Tab 4. QYZH 24-0018 Construct ICF Shower Shave Latrine_Civil Bill of Materials_No Links.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- FA489726QSS01
About this file
This is a Civil Material Estimate Bill of Materials for construction of an ICF Shower Shave Latrine facility, documenting required materials and anticipated concrete pour schedules. The estimate specifies seven primary civil material line items required by April 15, 2026, including 250 tons of 3/4" minus road mix, 250 cubic yards of 3,500 PSI concrete, 80 tons of utility sand, 210 tons of #4 rock (1"-3"), 2 rolls of TenCate Mirafi geotextile (15'X300', 4500 SQFT), 5 rolls of TenCate Miragrid 3XT geogrid (12' x 150'), and 5 days of pump truck service with operator. The document outlines seven anticipated concrete pour dates spanning May 8 through June 26, 2026, with quantities ranging from 22 to 55 cubic yards per pour and a total of 250 cubic yards, with pump truck requirements specified for five of the seven scheduled pours.
This materials estimate is associated with Air Force Air Combat Command's Sources Sought pre-solicitation (FA489726QSS01) for various construction materials, issued for market research purposes only with no contract award contingent upon closing. Vendors capable of providing all listed materials are requested to submit responses by February 10, 2026 at 12:00 PM MST to TSgt Augustus Shinn (augustus.shinn@us.af.mil) and SSgt Yan Hampp (yan.hampp@us.af.mil), with all questions due by February 5, 2026. Responses should include company information, SAM UEI/Cage Code, point of contact details, and applicable small business certifications based on relevant NAICS codes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CIVIL MATERIAL ESTIMATE | ||||||||
| ITEM NO. | DESCRIPTION | Required NLT | U/I | EST. QUANTITY | ||||
| 1 | 3/4" Minus Road Mix | 15-Apr-26 | Ton | 250 | ||||
| 2 | Concrete: 3,500 PSI compressive strength @28 days, 5 in slump, 3/4" aggregate | VARIES | CY | 250 | ||||
| 3 | Utility Sand | 15-Apr-26 | Ton | 80 | ||||
| 4 | #4 Rock (1"-3") Angular | 15-Apr-26 | Ton | 210 | ||||
| 5 | Tencate Mirafi 15'X300' 4500SQFT 180NC ROLL MIRAFI MFG#:180NC15300 | 15-Apr-26 | EA | 2 | ||||
| 6 | TenCate Miragrid 3XT 12' x 150' Geogrid 1800 ft Squared/Roll | 15-Apr-26 | EA | 5 | ||||
| 7 | Pump Truck w. Operator | VARIES | Days | 5 | Anticipated Concrete Pour Dates (Will Call) | |||
| 8 | NO DATE | Date | U/I | Quantity | PUMP TRUCK | |||
| 9 | NO DATE | 8-May | CY | 22 | NO | |||
| 10 | NO DATE | 13-May | CY | 30 | YES | |||
| 11 | NO DATE | 27-May | CY | 55 | YES | |||
| 12 | NO DATE | 8-Jun | CY | 30 | YES | |||
| 13 | NO DATE | 12-Jun | CY | 29 | YES | |||
| 14 | NO DATE | 17-Jun | CY | 29 | YES | |||
| 15 | NO DATE | 26-Jun | CY | 55 | NO | |||
| 16 | NO DATE | |||||||
| 17 | NO DATE | |||||||
| 18 | NO DATE | |||||||
| 18 | NO DATE | |||||||
| 19 | NO DATE |
File details come from the government source that posted it. Updated .