Statement of Work Summary: NCCIPS FY25 Switch and Transformer Maintenance

This Statement of Work describes maintenance services for Eaton/Cooper switches and transformers at NASA's Building 9325 (National Center for Critical Information Processing and Storage) at Stennis Space Center, Mississippi. The contract period runs from the date of award through September 30, 2026, and is structured as a Firm Fixed Price project. The contractor must conduct five primary service categories: (A) Dissolved Gas Analysis (DGA) testing on 57 pad mount transformers and 23 pad mount switchgears, delivering 80 standardized test reports; (B) leak inspections on 10 units with nitrogen recharge procedures; (C) fluid replacement in one switchgear using approved E200 fluid; (D) rust inspection and recommendations on one transformer; and (E) standard nitrogen recharge procedures on 10 total units (4 transformers and 6 switchgears). All services must be performed during the Principal Period of Maintenance (7 AM to 5 PM, Monday through Friday) at the specified location in Mississippi.

Security and operational requirements include mandatory U.S. citizenship for site access, NCCIPS escort requirements for all subcontract personnel, formal Site Visit Request coordination with project managers, and prohibitions on photography, video, and cellular hotspots. The contractor must provide new equipment only (no remanufactured or gray-market items) and cannot include pricing for additional testing services or equipment replacement beyond the specified scope. The payment schedule allocates 80 percent of total contract value upon completion of fluid sampling, external sample valve installation, and leak repairs, with the remaining 20 percent due upon delivery and NCCIPS approval of fluid sampling reports. No more than two switches and/or transformers may be powered down simultaneously, with all electrical switching performed by NCCIPS personnel. Services must be scheduled at least five working days in advance, coordinated with data center client availability.

View the file

Other files

File Type Posted
Tab 04 SOW Revised 2.pdf PDF
Tab 10 RFQ 80NSSC26930323Q Revised 2.pdf PDF
Tab 04 SOW Revised.pdf PDF
Tab 10 RFQ 80NSSC26930323Q Revised.pdf PDF
Notice ID 80NSSC26930323Q Q_A.pdf PDF
Tab 10 RFQ 80NSSC26930323Q.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Dated 1/20/2026

NCCIPS FY25 Switch and Transformer Maintenance

A. Scope of Contract:

This Statement of Work (SOW) describes the scope of work and deliverables required for the maintenance of Eaton/Cooper Switches and Transformers at Building 9325, National Center for Critical Information Processing and Storage (NCCIPS) Complex, located at Stennis Space Center, MS.

B. Period of Performance:

Date of Award – 09/30/26

C. Place of Performance:

National Aeronautics and Space Administration (NASA), Building 9325, Cypress Loop Road, Stennis Space Center, Mississippi 39529

D. Security Requirements:

• United States citizenship is required to gain access into the NASA Stennis Space Center and into the NCCIPS data center.

• All subcontract personnel will require an NCCIPS escort during performance of the work described in this SOW.

• Contractor personnel required to visit NCCIPS to perform their work will require a formal Site Visit Request (SVR) to be coordinated with NCCIPS Project Managers

(PM).

• All photography or video requirements of the NCCIPS complex must be coordinated with NCCIPS personnel, as photography and video of any kind is prohibited at

NCCIPS.

• Cellular hotspots which generate a personal wireless network of any kind are also prohibited on NCCIPS grounds.

E. Principal Period of Maintenance (PPM):

The hours of 7 AM to 5 PM local time, Monday through Friday of each week will be referred to as the Principal Period of Maintenance.

F. Contractor Requirements The Contractor shall provide services including but not limited to the following The Contractor Requirements will be outlined in Appendix A:

A. Provide Dissolved Gas Analysis (DGA) Testing

• Scope: Conduct baseline DGA fluid testing and provide reports for:

o 57 Pad Mount Transformers.

o 23 Pad Mount Switchgears.

• Deliverable: Standardized DGA test report for each unit (80 total reports).

• Requirements: Use industry-standard testing equipment and methods.

B. Leak Inspection

• Scope: Inspect leaks for:

o 3 Pad Mount Transformers.

o 5 Pad Mount Switchgears.

o 1 Pad Mount Switchgear (as part of fluid replacement, see requirement

C).

o 1 Pad Mount Transformer (as part of recommendation for mitigating corrosive deterioration, see requirement D).

• Procedure:

o Inspect for potential nitrogen leaks.

o Provide recommendation for confirmed leaks to include necessary parts and materials.

o Verify Pressure Gauge functionality for three (3) Pad Mount

Transformers and five (5) Pad Mount Switchgears.

• Post-Service: Purge and recharge headspace with dry nitrogen per Standard

Nitrogen Recharge Procedure (see requirement E).

• Deliverable: Summary of inspections and gauge verification results.

C. Fluid Replacement

• Scope: Replace fluid in One (1) Pad Mount Switchgear.

• Procedure:

o Remove existing fluid from the tank.

o Inspect tank for potential fluid leaks and repair confirmed leaks with necessary parts and materials.

o Replace fluid with approved E200 fluid.

o Verify pressure gauge functionality for One (1) Pad Mount Switchgear.

• Post-Service: Purge and recharge headspace with dry nitrogen per Standard

• Deliverable: Report confirming fluid replacement and tank integrity.

D. Recommendation for Mitigating Corrosive Deterioration (rust)

• Scope: Inspect and provide recommendation for mitigating rust on One (1) Pad

Mount Transformer.

• Procedure:

o Inspect for corrosive deterioration and potential nitrogen leaks.

o Provide recommendation for confirmed issues (rust and leaks) to include necessary parts and materials.

o Replace gasket.

o Verify pressure gauge functionality for One (1) Pad Mount Transformer.

• Post-Service: Purge and recharge headspace with dry nitrogen per Standard

• Deliverable: Report detailing recommendations for repair and gauge verification.

E. Standard Nitrogen Recharge Procedure

• Applicability: Necessary for requirements B, C and D after service completion.

o 4 Pad Mount Transformers o 6 pad Mount Switchgears

• Procedure:

o Fill headspace with dry nitrogen to a pressure of 5 psi.

o Maintain pressure and verify no change for at least 15 min.

o Vent headspace to atmospheric pressure.

o Refill headspace with nitrogen to 2‐3 psi.

• Requirements: use calibrated pressure regulation equipment and dry nitrogen supply.

G. General Comments and Assumptions:

• No more than two (2) switches and/or two (2) transformers may be powered down at a time.

• NCCIPS Electrical personnel will perform all necessary switching to remove power to switches before service.

• Schedule for services shall be coordinated with the government’s technical representative not less than five (5) working days prior to performance of services. If downtime is required, work will be scheduled at the earliest convenience of the affected data center clients.

• NCCIPS team members will review the Dissolved Gas Analysis (DGA) baseline fluid test reports once the Contractor delivers them.

• The Contractor will notify the government’s technical representative of any engineering change notices and any production enhancements.

• At the conclusion of each service visit, an electronic report summarizing the performed service, findings, and recommended action will be made available to SAIC’s technical representative for review.

H. Payment Schedule:

DELIVERABLES PAYMENT

Fluid Sampling/External Sample Valve Install/Leak Repairs 80% of total contract value

Delivery and NCCIPS approval of Fluid Sampling Reports 20% of total contract cost

I. Contract Type:

This will be issued as a Firm Fixed Price project.

J. Special Terms and Conditions:

a. Pricing shall not include labor for any additional testing services not specifically covered.

b. Pricing shall not include replacement of any failed equipment or devices, purchase of such items will be authorized as a separate procurement prior to delivery of items.

c. Contractor shall guarantee the use of new equipment only, no remanufactured products, and no gray-market items.

MFR Equipment Description Model NO Serial NO Fluid Tag

Number

External Sample Valve

Take Sample (Requirement A)

Inspect for Leaks and Provide

Recommendation (Requirement B)

Replace Fluid (Requirement C)

Inspect Rust Area and Provide

Recommendation (Requirement D)

Purge and Recharge Headspace

(Requirement E) Replace Gaskets

Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 0000DA66XCCA CP095900952 FR3 PT-01 X X Cooper Transformer, Pad-Mounted, 2000 KVA 13.8/480 002E1A65X20A CP0659000470 FR3 PT-02 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 002J0P13X85A CP0650004887 FR3 PT-03 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 002J0P13X85A CP0650004886 FR3 PT-04 X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 003J3A66X65A CP0659000449 FR3 PT-05 X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 003J3A66X65A CP0659000450 FR3 PT-06 X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 0000DP13XCBA CP0950004063 FR3 PT-07 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 003J0P13X34A CP0650019750 FR3 PT-08 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 003J0P13X34A CP0650019749 FR3 PT-09 X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 002E1A66X83A CP0659002429 FR3 PT-10 X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 002E1A66X83A CP0659002430 FR3 PT-11 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 003J0P13X24A CP0650014913 FR3 PT-12 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 003J0P13X24A CP0650014914 FR3 PT-13 X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 002E1A66X65A CP0659001926 FR3 PT-14 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 0000LP13XLEA CP1150004765 FR3 PT-15 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 003J0P13X34A CP0650019748 FR3 PT-16 X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 002E1A66X83A CP0659001926 FR3 PT-18 X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 002E1A66X83A CP0659002456 FR3 PT-19 X X Cooper Transformer, Pad-Mounted, 2000 KVA 13.8/480 0000LA65XLFA CP1159000746 FR3 PT-20 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 00027A66XJWS CP1759001886 FR3 PT-21 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 0000LP13XLEA CP1150004764 FR3 PT-22 X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 004J4A66X55A CP0659001928 FR3 PT-23 X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 005J5A66X17A CP0659002396 FR3 PT-24 X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 005J5A66X17A CP0659002397 FR3 PT-25 X X X X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 005J5A66X17A CP0659002398 FR3 PT-26 X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 00014A66X5MA CP1259002183 FR3 PT-27 X Cooper Transformer, Pad-Mounted, 112.5 KVA 13.8/480 003J0P07X67A CP0750007503 FR3 PT-28 X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 003J0P13X26A CP0859000095 FR3 PT-29 X X Cooper Transformer, Pad-Mounted, 2000 KVA 13.8/480 0000LA65XLFA CP1059001522 FR3 PT-30 X X Cooper Transformer, Pad-Mounted, 2000 KVA 13.8/480 0000LA65XLFA CP1059001521 FR3 PT-31 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 0000LP13XLEA CP1050009050 FR3 PT-32 X X X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 0000LP13XLEA CP1050009049 FR3 PT-33 X X X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 0000DP13XCBA CP0950009402 FR3 PT-34 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 0000DP13XCBA CP0950009403 FR3 PT-35 X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 0000DA66XCCA CP0959001844 FR3 PT-36 X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 0000DA66XCCA CP0959001853 FR3 PT-37 X X X X Cooper Transformer, Pad-Mounted, 4000 KVA 13.8/4160 0000DA68XCAS CP0959001822 FR3 PT-38 X Cooper Transformer, Pad-Mounted, 4000 KVA 13.8/4160 0000DA68XCAS CPO959000946 FR3 PT-39 X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 002E1A66X83A CP0659002458 FR3 PT-40 X X Cooper Transformer, Pad-Mounted, 2000 KVA 13.8/480 0000LA65XLFA CP159000745 FR3 PT-41 X X Cooper Transformer, Pad-Mounted, 1500 KVA 13.8/480 0002RA64XALS 2059000595 FR3 PT-42 X X Cooper Transformer, Pad-Mounted, 1500 KVA 13.8/480 0002RA64XALS 2059000594 FR3 PT-43 X X Cooper Transformer, Pad-Mounted, 4000 KVA 13.8/4160 00014A68X5KA CP1259002207 FR3 PT-44 X Cooper Transformer, Pad-Mounted, 1500 KVA 13.8/480 00000A64X1WS CP2459000463 FR3 PT-46 X X Cooper Transformer, Pad-Mounted, 1500 KVA 13.8/480 00000A64X1WS CP2459000467 FR3 PT-47 X X Cooper Transformer, Pad-Mounted, 300 KVA 13.8/480 00014P10X5PA CP1250012259 FR3 PT-48 X X Cooper Transformer, Pad-Mounted, 2500 KVA 13.8/480 005J5A66X17A CP0659002444 FR3 PT-49 X Cooper Transformer, Pad-Mounted, 500 KVA 13.8/480 00014P11X5PA CP1250023446 FR3 PT-50 X X Cooper Transformer, Pad-Mounted, 500 KVA 13.8/480 00014P11X5PA CP1250012447 FR3 PT-51 X X Cooper Transformer, Pad-Mounted, 1500 KVA 13.8/480 00000A64X1WS CP2459000481 FR3 PT-52 X X Cooper Transformer, Pad-Mounted, 1500 KVA 13.8/480 00000A64X1WS CP2459000474 FR3 PT-53 X X Cooper Transformer, Pad-Mounted, 1500 KVA 13.8/480 00006A64X6XA FR3 PT-54 X X Cooper Transformer, Pad-Mounted, 1000 KVA 13.8/480 003J0P13X34A CP0650019751 FR3 PT-55 X X Cooper Transformer, Pad-Mounted, 1500 KVA 13.8/480 008J8A64X41A CP0850003510 FR3 PT-9313 X X

Appendix A Services RequiredEquipment Info

MFR Equipment Description Model NO Serial NO Fluid Tag

Number

External Sample Valve

Take Sample (Requirement A)

Inspect for Leaks and Provide

Recommendation (Requirement B)

Replace Fluid (Requirement C)

Inspect Rust Area and Provide

Recommendation (Requirement D)

Purge and Recharge Headspace

(Requirement E) Replace Gaskets

Cooper Transformer, Pad-Mounted, 75 KVA 13.8/480 RB2A43138Y6BS0B CP1955056294 FR3 PT-G X X Cooper Transformer, Pad-Mounted, 1500 KVA 13.8/480 FSEE147WK6 13JC663140001 FR3 PT-P1 X X Cooper Transformer, Pad-Mounted, 1500 KVA 13.8/480 FSEE147WK6 13JC663140002 FR3 PT-P2 X X Cooper 15 KV VFI Switch KP00622L15S02M CP570901010 E200 SW-01 X X Cooper 15 KV VFI Switch KP00622L15S02M CP570913055 FR3 SW-02 X X X X Cooper 15 KV VFI Switch KP00622L15S02M CP570901009 E200 SW-03 X X Cooper 15 KV VFI Switch KP00622L15S04M CP570911167 FR3 SW-04 X X X X Cooper 15 KV VFI Switch KP00622L15S04M CP570911171 FR3 SW-05 X X X X Cooper 15 KV VFI Switch KP00622L15S08M CP570913162 FR3 SW-06 X X Cooper 15 KV VFI Switch KP00622L15S04M CP570911173 E200 SW-07 X X Cooper 15 KV VFI Switch KP00622L15S08M CP570912863 FR3 SW-08 X X X X X X Cooper 15 KV VFI Switch KP00622L15S08M CP570911166 E200 SW-09 X X Cooper 15 KV VFI Switch KP00622L15S04M CP570907629 E200 SW-10 X X Cooper 15 KV VFI Switch KP00622L15S04M CP570911168 E200 SW-11 X X X X Cooper 15 KV VFI Switch KP00622L15S04M CP570911169 FR3 SW-12 X X Cooper 15 KV VFI Switch KP00622L15S04M CP570911172 E200 SW-13 X X Cooper 15 KV VFI Switch KP00622L15S04M CP570911163 E200 SW-14 X X X X Cooper 15 KV VFI Switch KP00622L15S04M CP570911170 E200 SW-15 X X Cooper 15 KV VFI Switch KP00622L15S08M CP570913054 E200 SW-16 X X Cooper 15 KV VFI Switch KP00622L15S08M CP570911165 E200 SW-17 X X Cooper 15 KV VFI Switch KP00622L15S37M CP5720057015 E200 SW-18 X X Cooper 15 KV VFI Switch KP00622L15S07M CP570910614 FR3 SW-19 X X Cooper 15 KV VFI Switch KP00622L15S08M CP570913053 FR3 SW-20 X X Cooper 15 KV VFI Switch KP00622L15S04M CP570911164 E200 SW-21 X X Cooper 15 KV VFI Switch KP00622L15S04M CP570910466 E200 SW-22 X X Cooper 15 KV VFI Switch KP00622L15S08M CP570913052 FR3 SW-23 X X Cooper 15 KV VFI Solid State Switch PS6240622226-30XA-A0X No Fluid SW-24 N/A N/A Cooper 15 KV VFI Solid State Switch PS6240622226-30XA-A0X No Fluid SW-25 N/A N/A

Appendix A Equipment Info Services Required