSURE REDUCING
VALVE, SET @ 30PSIG
PRESSURE RELIEF
VALVE, SET @ 35PSIG
(8")
(3")
FROM
BUILDING
8"
8"
CHWR
CHWSCHWR
CHWS
CHWR
CHWS
CHWR
CHWS
3"
(3")
FROM
DOMESTIC CW
(8")
TO
BUILDING
8"
21 C-1 21 C-2
VFD
P-3
VFD
P-4
VFD
P-5
VFD
P-6
932 GPM932 GPM466 GPM466 GPM
932 GPM
4" CONCRETE PAD
TO REMAIN
4" CONCRETE PAD
TO REMAIN
FINISHED FLOOR
PROVIDE CONDENSER WATER PIPING, ACCESSORIES,
AND HANGERS AND RECONNECT TO EXISTING AT POINT
INDICATED.
PROVIDE PUMP MOTOR VFD AND MOUNT ON UNISTRUT
RACK. REFER TO ELECTRICAL DRAWINGS AND 230500
2.9 FOR ADDITIONAL REQUIREMENTS.
PROVIDE AIR DIRT SEPARATOR SPIROTHERM MODEL
VDN800 OR EQUAL.
PROVIDE 53-GALLON EXPANSION TANK, BELL &
GOSSETT MODEL B200 OR EQUAL. MOUNT ON NEW
CONCRETE PAD.
PROVIDE NEW 4" CONCRETE HOUSEKEEPING PAD.
REFER TO "CONCRETE HOUSEKEEPING PAD DETAIL" ON
DRAWING M301 FOR ADDITIONAL INFORMATION.
PROVIDE COMPLETE COOLING TOWER CHEMICAL
TREATMENT SYSTEM. REFER TO "CHEMICAL
TREATMENT PIPING DIAGRAM" ON DRAWING M301 FOR
ADDITIONAL INFORMATION.
MOUNT CHILLER ON NEW 8" CONCRETE PAD SUCH THAT
PAD EXTENDS 6" BEYOND EDGE OF CHILLER BASE ON
ALL SIDES. REFER TO "CHILLER CONCRETE PAD
DETAIL" ON M301 FOR ADDITIONAL INFORMATION.
PROVIDE 5-GALLON CHEMICAL SHOT FEEDER WITH
FUNNEL, STAND, AND ISOLATION VALVES AND MOUNT
ON EXISTING CONCRETE PAD. REFER TO "5 GALLON
CHEMICAL FEED TANK DETAIL" ON M301 FOR
ADDITIONAL INFORMATION.
PROVIDE INVERTED PIPE TRAP TO PREVENT DRAIN
DOWN OF WATER INTO TOWER BASIN. TOP OF TRAP
SHALL BE A MINIMUM OF 1'-6" ABOVE TOWER
CONNECTION.
PROVIDE TWO-WAY BYPASS VALVE SIZED FOR 230 GPM.
PROVIDE 4" PIPING AND RECONNECT TO EXISTING TAPS
AT AHU-3 CHILLED WATER PIPING.
PROVIDE NEW DP SENSOR ACROSS AHU-3 CHILLED
WATER COIL CONNECTION.
DESCRIPTIONNO.
NEW WORK NOTES
V-1 V-2
24 25
24 25
4"
4"
1/2"
1/2"
T 7
HTC-1
HTC-2
HTC-3
EXISTING
PRE-INSULATED
PIPING IN
CONDUIT (TYP.)
MOTORIZED
ISOLATION
VALVE (TYP.)
MOTORIZED
ISOLATION
VALVE (TYP.)
M301
M E
C H
A N
IC
A
L D
E T
A
IL
S
BDC
MAR
KDA
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD VA BEACH, VA 23452
V
IR
G
IN
IA
B
E A
C H
V
IR
G
IN
IA
A T
C R
E P
L A
C E
C H
IL
L
E D
W A
T E
R P
L A
N T
T
ID
E W
A T
E R
C O
M M
U N
IT
Y
C O
L L
E G
E
V
IR
G
IN
IA
B
E A
C H
C A
M P
U S
S T
A T
E P
R O
J E
C T
N O
-B
-1
M
T
C
09-25-2026
HEAT TRACE THERMOSTAT CONTROLLER DETAIL
NOT TO SCALE
AMBIENT AIR TEMPERATURE SENSOR TO BE
PROVIDED BY THERMOSTAT CONTROLLER
MANUFACTURER. IF THE CONTROLLER IS
LOCATED INSIDE, DIVISION 23 CONTRACTOR
SHALL RUN THE SENSOR OUTSIDE NEAR
TRACED PIPE. IF TERMINAL IS LOCATED
OUTSIDE, BIND TEMPERATURE SENSOR NEXT TO
THE TERMINAL.
THERMOSTAT
CONTROLLER
NEMA 4X JUNCTION BOX AND
PIPE STAND OFF CONTAINING
POWER WIRING TO HEAT
TRACE CABLE CONNECTION.
MANUFACTURER POWER
CONNECTION KIT PROVIDED BY
DIVISION 23 CONTRACTOR.
HEAT TRACE CABLE PROVIDED
AND INSTALLED BY DIVISION
23 CONTRACTOR.
HYDRONIC PIPE
HYDRONIC PIPING
INSULATION
POWER WIRE AND CONDUIT
DIVISION 26 PROVIDED AND
INSTALLED. CONNECTION TO
POWER CONNECTION KIT
MADE BY DIV 26 CONTRACTOR.
POWER WIRE AND CONDUIT
DIVISION 26 PROVIDED AND
INSTALLED.
ALL LABOR AND MATERIAL IN THIS
DETAIL SHALL BE DIVISION 23
PROVIDED AND INSTALLED UNLESS
OTHERWISE INDICATED.
BAS CONTRACTOR TO PROVIDE WIRE
AND CONDUIT TO CONNECT TO
INTEGRAL CONTACTS. BAS
CONNECTION SHALL BE FOR
MONITORING ONLY.
HEAT TRACE ORIENTATION DETAIL
NOT TO SCALE
45° 45°
HEAT TRACE
CABLE
SINGLE TRACE
HEAT TRACE
CABLE
DUAL TRACE
45° 45°
TYPICAL HEAT TRACE CABLE - TEE FITTINGS DETAIL
NOT TO SCALE
PIPE TEE - DOUBLE TRACED
PIPE TEE - SINGLE TRACED
FIBERGLASS TAPE
FIBERGLASS TAPE
MANUFACTURER
TEE SPLICE KIT
REMARK:
THE BASIS OF DESIGN HEAT TRACE CABLE IS THE HEAT TRACE PRODUCTS, LLC MODEL 2700. THE ABOVE ARE
MANUFACTURER RECOMMENDED TRACINGS FOR THE BASIS OF DESIGN HEAT TRACE CABLE. THE CONTRACTOR IS
RESPONSIBLE FOR OBTAINING AND FOLLOWING THE SUBMITTED HEAT TRACE MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
PIPE
PIPE WELDED TO ANGLE (TYP)
DOUBLE NUTTED (TYP)
2-3" x 3" x 1/4" ANGLE SUPPORTS
DOUBLE NUTTED (TYP)
WASHER (TYP)
PIPE HANGER SUPPORT DETAIL
NOT TO SCALE
PIPE INSULATION WITH
VAPOR BARRIER
CALCIUM SILICATE
PIPE INSERT (TYP)
VIBRATION ISOLATORS
WHERE REQUIRED BY
SPECIFICATIONS
HANGER ROD, SUSPEND
FROM OVERHEAD (TYP)
WASHER (TYP)
BASE MOUNTED PUMP PIPING DIAGRAM
NOT TO SCALE
GROUT PUMP BASE PER
MANUFACTURER'S INSTRUCTIONS.
ALIGN PUMP AFTER INSTALLATION
AND PRIOR TO GROUTING BASE.
4" CONCRETE PAD
PUMP
PUMP BASE
MOTOR
COUPLING GUARD
CONCENTRIC REDUCER
Y-STRAINER (PUMPS
P-1 AND P-2 ONLY)
PRESSURE
GAUGE (TYP)
RUBBER FLEXIBLE CONNECTOR (TYP)
(ISOLATION) BUTTERFLY VALVE (TYP)
VERTICAL LIFT CHECK VALVE
CHEMICAL TREATMENT PIPING DIAGRAM
NOT TO SCALE
CWS (FROM
COOLING TOWER)
COLD WATER
MAKEUP
CWR (TO COOLING
TOWER)
CHILLER
CONDENSER
BARREL
SAMPLE
LINE
4 (TYP. OF 3)
BLOWDOWN
CHEMICAL FEED RETURN
TO CONDENSER RETURN
INHIBITOR BIOCIDE A BIOCIDE B
8 (TYP.)
NOTE: RECEPTACLE FOR
CONTROLLER AND
CHEMICAL FEED SYSTEM
SHALL BE PROVIDED BY
DIVISION 26
COOLING WATER CONTROLLER,
"WALCHEM WCT600" OR EQUAL.
FLOWSWITCH PLUMBING
ASSEMBLY
CONDUCTIVITY PROBE
CHEMICAL PUMP, "WALCEHM
EZB11D1-VC" OR EQUAL.
3/4" BLEED SOLENOID VALVE
BILL OF MATERIALS
DESCRIPTIONNO.
(THIS DIAGRAM
ONLY)
3/4" CONTACT HEAD MAKE-UP
WATER METER
SAMPLE VALVE
3/4" PVC PIPING
PVC BALL CHECK VALVE
3/4" PVC Y-STRAINER
3/8" POLYETHYLENE BACKBOARD
DESCRIPTIONNO.
BILL OF MATERIALS
(THIS DIAGRAM
ONLY)
IN-LINE EXHAUST FAN MOUNTING DETAIL
NOT TO SCALE
SPRING HANGER. INSTALL
AS CLOSE TO STRUCTURE
ATTACHMENT AS POSSIBLE
(TYP)
THREADED
ROD TO
STRUCTURE
FLEXIBLE
CONNECTION
(TYP OF 2)
BACKDRAFT
DAMPER
UNISTRUT
PLUGGED CROSSES (TYP.)
3/4" TO PUMP SUCTION
3/4" TO PUMP DISCHARGE
HOSE BIBB
BALL VALVE
3 1/2" MIN.
OPENING
CAPACITY
APPROX.
TWIST OFF
APPROX. 15"
PRESSURE CAP
5 GALLON MINIMUM
5 GALLON CHEMICAL FEED TANK DETAIL
10"
NOTE: INSTALL IN ACCORDANCE WITH MANUFACTUER RECOMMENDATIONS.
NOT TO SCALE
FUNNEL
CHILLER CONCRETE PAD DETAIL
NOT TO SCALE
NOTE: PROVIDE 3000 PSI
CONCRETE AND FRAME CORNERS
WITH 1-1/2" ANGLE.
4"
CONCRETE PAD (TYP.)
8"
#5 BARS @ 12" O.C.
EACH WAY TOP AND
BOTTOM
12" THICK STRUCTURAL
CONCRETE MAT SLAB
C L R
C L R
3" CLR. (TYP.)
COMPACTED EARTH (TYP.)
1" CHAMFER (TYP)CHILLER
M401
A U
T O
M A
T
IC
T E
M P
E R
A T
U R
E C
O N
T R
O L
S
BDC
MAR
KDA
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD VA BEACH, VA 23452
V
IR
G
IN
IA
B
E A
C H
V
IR
G
IN
IA
A T
C R
E P
L A
C E
C H
IL
L
E D
W A
T E
R P
L A
N T
T
ID
E W
A T
E R
C O
M M
U N
IT
Y
C O
L L
E G
E
V
IR
G
IN
IA
B
E A
C H
C A
M P
U S
S T
A T
E P
R O
J E
C T
N O
-B
-1
M
T
C
09-25-2026
CHILLED AND CONDENSER WATER SYSTEM SEQUENCE OF OPERATION
CHILLED AND CONDENSER WATER SYSTEM POINTS LIST
POINT NAME
HARDWARE POINTS
AI AO BI BO AV BV
TREND
SOFTWARE POINTS
OUTSIDE AIR TEMP.
GRAPHICAL USER INTERFACE MAIN SCREEN
A. CHILLED WATER SYSTEM CONTROL
1. ON A CALL FOR COOLING AT AHU-1, -2 , OR -3 (i.e. IF THE UNIT'S
ASSOCIATED CHILLED WATER VALVE MODULATES MORE THAN 5%
OPEN), THE BAS SHALL ENABLE THE SECONDARY CHILLED WATER PUMP
(P-5 LEAD, P-6 STAND-BY). AFTER A PERIOD OF 3 MINUTES (ADJ.), ON A
RISE IN CHILLED WATER SUPPLY TEMPERATURE ABOVE SETPOINT (44°F,
ADJ.), THE BAS SHALL ENABLE THE PRIMARY CHILLED WATER PUMP (P-3
LEAD, P-4 LAG) AND THE CHILLER (C-1 LEAD, C-2 LAG). THE
FACTORY-PROVIDED CHILLER CONTROLLER SHALL MODULATE THE
CHILLER TO MAINTAIN THE CHILLED WATER SUPPLY TEMPERATURE
SETPOINT.
a. WHEN THE BAS BEGINS TO ENABLE THE LEAD CHILLER, IT SHALL
FIRST MODULATE OPEN THE ASSOCIATED CHILLER'S ISOLATION
VALVES ON ITS EVAPORATOR AND CONDENSER WATER RETURN
PIPING. AFTER A 90 SECOND (ADJ.) DELAY, THE LEAD PRIMARY
CHILLED WATER PUMP AND LEAD CONDENSER WATER PUMP SHALL
BE ENABLED. LEAD CHILLER SHALL THEN BE ENABLED ONCE FLOW
IS PROVEN THROUGH THE CONDENSER AND EVAPORATOR BARRELS
VIA THE CHILLER'S INTERNAL FLOW SWITCHES. IF THE LEAD
CHILLER HAS BEEN ENABLED AND THE CHILLED WATER SUPPLY
TEMPERATURE IS STILL ABOVE SETPOINT, THE LAG CHILLER AND ITS
ASSOCIATED PRIMARY CHILLED WATER PUMP SHALL BE ENABLED.
THE LAG CHILLER SHALL BE MODULATED AS NECESSARY TO
MAINTAIN THE CHILLED WATER SUPPLY TEMPERATURE.
b. THE PRIMARY CHILLED WATER PUMP SHALL OPERATE AT CONSTANT
SPEED WHEN ENABLED TO MAINTAIN THE CHILLER EVAPORATOR
MINIMUM FLOW.
c. WHEN THE SECONDARY CHILLED WATER PUMP HAS BEEN ENABLED, ITS SPEED SHALL BE CONTROLLED TO MAINTAIN CHILLED WATER
SYSTEM PRESSURE SETPOINT (30 PSIG, ADJ.) AS MEASURED BY A
DIFFERENTIAL PRESSURE TRANSMITTER LOCATED DOWNSTREAM
(ACROSS AHU-2 CHWS/CHWR PIPING UPSTREAM OF THE NEW 2-WAY
BYPASS VALVE). THE MINIMUM SPEED OF THE SECONDARY CHILLED
WATER PUMP SHALL BE SET NOT TO EXCEED THE MAXIMUM FLOW
THROUGH THE EXISTING 2-WAY BYPASS VALVE (230 GPM). ON A
FALL IN SYSTEM DIFFERENTIAL PRESSURE, THE PUMP SPEED SHALL
BE INCREASED. ON A RISE IN SYSTEM DIFFERENTIAL PRESSURE,
THE REVERSE SHALL OCCUR. ON A CONTINUED RISE IN PRESSURE
IF THE PUMP SPEED IS AT MINIMUM, THE BAS SHALL MODULATE
OPEN THE 2-WAY BYPASS VALVE LOCATED ACROSS AHU-2 CHILLED
WATER PIPING.
d. THE SECONDARY DIFFERENTIAL PRESSURE SETPOINT SHALL BE
RESET DOWNWARD IN 1PSIG INCREMENTS EVERY 10 MINUTES (ADJ.)
UNTIL ONE CHILLED WATER VALVE IS 95% OPEN.
2. IF THE LEAD PRIMARY CHILLED WATER PUMP FAILS, THE LAG PUMP
SHALL BE ENABLED. IF THE LEAD CHILLER FAILS, THE LAG CHILLER
SHALL BE ENABLED. IF THE LEAD SECONDARY CHILLED WATER PUMP
FAILS, THE STAND-BY PUMP SHALL BE ENABLED. LEAD AND
LAG/STAND-BY CHILLERS/PUMPS SHALL BE ALTERNATED WEEKLY,
MONTHLY, OR BASED ON RUNTIME AS SELECTED BY SYSTEM
OPERATOR. AN ALARM SHALL BE TRIGGERED AT THE OWNER'S
WORKSTATION ANYTIME A PUMP OR CHILLER FAILS.
B. CONDENSER WATER SYSTEM (COOLING TOWER) CONTROL
1. ONCE THE CHILLED WATER PLANT HAS BEEN ENABLED, THE LEAD
CONDENSER WATER PUMP (P-1 LEAD, P-2 LAG) SHALL BE ENABLED.
INITIALLY, THE LEAD COOLING TOWER (CT-1 LEAD, CT-2 LAG) BYPASS
CONTROL VALVE (V-1 LEAD, V-2 LAG) SHALL BE FULLY OPEN TO THE
TOWER BASIN AND FULLY CLOSED TO THE TOWER INLET. ON A RISE IN
CONDENSER WATER SUPPLY TEMPERATURE ABOVE SETPOINT (85°F),
THE BAS SHALL MODULATE THE BYPASS CONTROL VALVE OPEN TO THE
LEAD TOWER INLET.
a. IF THE LEAD AND LAG CHILLERS HAVE BEEN ENABLED BY THE BAS, THE LEAD AND LAG CONDENSER WATER PUMPS AND COOLING
TOWERS SHALL ALSO BE ENABLED BY THE BAS TO MATCH THE
SYSTEM LOAD.
2. IF THE VALVE HAS BEEN MODULATED 100% OPEN TO THE LEAD TOWER
INLET AND THE CONDENSER WATER SUPPLY TEMPERATURE IS STILL
ABOVE SETPOINT, THE LEAD COOLING TOWER FAN SHALL BE ENABLED
BY THE BAS AND MODULATED TO MAINTAIN THE CONDENSER WATER
SUPPLY TEMPERATURE SETPOINT. ON A RISE IN CONDENSER WATER
SUPPLY TEMPERATURE, THE FAN SPEED SHALL BE INCREASED. ON A
FALL IN CONDENSER WATER SUPPLY TEMPERATURE, THE REVERSE
SHALL OCCUR.
3. ON A FALL IN CONDENSER WATER SUPPLY TEMPERATURE BELOW
SETPOINT, THE COOLING TOWER FAN SHALL BE MODULATED DOWN TO
MINIMUM SPEED. ON A CONTINUED FALL, THE FAN SHALL BE DISABLED,
AND THE BYPASS CONTROL VALVE SHALL BE MODULATED OPEN TO THE
TOWER BASIN AND CLOSED TO THE TOWER INLET.
4. IF THE LEAD CONDENSER WATER PUMP FAILS, THE LAG PUMP SHALL BE
ENABLED. IF THE LEAD COOLING TOWER FAILS, THE LAG TOWER SHALL
BE ENABLED. LEAD AND LAG PUMPS/TOWERS SHALL BE ALTERNATED
WEEKLY, MONTHLY, OR BASED ON RUNTIME AS SELECTED BY SYSTEM
OPERATOR. AN ALARM SHALL BE TRIGGERED AT THE OWNER'S
WORKSTATION ANYTIME A PUMP OR TOWER FAILS.
5. ON A FALL IN OUTSIDE AIR TEMPERATURE BELOW 40°F (ADJ.), THE
TOWER BASIN HEATER AND HEAT TRACE ON CONDENSER WATER PIPING
SHALL BE ENABLED. ON A RISE IN OUTSIDE AIR TEMPERATURE ABOVE
40°F (ADJ.), THE BASIN HEATERS AND HEAT TRACE SHALL BE DISABLED.
AN INDIVIDUAL LOCAL PILOT LIGHT SHALL BE MOUNTED ON COOLING
TOWER CONTROL PANEL FOR BOTH THE HEAT TRACE AND BASIN
HEATERS AND SHALL INDICATE WHENEVER EACH COMPONENT IS
ENERGIZED.
C. THE FOLLOWING ALARMS SHALL BE GENERATED AT THE OWNER'S
WORKSTATION IF:
1. COOLING TOWER FAN STATUS DOES NOT MATCH FAN COMMAND
2. PUMP STATUS DOES NOT MATCH PUMP COMMAND
3. BUILDING CHILLED WATER SUPPLY TEMPERATURE RISES ABOVE 46°F
(ADJ.) FOR MORE THAN 5 MINUTES (ADJ.)
4. BUILDING CHILLED WATER SUPPLY TEMPERATURE FALLS BELOW 40°F
(ADJ.) FOR MORE THAN 5 MINUTES (ADJ.)
5. COOLING TOWER BASIN WATER TEMPERATURE FALLS BELOW 38° F
(ADJ.)
6. CONDENSER WATER SUPPLY TEMPERATURE RISES ABOVE 87°F (ADJ.)
7. CONDENSER WATER RETURN TEMPERATURE RISES ABOVE 97°F (ADJ.)
8. BUILDING CHILLED WATER DIFFERENTIAL PRESSURE IS MORE THAN 5
PSI (ADJ.) ABOVE SETPOINT FOR MORE THAN 15 MINUTES (ADJ.)
9. ANY VFD ALARM IS GENERATED
10. ANY CHILLER ALARM IS GENERATED
11. ANY COOLING TOWER ALARM IS GENERATED
CHW SYSTEM ENABLE
C-1
C-2
P-3
BACNET
BACNET COMM FROM
PREVIOUS CONTROLLER
S/S
SPEED
STATUS
AI
BO
P-3 SPEED
P-3 START/STOP
P-3 STATUS
BACNET COMM TO
NEXT CONTROLLER
BI
AI
C-1
CHWS
TEMP.
AI
C-2
SUPPLY
WATER
TEMP.
P-4
BACNET
BACNET COMM FROM
PREVIOUS CONTROLLER
S/S
SPEED
STATUS
AI
BO
P-4 SPEED
P-4 START/STOP
P-4 STATUS
BACNET COMM TO
NEXT CONTROLLER
BI
P-5
BACNET
BACNET COMM FROM
PREVIOUS CONTROLLER
S/S
SPEED
STATUS
AI
BO
P-5 SPEED
P-5 START/STOP
P-5 STATUS
BACNET COMM TO
NEXT CONTROLLER
BI
P-6
BACNET
BACNET COMM FROM
PREVIOUS CONTROLLER
S/S
SPEED
STATUS
AI
BO
P-6 SPEED
P-6 START/STOP
P-6 STATUS
BACNET COMM TO
NEXT CONTROLLER
BI
CHWS
CHWR
24 VAC
SYSTEM DP
(LOCATED
ACROSS
AHU-2)
BYPASS
VALVE
POSITION
AI
AI
AI
AI
C-2
RETURN
WATER
TEMP.
C-1
CHWR
TEMP. AI
PRIMARY
CHWS
TEMP.
AI
SECONDARY
CHWS
TEMP.
AI
SECONDARY
CHWR
TEMP.
AI
PRIMARY
CHWR
TEMP.
AI
SYSTEM
CHWS
TEMP.
P-2
BACNET
BACNET COMM FROM
PREVIOUS CONTROLLER
S/S
SPEED
STATUS
AI
BO
P-2 SPEED
P-2 START/STOP
P-2 STATUS
BACNET COMM TO
NEXT CONTROLLER
BI
P-1
BACNET
BACNET COMM FROM
PREVIOUS CONTROLLER
S/S
SPEED
STATUS
AI
BO
P-1 SPEED
P-1 START/STOP
P-1 STATUS
BACNET COMM TO
NEXT CONTROLLER
BI
AI
C-1
CWR
TEMP.
AI
C-1
CWS
TEMP.
AI
C-2
CWR
TEMP.
AI
C-2
CWS
TEMP.
S/S
SPEED
BACNET
STATUS
CT-2 SPEED
CT-2 START/STOP
CT-2 STATUS
CT-2
BACNET COMM TO
NEXT CONTROLLER
BACNET COMM FROM
PREVIOUS CONTROLLER
SOLENOID
FILL VALVE
AI
BO
BI
S/S
SPEED
BACNET
STATUS
CT-1 SPEED
CT-1 START/STOP
CT-1 STATUS
CT-1
BACNET COMM TO
NEXT CONTROLLER
BACNET COMM FROM
PREVIOUS CONTROLLER
VIBRATION
SWITCH BY
TOWER
MNFR (TYP.)
ELECTRONIC
SUMP LEVEL
CONTROL
(TYP.)
SOLENOID
FILL VALVE
AI
BO
BI
BYPASS
VALVE V-1
POSITION
AI
BYPASS
VALVE V-2
POSITION
AI
AI
BASIN
TEMP.AI
BASIN
TEMP.
AI
CT-1
CWR
TEMP
AI
CT-2
CWR
TEMP
AI
CT-1
CWS
TEMP
AI
CT-2
CWS
TEMP
CW CW
AIAI
CT-1 BASIN
HEATER
STATUS
MOUNT LIGHT ON
FACE OF CT-1
CONTROL CABINET
BI
CT-1 HEAT
TRACE
STATUS
MOUNT LIGHT ON
FACE OF CT-1
CONTROL CABINET
BI
CT-2 BASIN
HEATER
STATUS
MOUNT LIGHT ON
FACE OF CT-2
CONTROL CABINET
BI
CT-2 HEAT
TRACE
STATUS
MOUNT LIGHT ON
FACE OF CT-2
CONTROL CABINET
BI
OUTSIDE
AIR TEMP.
OUTSIDE AIR
TEMP. SENSOR
(BY BAS
CONTRACTOR)
AI
CT-1 BASIN
HEATER
ENABLE
BO
CT-2 BASIN
HEATER
ENABLE
BO
C-2 EVAP.
DIFF.
PRESS.
AI
C-2 EVAP.
DIFF.
PRESS.
AI
C-1 EVAP.
DIFF.
PRESS.
AI
C-2 COND.
DIFF.
PRESS.
AI
AI
SYSTEM
CWR
TEMP.
AI
SYSTEM
CWS
TEMP.
CHILLED AND CONDENSER WATER SYSTEM CONTROL DIAGRAM
NOT TO SCALE
ALARM
SHOW
ON
GRAPHIC
X X X
X X X
CT-1 SPEED
CT-1 START/STOP
CT-1 STATUS
X
X
X X
X
X
X
X
BYPASS VALVE V-1 POSITION
CT-1 BASIN TEMPERATURE
CT-1 SUMP LEVEL
CT-1 CWS TEMP
CT-1 CWR TEMP
CT-1 BASIN HEATER STATUS
CT-1 BASIN HEATER ENABLE
CT-1 HEAT TRACE STATUS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
CT-2 SPEED
CT-2 START/STOP
CT-2 STATUS
X
X
X XX
X
BYPASS VALVE V-2 POSITION
CT-2 BASIN TEMPERATURE
CT-2 SUMP LEVEL
CT-2 CWS TEMP
CT-2 CWR TEMP
CT-2 BASIN HEATER STATUS
CT-2 BASIN HEATER ENABLE
CT-2 HEAT TRACE STATUS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XSYSTEM CWS TEMP X X X
SYSTEM CWR TEMP X X X
CHILLER CONTROL PANEL PROVIDED
BY CHILLER MANUFACTURER. BAS
CONTRACTOR SHALL INTEGRATE
ALL FACTORY-PROVIDED POINTS
INTO SECONDARY GRAPHIC
DEDICATED TO EACH CHILLER
C-1 CWR TEMP X X X
C-1 CWS TEMP X X X
C-1 COND. DIFF. PRESS.
C-1 STATUS
STATUSBI
STATUSBI
C-1 CHWR TEMP
C-1 CHWS TEMP
C-1 EVAP. DIFF. PRESS.
X
X
X
X
X
X
X
X
C-2 CWR TEMP X X X
C-2 CWS TEMP X X X
C-2 COND. DIFF. PRESS.
C-2 STATUS
C-2 CHWR TEMP
C-2 CHWS TEMP
C-2 EVAP. DIFF. PRESS.
X
X
X
X
X
X
X
X
X
X
X
PRIMARY CHWR TEMP.
PRIMARY CHWS TEMP.
SECONDARY CHWR TEMP.
SECONDARY CHWS TEMP.
SYSTEM CHWS TEMP.
SYSTEM DP
BYPASS VALVE POSITION
PUMP SPEED (TYP. OF 6)
PUMP START/STOP (TYP. OF 6)
PUMP STATUS (TYP. OF 6)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AI
SYSTEM
SECONDARY
CHWS
FLOW
AI
SYSTEM
PRIMARY
CHWR
FLOW
SYSTEM PRIMARY CHWR FLOW X XX
SYSTEM SECONDARY CHWS FLOW X XX
ABBREVIATIONS
AI ANALOG INPUT
AO ANALOG OUTPUT
AV ANALOG VARIABLE
BI BINARY INPUT
BO BINARY OUTPUT
BV BINARY VARIABLE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
COND CONDENSER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DP DIFFERENTIAL PRESSURE
DIFF DIFFERENTIAL
EVAP EVAPORATOR
PRESS PRESSURE
S/S START/STOP
TEMP TEMPERATURE
CW MAKEUP FLOAT
SWITCH (TYP.)
M402
A U
T O
M A
T
IC
T E
M P
E R
A T
U R
E C
O N
T R
O L S
BDC
MAR
KDA
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
COMM. NO:
09.25.2026
24-110
MARK DESCRIPTION DATE
REVISIONS
TELEPHONE: (757) 599-4415
THOMPSON
22 ENTERPRISE PARKWAY HAMPTON, VA 23666
PROJECT NUMBER: 24-110
4323 COX ROAD GLEN ALLEN, VA 23060
2809 S. LYNNHAVEN ROAD…