Tab 1. QYZH 24-0018 Equipment Rental.pdf
PDF 298 KB Posted
- Attached to
- Heavy Equipment Rental 2
- Solicitation number
- FA489726QA013
About this file
This is a Statement of Work for rental equipment required by the 823rd RED HORSE Squadron at Mountain Home Air Force Base (MHAFB), Idaho. The contract performance period runs from April 15, 2026 through August 30, 2026, with equipment deliveries occurring Monday through Friday between 6 AM and 6 PM, with a minimum of 48 hours' notice required. The contractor must deliver 11 pieces of heavy equipment to MHAFB, including an excavator, water truck, dump truck, loader with fork attachment, backhoe, mini excavator, tracked skid steer, walk-behind roller, scissor lift, off-road scissor lift, and telehandler. Equipment specifications reference CAT and other manufacturer models as primary or equivalent alternatives. All equipment must be delivered in good working order per manufacturer, OSHA, and DOT requirements and operate on construction-grade diesel fuel. Estimated usage ranges from 160 to 800 hours per unit depending on equipment type, with individual rental periods varying from one to five months within the overall performance window.
The contractor is responsible for all transportation, field service repairs, preventative maintenance, and operator maintenance supplies. Repairs must be completed within 48 hours of notification, with a qualified Montana-licensed mechanic provided by the contractor. For preventative maintenance exceeding eight hours, the contractor must provide a suitable substitute. Normal wear-and-tear repairs are contractor responsibility; negligence or operator error damages require three repair quotes for reimbursement. All equipment requires daily inspection checklists, and the contractor must maintain diesel exhaust fluid levels. The contractor must comply with military installation security procedures, maintain valid identification for personnel, provide a supervisor available during work hours, and ensure immediate reporting of environmental spills or incidents. Equipment delivery will be coordinated with Capt. Ryan Stancil (ryan.stancil.1@us.af.mil), the 823 RHS Project Engineer, with specific drop-off locations confirmed prior to delivery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA489726QA013 Solicitation - Heavy Equipment Rental.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Mountain Home AFB, ID
RENTAL EQUIPMENT
PART I - General Contract Requirements
1. General Requirements
1.1. The 823d RED HORSE Squadron operating on Mountain Home Air Force Base
(MHAFB), ID requires rental equipment.
1.2. The Contractor shall deliver the equipment to the job site. The equipment shall conform to the specifications provided in Part II.
1.3. All equipment is to be delivered to MHAFB. See attachment for delivery location.
Commercial gate coordinates: 43.06867648543597, -115.89511327683712 Delivery site coordinates: 43.031538143238514, -115.86925124055186
1.3.1. Specific drop-off location on site will be coordinated with the 823 RHS Project Engineer, Capt Ryan Stancil (ryan.stancil.1@us.af.mil).
1.4. All increases, decreases, or modifications to the requirements specified in this document must be directed by the Contracting Officer (CO).
2. Delivery Periods. The delivery of equipment will occur during standard business hours on Monday through Friday between 6AM and 6PM, however the times will fluctuate.
2.1. The performance period for this contract shall be between 15 April 2026 and 30 August 2026.
2.2. The Contractor shall be responsible for transporting the equipment to the construction site. The Government will make every effort to provide the Contractor the maximum amount of notice possible.
2.3. Notification of date and time of delivery will be made as early as possible for all equipment. A minimum of 48 hours prior to the required delivery date, the 823 RHS Project Engineer will contact the provider to coordinate the date/time and specific location of deliveries.
2.4. In the event of adverse weather events prohibiting safe delivery of equipment, the 823 RHS Project Engineer will contact the contractor to coordinate rescheduling of delivery within the following 48 hours.
3. Military Installation Requirements
3.1. All mud, dirt, debris, foreign objects, trash, or spills caused by the contractor (including Sub-Contractors) on a street or parking lot, used as access to the work site or staging area shall be cleaned off the same day or as soon as practicable or requested by the CO.
3.2. The Contractor shall immediately report to the CO to discuss any issues or incidents which may indicate potential imminent risk to Government personnel or the environment. Following the notification, the Contractor shall be available to the CO for instructions regarding remediation of the release. Contractor should be aware of “you spill, you dig” policies, which means if you are the cause of the spill then you are responsible for the cleanup. To report a release or spill, contact the CO immediately.
3.3. The Contractor shall follow existing security procedures and instructions applicable to MHAFB. The Contractor is responsible for providing required documents in a timely manner to maintain the submitted work schedule. Delays caused by documents not being submitted early enough are the responsibility of the Contractor.
3.4. The contractor shall adhere strictly to existing security procedures and instructions applicable to accessing MHAFB. Contractor personnel attempting to access MHAFB shall hold a current, valid identification (ID). The U.S Government shall not be liable for delays resulting from pass coordination/approval. Contractor shall allot time into its schedule for obtaining base access.
3.5. The Contractor shall adhere to all requirements specified in Department of Defense (DoD) FAR clause 252.204-7004.
4. Emergency Situations. Installation access may be restricted at any time. Restricted access is reserved for emergency actions, exercises, or increased installation security.
5. Contractor Responsibility.
5.1. The Contractor is responsible for the wellbeing of their workers. The Government will not be responsible for supplying food or water to the Contractor’s workers. The Contractor should bring enough food and water for his/her workers to last the entire delivery period.
5.2. The Contractor shall provide the name and phone number of a supervisor that can make decisions for the Contractor and who is responsible for the performance of the work.
The supervisor shall be designated in writing when the contract is awarded and must always be available during work hours. The supervisor shall read, write, and speak fluent English. Additionally, the supervisor shall have sufficient technical knowledge regarding the requirements prescribed in this document. The identified Government representative shall have the right to request a replacement for any individual not deemed acceptable to the Government at any time.
END OF SECTION
PART II – Equipment Specifications
1. General
1.1. The Contractor shall deliver 11 pieces of equipment.
1.2. Equipment will be delivered on specified delivery dates.
2. Equipment specifications
QTY EQUIPMENT
TYPE
SPECIFICATIONS ATTACHMENT DURATION (Months)
(Delivery Date/Pick-up Date)
Estimated
PROJECTED
USAGE/VEHICLE (hrs)
1 Excavator – 20 Ton (2 CY
Bucket)
CAT 320D or equivalent
(15 April 2026 – 15 May 2026)
(160 hrs per unit per month)
1 2,000 gal Water Truck
CAT Class: 953-2225 or equivalent
(15 April 2026 – 18 September)
(160 hrs per unit per month)
1 10 Yard Dump Truck
CAT Class 952-7075 or equivalent
(15 April 2026 – 15 July 2026)
(160 hrs per unit per month)
1 4 CY Loader CAT Class 904-2040 or equivalent
Fork Attachment 3
(15 April 2026 – 15 July 2026)
(160 hrs per unit per month)
1 Backhoe CAT 420F or equivalent
(15 April 2026 – 15 June 2026)
(160 hrs per unit per month)
1 Mini Excavator CAT 300.9D or equivalent
(01 May 2026 – 30 August 2026)
(160 hrs per unit per month)
1 Tracked Skid steer
CAT Model 293D3 or equivalent
(15 April 2026 – 18 September 2026)
(160 hrs per unit per month)
1 Walk-Behind Roller
Wacker Neuson RD7AFB HRC or equivalent
(01 May 2026 – 30 August 2026)
(160 hrs per unit per month)
1 Scissor Lift
(19 ft reach)
JLG ES1932 or equivalent
3.5
(01 June 2026 – 18 September 2026)
(160 hrs per unit per month)
1 Off-Road Scissor Lift
(26 ft reach)
JLG RT2669 or equivalent
3.5
(01 May 2026 – 18 September 2026)
(160 hrs per unit per month)
1 Telehandler
(56 ft reach)
GTH 1256 or equivalent
3.5
(01 May 2026 – 18 September 2026)
(160 hrs per unit per month)
2.1. All equipment shall operate off DSS (construction grade) Diesel fuel.
2.2. Contractor will provide Diesel Exhaust Fluid replacements and refilling in required equipment.
2.3. The projected usage included above are estimates per individual piece of heavy equipment.
2.4. At the time of delivery, all equipment shall be in good, working order in accordance with all applicable manufacturers’, OSHA, and DOT requirements.
3. Field Service (Repair & Preventative Maintenance).
3.1. Contractor shall schedule all maintenance of heavy equipment between the hours of 6AM – 6PM Monday-Friday, excluding federal holidays. In the event a repair is required, the contractor shall repair within 48 hours from the time the repair call is placed. Contractor shall provide a letter containing a point of contact’s name and phone number for a maintenance contact.
3.2. Contractor shall provide the name of a qualified mechanic, licensed by the State of Montana to complete field service repairs, as required, in accordance with the timelines specified above.
3.3. If field service is determined by the POC and the Contractor to be impractical, or the rented equipment remains inoperable, Contractor shall provide a suitable substitute, acceptable to the POC, within 24 hours.
3.4. All repairs due to normal wear-and-tear in operation of heavy equipment will be the responsibility of the Contractor. Normal wear and tear is defined as tire tread wear, body panels coming loose, rock chips, leaks and other issues occurring during operation of the vehicle in accordance with the manufacturer’s published operation’s manual. If it is deemed that damage is caused by negligence or operator error, the Contractor shall provide a minimum of three (3) repair quotes to the contracting officer for reimbursement.
3.5. Contractor is responsible for all routine preventative maintenance associated with the equipment rentals and shall provide a detailed maintenance schedule for each individual piece of equipment at the time of delivery. If the preventative maintenance requires a piece of equipment to be down for more than eight (8) hours the Contractor shall provide a suitable substitute, acceptable to the contracting officer’s designated representative during the maintenance period.
3.6. Contractor shall remove all product waste associated with the field services provided.
3.7. Contractor shall provide a daily inspection checklist for each piece of equipment.
3.8. Contractor shall provide all items for operator maintenance (i.e. grease, grease guns, etc.) and be responsible for disposal of these items.
RYAN J. STANCIL, Capt, USAF Project Engineer