This is a Request for Quote issued by Collier County, Florida for roof and hatch replacement services at two well house locations. The project involves the removal and replacement of two complete roofs and roof hatches located at 841 7th Street SW (TAM#1) and 851 3rd Street SW (TAM#3). The scope includes replacement of all fascia boards, installation of new roof hatches designed to allow access for pump and motor removal and maintenance, protective covering of interior equipment and electrical cabinets during construction, painting of interior ceilings and exterior fascia, and complete debris disposal including removal of old roofing materials and hatches. A site visit is recommended but not mandatory for contractors to review the existing conditions prior to quote submission. The contractor must provide project manager contact information within five business days of purchase order issuance and is allotted 365 days to achieve final completion from the purchase order date, with the extended timeline accounting for potential long lead times on hatch procurement. The county will provide site access assistance, material review, and inspection services during installation.
The county requests a lump sum quote covering all personnel, equipment, and materials necessary to complete the outlined work. Collier County Project Manager Anthony Lupo (239) 207-0248 is the primary contact for the project. Contractors must submit shop drawings for the selected hatch after purchase order issuance but before hatch ordering, and must provide paint samples for county approval prior to paint procurement. The county will supply the paint colors. Collier County procurement policy prohibits acceptance of quotes containing terms and conditions other than those specified in the request. No specific budget amount, award date, or set-aside information is provided in the documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TAMAMI_WELL_HOUSE_ROOFS_AND_HATCHS_(TAM#1)_and_(TAM#3)..pdf | ||
| Insurance_Requirements_Template.docx | DOCX document | |
| Hatch’s_.msg | MSG file | |
| Regional_Water_System_Phase_1_Water_Supply_Well_Field.pdf | ||
| Quick_Quotes_Instructions_Version_1_.pdf | ||
| PO_Terms_and_Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pathway / Parking
Building Envelope
Life & Safety
REQUEST FOR QUOTE
PROJECT TYPE
Repairs
Renovation
Maintenance
PROJECT SUMMARY
The Scope of Work is the official description of the work that is to be completed during the contract. The scope of work must be consistent with the project timeline and contract price methodology.PROJEC PROJECT NAME
REQUIRED SIGNATURES
FUND/ COST CENTER
GL CODE
PROJECT NAME PROJECT LOCATION & ADDRESS
QUOTE DUE DATE AUTHORIZED PROJECT
DECISION & BUDGET CONTACT
CONTRACT # REQUEST DATE
SCOPE OF WORK
PER OUR PROCUREMENT DIVISION, COLLIER COUNTY IS NOT ALLOWED TO ACCEPT QUOTES WITH TERMS AND CONDITIONS.
FOR MORE INFORMATION REFERENCING THE FOLLOWING, PLEASE CLICK THE LINK BELOW
COLLIER COUNTY TERMS AND CONDITIONS
DIVISION DESIGNEE (REQUESTING DIVISION)
ASSIGNED PROJECT MANAGER SITE VISIT
DATE & TIME
New Construction
Development
Consulting / Estimate
Other - _________________
PROJECT MANAGER
Attached Photos https://www.colliercountyfl.gov/home/showpublisheddocument/74077/636364888296470000
Untitled
VCP Pathways
Project Name :
Scope of work
Task Description Quantity Total Price
Total $ - 0
** All quantities given are estimates. Contractor is responsible for final take off and quantities. **
Company:
Signature:
image1.png
| Check Box1: Off | |
| Check Box2: Off | |
| Check Box3: Off | |
| Check Box4: Off | |
| Check Box5: Yes | |
| Check Box6: Off | |
| Check Box7: Off | |
| Check Box8: Off | |
| Check Box9: Off | |
| Check Box10: Off | |
| Text18: Pamela Libby | |
| Text19: 4008-253214 | |
| Text20: | |
| 2026-03-12T06:38:03-0400 | |
| LupoAnthony |
| 2026-03-13T07:14:55-0400 | |
| libby_p |
| Date2_af_date: |
| Date3_af_date: |
| Date4_af_date: |
| Check Box11: Off |
| Text11: NA |
| Text13: TAM #1,3 ROOF AND HATCH |
| Text14: 841 7TH ST SW AND 851 3RD ST SW |
| Text17: ANTHONY LUPO |
| Text3: CALENDAR INVITE FOR SITE VISIT TO FOLLOW, IF APPROPRIATE |
| Text2: "REQUEST FOR QUOTE" RECEIVAL RESPONSE REQUIRED |
| Scope: The County is requesting a quote to remove and replace 2 complete Roofs and Roof Hatches located at 841 7TH ST SW ( TAM#1 ) and 851 3RD ST SW ( TAM#3 ). The roof replacements will include all fascia boards. |
The hatches are utilized to remove pumps and motors through the roof for maintenance. Contractor will submit a shop drawing on the hatch they would like to use after issuance of the purchase order, but before the hatch is ordered. A picture of the hatch is attached and made a part of this request for quote. Contractor will be responsible to cover the equipment inside the building including the electrical cabinets to ensure no dust or derbies enter these critical pieces of equipment.
It is recommended the contractor visit the site to review the hatch and roof prior to submittal of their quote.
Contractor will also be responsible to paint the ceiling and the outside fascia. County will supply the color and the contractor will submit a paint sample prior to purchase of the paint.
Contractor is responsible for all disposal of debris, including the old roof and hatch.
County to Provide: Assistance with access to the gated secured site; review of all materials to be utilized, and inspection service during installation work.
Contractor to Provide: A lump sum quote for all personnel, equipment, and materials to complete the scope of work outlined above.
Additional Information:
1. Upon issuance of purchase order contractor will provide Project Manager contact within 5 work days.
2. Collier County Project Manager is Anthony Lupo (239) 207-0248.
3. Contractor will have 365 days to final completion from issuance of the purchase order. The long work time is due to the potential long lead time for the contractor to obtain the hatches.