Tab 16 SIR Attach 1 (SOW).pdf
PDF 386 KB Posted
- Solicitation number
- 6973GH-25-R-00128
About this file
This document is a Statement of Work (SOW) for replacing flooring at the Federal Aviation Administration (FAA) Enroute facility in Guam. The project involves providing protective coating for Rooms 117, 118, 119, 120, and 141 at the Guam Combined Center Radar Approach (CERAP) located in Barrigada, Guam. The scope of work includes removing existing flooring, preparing surfaces, repairing cracks, applying primer and epoxy coatings, installing new rubber coving, and ensuring minimal disruption to facility operations.
Key project requirements include completing the work within 30 calendar days after notice to proceed, coordinating with the FAA site manager, complying with security requirements, and submitting a flooring replacement control plan and material safety data sheets for approval. The project is funded under the 2022 Bipartisan Infrastructure Law and will use specific materials like Elasto-Thane 230 sealant, Elasto-Poxy primer, and Elasto-Deck 6500 epoxy coating. All work must be performed under FAA escort to maintain site security and operational continuity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Guam CERAP Provide Protective Coating to
Environmental Support Complex Wing Floors
FY25
JCN 1303559 ZUA Provide Protective Coating to Environment Support Complex Wing Floors
1 PROJECT DESCRIPTION AND LOCATION
• This project is for Replacing the Mechanical Room Flooring Power Services building at the Federal Aviation Administration (FAA) Enroute facility, Guam Combined Center Radar Approach (ZUA). This project has been approved for funding under the 2022 Bipartisan Infrastructure Law (WSA BIL FY23).
• This project is located at the Guam CERAP located at 1775 Admiral Sherman Blvd.
Barrigada, Guam 96913
2 SCOPE
1. Furnish all necessary labor, material, equipment, transportation, and services to perform the following items of work.
2. Remove current flooring, and coving ZUA Rooms 117, 118, 119, 120, 141.
3. The floor surface must be prepared to accept the new coat of epoxy coating on its top.
4. Remove foreign materials such as dust particles from the surface.
5. Follow by grinding, shot blasting, and scarifying to have a course surface for better bonding with the mother floor.
6. Patch and repair all the major cracks identified on the floor to provide durability to epoxy flooring. Use Elasto-Thane 230 or approved equal, single-component, moisture-cured, polyurethane sealant.
7. Apply surface priming coat to the floor. During priming, ensure that the primer makes its way deep into the floor. Use Elasto-Poxy, a water based Primer or approved equal prior to application of the coating system per manufacturers recommendation.
8. After applying the primer coat, fill all the visible cracks and holes present on the floor with epoxy.
9. The floor must be lightly ground, sanded, and re-layered.
10. Test sealant using a significant amount of water applied to the floor. If the water is not soaked in, then the floor can be applied with an epoxy coating.
11. Mix Epoxy hardener with an epoxy resin and apply over the floor surface in multiple layers in the final stage. Use Elasto-Deck 6500 or approved equal, applied according to manufacturer recommendations.
12. After application, cure the epoxy floor at the required temperature.
13. Ensure that the curing process is initiated only when the epoxy begins a reaction with another curing agent.
14. Install new rubber coving when floor curing is complete.
15. Submit a flooring replacement control plan for approval by FAA prior to beginning any flooring replacement operations.
16. Submit Material Safety Data Sheets for approval by FAA prior to beginning work.
17. During flooring and curing operations shut off all fresh air intakes to prevent epoxy curing fumes or odors from propagating into the building.
3 ASSUMPTIONS, CONSTRAINTS AND CONDITIONS
• The Contractor shall be required to (a) Commence work under this contract upon coordination with ZUA SSC Coordinator after the Contractor receives the award, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than thirty (30) calendar days after notice to proceed (NTP) . The time stated for completion shall include final cleanup of the premises.
• The Contractor will, prior to notice to proceed (NTP), submit to the CO for approval a practical project schedule. The schedule will show the order in which the Contractor proposes to carry out the work for the project contracted for and the contemplated dates for completing the work. The schedule will include an execution plan narrative that summarizes contractor and subcontractor intentions for work sequences, work shifts, crew sizes, anticipated equipment, supply deliveries and storage and any support needs from FAA.
• All work shall be scheduled and performed at the designated times coordinated with Mike Carandang, ZUA SSC Manager. All work shall be performed so that normal CERAP operation may continue with a minimum of disruption or interference.
• The Contractor shall comply with all security requirements of the Government.
• Work performed at the site shall be always done under FAA escort. The point of contact for access into the site is Mike Carandang, SSC Manager.
Protective Coatings for Rooms #117, 118, 119, 120, 141
| 1 Project Description and Location |
| 2 Scope |
| 3 Assumptions, Constraints and Conditions |