TamarackChimneyIRSC_DraftMap.pdf

PDF 3 MB Posted

Attached to
Tamarack Chimney Stewardship IRSC, Plumas National Forest, R5 CA Federal contract opportunity
Solicitation number
12363N22Q4033
Issued by
Department of Agriculture Forest Service

About this file

This notice provides details for the Tamarack Chimney Stewardship Integrated Resource Service Contract (IRSC) to be awarded on the Plumas National Forest in California. The contract aims to restore forest health through a series of silvicultural and fuels management activities on approximately 365 acres. Mandatory work includes the removal of an estimated 2,006 thousand board feet of various sawlog species from 250 acres and hazardous fuels treatment along 6 miles of roadsides. Optional work comprises mechanical treatment and possible removal of dead material in 115 acres of meadows and stream buffers. A pre-solicitation site visit is scheduled for early May 2022 with the solicitation to be posted in mid-May containing final requirements. Interested offerors should refer to the notice for information on contract scope, location, and evaluation criteria.

View the file

Other files for this federal contract opportunity

Other files attached to Tamarack Chimney Stewardship IRSC, Plumas National Forest, R5 CA, newest first.
File Type Posted
TamarackChimneySalvageIRSCVicinitymap040622.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H H

H H

H

H

H H

H

H

H H

H H

H H

H H

H

H H H

H H

H H H

H H

H

H H H

H H H

H H

H H H

H

H H

H H

H

H H

H

H H H

H

H H

H H

H

H H H H

H H H

H H

H H H

H

H H H H

H

H

H

H H H H H

H

H H

H H H

H H

H H

H

H H H

H H

H H

H H

H

H

H H H

H H

H

H H H H

H H

H H H

H

H H H

H

H

H H H H H

H

H

H H H

H

H

H H H H

H

H H

H H

H

H H

H

H H

H H H

H

H H

H H H H

H H

H H H

H H

H H H

H H H H H

H H

H H H H

H

H

H

H H

H H

H H H

H H H H

H

ÑØ

T.22N R.8E T.22N R.9E

¬«1

¬«4

¬«5

¬«6

¬«3

¬«2

!(7

!(8

!(9 !(10

00540

22N27

N5

6X A

22N94D22N85YD

22N44Y

N5

8X A

22N94A1

21N74Y

22N91Y

22N24C

N7

4Y

22N77YA

22N81Y

22N76Y

22N24D

22N74YB22

N5

7X

N8

0Y

N5

6X

22N74YA

22N85YE1

22N85Y

22N 94A

PC514

22N72Y

22N27A

22N54X

22N

23N 65Y

A

22N

N6

8X

22N85YE

22N22

N5

22N85Y

N1

N5

N6

5Y

22N07Y

22N

Y

22N73Y

N7

4Y

22N

22N27

22N72

22N77Y

22N94

MD4

Little Grass Valley

Reservoir

Little Grass Valley

Reservoir

0 10.5 Miles

21N

Tamarack Chimney IRSC Sub divisions Sub division RX Acres

1 Roadside Hazard Tree Removal 28 2 Roadside Hazard Tree Removal 10 3 Roadside Hazard Tree Removal 7 4 Roadside Hazard Tree Removal 92 5 Roadside Hazard Tree Removal 20 6 Roadside Hazard Tree Removal 93 Roadside Total 250 7 Meadow Enhancement 15 8 Meadow Enhancement 75 9 Meadow Enhancement 7 10 Meadow Enhancement 18 Meadow Total 115

Grand Total 365

C6.315# - SALE OPERATIONS SCHEDULE . (8/2006) Unless otherwise agreed in writing, Purchaser’s Operations shall be performed in accordance with the following schedule

Subdivision/Area/Unit

Conditions of Operation

Purpose

Sale Area

Operations may occur when soil is dry; that is, soil moisture in the upper 8 inches is not sufficient to allow a soil sample to be squeezed and hold its shape, or will crumble when the hand is tapped.

Operations may also occur when the ground is frozen to a depth of 5 inches, or snow depth is at least 18 inches or machine compacted to 8 inches.

Soil Protection

Requirements Tab le ITM Individual Tree Mark, C2.35# DXDAM Designation by Damage Class C2.353# TSTA Timber Subject To Agreement C2.11# DF Directional Falling , C6.41# TRAC Ground Based Skidding , Skid Trail Layout, C6.42# SUSP Ground Based Skidding , One End Suspension, C6.42# SPACE Ground based Skidding, Skid T rail Spacing, C6.42# ENDL Ground Based Skidding, Endlining, C6.42# SEPM Special Erosion Prevention Measu res, C6.6# COVER Slash Treatment, Cover Piles, C6.7# SCAT 18” Slash Treatment, Scattering , 18 inch depth C6.7# SCAT 30” Slash Treatment, Scattering , 30 inch depth C6.7# FELL Slash Treatment, Fell Damaged Trees, C6.7# MACH Slash Treatment, Machine Pile Landing, C6.7#

Ephemeral (50 ft Stream Buffer) (C6.5) Intermittent (100 ft Stream Buffer) (C6.5) Perenial (100 ft Stream Buffer) (C6.5)

FS - Forest Service System Road P - Private Road

Haul Route (B6.841)

Non-Forest Service Ownership (B1.1) USDA Forest Service Ownership (B1.1)

Contract Area Boundary (B1.1) Mandatory Item 1 (C2.35#), (C2.3.53#) Timber subject to agreement (C2.11#)

È

Water Hole (C5.35#)ÑØ

C - County Road

Botany Control Area (Solicitation, Section 24) Botany Control Area (Solicitation, Section 24) Botany Control Area (Solicitation, Section 24)C

Meadow Enhancement (C2.11#)#

Tamarack Chimney

IRSC

Contract Area Map

"DRAFT MAP"

All lines are approximate Reference Scale:

Main Map - 1:12,000 40 Feet Contour Intervals

For daily project activity level (PAL) information, Call PAL WEST at 1-800-847-7766 (C7.22#)

<BOL>Weather Station: Pike County Lookout (C7.22#) Project Activity Level: Westside

Map 1 of 1

/ Plumas National Forest Feather River Ranger District

Map Created by: Jose Rodriguez 03/11/2022 T:\FS\NFS\Plumas\Project\FRRD\PINS\GIS\FY_22\Tamarack_Chimney_Salvage\

Implementation\Timber\Maps

File details come from the government source that posted it. Updated .