This is a Statement of Work for the procurement of stainless steel pipe and fittings to be delivered to NASA Stennis Space Center in Mississippi. The scope includes 20 linear feet of 4" seamless pipe (ASTM A312 GR 304/304L, SCH 160), 40 linear feet of 2" seamless pipe (ASTM A312 GR 304/304L, SCH 160), two 4" x 2" reducing weld-o-lets with different schedules, 20 linear feet of 6" seamless pipe (ASTM A312 GR 304/304L, SCH 10S), eight 6" tees, one 6" cap, eight 6" flanges, eight 6" blind flanges, and one 4" elbow. All materials must be dual-rated stainless steel per applicable ASTM standards, with specified wall thicknesses and end configurations (buttweld or weld-o-let as applicable).
The contractor must deliver all pipe and fittings along with material test reports or approved equivalents to NASA Stennis Space Center, Building 9166, Stennis Space Center, MS 39529-6000. The required lead time is 16 weeks after receipt of order to shipment. All components must comply with specified standards including ASME B16.9 and ASME B16.5 for fittings and flanges, with seamless construction required for all pipes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0042854 Tab 04 4 SOW UPDATED.pdf | ||
| SATPC0042854 Tab 10 Open Market RFQ Questions.pdf | ||
| Tab 10 RFQ 80NSSC27944832Q.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
1. Scope of Work
Item Quantity 4” Pipe
• ASTM A312 GR 304/304L, dual rated
• SCH 160
• Pipe shall be seamless
20 LF
2” Pipe
• ASTM A312 GR 304/304L, dual rated
• SCH 160
• Pipe shall be seamless
40 LF
4” x 2” Reducing Weld-o-let
• ASTM A182 GR 304/304L, dual rated
• SCH 160
4” x 2” Reducing Weld-o-let
• ASTM A182 GR 304/304L, dual rated
• SCH XXS
6” Pipe
• ASTM A312 GR 304/304L, dual rated
• SCH 10S
• Pipe shall be seamless
20 LF
6” Tee
• ASTM A403 WP304/304L, dual rated
• SCH 10S
• ASME B16.9
• Buttweld ends
6” Cap
• ASTM A403 WP304/304L, dual rated
• SCH 10S
• ASME B16.9
• Buttweld ends
6” Flange
• 300# Weld Neck Raised Face
• ASTM A182 GR 304/304L, dual rated
• SCH 10S bore
• ASME B16.5
• Buttweld ends
6” Blind Flange
• 300# Raised Face
• ASTM A182 GR 304/304L, dual rated
• ASME B16.5
4” Elbow
• ASTM A234 WPC
• SCH XXS
• 90 degree, Long Radius
• ASME B16.9
• Buttweld ends
2. Deliverables
• All pipe and fittings detailed in the scope of work.
• Material test reports or approved equal for each line item.
• Items to be shipped to address below o NASA Stennis Space Center Bldg. 9166 Stennis Space Center, MS 39529-6000
• Schedule
• Lead time: 16 weeks after receipt of order (ARO) to shipment