This is a Civil Material Estimate Bill of Materials for construction of an ICF Shower Shave Latrine facility, documenting required materials and anticipated concrete pour schedules. The estimate specifies seven primary civil material line items required by April 15, 2026, including 250 tons of 3/4" minus road mix, 250 cubic yards of 3,500 PSI concrete, 80 tons of utility sand, 210 tons of #4 rock (1"-3"), 2 rolls of TenCate Mirafi geotextile (15'X300', 4500 SQFT), 5 rolls of TenCate Miragrid 3XT geogrid (12' x 150'), and 5 days of pump truck service with operator. The document outlines seven anticipated concrete pour dates spanning May 8 through June 26, 2026, with quantities ranging from 22 to 55 cubic yards per pour and a total of 250 cubic yards, with pump truck requirements specified for five of the seven scheduled pours.

This materials estimate is associated with Air Force Air Combat Command's Sources Sought pre-solicitation (FA489726QSS01) for various construction materials, issued for market research purposes only with no contract award contingent upon closing. Vendors capable of providing all listed materials are requested to submit responses by February 10, 2026 at 12:00 PM MST to TSgt Augustus Shinn (augustus.shinn@us.af.mil) and SSgt Yan Hampp (yan.hampp@us.af.mil), with all questions due by February 5, 2026. Responses should include company information, SAM UEI/Cage Code, point of contact details, and applicable small business certifications based on relevant NAICS codes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CIVIL MATERIAL ESTIMATE
ITEM NO.DESCRIPTIONRequired NLTU/IEST. QUANTITY
13/4" Minus Road Mix15-Apr-26Ton250
2Concrete: 3,500 PSI compressive strength @28 days, 5 in slump, 3/4" aggregateVARIESCY250
3Utility Sand15-Apr-26Ton80
4#4 Rock (1"-3") Angular15-Apr-26Ton210
5Tencate Mirafi 15'X300' 4500SQFT 180NC ROLL MIRAFI MFG#:180NC1530015-Apr-26EA2
6TenCate Miragrid 3XT 12' x 150' Geogrid 1800 ft Squared/Roll15-Apr-26EA5
7Pump Truck w. OperatorVARIESDays5Anticipated Concrete Pour Dates (Will Call)
8NO DATEDateU/IQuantityPUMP TRUCK
9NO DATE8-MayCY22NO
10NO DATE13-MayCY30YES
11NO DATE27-MayCY55YES
12NO DATE8-JunCY30YES
13NO DATE12-JunCY29YES
14NO DATE17-JunCY29YES
15NO DATE26-JunCY55NO
16NO DATE
17NO DATE
18NO DATE
18NO DATE