This document is a Statement of Work (SOW) for a crane rental service to support a cab glass replacement project at the Miami International Airport (MIA) Air Traffic Control Tower (ATCT).

The SOW outlines the requirements for the vendor to provide a mobile crane capable of lifting and lowering the 12-foot tall cab glass units from ground level to the ATCT cab, along with a glass lifting device and counterbalance unit. The work is to be performed over a two-day period from November 20-21, 2024. The vendor must provide a lift plan, drawings, and other documentation detailing the crane specifics, lift plan, and mobilization/demobilization timeline. The vendor is also responsible for all crane mobilization, fuel, tolls, permits, and any damage to the surrounding area during the process.

This SOW is related to a federal contract opportunity issued by the Department of Transportation Federal Aviation Administration Franchise Acquisition Services for the upcoming crane support services requirement at the MIA ATCT. The agency is conducting a market survey to determine if adequate competition exists to set-aside the requirement for small businesses.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/17/2024

P a g e 1 | 4

Statement of Work (SOW)

CRANE RENTAL

Crane Rental for MIA ATCT Cab Glass Replacement Project

1. Introduction and Overview Service Order 41130 is for the replacement of One (1) cab glass window on the Airport Traffic Control Tower (ATCT) utilizing a temporary mobile crane with operator services in support of these efforts.

2. Purpose Provide complete crane rental with operator service to support Cab Glass Replacement Project.

3. Scope of Work Vendor shall provide complete crane rental service with a licensed operator as required to lift tools, materials, specialized equipment, and replacement glass units from ground level to the ATCT Cab.

4. Period of Performance November 20 thru November 21, 2024 (Wednesday-Thursday) for Two (2) consecutive days.

16Hrs for 2 Weekdays + 4Hrs Overtime

5. Deliverables Vendor shall provide a mobile crane capable of lifting/lowering cab glass units (12’ tall), glass lifting device with a counterbalance unit, material, and equipment in accordance with the requirements specified in Section 8 below.

Vendor shall perform a site visit and provide a lift plan in accordance with the requirements specified in Section 8 below.

6. Location of Work The crane service shall take place at the airport’s ATCT:

MIA ATCT Tower 6400 NW 22nd St Miami, FL 33122

7. Inspection, Compliance and Acceptance The FAA Team Lead Technician will ensure all work has been completed prior to releasing the crane service.

8. Additional Notes & Requirements As-built drawings and other information provided to the vendor shall be considered part of this SOW.

Crane vendor shall provide a mobile crane capable of lifting/lowering cab glass units (12’ tall), glass lifting device with a counterbalance unit, material, and equipment in accordance with the following:

a) Cab Finished Floor elevation +/- 297’ above ground level (AGL)

b) Top of Cab Glass elevation +/- 307’ AGL

c) Top of Roof / Parapet +/- 314’ AGL

d) Top of Lightning Terminal Rods +/- 327’ AGL

e) Top of ASDE (if applicable) +/- 321’ AGL

f) Not to Exceed Height (NEH) Crane Tip Height Not to Exceed 357’ AGL

g) Lift weight of cab glass unit with lifting and counterbalance units is 4,000 pounds max.

h) Lift radius +/- 160’ (360°) (crane vendor to determine based on Lift Survey & Lift Plan)

i) Crane load to capacity percent shall not exceed 65%

Crane vendor shall provide the following documentation:

(a) Crane Lift Plan, drawings, and information:

1) CAD-generated drawings of site-specific “plan view” of Tower and crane location including boom/jib length, radius, boom swing path, tail swing radius, outriggers, mats / blocking, and reference dimensions of crane location to tower.

2) CAD-generated drawings of site-specific “elevation view” of Tower and crane location including tip height, boom angle, radius, and reference dimensions of crane location to tower.

P a g e 2 | 4

3) Lift Plan Data of proposed / recommended crane location including crane make, model number, tonnage, load chart data, radius, main boom length, boom angle, jib length, jib angle, tip height, tip to ground distance overall, counterweights, ball weight, rigging weight, lift load, total load, chart load and percent load to chart load.

4) An estimate of time required to mobilize and assemble the crane, and an estimate of time required to disassemble and de-mobilize the crane.

5) Crane lift plan should be issued within 5 days to FAA after awarded the crane contract.

Crane vendor shall:

a) Perform a site visit and Lift Survey to ensure that the crane and crane services quoted will fully meet the requirements of this cab glass replacement project.

b) Be responsible for all crane mobilization / demobilization, fuel, tolls and permits required.

c) Provide to FAA prior to the start of operations documentation showing the licensed operator’s certifications and proof of current crane inspection reports.

d) Furnish and install a white and orange checkered flag at the end of the crane boom and be in full compliance with airport regulations prior to any lifting operations.

e) Furnish and install crane mats and blocking as required.

f) Be responsible for damage caused during crane mobilization and demobilization to pavements, blacktop, concrete, curbs, sidewalks, and landscaping.

Below is a typical cab glass window attached to our glass lifting / counterbalance equipment:

P a g e 3 | 4

P a g e 4 | 4