Tab 04 SOW.pdf

PDF 104 KB Posted

Attached to
fluid system components Federal contract opportunity
Solicitation number
80NSSC26940862Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This is a procurement specification for spare parts to support Kennedy Space Center Propellants & Life Support Services (KPLSS) equipment for the Artemis III mission. The procurement is for nine line items of components manufactured by CS&P Technologies, including strainers, cryogenic check valves, relief valves, hose assemblies, and a pressure transducer. Total quantities requested range from 1 to 2 units depending on the component, with one item (ASSY., COLD END 2.70 DIA., UNLOADER) requiring 2 units while all others require 1 unit each.

All components must be cleaned according to specified standards prior to shipment to NASA/Kennedy Space Center, BOSS Warehouse M6-0744, Kennedy Space Center, FL 32899. Most items require cleaning to the 300A standard per ASTM G93 through full disassembly and reassembly, with three items designated for flow-through cleaning and one item (TRANSDUCER, PRESSURE) requiring cleaning to Level IV using ASTM B40.1. Quotes must include estimated Average Repair Outages (AROs) and any additional lead times from the manufacturer. A certificate of conformance must accompany each delivered component. These spare parts are essential to minimize equipment outages and maintain continuous support to Exploration Ground Systems (EGS), which provides high-pressure helium, low- and high-pressure nitrogen, breathing air, and oxygen.

View the file

Other files for this federal contract opportunity

Other files attached to fluid system components, newest first.
File Type Posted
Tab 06 BNJ Redacted.pdf PDF
Tab 10 RFQ 80NSSC26940862Q.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement of EGS Spare Parts, non-CCF

1.0 Background

Procurement of these components is necessary to ensure spare parts are available for Kennedy Space Center Propellants & Life Support Services (KPLSS) equipment to support Artemis systems, including commodity lines, rechargers, and panels. These systems provide high-pressure helium, low- and high-pressure nitrogen, breathing air, and oxygen. Spare parts are required to be purchased to have on-hand in the event of component failure, to minimize outages and provide continued support to Exploration Ground Systems (EGS). This purchase is for spare parts to support this effort. Each system has certain cleaning requirements, per KSC-C-123.

Cleaning specifications are noted for components using this standard, which is similar to industry standard ASTM G93.

2.0 Requirements

The following are the components needed to ensure EGS has the minimum number of spares needed for Artemis III. Quotes must have estimated AROs and any additional lead time from the manufacturer. Specified cleaning is requested to be completed by the vendor per ASTM G93 specifications through a full disassembly and reassembly process, unless otherwise noted to be flow-through or to use ASTM B40.1, prior to shipment to Kennedy Space Center. A certificate of conformance shall be included with the delivery of the component.

Brand Name – CS&P Technologies

Item No.

National Stock Number Part Number Description Quantity

1 473000P19175 339-00156- 99997

STRAINER, Y-TYPE, 2"

FNPT, BRONZE BODY

Cleaned to 300A, Flow-through

2 482000K860825 339-00029- 99997

VALVE, CRYOGENIC

CHECK, 1-1/2" FNPT

WITH KEL-F DISC,

BRASS

Cleaned to 300A

3 482000K860903 339-00177- 99997

VALVE, CRYOGENIC

CHECK, 1" FNPT WITH

KEL-F DISC, BRASS

Cleaned to 300A

4 431000K860843 645-05087- 00007

ASSY., COLD END 2.70

DIA., NON-UNLOADER

Cleaned to 300A

5 668500K860876 331-00268- 99997

TRANSDUCER,

PRESSURE, 10-32VDC

INPUT, 4-20mA OUTPUT, 0-10 KPSI

Procurement of EGS Spare Parts, non-CCF

Using ASTM B40.1, clean to Level IV.

6 482000K860873 851-01438- 00007

VALVE, RELIEF,

SAFETY, 1 INCH, AE, 0.75

INCH, FNPT, 15,000 MAX

PSIG, 11,000 PSIG, SST

Cleaned to 300A

7 472000K860845 851-00970- 00007

ASSY., HOSE SUCTION

FLEX, 1.50 DIA X 0.095

WALL TUBING

Cleaned to 300A, Flow-through

8 472000K860829 327-00115- 00007

HOSE, SS FLEX 1 IN FJIC

BE X 20.50 IN OAL

Cleaned to 300A, Flow-through

9 431000K860842 645-05088- 00007

ASSY., COLD END 2.70

DIA., UNLOADER

Cleaned to 300A

NASA / Kennedy Space Center

BOSS Warehouse - M6-0744

Kennedy Space Center, FL 32899