This is a Special Conditions document for HVAC Testing, Adjusting & Balancing (TAB) services issued by the Kentucky Community and Technical College System (KCTCS) for the renovation of an academic building at Hopkinsville Community College in Hopkinsville, Kentucky (RFB-167-24, Account No: 470-CADL-HK66-00). The project involves TAB services for a two-story renovation of an existing 47,420 square-foot facility containing classrooms and offices. The HVAC systems include water source heat pumps, boilers, a cooling tower, pumps, a dedicated outside air unit with energy recovery, and fume hood exhausts, along with a web-accessible building management control system. The scope of work requires the TAB agency to furnish all materials, tools, instruments, coordination, and labor to perform TAB services per project plans and specifications, including ductwork and casing pressure testing for all low-pressure ductwork excluding flexible ductwork to diffusers and grilles. The TAB agency must also attend project progress meetings, provide daily reports through the eComm system, participate in equipment start-up, calibrate airflow measuring stations, provide preliminary TAB reports, participate in owner training, and coordinate with the General Contractor (A&K Construction) and Commissioning Agency. The substantial completion date is April 19, 2025, and the final completion date is May 19, 2025.
Pricing is based on unit prices for calibration of devices and ductwork/casing pressure testing (quoted per hour) and additional trips to the job site (quoted per trip), with all labor, materials, supplies, services, overhead, and profit included in the unit prices. The TAB agency may submit invoices for partial payments up to 90 percent of the contract amount pending acceptance of completed work by the A/E Project Design Engineer, with the remaining 10 percent contingent upon final acceptance. Invoices and change orders must be submitted through the eComm system under "6.12 Invoice for TAB Services" and will proceed through engineer review and acceptance before payment is released. The document notes that there are no allowances in the project and that repeated testing or additional services due to equipment not being ready or failing initial tests will be back-charged by change order from the General Contractor's contract. Daily reports must document all time spent and indicate which items are repeats, not ready, or failed for back-charge purposes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC TESTING, ADJUSTING & BALANCING SERVICES
KCTCS – Renovate Academic Building
Hopkinsville Community College
Hopkinsville, Kentucky
Account No: 470-CADL-HK66-00 June 20, 2024
SPECIAL CONDITIONS 01000 A - 1
DIVISION 1 – GENERAL REQUIREMENTS
SECTION 01000 A - SPECIAL CONDITIONS for TAB Work
Re: KCTCS – Renovate Academic Building
Hopkinsville Community College 720 North Drive Hopkinsville, KY 42240 Account #: 470-CADL-HK66-00 Request for Bid No: RFB-167-24
Index:
1. Project Information / Scope
2. Related Documents and Information
3. TAB– Pressure Testing & Additional Services
4. List of Unit prices
5. Coordination and Participation
6. Substantial and Final Completion Dates
7. Payment
8. Project Directory
1. PROJECT INFORMATION / SCOPE:
A. The Building is a two story renovation of an existing facility consisting of classrooms and offices. Build-ing Square Footage: 47,420 SF
B. Scope of work for the TAB (Testing Adjusting and Balancing) Agency consists of furnishing all required materials, tools, instruments, coordination, participation and labor to perform and complete the TAB services per the Project plans and specifications for the above referenced Building Project.
a) The HVAC systems for the building consists of water source heat pumps, boilers, cooling tower, pumps, dedicated outside air unit with energy recovery, and fume hood exhausts.
b) Controls for the project consist of web accessible, building management control system for the HVAC systems in the building. The HVAC control system will interface into the existing HCC control system. The HVAC control system will be integrated into CEMCS.
C. These Special Conditions apply to all Divisions of the Specifications for the above project. Refer to the specifications for specific information.
2. RELATED DOCUMENTS AND INFORMATION:
A. Project Documents (plans and specifications) and related information for this project is available on DECA’s eCommunications web site hosted by Lynn Imaging.
B. After award of the TAB Contract, the successful bidder will receive a “Link” for access to the web site for the above referenced Project.
C. It is the Responsibility of the TAB Agency to review all Project Documents and coordinate their work with the GC (General Contractor), and the Commissioning Agency for the Project.
Hopkinsville Community College
SPECIAL CONDITIONS 01000 A - 2
3. TAB PRESSURE TESTING :
A. The TAB Agency shall include in their Bid the following.
a) Ductwork & Casing Pressure Testing for Leakage is required for the following:
i. All low pressure ductwork, excluding flexible ductwork to diffusers and grilles.
b) Additional Services:
1. Supplemental Services:
i. Attend Project Progress Meetings as needed
2. Un-anticipated Services:
i. Work not anticipated in the Base Bid Documents. This may include repeated testing due to the equipment not being ready for/or passing the initial tests; ad-ditional services requested by the Owner or Engineer.
B. Posting Daily Reports in eComm:
a) The TAB Agency shall document their time spent in Daily Reports Log.
b) TAB Agency shall post their Daily Reports Weekly under workflow “7.2 AE/ Owner Observation
Reports” in eComm (eCommunications) for this Project.
c) The TAB Agency shall indicate in their Project Log which items are repeats of work, not ready, failed, etc, as this time will be back-charged by Change Order from the GC’s Contract.
d) There are no allowances in this project.
4. LIST OF UNIT PRICES:
A. Unit Prices shall include furnishing all labor, materials, supplies, services and all items of cost, and overhead and profit for the Agency and any Subcontractor involved. Unit Prices shall be used uniformly without modification for either additions or deductions.
Description of Work Quantity Unit Price
Calibration of devices, Ductwork and Casing Pressure Testing 1Hour $ /Hour
Additional Trips to Job Site 1Trip $ /Trip
5. Coordination and Participation:
C. Coordination with GC and the HVAC Contractor:
a) The TAB Agency is responsible for certain aspects for this project including, but not limited to the following:
i. Completion of Checkout and Start-up Plans
ii. Participation in equipment start-up
iii. Calibration of airflow measuring stations
iv. Providing draft/pencil copies of preliminary TAB reports as systems complete TAB pro-
Hopkinsville Community College
SPECIAL CONDITIONS 01000 A - 3
cedures
v. Participation in Owner Training
vi. Participation in TAB Verification.
6. SUBSTANTIAL AND FINAL COMPLETION DATES:
A. Project Completion dates for the GC (General Contractor) and the TAB Agency are as follows:
• Substantial Completion date is April 19, 2025
• Final Completion date is May 19, 2025
B. The TAB Agency is responsible for coordinating their work with the project schedule through the Gen-eral Contractor and the Commissioning Agency.
7. PAYMENT:
A. The TAB Agency may submit invoicing for partial payments up to 90% of the contract amount pending the acceptance of the completed work by the A/E Project Design Engineer.
B. The TAB Agency may submit invoicing for remaining 10% of their contract contingent upon final ac-ceptance of the completed work.
C. Invoicing, and Change Orders for TAB Services shall be submitted under “6.12 Invoice for TAB Ser-vices” in eCommunications for this Project.
a) To post a Report go to your Dashboard in eComm; find this Project by RFB #; pick “Item Logs” (from the blue bar); pick “6.12 Invoice for TAB Services” from the dropdown menu; post your report, and then pick “save and submit to next step”.
b) The TAB Report will then go to the Engineer for either: review and comments; revert back a step; and/or for acceptance.
c) The TAB Agency will receive payment, after acceptance of the TAB Report by those in the eComm Workflow.
8. PROJECT DIRECTORY:
Owner Project Manager:
Dwayne Brown, Project Manager Division of Engineering and Contract Administration Bush Building 403 Wapping Street Frankfort, KY 40601 Phone: (270) 210-0253 dwayne.brown@ky.gov
Agency:
Jeff Hall Project Manager Kentucky Community and Technical College System Phone: 859 256-3563 Mobile 859 753-1327 jeff.hall@kctcs.edu
Hopkinsville Community College
SPECIAL CONDITIONS 01000 A - 4
Engineer:
Marcum Engineering Bryan Atkins, PE Paducah KY 42001 Phone 270 444-9274 batkins@marcumengineering.net
General Contractor (GC):
A&K Construction Justin Hopkins Paducah, KY Phone (270) 441-7752 Mobile (270) 559-2853 jhopkins@akconstruction.com
HVAC/Mechanical Contractor (MC):
Triangle Enterprises Steve Graves Paducah, KY Phone (270) 444-4995 Mobile (270) 559-1657 sgraves@triangle-co.com
Temperature Controls Contractor:
Automated Building Concepts Kevin Rickman Phone: (270) 898-1385 kevin@abchvac.com
END OF SECTION 203100A