TAB6_818CM3034_BD_PLANS.pdf
PDF 19 MB Posted
- Solicitation number
- 36C78621B0002
About this file
This document outlines a federal contract opportunity for construction services. The Department of Veterans Affairs National Cemetery Administration is soliciting proposals for a project to construct in-ground cremation sites at the Massachusetts National Cemetery. Solicitation number 36C78621B0002 has been assigned to this opportunity, which is designated as project number 18CM3034 and is contingent upon availability of fiscal year 2021 funds. Responses are due in accordance with the terms specified in solicitation 36C78621B0002 issued by the Department of Veterans Affairs National Cemetery Administration for construction of in-ground cremation sites at the Massachusetts National Cemetery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A0001 Mass Nalt Cem (36C78621B0002) In Ground Cremains.pdf | ||
| 36C25921Q0010 0001.docx | DOCX document | |
| TAB8_818CM3034_BD_BOD_InfoOnly.pdf | ||
| 36C78621B0002.docx | DOCX document | |
| TAB7_818CM3034_BD_SPECIFICATIONS.pdf | ||
| IFB Contractor Cost Estimate Worksheet (Mass Nalt Cem).xlsx | XLSX spreadsheet | |
| SOW Mass Nalt Cem 818CM3034 SOW.pdf | ||
| WD-Davis Bacon (Barnstable County) Mass Nalt Cem.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IN-GROUND CREMAINS DEVELOPMENT
PROJECT NUMBER: 818CM3034
BID DOCUMENTS
DEPARTMENT OF
VETERANS AFFAIRS
MASSACHUSETTS NATIONAL CEMETERY
BOURNE TOWNSHIP
BARNSTABLE COUNTY, MASSACHUSETTS
GI001
COVER SHEET
GRAVESITE YIELD SUMMARY
IN-GROUND
CREMAIN (4'x4')
1,614
CREMAIN PLOTS
375 EAST HORSETOOTH ROAD
BLDG 2-202
PH. 970-372-6104
FORT COLLINS, CO 80525
AQUA ENGINEERING, INC.
WWW.AQUAENGR.COM
TOTAL NUMBER
OF GRAVESITES
1,614
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818CM3034
SEPTEMBER 17, 2020 JPW KAE Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINS
PROJECT
LOCATION
DRAWING INDEX
1. GI001 COVER SHEET
2. GI002 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
3. CS100 OVERALL SITE PLAN
4. GI101 CONSTRUCTION SEQUENCING PLAN
5. GC001 EROSION AND SEDIMENT CONTROL NARRATIVE
6. GC101 EROSION AND SEDIMENT CONTROL PLAN - PHASES I & II
7. GC501 EROSION AND SEDIMENT CONTROL DETAILS
8. VL101 SURVEY
9. CD101 DEMOLITION PLAN
10. CS101 SITE LAYOUT PLAN
11. CS401 GRAVESITE NUMBERING PLAN
12. CG101 GRADING PLAN
13. CG501 SITE DETAILS 1
14. CG502 SITE DETAILS 2
15. LP101 SITE PLANTING PLAN
16. LP501 LANDSCAPE DETAILS & PLANTING SCHEDULE
17. LI100 IRRIGATION COVER SHEET
18. LI101 IRRIGATION PLAN
19. LI500 IRRIGATION DETAILS
20. LI501 IRRIGATION DETAILS
21. LI502 IRRIGATION DETAILS
NO. DRAWING DRAWING TITLE
RHODE ISLANDCONNECTICUT
NEW HAMPSHIRE
ATLANTIC OCEAN
PROJECT
SITE
FARLAND CORP.
401 COUNTY STREET
NEW BEDFORD, MA 02740
PH. 508-717-3479
WWW.FARLANDCORP.COM
GI002
GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818CM3034
SEPTEMBER 17, 2020 JPW KAE Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINS
GENERAL NOTES:
1. THE PROPOSED SITE IMPROVEMENTS FOR 'MASSACHUSETTS NATIONAL CEMETERY IN-GROUND CREMAINS DEVELOPMENT'
INCLUDES, BUT IS NOT LIMITED TO, THE CLEARING OF EXISTING VEGETATION, EARTHWORK FOR ADDITIONAL BURIAL SECTIONS, IRRIGATION EXTENSIONS, SITE FURNISHINGS, AND LANDSCAPING. THE PROJECT IS LOCATED IN BARNSTABLE COUNTY, MASSACHUSETTS. THE TOTAL SITE AREA IS 749.29 ACRES.
2. THE TOPOGRAPHIC CONTOUR INTERVAL IS ONE (1) FOOT. TOPOGRAPHIC INFORMATION IS BASED ON AERIAL RUN TOPOGRAPHY BY FARLAND CORP. DATED SEPTEMBER THROUGH OCTOBER 2018. THE HORIZONTAL DATUM IS REFERENCED TO NAD83 MASSACHUSETTS STATE PLANE MAINLAND ZONE. THE VERTICAL DATUM IS REFERENCED TO NAVD88.
3. THE SUBJECT PROPERTY IS LOCATED ON F.E.M.A. MAP 25001C0512J DATED JUNE 16, 2014. NO PORTIONS OF THE PROJECT
AREA ARE LOCATED WITHIN THE 100-YEAR FLOODPLAIN AREA.
4. SEE THIS SHEET FOR LEGEND OF SYMBOLS USED HEREIN.
5. BURIAL CEREMONIES MAY BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. DURING ALL CEREMONIES, ALL WORK MUST STOP, ESPECIALLY WHEN HEAVY EQUIPMENT ACTIVITY OR NOISE PRODUCING WORK IS BEING DONE. LIGHT WORK ACTIVITY CAN CONTINUE IF IT DOES NOT CREATE NOISE OR DISTRACTIONS TO THE CEREMONY. COORDINATE DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO ACCOMMODATE SCHEDULED BURIALS.
6. DUE TO THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH DAY AND/OR MORE FREQUENTLY AS REQUIRED.
7. AFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMAL AND SHALL BE COORDINATED WITH THE CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS. CONTRACTOR SHALL PROVIDE TWO SIGNS SIMILAR TO THE CEMETERY'S "PARDON OUR APPEARANCE" SIGNS. SIZE TO BE A MINIMUM OF 4'X5' HIGH MOUNTED ON TWO 4"X4" POSTS, PLACED IN A LOCATION AS DETERMINED BY THE CEMETERY DIRECTOR. TEXT SIZE SHALL BE MAXIMUM SIZE PROPORTIONAL TO WIDTH/HEIGHT OF SIGN.
TEXT WILL BE PROVIDED BY CEMETERY DIRECTOR.
8. THERE SHALL BE AT ALL TIMES WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE. THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
9. IF THE CONTRACTOR SHOULD ENCOUNTER UNEXPLODED ORDINANCE (UXO), CALL PAUL E. RENDON (508) 320-6906 OR BEN
GREGSON (508) 968-5821 FROM THE JOINT BASE CAPE COD IMMEDIATELY.
CONSTRUCTION NOTES:
1. THE CONTRACTING OFFICER REPRESENTATIVE AND CONTRACTOR ARE RESPONSIBLE FOR REVIEWING THE PLANS PRIOR
TO CONSTRUCTION AND NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CIRCUMSTANCES FOUND WITHIN THESE PLANS IN NEED OF VERIFICATION SO THAT APPROPRIATE REVISIONS CAN BE MADE, IF WARRANTED.
2. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH THE U.S.
DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS AND THE MASSCHUSETTS DEPARTMENT OF TRANSPORTATION
CONSTRUCTION STANDARDS AND SPECIFICATIONS, WHERE APPLICABLE.
3. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY LAND DISTURBANCE. REFER TO EROSION
AND SEDIMENT CONTROL PLAN FOR PHASING AND DETAILS.
4. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL
BE ADEQUATELY STABILIZED TO CONTROL EROSION AND SEDIMENTATION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY
CHANGES OR CONDITIONS ATTACHED TO PERMITS REQUIRED FOR CONSTRUCTION.
6. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS ARE KEPT IN A CLEAN
AND DUST FREE CONDITION AT ALL TIMES.
7. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION
ACTIVITIES.
8. THE CONTRACTOR SHALL CLEAR THE SITE OF ALL TREES, BUILDINGS, FOUNDATIONS, ETC. WITHIN THE LIMITS OF CONSTRUCTION AND SHALL BE RESPONSIBLE FOR COORDINATING ANY DISCONNECTION AND/OR ABANDONMENT OF EXISTING UTILITIES AND STRUCTURES. IF NECESSARY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND ABANDONING ALL EXISTING WELLS AND/OR SEPTIC DRAIN FIELDS AND COORDINATING THEIR ABANDONMENT WITH THE
HEALTH DEPARTMENT.
9. CONTRACTOR SHALL CONTACT MASSACHUSETTS 811 AT 888-DIG-SAFE OR BY DIALING 811 ON A MASSACHUSETTS PHONE LINE OR HTTP://WWW.DIGSAFE.COM/CONTACT.PHP A MINIMUM OF THREE (3) BUSINESS DAYS PRIOR TO ANY EXCAVATION WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE
PRESENCE OF ANY UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
10. GORDON DOES NOT CERTIFY TO THE LOCATION OF OR THE EXISTENCE OF ANY EXISTING UNDERGROUND UTILITIES. ANY UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE RECORDS AND DISCUSSION WITH THE OWNER.
THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING ANY CONSTRUCTION.
THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD, WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY GORDON. SO THAT APPROPRIATE REVISIONS IF WARRANTED CAN BE MADE TO THE PLANS AT
THE GOVERNMENT'S EXPENSE.
11. GORDON DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE, THE LOCATION OF UNDERLYING ROCK, OR THE LOCATION OF POTENTIAL SINKHOLES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION. IF SINKHOLES ARE FOUND IN THE FIELD, REMEDIATION WILL BE REQUIRED AS SPECIFIED BY A QUALIFIED GEOTECHNICAL ENGINEERING FIRM.
12. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING
FIRM AND PAID FOR BY THE CONTRACTOR.
13. ALL PROPOSED ELEVATIONS AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED.
14. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF ONE (1) FOOT SIX (6) INCHES BETWEEN CROSSING OF ALL UTILITY LINES
UNLESS OTHERWISE NOTED.
15. EARTHWORK SHALL BE COMPACTED IN ACCORDANCE WITH EARTHWORK SPECIFICATION 31 20 11.
16. THE CONTRACTING OFFICER REPRESENTATIVE, CONTRACTOR, AND/OR SURVEYOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO STAKEOUT AND/OR CONSTRUCTION. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE U.S. DEPARTMENT OF VETERANS AFFAIRS ATTENTION FOR
VERIFICATION PRIOR TO STAKEOUT.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS.
GORDON SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK.
18. CONTRACTOR SHALL IMMEDIATELY CEASE WORK AND CONTACT THE U.S. DEPARTMENT OF VETERANS AFFAIRS CONTRACTING OFFICER REPRESENTATIVE IF ANY PREHISTORIC, HISTORIC, OR CULTURAL ITEMS OR HUMAN REMAINS ARE DISCOVERED AT ANY TIME WITHIN THE LIMITS OF WORK. ALL ACTIVITIES INVOLVING SUBSURFACE DISTURBANCE IN THE VICINITY OF THE DISCOVERY SHALL BE HALTED UNTIL THE DISCOVERED ITEMS ARE PROPERLY IDENTIFIED AND
APPROPRIATELY TREATED IN ACCORDANCE WITH APPLICABLE STATE AND FEDERAL LAW(S).
S33°56'19"E
3530.00'
S66°58'37"E 4858.11'
.9 8'
S0 8°
'2
2" W
9.
S1 7°
'2
0" W
1066.86' N87°39'36"W
287.16'N77°03'38"W
215.65' N57°29'19"W
218.96' N43°07'22"W
781.83'
N71°35'06"W
200.00' S31°05'49"W
261.22' N58°54'11"W
255.82' N47°47'15"W
230.39' N40°36'38"W
1297.20'N76°20'34"W
1268.26'
S83°00'10"W
361.86'
S89°20'53"W
850.11' N86°20'57"W
S0 5°
'2
7" E
.1 0'
N2 0°
'4
6" E
.9 4'
N02°21'58"E 251.82'
L=612.91' R=850.54' D=41°17'19"
L=86.62' R=428.66' D=11°34'41"
L=341.56' R=400.00' D=48°55'32"
S43°26'26"W 56.97'
N
°2 2'
"W
8.
N
°4 6'
"E
7.
N14°18'30"E 218.18'
N14°30'54"E 109.44'
N
°1 1'
"E
0.
N
°1 9'
"E
0.
N14°32'37"E 122.69'
L=623.87' R=1081.92' D=33°02'18"
L=2216.24' R=15307.63' D=8°17'43"
1591.14'N69°55'28"W
N:2706146.28 E:911710.47
N:2706456.94 E:902811.21
N:2703809.59 E:907712.92
BUNKER
HILL
CIRCLE
PLYMOUTH
LANE
LANECONCORD
CIRCLE
LEXING
TON
WAYVETERANS
VETERANS
W
AY CIRCLE
WAMPANOAG
BO
UL
EV
AR
D
BE
NN
IN
GT
ON
PA
TR
IO
T
LA
NE
M
EM
O
RIAL
CIRCLE
BO
U
R N
E
D R
IVE
IN-GROUND
CREMAINS
DEVELOPMENT
PHASE IV
EXPANSION
AREA
MCKENNAROAD
S80°30'24"E 175.68'N45°19'17"E
222.85'
N:2711395.58 E:904620.77
NORTH
OVERALL SITE PLAN
CS100
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818CM3034
SEPTEMBER 17, 2020 JPW KAE Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINS
LEGEND
LIMITS OF WORK
B1
EX. AD B
EX. RIP RAP
EX. CB A
EX. HEADWALL
EX. DMH A
RIM=137.00
RIM=136.70
RIM=136.50
EX. 12" RCP
EX. FES 6
EX. AD A
RIM=137.80
CONTRACTOR PRIMARY
CONSTRUCTION ACCESS
CONSTRUCTION SEQUENCING ACTIVITIES:
· CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE MASSACHUSETTS NATIONAL
CEMETERY DIRECTOR AND DESIGNATED STAFF THROUGH THE RESIDENT
ENGINEER/CONTRACTING OFFICER'S REPRESENTATIVE (RE/COR) TO MINIMIZE IMPACT TO
CEMETERY OPERATION.
· ALL COSTS TO MEET THE CONSTRUCTION SEQUENCING REQUIREMENTS SHALL BE INCLUDED IN
THE CONTRACTOR'S BID AND SHALL NOT BE THE BASIS FOR ADDITIONAL COSTS TO THE
OWNER.
· THE CONTRACTOR SHALL DEVELOP A SEQUENCING PLAN, PROJECT SCHEDULE, TRAFFIC
CONTROL PLAN, & NETWORK ANALYSIS SYSTEM (NAS) SCHEDULE DEMONSTRATING
FULFILLMENT OF THE CONTRACT REQUIREMENTS IN ACCORDANCE WITH SPECIFICATION
SCHEDULE 01 32 16.13 NETWORK ANALYSIS SCHEDULES. THE NAS SCHEDULE SHALL ACCOUNT
FOR ALL OPERATIONAL CONSTRUCTION SEQUENCING ACTIVITIES, PHASING AND ANY SPECIFIC
IDENTIFIED WORK SEQUENCING TASKS INCLUDED IN THE CONSTRUCTION DOCUMENTS. THE
NAS SHALL BE SUBMITTED, REVIEWED AND MODIFIED AS REQUIRED UNTIL APPROVED BY THE
RE/COR AND CEMETERY DIRECTOR. THE APPROVED NAS SCHEDULE SHALL, AS MUCH AS
POSSIBLE, ALLOW THE CONTRACTOR FLEXIBILITY IN MEANS AND METHODS.
· DEVIATIONS FROM THE NAS SCHEDULE SHALL BE CONSIDERED ONLY IF THE CEMETERY
OPERATIONS AND INCONVENIENCE TO THE PUBLIC HAVE BEEN SATISFACTORILY ADDRESSED.
SUCH DEVIATION MUST BE APPROVED IN ADVANCE IN WRITING BY THE RE/COR.
· CONFIRM ALL APPLICABLE PERMITS FOR BARNSTABLE COUNTY, MASSACHUSETTS
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP), AND ALL OTHER LOCAL, STATE, AND
FEDERAL REGULATORY AGENCIES.
· THE CONTRACTOR SHALL FURNISH THE RE/COR A SCHEDULE OF APPROXIMATE DATES ON
WHICH THE CONTRACTOR INTENDS TO ACCOMPLISH WORK IN EACH SPECIFIC AREA OF THE
SITE OR PORTION THEREOF. IN ADDITION, THE CONTRACTOR SHALL NOTIFY THE RE/COR TWO
WEEKS IN ADVANCE OF THE PROPOSED DATE OF STARTING WORK IN EACH SPECIFIC AREA OF
THE SITE OR PORTION THEREOF. ARRANGE SUCH DATES TO INSURE ACCOMPLISHMENT OF
THIS WORK IN SPECIFIED SEQUENCES MUTUALLY AGREEABLE TO THE RE/COR AND THE
CEMETERY DIRECTOR.
GENERAL CONSTRUCTION REQUIREMENTS:
BEFORE ANY GENERAL CONSTRUCTION ACTIVITIES MAY COMMENCE, THE CONTRACTOR SHALL:
· INSTALL TEMPORARY CONSTRUCTION FENCING AND TEMPORARY SIGNAGE (IF APPLICABLE).
· COMPLETE INSTALLATION OF EROSION AND SEDIMENT CONTROLS FOR THE WORK AREAS.
INSTALL IMMEDIATELY PRIOR TO THE START OF THE WORK IN ACCORDANCE WITH THE
APPROVED EROSION & SEDIMENT CONTROL PLAN.
· RETAIN A PRIVATE UNDERGROUND LOCATOR SERVICE AND PERFORM THE TRACING AND
MARKING OF ALL THE ONSITE BELOW GRADE IMPROVEMENTS WITHIN OR ADJOINING THE
CONTRACTOR WORK AREAS FOR THE PROJECT. CONTRACTOR MUST WALK THE
CONSTRUCTION AREAS WITH THE RE/COR AND, IF REQUESTED BY THE RE/COR, ADJUST THE
LOCATIONS OF THE NEW WORK AS REQUIRED BY A/E TO AVOID CONFLICTS, DAMAGE OR
UNINTENDED INTERRUPTIONS OF THE SERVICES BEING PROVIDED BY THE UNDERGROUND
FACILITIES.
· OBSERVE AND DOCUMENT THE FUNCTIONALITY OF THE IRRIGATION SYSTEM IN THE VICINITY
OF THE CONSTRUCTION AREA. DAMAGED OR NONFUNCTIONAL IRRIGATION SYSTEM
EQUIPMENT NOT IDENTIFIED AS BEING DAMAGED OR NONFUNCTIONAL DURING THE
PRE-CONSTRUCTION SURVEY SHALL BE FULLY REPAIRED AND MADE FUNCTIONAL
IMMEDIATELY UPON DETECTION OF ANY DAMAGE, AT NO ADDED COST TO THE OWNER.
· CONTROL TRUCK AND EQUIPMENT MOVEMENT SO THEY DO NOT TRANSIT BETWEEN ONGOING
SERVICES AT THE COMMITTAL SHELTERS.
· CONTRACTOR'S PRIMARY STAGING AREA FOR OPERATION WILL BE WITHIN AREA B1.
· THE CONTRACTOR MAY REQUEST LIMITED USE OF OPEN AREAS THROUGHOUT THE CEMETERY
FOR SECONDARY STAGING. USE OF SUCH OPEN AREAS MUST BE APPROVED BY THE RE/COR
AND MUST BE DETERMINED TO BE OUT OF THE WAY OF DAILY OPERATIONS.
· GENERAL CONTRACTOR SHALL NOT USE MAIN PUBLIC ACCESS TO CEMETERY AT ANY TIME FOR
ANY REASON, AND ALL SIGNAGE NEEDED TO KEEP CONSTRUCTION TRAFFIC AWAY FROM MAIN
ENTRANCE SHALL BE PROVIDED BY CONTRACTOR AT THEIR COST.
· ALL WORK AREAS SHALL ACCESS THE SITE FROM THE MAINTENANCE AREA ENTRANCE OFF
CONNERY AVENUE AT ALL TIMES.
· ANY ROADWAY USED FOR CONSTRUCTION ACTIVITIES THAT IS DAMAGED DURING THE
IN-GROUND CREMAINS DEVELOPMENT CONSTRUCTION SHALL BE REHABBED OR REPLACED
AFTER CONSTRUCTION HAS BEEN COMPLETED.
· THE CONTRACTOR WILL BE RESPONSIBLE FOR ADEQUATE TRAFFIC CONTROL AND SIGNAGE TO
SAFELY REROUTE THE PUBLIC AND STAFF DURING CEMETERY ROAD CLOSURES.
· ALL SIGNAGE AND TRAFFIC MARKINGS INCLUDING CONSTRUCTION SIGNAGE SHALL COMPLY
WITH MASSACHUSETTS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
· EXISTING FACILITIES DAMAGED BY CONTRACTOR DURING CONSTRUCTION OPERATIONS SHALL
BE REPLACED BY THE CONTRACTOR TO APPLICABLE STANDARDS.
· THE CONTRACTOR WILL BE RESPONSIBLE FOR GRADING ALL AREAS TO ENSURE POSITIVE
DRAINAGE.
· THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND/OR SALVAGING AND LEGAL
OFFSITE DISPOSAL OF ALL WASTE MATERIAL GENERATED BY CONSTRUCTION .
· THE CONTRACTOR MUST KEEP ALL EXISTING STREETS CLEAN AND CLEAR OF CONSTRUCTION
RELATED DEBRIS AND EQUIPMENT AT ALL TIMES.
· OFF - SITE TRACKING OF CONSTRUCTION SITE SEDIMENTS OR OTHER SUBSTANCES SHALL NOT
BE ALLOWED. CONSTRUCTION SITE ENTRANCE/EXIT STABILIZATION MEASURES, ALONG WITH
FREQUENT ADJACENT STREET SWEEPING OR CLEANING OF EQUIPMENT WASH RACK AREAS,
SHALL BE EMPLOYED TO PREVENT OFF-SITE TRACKING AND TO CONTROL THE GENERATION OF
FUGITIVE DUST. OFF - SITE TRACKING CONTROLS WILL BE REQUIRED TO PROTECT ROADS AND
FACILITIES WITH EXISTING CEMETERY PROPERTY AS WELL AS EXTERIOR ROADS AND
FACILITIES.
· WHEREVER EXCAVATION FOR NEW UTILITY LINES CROSS EXISTING ROADS, AT LEAST ONE
LANE MUST BE OPEN TO TRAFFIC AT ALL TIMES. FLAGGING PERSONNEL SHALL BE PROVIDED
FOR SUCH INSTANCES OF ROAD WORK. WHERE EXISTING ROADS ARE BEING REMOVED,
MODIFIED OR NEW ROADS ARE BEING CONSTRUCTED, PROVIDE TEMPORARY ACCESS ROADS,
FLAGGERS, AND /OR SIGNAGE TO SAFELY MAINTAIN TRAFFIC FLOW AND VEHICULAR ACCESS
TO AND FROM FUNCTIONING AREAS.
· IN THE EVENT THAT ELECTRICAL POWER ON SITE WILL BE REQUIRED TO BE SHUT OFF FOR
IMPROVEMENTS THE CONTRACTOR SHALL NOTIFY THE RE/COR AND CEMETERY DIRECTOR.
SHUT OFF OF ELECTRICAL POWER MUST BE COORDINATED WITH AND APPROVED BY THE
RE/COR AND CEMETERY DIRECTOR. THE CONTRACTOR MUST MAKE REASONABLE EFFORTS TO
COMPLETE WORK AND LIMIT THE TIME THAT THE CEMETERY GOES WITHOUT ELECTRICAL
POWER.
· THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVAL OF TEMPORARY FACILITIES
REQUIRED BY THIS SEQUENCING PLAN AND BY THE CONTRACT DOCUMENTS. THE
CONTRACTOR SHALL RESTORE ALL GRADES, LANDSCAPING, IRRIGATION, UTILITIES, SIDEWALK, CURB AND PAVEMENT ALTERED OR DAMAGED BY INSTALLATION OF USE OF TEMPORARY
FACILITIES BACK TO THEIR PRE-CONSTRUCTION CONDITION OR TO THE PROPOSED CONDITION
WHERE SPECIFIED BY THE CONTRACT DOCUMENTS.
· COMPLETE ANY AND ALL OTHER CONTRACTUAL REQUIREMENTS AS IDENTIFIED ELSEWHERE IN
THE CONSTRUCTION DOCUMENTS.
MAINTENANCE OF TRAFFIC
· PREPARE A CONSTRUCTION TRAFFIC CONTROL PLAN IN ACCORDANCE WITH PART 1.16 USE OF
ROADWAYS IN SPECIFICATION SECTION 01 00 02 GENERAL REQUIREMENTS.
· DO NOT USE GENERAL PUBLIC ENTRANCE TO CEMETERY AT ANY TIME FOR ANY REASON, AND
ALL SIGNAGE NEEDED TO KEEP CONSTRUCTION TRAFFIC AWAY FROM THE MAIN ENTRANCE
SHALL BE PROVIDED BY CONTRACTOR AND MAINTAINED THROUGHOUT CONSTRUCTION AT THE
CONTRACTORS COST.
· TEMPORARY SIGNAGE IS REQUIRED THROUGHOUT THE PROJECT TO FACILITATE PUBLIC
ACCESS TO THE CEMETERY AND ADVANCE NOTIFICATION OF CONSTRUCTION ACTIVITIES.
· CONTRACTOR SHALL USE THE PRIMARY CONSTRUCTION ACCESS IDENTIFIED IN THE
CONSTRUCTION DOCUMENTS UNLESS OTHERWISE AUTHORIZATED IN ADVANCE BY THE
RE/COR.
· MAINTAIN ONE LANE OF TRAFFIC OPEN TO THE PUBLIC AT ALL TIMES, UNLESS OTHERWISE
AUTHORIZED BY THE RE/COR.
· EXISTING ROADWAYS AND CONSTRUCTION AREAS NEAR THE PUBLIC SHALL REMAIN CLEAN
AND FREE OF DEBRIS. ALL DEBRIS SHALL BE REMOVED AS IT OCCURS.
· CONTRACTOR SHALL MAINTAIN CEMETERY ROADS USED DURING CONSTRUCTION ACTIVITIES
THROUGH REGULAR STREET SWEEPING.
· CONTRACTOR SHALL ENSURE THE NOISE FROM TRUCK AND EQUIPMENT TRAFFIC DOES NOT
INTERFERE WITH FUNERAL SERVICES AT THE COMMITTAL SERVICE SHELTERS.
· CONTRACTOR STAGING AND STORAGE SHALL BE WITHIN AN AREA ISOLATED FROM PUBLIC
ACCESS WITHIN NEW IN-GROUND CREMAIN SECTION, AND WHERE APPROVED ALONG THE
CONTRACTOR CONSTRUCTION ACCESS ROADWAY.
· ROADWAY ACCESS TO THE ADMINISTRATION BUILDING AND MAINTENANCE YARD SHALL
REMAIN OPEN AT ALL TIMES DURING CONSTRUCTION.
LEGEND
NEW BURIAL SECTIONS
· IN-GROUND CREMAINS PLOT SECTIONB1
CONSTRUCTION SEQUENCING PLAN
GI101
NOTE: THIS DEVELOPMENT DOES NOT INCLUDE EARLY TURNOVER.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818CM3034
SEPTEMBER 17, 2020 JPW KAE Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINS
EROSION AND SEDIMENT CONTROL
NARRATIVE
GC001
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818CM3034
SEPTEMBER 17, 2020 JPW KAE Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
LEGEND:
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
SILT FENCE/
WILDLIFE BARRIER
SAFETY/TREE
PROTECTION FENCE
REINFORCED
SILT FENCE
CULVERT INLET
PROTECTION
SURFACE
ROUGHENING
PERMANENT EROSION
CONTROL MATTING
CONSTRUCTION SIGN
SAFETY SIGN
NORTH
EROSION AND SEDIMENT CONTROL
PLAN - PHASES I & II
GC101
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818CM3034
SEPTEMBER 17, 2020 JPW KAE Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
36" MIN.,2" HARDWOOD FENCE
POSTS, DRIVEN MIN.16" INTO GROUND
FILTER FABRIC FASTENED SECURELY
TO FENCE POSTS W/STAPLES
OR HOG RINGS EMBED FILTER CLOTH
MIN. 8" INTO GROUND
FILTER FABRIC
36" MIN. FENCE POST
UNDISTURBED
GROUND
NOTES:
1. REFER TO EROSION AND SEDIMENT SPECIFICATION SECTION FOR ADDITIONAL REQUIREMENTS. THIS DETAIL FUNCTIONS NOT ONLY FOR SEDIMENT AND EROSION CONTROL PURPOSES BUT ALSO THE PROTECTION OF WILDLIFE& VEGETATION.
2. WHEN 2 SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED BY SIX INCHES AND FOLDED.
3. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE.
4. POSTS SHALL BE 2" HARDWOOD
5. FILTER CLOTH SHALL BE MIRAFI 100X OR APPROVED EQUAL.
FLOW
FLOW
PERSPECTIVE VIEW
FLOW
SECTION
"A
BO
VE
G R
AD
E
10'-0"MAX.CENTER TO CENTER
16" MIN.
"M
IN
8"
BE
LO
W
G R
AD
E
FA
BR
IC
H
T.
2' -0
O
VE
R
AL
L
NOTES:
1.STONE SIZE-USE 2" STONE, OR RECLAIMED OR
RECYCLED CONCRETE EQUIVALENT
2.FILTER CLOTH WILL BE PLACED OVER THE ENTIRE
AREA PRIOR TO PLACING OF STONE.
3. SURFACE WATER-ALL SURFACE WATER FLOWING
OR DIVERTED TOWARD CONSTRUCTION ENTRANCES
SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING
IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1
SLOPES WILL BE PERMITTED
4. MAINTENANCE-THE ACCESS SHALL BE
MAINTAINED IN A CONDITION THAT WILL PREVENT
TRACKING OR FLOWING OF SEDIMENT ONTO
CEMETERY OR PUBLIC ROADS. THIS MAY REQUIRE
TOP DRESSING,REPAIR AND/OR CLEANOUT OF ANY
MEASURES USED TO TRAP SEDIMENT. ALL
SEDIMENT SPILLED, DROPPED, WASHED OR
TRACKED ONTO PUBLIC RIGHTS-OF-WAY OR
CEMETERY ROADS MUST BE REMOVED
IMMEDIATELY.
5.WHEN NECESSARY, WHEELS SHALL BE CLEANED
PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY.
WHEN WASHING IS REQUIRED, IT SHALL BE DONE
ON AN AREA STABILIZED WITH STONE AND WHICH
DRAINS INTO AN APPROVED SEDIMENT TRAPPING
DEVICE.
6. PERIODIC INSPECTION AND NEEDED
MAINTENANCE SHALL BE PROVIDED AFTER EACH
RAIN.
DIVERSION RIDGE REQUIRED
WHERE GRADE EXCEEDS 2% 2% OR GREATER
FILTER CLOTH
FLOW
10" THICK(MIN.)
DIVERSION RIDGE
PLAN
A
EX
IS
TI
N
G
PA
VE
D
R O
AD
W
AY
FLOW
SILT FENCE
COARSE AGGREGATE
(SET IN 2 LIFTS) ON
FILTER CLOTH
ENTRANCE GEOMETRY VARIES. SEE EROSION
CONTROL PLANS FOR ENTRANCE CONFIGURATION
SECTION A-A
PAVED
ROADWAY
A
50'MIN
SE
E
ER
O
SI
O
N C
O N
TR
O
L
PL
AN
S
SUPPLY WATER TO
WASH WHEELS
WASH RACK
EROSION AND SEDIMENT CONTROL
DETAILS
GC501
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818CM3034
SEPTEMBER 17, 2020 JPW KAE Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
M c
K
E
N
N
A
R O
A D
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
BARNSTABLE COUNTY, MASSACHUSETTS
818CM3034
SEPTEMBER 17, 2020 JPW KAE Dwg. of 20
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINSOCMI
(202) 229-0530
AQUA ENGINEERING, INC
(970) 229-9668
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
4501 Daly Drive, Suite 200
Chantilly, VA 20151
(703) 263-1900
MABBETT
(781) 275-6050
ECS MID-ATLANTIC LLC
(703) 471-8400
SURVEY
VL101
DEMOLITION LEGEND:
EX. TREELINE/VEGETATION
REMOVAL
REMOVE EX. GUARDRAIL
SAFETY/TREE
PROTECTION FENCE
NORTH
DEMOLITION PLAN
CD101
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818CM3034
SEPTEMBER 17, 2020 JPW KAE Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
NOTE: THIS IS NOT A CERTIFIED SURVEY.
MCKENNA ROAD
LIMIT OF
DISTURBANCE, TYP.
FLOWER WATERING
STATION, TYP.
48.00', TYP.
4.00'
TYP.
4.00'
TYP.
ALL TREES ALONG
COMMITTAL SERVICE
SHELTER ROAD TO
REMAIN, TYP.
SECTION MARKER, TYP.
SECTION MARKER, TYP.
IRRIGATION
AISLE, TYP.
EXISTING RIPRAP
OUTFALL TO REMAIN
.0
0' , T
YP
40.00'
GRAVESITE GRID
MONUMENT, TYP.
CG501
IN-GROUND CREMAIN
PLOT, TYP.
4.00'
TYP.
CG501
CG501
.00
.0
0'
SECTION CS3
IN-GROUND CREMAIN PLOTS
(4' X4')
1,614 PLOTS
LP1
LP2
LP3
LP4
SM1
SM2
FWS1
HE
AD
ST
O
NE
DI
RE
TI
O N
EXISTING WOODEN
GUARDRAIL
CG501
POB
POC
POE
12.50'
TYP.
4.00'
TYP.
ADD ALTERNATE #1:
APPROXIMATELY 205 L.F.
DECORATIVE WOODEN
GUARD RAIL; SEE NOTES
ADD ALTERNATE #2:
LANDSCAPE BUFFER PLANTING;
SEE PLANTING PLANS
CG502
PROPOSED TREE
LINE, TYP.
Layout Table
Layout Point
LP1
LP2
LP3
LP4
Northing
2706043.1214
2705775.4960
2705993.0744
2705997.7240
Easting
908180.5150
908194.6807
908143.1082
908230.9853
Section Marker Layout
Section Marker
SM1
SM2
Northing
2706063.9059
2706038.8217
Easting
908135.0452
908229.2890
Flower Watering Station Table
FWS
FWS1
Northing
2706070.3168
Easting
908143.5153
Base Line Table
Line #
BL1
BL2
Bearing
S03° 01' 47.57"E
N86° 58' 12.30"E
Guard Rail Layout Table
Layout Point
POB
POC
POE
Northing
2706045.5205
2705925.3845
2705842.0367
Easting
908081.9936
908095.9339
908084.9667
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
BARNSTABLE COUNTY, MASSACHUSETTS
818CM3034
SEPTEMBER 17, 2020 JDS JEB Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINSOCMI
(202) 229-0530
AQUA ENGINEERING, INC
(970) 229-9668
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
4501 Daly Drive, Suite 200 Chantilly, VA 20151
(703) 263-1900
MABBETT
(781) 275-6050
ECS MID-ATLANTIC LLC
(703) 471-8400
FARLAND CORP.
(508) 717-3479
9/17/2020 10
SITE LAYOUT PLAN
10 5 10 15 2020 0
Scale: 1" = 20'
CS101
LEGEND
HEADSTONE FACE DIRECTION
FLOWER WATER STATION (FWS)
IN-GROUND CREMAIN PLOT (IGC)
TREE CLEARING
LIMIT OF DISTURBANCE
NEW TREE PLANTING
RIP RAP OUTFALL
NOTES
1. COORDINATE INFORMATION SHOWN IS BASED ON GRID COORDINATE SYSTEM IN U.S.
FEET AND BASED ON THE HORIZONTAL DATUM NAD 1983 AND VERTICAL DATUM NGVD
2. ALIGNMENT OF BURIAL SECTION IS ESTABLISHED BY COORDINATE POINTS AND LAYOUT
LINE BEARINGS. LAYOUT LINES ARE PARALLEL AND PERPENDICULAR UNLESS
OTHERWISE NOTED.
3. ALL MONUMENTATION SHOWN SHALL BE LAID OUT BY A LICENSED LAND SURVEYOR
ENGAGED BY THE CONTRACTOR, USING COORDINATES AND BEARING SHOWN.
4. THE CONTRACTOR SHALL INSPECT AND VERIFY ALL FIELD DIMENSIONS AND SITE
CONDITIONS SHOWN HEREIN BEFORE PROCEEDING WITH SITE WORK. DISCREPANCIES
BETWEEN FIELD CONDITIONS AND THESE PLANS SHALL BE BROUGHT TO THE
ATTENTION OF THE RE/COR PRIOR TO THE COMMENCEMENT OF THE WORK.
5. LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN HEREIN ARE APPROXIMATE
AND HAVE NOT BEEN INDEPENDENTLY VERIFIED. THE CONTRACTOR SHALL DETERMINE
THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK.
6. SEE SHEET 12 FOR GRADING AND DRAINAGE PLANS.
ADD ALTERNATE #1 NOTES
1. THE CONTRACTOR SHALL INSPECT AND VERIFY ALL
FIELD DIMENSIONS AND SITE CONDITIONS SHOWN
HEREIN BEFORE PROCEEDING WITH SITE WORK.
DISCREPANCIES BETWEEN FIELD CONDITIONS AND
THESE PLANS SHALL BE BROUGHT TO THE
ATTENTION OF THE RE/COR PRIOR TO THE
COMMENCEMENT OF THE WORK. THIS INCLUDES
VERIFICATION OF IRRIGATION LINE AND SPRINKLER
HEAD LOCATIONS.
2. ALL LANDSCAPING SHALL BE RESTORED TO
EXISTING CONDITION ONCE WORK HAS BEEN
COMPLETED. RESTORATION INCLUDES ANY
DISTURBANCE TO IRRIGATION SYSTEMS.
EXISTING TREE LINE
PROPOSED TREE LINE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
M
CK
EN
NA
R
OA
D
9 22 36 51 68 86 106 125 146 167 190 215 241 268 296 324 353 382 411 440 469 498 526 554 582 610 638 665A 694 722 750 778 806
10761104113211601188
1215124312711299132713541380140514281450147114901509
21 35 50 67 85 105 124 145 166 189 214 240 267 295 323 352 381 410 439 468 497 525 553 581 609 637 665 693 721 749 777 805
10751103113111591187
12141242127012981326135313791404142714491470
14891508
20 34 49 66 84 104 123 144 165 188 213 239 266 294 322 351 380 409 438 467 496 524 552 580 608 636 664 692 720 748 776 804
10741102113011581186
12131241126912971325135213781403142614481469
14881507
19 33 48 65 83 103 122 143 164 187 212 238 265 293 321 350 379 408 437 466 495 523 551 579 607 635 663 691 719 747 775 803
10731101112911571185
1212124012681296132413511377140214251447
14871506
18 32 47 64 82 102 121 142 163 186 211 237 264 292 320 349 378 407 436 465 494 522 550 578 606 634 662 690 718 746 774 802
10721100112811561184
121112391267129513231350137614011424
14861505
31 46 63 81 101 120 141 162 185 210 236 263 291 319 348 377 406 435 464 493 521 549 577 605 633 661 689 717 745 773 801
10711099112711551183
12101238126612941322134913751400
14851504
45 62 80 100 119 140 161 184 209 235 262 290 318 347 376 405 434 463 492 520 548 576 604 632 660 688 716 744 772 800
10701098112611541182
12091237126512931321134813741399
14841503
61 79 99 118 139 160 183 208 234 261 289 317 346 375 404 433 462 491 519 547 575 603 631 659 687 715 743 771 799
10691097112511531181
1208123612641292132013471373
14831502
60 78 98 117 138 159 182 207 233 260 288 316 345 374 403 432 461 490 518 546 574 602 630 658 686 714 742 770 798
10681096112411521180
120712351263129113191346
14821501
77 97 116 137 158 181 206 232 259 287 315 344 373 402 431 460 489 517 545 573 601 629 657 685 713 741 769 797
10671095112311511179
12061234126212901318
14811500
96 115 136 157 180 205 231 258 286 314 343 372 401 430 459 488 516 544 572 600 628 656 684 712 740 768 796
10661094112211501178
12051233126112891317
14801499
95 114 135 156 179 204 230 257 285 313 342 371 400 429 458 487 515 543 571 599 627 655 683 711 739 767 795
10651093112111491177
1232126012881316
14791498
134 155 178 203 229 256 284 312 341 370 399 428 457 486 514 542 570 598 626 654 682 710 738 766 794
106410921120114811761204
1231125912871315
133 154 177 202 228 255 283 311 340 369 398 427 456 485 513 541 569 597 625 653 681 709 737 765 793
106310911119114711751203
1230125812861314
176 201 227 254 282 310 339 368 397 426 455 484 512 540 568 596 624 652 680 708 736 764 792
106210901118114611741202
1229125712851313
175 200 226 253 281 309 338 367 396 425 454 483 511 539 567 595 623 651 679 707 735 763 791
106110891117114511731201
1228125612841312
199 225 252 280 308 337 366 395 424 453 482 510 538 566 594 622 650 678 706 734 762 790
106010881116114411721200
1227125512831311
198 224 251 279 307 336 365 394 423 452 481 509 537 565 593 621 649 677 705 733 761 789
105910871115114311711199
1226125412821310
223 250 278 306 335 364 393 422 451 480 508 536 564 592 620 648 676 704 732 760 788
105810861114114211701198
1225125312811309
249 277 305 334 363 392 421 450 479 507 535 563 591 619 647 675 703 731 759 787
105710851113114111691197
1224125212801308
276 304 333 362 391 420 449 478 506 534 562 590 618 646 674 702 730 758 786
105610841112114011681196
1223125112791307
332 361 390 419 448 477
FLOWER WATERING STATION, TYP.
SECTION MARKER, TYP.
LIMIT OF DISTURBANCE, TYP.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
BARNSTABLE COUNTY, MASSACHUSETTS
818CM3034
SEPTEMBER 17, 2020 JDS JEB Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINSOCMI
(202) 229-0530
AQUA ENGINEERING, INC
(970) 229-9668
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
4501 Daly Drive, Suite 200 Chantilly, VA 20151
(703) 263-1900
MABBETT
(781) 275-6050
ECS MID-ATLANTIC LLC
(703) 471-8400
FARLAND CORP.
(508) 717-3479
9/17/2020 11
GRAVESITE NUMBERING PLAN
86425 1010 0
Scale: 1" = 10'
CS401
LEGEND
IN-GROUND CREMAIN PLOT (IGC)
LIMIT OF DISTURBANCE
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
IN-GROUND CREMAIN
PROP. TREELINE
NORTH
GRADING PLAN
CG101
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818CM3034
SEPTEMBER 17, 2020 JPW KAE Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
4" 7-
1/ 2"
1'-212"
1/4" TYP.
NOTE: SUBMIT SHOP
DRAWINGS FOR TEXT
APPROVAL BY THE
RE/COR & CEMETERY
DIRECTOR PRIOR TO
FABRICATION
CLEAR DECALS
W/ WHITE TEXT
(MP32071);
MATTE FINISH;
LETTERING TO
BE 'HELVETICA',
UPPER & LOWER
CASE, TITLE TO
BE 1" HT. BOLD,
ALL OTHER TEXT
TO BE 3/16" HT.
FLOWER VASE
RECEPTACLE LID
1/4"Ø HOLES TO RECEIVE
3/16"Ø X 2" SS
TAMPER-PROOF SCREWS
WITH EXPANSION
SHIELDSSCREWS,
COLOR OF SCREWS TO
MATCH PANEL, TYP.
4"
1' -33 4"
1 2"
1/8" THICK ALUMINUM
SIGN PANEL; (COLOR
MP15178 - GEATA OLIVE)
DECAL HAS CLEAR
BACKGROUND
WHITE TEXT (MP32071)
3 4" 11 4"
3" 3 4"
1 2"
DO
NOT
DRINK
OSHA RED (MP55153)
WHITE (MP32071)
TrashFlower Vases
2' -0
"3' -0
" M
IN
1'-6"
1' -0
2'-6" DIA.
SUMP PIT
CONTROL
JOINT, TYP.
2' -5
"DO NOT DRINK"
SIGN; (3) SIDES
HAWS SPIGOT,
SEE SPECS
8" SQ. 'BARRE GREY' GRANITE
POST W/ 18"Ø CONC. FOOTING;
MATCH EXISTING, TYP.
2'
CL
SUMP PIT WRAPPED WITH
NON-WOVEN GEOTEXTILE
FABRIC ON SIDES AND
BOTTOM; DRAINAGE FILL
AGGREGATE COMPACTED TO
95% RD (SEE SPECIFICATIONS)
4,000 PSI CONC. FOOTING, TYP.
3/8" DIA. WASHED, ROUNDED
GRAVEL DRAINAGE FILL - 4"
DEPTH; GRAVEL PIT WRAPPED
WITH NON-WOVEN
GEOTEXTILE FABRIC ON SIDES
AND BOTTOM
TRASH
RECEPTACLE
VASE CONTAINER
RECEPTACLE
VALVE BOX WITH
PRESSURE REDUCER;
SEE IRRIGATION DETAILS
3/4" BRASS PIPE, TYP.; SEE
IRRIGATION DRAWINGS
AND SPECS
FLOWER VASE
RECEPTACLE
5" THICK REINFORCED 3500
P.S.I. CONC. PAD W/ 1/4"
RADIUS @ EDGE, TYP; MED.
BROOM FINISH; RUB OUT
ALL SURFACE TOOL MARKS
R9"
8'-0"±
UNLESS SHOWN OTHERWISE
1'-6" 2'-6"
1' -9
1'
-9
TRASH
RECEPTACLE
LID WITH FLORAL
REGULATIONS
CG501
1'-6"
CL
2'-6"
CL
CL
R1'
CL
8" SQ. 'BARRE GREY'
GRANITE POST W/ 18"Ø
CONC. FOOTING (BELOW);
MATCH EXISTING, TYP.
CL
2' -0
"3' -0
" M
IN
1'-6"
1' -0
2'-6" DIA.
SUMP PIT
2' -5
2'
SUMP PIT WRAPPED WITH
NON-WOVEN GEOTEXTILE
FABRIC ON SIDES AND
BOTTOM; DRAINAGE FILL
AGGREGATE COMPACTED TO
95% RD (SEE SPECIFICATIONS)
4,000 PSI CONC. FOOTING, TYP.
3/8" DIA. WASHED, ROUNDED
GRAVEL DRAINAGE FILL - 4"
DEPTH; GRAVEL PIT WRAPPED
WITH NON-WOVEN
GEOTEXTILE FABRIC ON SIDES
AND BOTTOM
"DO NOT DRINK" SIGN; (3)
SIDES (EXCLUDES BACK)
HAWS SPIGOT,
SEE SPECS
8" SQ. 'BARRE GREY' GRANITE
POST W/ 18"Ø CONC. FOOTING;
MATCH EXISTING, TYP.
3/4" BRASS PIPE, TYP.; SEE
IRRIGATION DRAWINGS
AND SPECS
BRASS PIPE BRACKETS W/
S.S. ANCHORS, TYP.; (2) EACH
6" 6"
DO
NOT
DRINK
DO
NOT
DRINK
CONCRETE PAD
CG501
2' -4
/8
1' -93 4"
BOTTOM VIEW
LID PLAN VIEW
FLOWER VASE RECEPTACLE
PERSPECTIVE
TRASH RECEPTACLE
PERSPECTIVE
NOTES:
1. SEE SPECIFICATIONS FOR TRASH AND FLOWER VASE RECEPTACLES
2. ALL COLOR TO BE POWDER COATED GREEN TO MATCH EXISTING.
STEEL CONVEX,
SELF-CLOSING
TOP LID
SPECIAL HINGED LID W/
FLORAL REGULATIONS DECAL
ATTACHED - SEE LID PLAN
VIEW
FLORAL REG. DECAL
HANDLE
HANDLE3/4" SQUARE
HOLE FOR
ANCHOR BOLT
SEE SPECIFICATIONS
1' -7
CG501
1" MIN.
2"
3"
3' -6
DE
PT
H
TO
F
RO
ST
SET TOP OF
MONUMENT 1/2"
ABOVE
FINISH
GRADE
NOTE:
ALL LAWNS WITHIN THE BURIAL
SECTIONS SHALL BE INSTALLED AND
ACCEPTED PRIOR TO
MONUMENT-BASE PLACEMENT; ALL
LAWNS DAMAGED DURING
INSTALLATION SHALL BE REPAIRED AT
CONTRACTOR'S EXPENSE
NOTE:
PER NCA
REQUIREMENTS, ALL
GRAVESITE GRID
MONUMENTS SHALL BE
CAST-IN-PLACE.
PRECAST MONUMENTS
WILL NOT BE
ACCEPTED.
NOTE:
FINISH GRADE IS TOP OF
TOPSOIL
MONUMENT MARKER
CONCRETE BASE
EDGE OF MONUMENT MARKER SHALL
BE NO CLOSER THAN 1" TO OUTSIDE
EDGE OF CONCRETE
MONUMENT MARKER (PROTECT
VISIBLE SURFACES DURING
PLACEMENT INTO CONCRETE)
FORGED ALUMINUM DOMED-TOP MONUMENT
MARKER WITH 3/4" DIAMETER SPLIT STYLE
STEM AND INTEGRAL LOCATION MAGNET
EMBEDDED
SMOOTH-TROWEL FINISH TOP
SURFACE, ENSURING POSITIVE
DRAINAGE
FORM THE TOP 4" OF THE CONC.
CYLINDER INTO A SMOOTH 8"Ø CIRCLE
COMPACTED APPROVED FILL OR
NATIVE EARTH
CONC. CYLINDER W/3,500 PSI
CONCRETE @ 28 DAYS
CG501
3-1/2"Ø FORGED
ALUMINUM DOMED-TOP
MONUMENT MARKER
FIELD INCISED HAIRS ON
CAP; CROSS-HAIRS
SHALL BE PARALLEL AND
PERPENDICULAR TO THE
GRAVESITE GRIDLINES &
PRECISE TO ±0.005'
REQUIRED TEXT ENGRAVED ON
CAP,
(WETLAND CONSERVATION
MONUMENT SHALL STATE
"CONSERVATION AREA")
TYP.
CROSS HAIRS
MUST FALL WITHIN
3/4" OF THE
CENTER OF THE
MARKER OR THE
ENTIRE
MONUMENT MUST
BE MOVED
PLAN
G R
A V
E
S
I T E G R I D MO N U
M E
N T
FACING
ROAD, TYP.
CS3
2"
8"
3' -6
2'
-0
8"
LIGHT GRAY GRANITE SECTION
MARKER TO MATCH EXISTING,
HONED INSCRIPTION FACE, ALL
SURFACES TO BE HONED FINISH;
ALL CORNERS AND EDGES
INCLUDING 12" BELOW GROUND
LEVEL SHALL BE EASED TO 1
8"
RADIUS.
REFERENCE POINT, SEE SIGNANGE
SCHEDULE FOR COORDINATES
10 34 "
91 8"
4"
8"
8" CS3
TOP VIEW
23 8"
55 8"
10 34 "
ENGRAVED NUMBERS
OR LETTERS TO
MATCH EXISTING
FONT AND HEIGHT OF
INSTALLATION
ACROSS MCKENNA
ROAD, TYP.
5" 1'
5" DEPTH (MIN) CONCRETE, MEDIUM
BROOM FINISH PERPENDICULAR TO
DIRECTION OF TRAVEL, JOINTS AS
SHOWN, TYP.
3"
SHEET 6" x 6" W3.4 X W3.4 W.W.M.
2" CLEAR FROM BOTTOM, TYP.
FINISH GRADE
12" DEPTH CRUSHED
STONE MADOT M1.02.03
OR M2.01.03 (COMPACTED
TO 95% MIN., SEE SPEC.)
SUBGRADE (COMPACTED
TO 95% MIN., SEE SPEC.)
CG501
TOOLED JOINT W/
SPACING AS SHOWN ON
PLANS; TOOLING SHALL
ALSO OCCUR AROUND
PERIMETER OF
CONCRETE PAVEMENT,
TYP.
3/8"
1/
SL
AB
DE
PT
H, TY
P.
CONTROL JOINTEXPANSION JOINT
3/8"
EXPANSION JOINTS TO
OCCUR 60' O.C. MAX &
AT ALL CURBS, WALLS,
& WHERE SHOWN ON
PLANS AND OTHER
DETAILS.
PREMOULDED
JOINT FILLER
TOOLED JOINT W/
1/4" RADIUS
EDGES AS SHOWN,
TYP.
JOINT SEAL &
BACKER ROD; SEE
SPECIFICATIONS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
BARNSTABLE COUNTY, MASSACHUSETTS
818CM3034
SEPTEMBER 17, 2020 JDS JEB Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINSOCMI
(202) 229-0530
AQUA ENGINEERING, INC
(970) 229-9668
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
4501 Daly Drive, Suite 200 Chantilly, VA 20151
(703) 263-1900
MABBETT
(781) 275-6050
ECS MID-ATLANTIC LLC
(703) 471-8400
FARLAND CORP.
(508) 717-3479
9/17/2020 13
SITE DETAILS 1
CG501
1" = 1'-0"
FLOWER WATERING STATION1 1'0 6"3"
3/4" = 1'-0"
FLORAL REGULATIONS DECAL2 1'0 6"3" 3" = 1'-0"
'DO NOT DRINK' SIGN3 0 4"1" 2"
3" = 1'-0"
GRAVESITE GRID MONUMENT4 0 4"1" 2"
6" = 1'-0"
MONUMENT MARKER5 2"0 1"
1" = 1'-0"
GRANITE SECTION MARKER6 1'0 6"3"
1" = 1'-0"
CONCRETE PAVEMENT7 1'0 6"3"
3" = 1'-0"
CONCRETE PAVEMENT JOINTS8 0 4"1" 2"
AutoCAD SHX Text
FLORAL REGULATIONS
AutoCAD SHX Text Cut flowers and temporary containers are permitted at all times. Artificial plants permitted only from October 10 to April 15. Potted plants permitted 10 days before through 10 days after Easter Sunday. Christmas arrangements permitted beginning December 1 and must be removed by January 20. Statues, religious articles, breakable containers, baskets and similar items are not permitted. At no time will items be allowed to be hung from or attached to trees or shrubs. Floral items or decorations are not allowed to be secured to markers. Floral items will be removed when they become faded or unsightly. Unauthorized items will be removed and disposed of.
AutoCAD SHX Text
REGULATIONS
AutoCAD SHX Text
FLORAL
AutoCAD SHX Text
%%UPLAN
%%UPLAN
2"
5"
2" 51 2"
M
AX
2" 23 4"
2"
1 2" 2"
31 2"
3 4"
2"
2"
2"
1" 2"
2"
3'-6"
2' -6
2"
HELVETICA STYLE 2"
HIGH LETTERING
LETTERING TO BE HELVETICA
STYLE 1 1/2" HIGH TO BE
CENTERED HORIZONTAL
(4) #4 GROMMETS AT
CORNERS WITH 1/2" S.S. HEX
BOLTS WITH WASHERS AND
NUTS TO SECURE SIGN
PANELS TO TEMPORARY
CONSTRUCTION FENCE.
ATTACH SIGN TO FENCE MESH
USING LARGE O.D. WASHERS
TO PIN MESH BETWEEN SIGN
AND WASHERS.
WHITE CORRUGATED PLASTIC
BOARD, MIN. 10MIL
THICKNESS, CUT TO SIZE
CENTER TO BE WHITE,
BORDER TO BE BLUE
NOTE: ALL LETTERING SHALL BE
BLACK WITH EXCEPTION OF PROJECT
TITLE WHICH SHALL BE BLUE
1 2"
2"
1 2"
61 2" 2"1"1 2"
1" 1" 2"1"11 2" 1 2"
11 2"
1" 11 2"
2" 5"
1'-6" 1'-6"C.L.
(4) #4 GROMMETS AT
CORNERS WITH 1/2" S.S. HEX
BOLTS WITH WASHERS AND
NUTS TO SECURE SIGN
PANELS TO TEMPORARY
CONSTRUCTION FENCE.
ATTACH SIGN TO FENCE MESH
USING LARGE O.D. WASHERS
TO PIN MESH BETWEEN SIGN
AND WASHERS.
RED
WHITE
BLUEBLUE OUTLINE,
WHITE CENTER
2'
3'
CENTER TO BE WHITE,
BORDER TO BE BLUE
NOTE: ALL LETTERING SHALL BE
BLACK WITH EXCEPTION OF PROJECT
TITLE WHICH SHALL BE BLUE
WHITE CORRUGATED PLASTIC
BOARD, MIN 10MIL
THICKNESS, CUT TO SIZE
8' O.C.
TYP.
1' TY
P.
2' -2
C L
6" 8"
C L
6"
5' -8
TY
P.
8"
2' -2
1' TY
P.
3' -6
M
IN
DISTANCE
BETWEEN
EDGE OF
PAVEMENT
AND FACE OF
GUARDRAIL
VARIES, SEE
LAYOUT PLAN
5' -8
TY
P.
4"
3' -6
M
IN
1' TY
P.
8"
TYP.
2"
8" DIA. TREATED POST, TYP.
GALVANIZED 60d SPIKES,TYP.
4"
TYP.
2" JNT., TYP.
3"X8" TREATED
SPRUCE PLANK,
TYP.; INSTALL
PLANKS IN LENGTHS
OF 16' WHEREVER
POSSIBLE
8" DIA. TREATED POST, TYP.;
FIRST AND LAST POST OF EACH
SECTION TO BE SET BACK 12"
FROM THE GENERAL LINE OF
POSTS
EDGE OF ROADWAY, TYP.
FINISHED GRADE, TYP.
8" DIA. TREATED POST, TYP.;
NOTCH POST TO ACCEPT
SPRUCE PLANKS
3"X8" TREATED SPRUCE PLANK
SECURED TO POST WITH (3)
GALV. 60d SPIKES, TYP.
FINISHED GRADE, TYP.
ROADWAY
PLAN VIEW
ELEVATION VIEW
SECTION VIEW
LAWN TURF, TYP.
CL CL
8' O.C.
TYP.
8' O.C.
TYP.
DISTANCE BETWEEN EDGE
OF PAVEMENT AND FACE OF
GUARDRAIL VARIES, SEE
LAYOUT PLAN
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
BARNSTABLE COUNTY, MASSACHUSETTS
818CM3034
SEPTEMBER 17, 2020 JDS JEB Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINSOCMI
(202) 229-0530
AQUA ENGINEERING, INC
(970) 229-9668
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
4501 Daly Drive, Suite 200 Chantilly, VA 20151
(703) 263-1900
MABBETT
(781) 275-6050
ECS MID-ATLANTIC LLC
(703) 471-8400
FARLAND CORP.
(508) 717-3479
9/17/2020 14
SITE DETAILS 2
CG502
1 1/2" = 1'-0"
TEMPORARY CONSTRUCTION SIGN1 8"0 4"2" 1 1/2" = 1'-0"
TEMPORARY SAFETY SIGN2 8"0 4"2"
1/2" = 1'-0"
DECORATIVE GUARD RAIL3 0 1' 2'6"
ALL DETAILS PERTAIN TO ADD ALTERNATE #1 - SEE SITE LAYOUT PLAN
AutoCAD SHX Text
DESIGNED AND SUPERVISED BY: DEPARTMENT OF VETERANS AFFAIRS WASHINGTON D.C.
AutoCAD SHX Text
GENERAL CONTRACTOR
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text Department of
AutoCAD SHX Text
THIS SPACE FOR CONTRACTORS NAME ONE OR TWO LINES AS REQUIRED
AutoCAD SHX Text Massachusetts
AutoCAD SHX Text National Cemetery
AutoCAD SHX Text
GENERAL CONTRACTOR
AutoCAD SHX Text
WITHOUT A LOST TIME ACCIDENT
AutoCAD SHX Text
DAYS
AutoCAD SHX Text
HAS WORKED
AutoCAD SHX Text
THIS PROJECT
AutoCAD SHX Text
ON SAFETY
AutoCAD SHX Text in
AutoCAD SHX Text
ZERO
AutoCAD SHX Text Department of Veterans Affairs
AutoCAD SHX Text
THE LIFE YOU SAVE MAY BE YOUR OWN
0 0 0
MCKENNA ROAD
LIMIT OF
DISTURBANCE, TYP.
ALL TREES ALONG
COMMITTAL SERVICE
SHELTER ROAD SHALL
REMAIN, TYP.
AR
CA
AR
CA
CA
RE
AR
LAWN SOD, TYP.
ADD ALTERNATE #2:
LANDSCAPE BUFFER PLANTING.
INCLUDES TREES, SHRUBS, AND
ADDITIONAL SOD WITHIN
INDICATED BOUNDARY
ADD ALTERNATE #1:
DECORATIVE WOODEN
GUARDRAIL; SEE NOTES ON SITE
LAYOUT PLAN FOR LANDSCAPE
RESTORATION REQUIREMENTS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
BARNSTABLE COUNTY, MASSACHUSETTS
818CM3034
SEPTEMBER 17, 2020 JDS JEB Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINSOCMI
(202) 229-0530
AQUA ENGINEERING, INC
(970) 229-9668
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
4501 Daly Drive, Suite 200 Chantilly, VA 20151
(703) 263-1900
MABBETT
(781) 275-6050
ECS MID-ATLANTIC LLC
(703) 471-8400
FARLAND CORP.
(508) 717-3479
9/17/2020 15
SITE PLANTING PLAN
10 5 10 15 2020 0
Scale: 1" = 20'
LP101
LEGEND
MAJOR CONTOUR
MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
NOTES:
1. SEE SHEET LP501 FOR PLANTING SCHEDULE AND
DETAILS.
2. SEE SPECIFICATIONS FOR SOD REQUIREMENTS.
IN-GROUND CREMAIN PLOT (IGC)
LAWN SOD
DECIDUOUS TREES
EVERGREEN TREES
3/4
LP501
3/5
LP501
SHRUBS 2/3
LP501
LIMIT OF DISTURBANCE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
BARNSTABLE COUNTY, MASSACHUSETTS
818CM3034
SEPTEMBER 17, 2020 JDS JEB Dwg. of 21
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
MASSACHUSETTS NATIONAL
CEMETERY
IN-GROUND CREMAINSOCMI
(202) 229-0530
AQUA ENGINEERING, INC
(970) 229-9668
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
4501 Daly Drive, Suite 200 Chantilly, VA 20151
(703) 263-1900
MABBETT
(781) 275-6050
ECS MID-ATLANTIC LLC
(703) 471-8400
FARLAND CORP.
(508) 717-3479
9/17/2020 16
LANDSCAPE DETAILS &
PLANTING SCHEDULE
LP501
STAKE
TREE TRUNK
STAKESTAKE
PLAN
VIEW
STRAPS. ENCASE STRAPS AROUND TRUNK
DRIVEN IN ON AN SLIGHT ANGLE.
STAKES TO BE OUTSIDE OF ROOT BALL.
3 PER TREE. STAKES TO BE SAME HEIGHT,
IN REINFORCED RUBBER HOSE ABOVE
FIRST BRANCH. SECURE GUYING STRAPS
3" Ø x 8'-0" CEDAR STAKES, 4" HT. PLANTING MIX SAUCER
WITH GALV. OR CADMIUM-PLATED TURNBUCKLES.
PERIMETER OF MOUND TO DEPTH SHOWN.
COMPACTED 92%; TRENCH AROUND
UNDISTURBED NATIVE SOIL DRAINAGE MOUND
AMENDED PLANTING MIX, COMPACTED
3" DEPTH HARDWOOD MULCH;
PULL MULCH AWAY FROM TRUNK
(SEE SPEC.)
2'-0"
TYP.
1' -0
F.G.
TO STAKE. NOTCH STAKE TO RECEIVE
ATTACH FABRIC MATERIAL GUYING STRAPS
NOTES:
CONTRACTOR TO REMOVE GUYING TWO (2)
GROWING SEASONS AFTER INSTALLATION.
BOTTOM OF TREE TRUNK AFTER BACKFILLING
TOP 1/3 OF BALL ROOT. IF PLASTIC WRAP OR
BUT BEFORE MULCHING. REMOVE BURLAP FROM
TREATED BURLAP IS USED, COMPLETELY REMOVE
MUST BE REMOVED. CUT ROPE SURROUNDING
ANY WIRE CAGING OR SIMILAR MATERIAL
THESE MATERIALS.
SECTION
VIEW
N.T.S.
DECIDUOUS TREE PLANTING4
TREE SHALL BE PLUMB & STRAIGHT; TREES
2-1/2" CALIPER & LARGER SHALL BE
STAKED & GUYED AS SHOWN BELOW.
SET PLANT SO THAT THE ROOT CROWN IS 1"
HIGHER THAN THE SURROUNDING GRADE.
THIN BRANCHES & FOLIAGE AS DIRECTED (SEE
SPECS) WHILE RETAINING NORMAL SHAPE OF
TREE. NEVER CUT A LEADER.
NOTES:
1. TREE SHALL BEAR SAME RELATIONSHIP
TO FINISH GRADE AS IN THE NURSERY.
2. NEVER CUT A LEADER
3. TREE SHALL BE PLUMB & STRAIGHT
INSTALL 3 GUYS PER TREE EQUALLY SPACED
AROUND ROOTBALL. ATTACH 1
8" GALV. STEEL
CABLES @ 23 HEIGHT OF TREE. PROVIDE
REINFORCED RUBBER HOSE TO ENCASE CABLE
AROUND TRUNK. SECURE ALL ENDS OF CABLE
W/GALV. CLAMPS
4" GALV. TURNBUCKLE EA. CABLE
3" Ø X 2'-0" CEDAR STAKES, 3 PER TREE,
DRIVEN IN AT A 25° ANGLE STAKES TO BE
OUTSIDE OF TREE PIT.
3" HT. PLANTING MIX SAUCER
3" DEPTH PINE BARK MULCH; PULL MULCH
AWAY FROM TRUNK.
AMENDED PLANTING MIX, COMPACTEDREMOVE WIRE BASKET COMPLETELY. CUT ROPE
SURROUNDING BOTTOM OF TREE TRUNK AFTER BACK
FILLING BUT BEFORE MULCHING. DO NOT REMOVE BURLAP.
NATIVE SOIL DRAINAGE MOUND,
COMPACTED TO 92%
UNDISTURBED SUBGRADE
F.G.
TREE PIT MINIMUM
WIDTH TO BE 2X
WIDTH OF ROOT BALL
PLAN VIEW
NOTES:
1. THE CONTRACTOR SHALL SUPPLY ALL NEW PLANT MATERIAL IN QUANTITIES SUFFICIENT TO COMPLETE ALL PLANTING SHOWN ON THE
DRAWINGS. WHERE DISCREPANCIES EXIST BETWEEN THE PLANS AND THE LANDSCAPE SCHEDULE, THE PLANS SHALL TAKE PRECEDENCE.
2. ALL DISTURBED AREAS TO BE SODDED LAWN.
3. CONTRACTOR SHALL VERIFY POTENTIAL UTILITY CONFLICTS PRIOR TO STAKING. ALL UTILITY LINES DAMAGED BY THE INSTALLATION OF
PLANT MATERIAL SHALL BE REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.
4. SEE LANDSCAPE PLANS FOR EXISTING TREES TO REMAIN.
N.T.S.
LANDSCAPE SCHEDULE1
PLANT LIST
SYM. QTY.
This is the start of the file's text. The full file is on GovTribe.