This performance work statement and related federal contract opportunity outline requirements for ocean transportation services between Denmark and Thule Air Base in Greenland. The incumbent contractor will receive, store, process, load, transport, and offload various types of cargo including general goods, construction materials, refrigerated items, and hazardous materials. The contractor must use Polar-rated vessels and comply with international maritime regulations. Services will be provided from the port of embarkation in Denmark to the delivery point on the pier at Thule Air Base within the 60-day port season. The annual contract type is ID/IQ with a minimum guarantee of $5,000 and firm fixed-price task orders. The period of performance is through September 2023. Interested parties must respond to the sources sought notice by April 2018 with company and vessel details to be considered for the future solicitation.
The Government is currently requesting Industry comments on the attached draft Performance Work Statement. Any comments, corrections or questions you may have should be returned to Contract Specialist Jesper Nielsen at jesper.nielsen@det1.dk before Friday 31 August, 2018 at 17:00 CET.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sealift_Q&A__2.pdf | ||
| Q&A_Response_-_24_Jan_2019.pdf | ||
| Amendment_0002.PDF | ||
| Sealift_RFP_Q&A_Matrix.xlsx | XLSX spreadsheet | |
| Amendment_0001.pdf | ||
| Attach-3_POLAR_CODE.PDF | ||
| FA2523-18-R-0001_Sealift_Solicitation.pdf | ||
| Attach-2_Historical_Data.pdf | ||
| Solicitation_Cover_Letter_FA2523-18-R-0001.pdf | ||
| Attach-4_Excel_Spread_sheet__Pricing.xlsx | XLSX spreadsheet | |
| Attach-1_Sealift_PWS.pdf | ||
| Attach-5-DoDI_4500-57.pdf | ||
| Synopsis_Ocean_Transportation_to_Thule_Air_Base.pdf | ||
| Sealift_PWS_-_DRAFT_12Oct18.pdf | ||
| Request_to_extend_response_time..docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
THULE AIR BASE SEALIFT
22 Aug 2018
1 Scope The scope of this requirement is all management, labor and services to accomplish the functions and responsibilities of receiving cargo from vendors, providing in-transit origin storage, loading/offloading and transporting United States (US) Government and US Government Sponsored cargo to and from Denmark and Thule Air Base (AB), Greenland.
2 General Requirements The requirements have been organized in a manner that facilitates clear and concise description. The grouping of requirements is not intended to imply a preferred organizational structure. In addition, the requirements of one section may apply to some or all contractor operations.
Any reference to “Government” within this Performance Work Statement (PWS) is intended to be reference to the Government of the United States of America unless otherwise specified.
In any dispute arising out of this contract, the decision of which requires consideration of questions of law, the rights and obligations of the parties shall be interpreted in accordance with the substantive laws of the United States of America.
2.1 Non-Personal Services
This is a non-personal services contract as defined in Federal Acquisition Regulation (FAR)
37.101. The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it is the contractor’s responsibility to notify the Procuring Contracting Officer (PCO) in writing immediately.
2.2 Vessel Registry
In accordance with the Cargo Preference Act of 1904 (10 U.S.C. 2631) only US flag vessels shall be used for the ocean transport of US Government or US Government sponsored cargo between Denmark and Greenland. If the use of a US flag vessel is not proposed during the solicitation phase, only Danish flag vessels shall be used for the ocean transport of cargo between Denmark and Greenland.
2.3 Government Multifunctional Team (MFT) Members
The Government MFT manages the contract, assesses performance and works to improve customer support. The MFT is comprised of Government representatives including the Program Manager (PM), Contracting Officer (CO), Quality Assurance Manager (QAM), and Contracting Officer’s Representative (COR).
CORs from the functional area receiving the contract services will participate in the administration of this contract specifically to evaluate contractor performance, inspect the services for the Government, and provide a report of inspection to the CO. This designation does not include authority to direct and/or authorize the contractor to make changes in the scope or terms of the contract without the written authority of the CO. The contractor will be notified in writing by the CO of the names, duties, and limitations of the CORs.
Inspection and acceptance of the services required by the PWS will be performed at contractor’s origin storage facilities in Denmark and at Thule AB.
2.4 Standards and Publications
The contractor shall comply with all directives listed as standards (STD) in this PWS under paragraph 3. If a referenced directive requires compliance with one or more secondary directives, those secondary directives shall be used as guidance and are not mandatory unless specifically required within this PWS. If no standard is explicitly listed for a requirement contractor operations will comply with industry or commercial standards.
When directive chapters, paragraphs, appendices, attachments, etc are referenced, the STD shall be inclusive of all subordinate paragraphs unless specifically excluded. For example, if the PWS STD lists paragraph 1.2 and paragraph 1.2 has subparagraphs 1.2.1, 1.2.1.1 and 1.2.1.2, those subparagraphs are directive.
The contractor shall stay up to date on all directive updates. All contractor operations shall comply with the current version of the directives. The contractor shall notify the CO in writing within 30 days of directive revisions, changes, supplements and rescissions. If there is any cost impact resulting from such revisions, changes, supplements and rescissions the contractor shall provide the cost information with the notification. If the CO is not notified in writing within 30 days, the contractor shall perform in accordance with directive revisions, changes, supplements and rescissions at no increase to contract price.
Days referenced in this PWS shall be calendar days, unless otherwise noted.
Cargo referenced in this PWS is US Government or US Government sponsored cargo.
2.5 Business Relations
The contractor shall integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness and quality of problem identification and resolution. The contractor shall provide corrective action plans, proposal submittals, and timely identification of issues. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.
2.6 Contract Administration
The following subsections specify requirements for contract requests and contracted rates and basis.
2.6.1 Contract Requests
The contractor shall respond to Government requests for contractual actions as defined by the CO.
The contractor shall have a single point of contact for contract administrative duties.
2.6.2 Contracted Rates and Basis
Services shall be provided to the US Government at the rates stipulated in Section B – Price Schedule. The shipping rates listed in Section B – Price Schedule shall include all costs incident to delivery from "dock-to-dock." Whereas the Sealift contractor performs offloading and loading of all vessels at Thule AB during established port season/hours, the US Government shall not be charged separately for such offloading and loading.
The applicable shipping rates charged will be determined on the basis of cubic measure (cubic meter - M³) when the cargo weighs less than six hundred (600) kilos (approximately 1,320 pounds) per cubic meter and on the basis of weight measure (kilograms - KG) when a cubic meter weighs six hundred (600) kilos or more EXCEPT that the ratio for lumber is eight hundred (800) kilos per cubic meter.
2.7 Contractor Personnel, Disciplines, and Specialties
The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, certifications, training, and experience. All contractor personnel manning and training shall be IAW the International Code for Ships Operating in Polar Waters (Polar Code)
2.7.1 Employee Identification
Employees will, while on duty at a US Government installation, wear in plain view on the upper portion of the outer garment a metal or plastic identification badge to be furnished by the contractor containing the company name, employee's name, or company identification number of employee, if any. Departure from ship by contractor personnel onto main base shall be coordinated prior with Danish Liaison Officer.
2.7.2 Security Clearance
At no time will contractors be authorized to transport classified/sensitive material that will require a national security determination (security clearance).
2.7.3 Country Clearances
All US personnel must acquire a country clearance per 821 SPTS/LG requirements in order to qualify for employment. Evidence of screening will be provided annually to the CO by 1 Jun and will be in the possession of the contractor when in port at Thule AB and available for Government review.
2.7.4 Language
All information and documentation required to be generated or maintained (to include Government-furnished documents) by this contract are in English.
3 Performance Requirements The following section specifies the performance requirements for the contract.
3.1 General
3.1.1 Designate the port(s) of embarkation in Denmark and location of origin storage.
Port and storage location could be same location. For all cargo shipments to Thule AB.
Deliverables A001, Port of Embarkation and Origin Storage
3.1.2 Provide most recent and complete copies of the vessel Polar Ship Certificate, Safety Management Certificate (SMC), the Company Document of Compliance, the vessel International Ship Security Certificate (ISSC), the vessel Document of Compliance for the Carriage of Dangerous Goods (IMDG) certificate and most recent and complete Certificate of Inspection (COI).
Performance Standards
a) STD: In accordance with (IAW) the International Code for Ships Operating in Polar Waters (Polar Code) paragraph 1.3
Deliverables A002, Vessel Certificates
3.1.3 Secure and protect all cargo while in the custody of the contractor.
Includes the origin storage, port(s) in Denmark, ocean freight transport and destination handling during loading/offloading.
Performance Standards
a) STD: From loss, theft and/or any other damage, including adequate protection of cargo against inclement or unusually severe weather
3.1.3.1 Provide proof of insurance.
Performance Standards
a) STD: IAW DFARS 252.247-7007 Deliverables A003, Proof of Insurance
3.1.4 Report Contractor direct labor hours and dollars (to include Subcontractor hours and dollars) required for performance of services provided under this contract.
Fill in all required data fields. Information provided is considered to be proprietary in nature when the contract number and Contractor identity are associated with the direct labor hours and direct labor dollars.
Performance Standards
a) STD: Annually; NLT end of fiscal year (EOFY) + 30 days
b) STD: Using Electronic Contractor Manpower Reporting Application (eCMRA) at https://afcmra.hgda.pentagon.mil/
3.1.5 Establish, document, implement and maintain a Quality Program in a Quality Program Plan (QPP).
Deliverables
A004, QPP
3.1.5.1 Correct contractor-controlled performance deficiencies Identify the root cause, corrective actions, timelines for corrective actions, and preventive actions to prevent recurrence.
3.1.5.2 Determine and document impacts of conditions outside contractor control that effect the ability to meet contractual requirements.
Performance Standards
a) STD: Provide in writing to the CO, PM, QAM and COR
3.2 Cargo Receipt, Processing, Loading, Transport and Offloading
3.2.1 Receive and book cargo at origin storage in Denmark.
Cargo will be duly packed by the vendor for export shipment by ocean vessel and will be marked, labeled, and accompanied by freight warrant(s) and export certificate(s) at time of delivery to the origin storage.
Performance Standards
a) STD: Coordinate delivery/receipt schedule with the vendor after receipt of documentation, such as bills of lading
b) STD: Notify vendor and CO in writing within 48 hours of any cargo that is damaged upon receipt
c) STD: Notify vendor and CO in writing within 48 hours of any cargo that is improperly packed for ocean transportation or not accompanied by the required documentation
3.2.1.1 Provide the final date(s) of acceptance of cargo for each vessel.
Deliverables A005, Acceptance of Cargo Dates
3.2.2 Store cargo at origin storage location.
Performance Standards
a) STD: From time of delivery from the vendor until time of shipment
b) STD: Includes all types of cargo to include, but not limited to, general cargo, construction materials, frozen and chilled cargo
3.2.3 Process, handle and prepare necessary cargo documentation prior to loading cargo for shipment.
Includes manifests, bill of ladings, booking requests, stowage plans and receiving reports.
Performance Standards
a) STD: For cargo shipments to Thule AB and cargo return to Denmark
3.2.3.1 Provide final ship manifests.
Deliverables A006, Final Ship Manifests
3.2.3.2 Provide a pre-stowage plan.
Deliverables A007, Pre-Stowage Plan
3.2.4 Load and secure cargo destined for Thule AB into containers and onto ocean vessel.
Containers with clearly marked container numbers that are clean, dry, empty, odor free, suitable for protecting cargo from damage.
Performance Standards
a) STD: Manufacturer’s recommendations and commercial standards
b) STD: Containers comply with International Standards Organization (ISO), International Maritime Organization (IMO), and Convention of Safe Containers (CSC) standards
c) STD: Refrigerated containers that maintain a temperature within three degrees Fahrenheit of the in-transit temperature specified for controlled atmosphere and straight chill, and five degrees Fahrenheit for frozen
d) STD: Refrigerated containers have continuous measurement of internal temperature using a Ryan-type recorder or equivalent capable of continuous recording from availability date for a minimum period of 90 days
e) STD: Containers must be packed as full and optimal as possible
f) STD: To the extent possible containers must be packed with contents from the same vendor
3.2.4.1 Provide listing of all DoD owned or DoD leased containers Deliverables A008, DoD Owned/Leased Container Listing
3.2.5 Transport cargo via ocean vessel.
Estimate of projected quantities/types of cargo will be Government-furnished annually by 1 May by the CO in writing.
Performance Standards
a) STD: Using vessels appropriately rated for the severe ice conditions present in the Greenland waters
b) STD: Using vessels operated and maintained IAW the International Code for Ships Operating in Polar Waters (Polar Code)
c) STD: IAW the International Code for Ships Operating in Polar Waters (Polar Code)
3.2.5.1 Maintain cargo containers while in transit.
Performance Standards
a) STD: Manufacturers recommendations and commercial standards
b) STD: Continuous operation of refrigerated containers to maintain temperatures
3.2.6 Deliver and offload cargo at Thule AB.
Exact dates and hours of port operation at Thule AB will be Government-furnished annually by 1 May by the CO in writing. Thule AB port operates approximately 60 days normally between 1 July and 1 September.
Performance Standards
a) STD: During the port season and port operating hours
b) STD: Delivery point at Thule AB is “on the pier”
c) STD: All offloading will be performed by the Sealift contractor IAW manufacturer’s recommendations and commercial standards
d) STD: For any services rendered by the Thule BMC outside the normal port season or operating hours, the reimbursement for direct labor, material, equipment or vehicle charges are a matter between the BMC and the Sealift contractor, and are not billed against this contract
3.2.6.1 Coordinate arrival and departure dates.
Performance Standards
a) STD: Mutually agreed to between contractor and CO annually by 15 May
3.2.6.2 Notify the Thule BMC of estimated time of arrival for all cargo vessels.
BMC contact information will be Government-furnished annually by 1 May by the CO in writing.
Performance Standards
a) STD: NLT 72 hours in advance
3.2.6.3 Provide Departure, Movement, Position, Arrival report.
Performance Standards
a) STD: Initiated when the vessel leaves port concluding upon arrival at destination Deliverables A009, Departure/Movement/Position/Arrival Report
3.2.6.4 Identify and report vessel equipment casualties.
Performance Standards
a) STD: Affecting vessel’s proper operation, vessel’s ability to meet the agreed upon schedule, or the loading/discharging of the cargo Deliverables A010, Vessel Equipment Casualties
3.2.6.5 Require all material handling equipment (MHE) and cargo gear be able to perform 24-7 cargo operations.
3.2.7 Load cargo destined for Denmark onto ocean vessel.
Performance Standards
a) STD: Manufacturer’s recommendations and commercial standards
3.2.7.1 Ensure vessel supplies and maintain lashing gear inventory to cover contracted load
3.2.8 Deliver and offload cargo at port in Denmark.
Performance Standards
a) STD: Delivery point in Denmark is the port of embarkation as defined in PWS para 3.1.1
b) STD: All offloading will be performed by the Sealift contractor IAW manufacturer’s recommendations and commercial standards
c) STD: Coordinate delivery/pickup schedule with the vendor
4 Deliverables Deliverables are referenced in applicable line items under paragraph 3 of this PWS and detailed in the table below. The Contractor shall deliver the Deliverables as specified in the following table. If there is any conflict between the Deliverable reference in paragraph 3 of this PWS and the Deliverable specifics in the following table; the table in PWS paragraph 4 takes precedence. Days referenced shall be calendar days, unless otherwise noted. For recurring Deliverables, if the due date falls on a holiday or a weekend the Deliverable may be sent on the following business day.
Contractor format is acceptable unless a specific format is identified. However, Contractor name and logos may not be used on any Deliverable.
All Deliverable distribution shall be by an electronic method unless otherwise specified. Email subject line will read as “Report Number (Submission Date) Title” for example “A001 (1 Jun 19) TTLE.” Email documents in a Microsoft Office or Adobe Acrobat-compatible format.
Since points of contact within the offices identified in the “Distribution” block may change, the CO will assist the Contractor and maintain a current e-mail address listing.
Deliverable Table
Identifier Name PWS # Schedule Distribution A001 Port of
Embarkation and Origin Storage
3.1.1 30 days after contract award
21 CONS/DET 1
21 SW/PMD
21 LRS/LGRD
Description:
A002
Vessel Certificates
3.1.2 Annually; no later than
(NLT) 1 June
21 CONS/DET 1
21 SW/PMD
Description:
Required for all vessels to be used. Certificate and any associated survey must consider the intended route/locations established by the requirements of this contract. Must either be English or include a translation into English.
A003 Proof of
Insurance
3.1.3.1 Annually; NLT 1 June 21 CONS/DET 1
21 SW/PMD
A004 Quality Program
Plan (QPP)
3.1.5 NLT 30 days prior to
contract performance start date and within 14 days of changes occurring thereafter
21 CONS/DET 1
21 SW/PMD
21 LRS/LGRD
Description:
As a minimum, ensure the QPP addresses the following processes: control of documents, control of records, internal audits and inspections, process to correct non-conforming services, and process to prevent non-conforming services from recurrence.
A005 Acceptance of Cargo Dates
3.2.1.1 Annually; NLT 1 May 21 CONS/DET 1
21 SW/PMD
21 LRS/LGRD
Include dates for each vessel
A006 Final Ship
Manifests
3.2.3.1 NLT 1 week prior to
vessel arrival at port
21 CONS/DET 1
21 SW/PMD
21 LRS/LGRD
821 SPTS/LG
BMC contractor
Required for each vessel, each direction.
A007 Pre-Stowage
Plan
3.2.3.2 NLT 2 days prior to
ship arrival in port
21 CONS/DET 1
21 SW/PMD
21 LRS/LGRD
821 SPTS/LG
MSCLANT N32
Required for each vessel, before cargo is loaded in Denmark or Thule
A008 DoD
Owned/Leased Container Listing
3.2.4.1 Annually; 1 September 21 CONS/DET 1
21 SW/PMD
21 LRS/LGRD
21 SW Traffic Management Officer
Description:
Listing to include container number, received (loaded) and delivered (offloaded) date, and nomenclature. If no DoD owned/leased containers were received/delivered, provide email confirmation of such in place of this deliverable.
A009 Departure/
Movement/ Position/ Arrival Report
3.2.6.3 Initiated when the
vessel leaves port, submitted every 6 hours, and concluding upon arrival at destination
21 CONS/DET 1
21 SW/PMD
21 LRS/LGRD
821 SPTS/LG
BMC contractor
MSCLANT N32
Documenting the vessel’s movements.
A010 Vessel
Equipment Casualties
3.2.6.4 Within 1 hour of
identification
21 CONS/DET 1
21 SW/PMD
21 LRS/LGRD
821 SPTS/LG
BMC contractor
MSCLANT N32
5 Services Summary The Services Summary (SS) is a summary of the major performance objectives and performance thresholds required by the Government in Contractor performance. The absence of any contract requirements from the SS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Government has the right to inspect all services required in the contract.
SS Requirement PWS Para Threshold
1.1 Secure and protect all cargo 3.1.3 Performance is acceptable when:
a) Cargo is secured and protected from loss, theft and other damage at origin storage
b) Cargo is secured and protected from loss, theft and other damage at the port in Denmark
c) Cargo is secured and protected from loss, theft and other damage during ocean transport
d) Cargo is secured and protected from loss, theft and other damage at destination during loading/offloading
1.2 Transport cargo 3.2.5 Performance is acceptable when:
a) Vessels used are appropriately rated for the location
b) Vessels used are operated and maintained IAW the Polar Code
c) Transport is IAW the Polar Code
Appendix 1 - Abbreviations and Acronyms
821 SPTS/LG 821st Support Squadron, Logistics AB Air Base ACO Administrative Contracting Officer BMC Base Maintenance Contractor CO Contracting Officer COR Contracting Officer’s Representative DFARS Defense Federal Acquisition Regulation Supplement eCMRA Electronic Contractor Manpower Reporting Application EOFY End of Fiscal Year FAR Federal Acquisition Regulation IAW In Accordance With KG Kilograms Kilos Kilograms M³ Cubic Meter MFT Multi-Functional Team MHE Material Handling Equipment NLT No Later Than PCO Procuring Contracting Officer PM Program Manager PWS Performance Work Statement QAM Quality Assurance Manager STD Standard US United States
Appendix 2 - Definitions
CARGO: US Government and US Government sponsored cargo
CEMENT: Cement, sand and other heavy products packed in sacks with a weight of more than 1,000 kilograms per cubic meter.
CHILLED CARGO: Subsistence items that require a temperature of between 2 and 5 degrees Celsius during transportation.
DANGEROUS/HAZARDOUS CARGO: Certain types of paint, turpentine, asphalt products, dynamite, etc.
DEMURRAGE: (1) The detention of a ship or vessel by the US Government beyond the time allowed for offloading and loading at ports in Greenland. (2) The charge(s) for the detention of a ship or vessel caused by the US Government beyond the maximum time allowed for offloading and loading at ports in Greenland.
FROZEN CARGO: Frozen subsistence items that require a temperature lower than -18 degrees Celsius during transportation.
GENERAL CARGO: Cargo that is not separately listed below.
IRON: Iron or steel in various lengths and sheets.
LUMBER: Beams, two by fours, rafters and braces.
“ON THE PIER”: All cargo being off/on loaded by the Sealift Contractor is placed directly on the pier or placed on trailer by direction of port master.
PIPES: All types of various size metal and/or plastic pipe with or without insulation.
US GOVERNMENT AND US GOVERNMENT SPONSORED CARGO: All cargo purchased by US Government and contractors in direct support of US Government contracts.
VENDOR: The supplier entity that delivers US Government and US Government sponsored cargo to the port of embarkation to be sent from Denmark to Greenland.