This solicitation requests proposals for construction services for the Weis United States Courthouse Relocation Project in Pittsburgh, Pennsylvania. The General Services Administration seeks a general contractor to perform interior renovation and demolition work totaling approximately 59,000 gross square feet across several floors of the historic 825,000 gross square foot courthouse building. Scope of work includes demolition, renovation, and associated mechanical, electrical, plumbing and structural infrastructure work to construct new courtrooms, judges' chambers, offices, conference rooms and other spaces. Proposals are due by August 30, 2022 and the contract is reserved exclusively for small businesses. The period of performance is 28 months from notice to proceed to substantial completion. The estimated total construction cost is over $10 million. Technical factors such as project management approach, past experience and performance will be more important than price in the best value determination and selection process.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Joseph F. Weis Jr. U.S. Courthouse Backfill Project Pittsburgh, PA
Project Manual Final Construction Documents Submission DLR Group Project No. 31-21101-00
June 29, 2022
GENERAL SERVICES ADMINISTRATION 31-21101-00
JOESEPH F. WEIS JR. U.S. COURTHOUSE JUNE 29, 2022
BACKFILL PROJECT 75% CONSTRUCTION DOCUMENTS
SEALS PAGE 000110 - 1
PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICIAL USE ONLY
Do not remove this notice – Properly destroy documents when no longer needed.
LIST OF PROFESSIONALS
DISCIPLINE – ARCHITECT SEAL - SIGNATURE
DLR Group
701 8th Street, NW, Suite 700
Washington, DC 20001
Tel: (202) 393-6445
DISCIPLINE – MECHANICAL ENGINEER SEAL - SIGNATURE
Suite 700
DISCIPLINE – ELECTRICAL ENGINEER SEAL - SIGNATURE
Suite 700
SEALS PAGE 000110 - 2
DISCIPLINE – STRUCTURAL ENGINEER SEAL - SIGNATURE
1422 Euclid Avenue, Suite 300
Cleveland, OH 44115
Tel: (216) 522-1350
DISCIPLINE – CIVIL ENGINEER SEAL - SIGNATURE
AMT, LLC
10 G Street NE, Suite 430
Washington, DC 20002
Tel: (202) 975-1806
END OF THE LIST OF PROFESSIONALS
TABLE OF CONTENTS 000110 - 1
SECTION 00 01 10 - TABLE OF CONTENTS
VOLUME 1
DIVISION 00 - CONDITIONS OF THE CONTRACT (to be issued by GSA at 100% CD)
000107 SEALS PAGE
000110 TABLE OF CONTENTS
001116 INVITATION TO BID
002113 INSTRUCTION TO BIDDERS
003132 GEOTECHNIICAL DATA
004100 BID FORM
004313 BID SECURITY FORM
005200 AGREEMENT FORM
006113 PERFORMANCE AND PAYMENT BOND FORM
007200 GENERAL CONDITIONS OF THE CONSTRUCTION AGREEMENT
DIVISION 01 – GENERAL REQUIREMENTS (to be reviewed by GSA)
011000 SUMMARY
011400 WORK RESTRICTIONS
012500 SUBSTITUTION PROCEDURES
012100 ALLOWANCES
012300 ALTERNATES
012400 OPTIONS
012500 SUBSTITUTION PROCEDURES
012700 UNIT PRICES
012900 PAYMENT PROCEDURES
013000 ELECTRONIC PROJECT MANAGEMENT INFORMATION SYSTEM
013100 PROJECT MANAGEMENT AND COORDINATION
013110 PROSPECTUS CPM SCHEDULE
013120 CRITICAL PATH METHOD SCHEDULING
013200 CONSTRUCTION PROGRESS DOCUMENTATION
013220 PHOTOGRAPHIC DOCUMENTATION
013300 SUBMITTAL PROCEDURES
013510 HISTORIC BUILDING TREATMENT PROCEDURES
013525 FIRE PREVENTION & PROT. CONSTRUCTION, ALT, AND DEMO.
013526 SAFETY AND HEALTH
013600 COBIE PMIS
014000 QUALITY REQUIREMENTS & CONTROL
014025 QUALITY CONTROL TESTING FOR AIR BARRIERS
014050 SYSTEM QUALITY CONTROL
014100 STRUCTURAL TESTING LABORATORY SERVICES
014200 REFERENCES
014500 STRUCTURAL TESTING AND INSPECTION
015000 TEMPORARY FACILITIES AND CONTROLS
015930 SECURITY REGULATIONS
015950 SAFETY & HEALTH
TABLE OF CONTENTS 000110 - 2
016000 PRODUCT REQUIREMENTS
017000 EXECUTION REQUIREMENTS
017310 CUTTING & PATCHING
017320 SELECTIVE DEMOLITION
017350 FIRE PREVENTION PRECAUTIONS FOR HOT WORK
017419 CONSTRUCTION NON-HAZARDOUS WASTE MANAGEMENT & DISPOSAL
017700 CLOSEOUT PROCEDURES
017810 PROJECT RECORD DOCUMENTS
017822 OPERATION AND MAINTENANCE DOCUMENTATION
018111 SUSTAINABLE DESIGN REQUIREMENTS
018200 DEMONSTRATION & TRAINING
019113 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 – EXISTING CONDITIONS
024119 SELECTIVE DEMOLITON
DIVISION 03 – CONCRETE
031000 CONCRETE FORMING AND ACCESSORIES
032000 CONCRETE REINFORCING
033000 CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY
044313.16 ADHERED STONE MASONRY VENEER
DIVISION 05 – METALS
051200 STRUCTURAL STEEL FRAMING
055000 METAL FABRICATIONS
055213 PIPE AND TUBE RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061053 MISCELLANEOUS ROUGH CARPENTRY
064023 INTERIOR ARCHITECTURAL WOODWORK
064116 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
064214 STILE AND RAIL WOOD PANELING
064216 FLUSH WOOD PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
072100 THERMAL INSULATION
078100 APPLIED FIRE PROTECTION
078413 PENETRATION FIRESTOPPING
079200 JOINT SEALANTS
079219 ACOUSTICAL JOINT SEALANTS
TABLE OF CONTENTS 000110 - 3
DIVISION 08 - OPENINGS
081113 HOLLOW METAL DOORS AND FRAMES
081416 FLUSH WOOD DOORS
081433 STILE AND RAIL WOOD DOORS
083113 ACCESS DOORS AND FRAMES
084313 ALUMINUM-FRAMED STOREFRONTS
087100 DOOR HARDWARE (to be completed at 100% CD)
088000 GLAZING
DIVISION 09 - FINISHES
090190.52 MAINTENANCE REPAINTING
092216 NON-STRUCTURAL METAL FRAMING
092900 GYPSUM BOARD
093013 CERAMIC TILING
095113 ACOUSTICAL PANEL CEILINGS
096513 RESILIENT BASE AND ACCESSORIES
096519 RESILIENT TILE FLOORING
096813 TILE CARPETING
097200 WALL COVERINGS
098260 ACOUSTICAL PLASTER SYSTEM
099123 INTERIOR PAINTING
099300 STAINING AND TRANSPARENT FINISHING
DIVISION 10 - SPECIALTIES
101100 VISUAL DISPLAY UNITS
101419 DIMENSION LETTER SIGNAGE
101423 PANEL SIGNAGE
102641 BULLET RESISTANT PANELS
102800 TOILET, BATH AND LAUNDRY ACCESSORIES
104413 FIRE PROTETION CABINETS
104416 FIRE EXTINGUISHERS
DIVISION 11 – EQUIPMENT
119812 DETENTION DOORS AND FRAMES
119814 DETENTION HARDWARE
DIVISION 12 – FURNISHINGS
120510 FABRICS (to be added)
122113 HORIZONTAL LOUVER BLINDS
122413 ROLLER WINDOW SHADES
123623.13 PLASTIC-LAMINATE-CLAD COUNTERTOPS
123661.16 SOLID SURFACING COUNTERTOPS
126100 FIXED AUDIENCE SEATING
126713 PEWS
TABLE OF CONTENTS 000110 - 4
DIVISION 14 – CONVEYING EQUIPMENT
142100 ELECTRIC TRACTION ELEVATOR (to be added for controls)
144200 WHEELCHAIR LIFTS
DIVISION 21 – FIRE SUPPRESSION
211315 SPRINKLER SYSTEM MODIFICATIONS
DIVISION 22 – PLUMBING
220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
220518 ESCUTCHEONS FOR PLUMBING PIPING
220523.12 BALL VALVES FOR PLUMBING PIPING
220523.13 BUTTERFLY VALVES FOR PLUMBING PIPING
220523.15 GATE VALVES FOR PLUMBING PIPING
220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
220548.13 VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
220716 PLUMBING EQUIPMENT INSULATION
220719 PLUMBING PIPING INSULATION
221116 DOMESTIC WATER PIPING
221119 DOMESTIC WATER PIPING SPECIALTIES
221316 SANITARY WASTE AND VENT PIPING
221319 SANITARY WASTE PIPING SPECIALTIES
221319.13 SANITARY DRAINS
221414 STORM DRAINAGE PIPING
223300 ELECTRIC, DOMESTIC-WATER HEATERS
224100 RESIDENTIAL PLUMBING FIXTURES
224213.13 COMMERCIAL WATER CLOSETS
224216.13 COMMERCIAL LAVATORIES
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
230516 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
230518 ESCUTCHEONS FOR HVAC PIPING
230519 METERS AND GAUGES FOR HVAC PIPING
230523.11 GLOBE VALVES FOR HVAC PIPING
230523.12 BALL VALVES FOR HVAC PIPING
230523.13 BUTTERFLY VALVES FOR HVAC PIPING
230523.14 CHECK VALVES FOR HVAC PIPING
230523.15 GATE VALVES FOR HVAC PIPING
230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230548.13 VIBRATION CONTROLS FOR HVAC
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
TABLE OF CONTENTS 000110 - 5
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 DUCT INSULATION
230719 HVAC PIPING INSULATION
230800 COMMISSIONING OF HVAC
230923 DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC
230923.11 CONTROL VALVES
230923.12 CONTROL DAMPERS
230923.13 ENERGY METERS
230923.14 FLOW INSTRUMENTS
230923.23 PRESSURE INSTRUMENTS
230923.24 SPEED INSTRUMENTS
230923.27 TEMPERATURE INSTRUMENTS
230993.11 SEQUENCE OF OPERATIONS FOR HVAC DDC
232113 HYDRONIC PIPING
232116 HYDRONIC PIPING SPECIALTIES
232213 STEAM AND CONDENSATE PIPING
232216 STEAM AND CONDENSATE HEATING PIPING SPECIALTIES
233113 METAL DUCTS
233300 AIR DUCT ACCESSORIES
233346 FLEXIBLE DUCTS
233416 CENTRIFUGAL HVAC FANS
233600 AIR TERMINAL UNITS
233713.13 AIR DIFFUSERS
233713.23 REGISTERS AND GRILLES
234100 PARTICULATE AIR FILTRATION
237313.16 INDOOR, SEMI-CUSTOM AIR-HANDLING UNITS
238123.13 COMPUTER-ROOM AIR-CONDITIONERS, CEILING-MOUNTED UNITS
238126 SPLIT-SYSTEM AIR-CONDITIONERS
238236 FINNED-TUBE RADIATION HEATERS
238239.16 PROPELLER UNIT HEATERS
238413.29 SELF-CONTAINED STEAM HUMIDIFIERS
DIVISION 26 – ELECTRICAL
260500 COMMON WORK RESULTS FOR ELECTRICAL
260503 DEMOLITION FOR ELECTRICAL SYSTEMS
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
260570 OVERCURRENT PROTECTIVE STUDIES
260923 LIGHTING CONTROL SYSTEMS AND DEVICES
262213 LOW-VOLTAGE DISTRIBUTION TRANSFORMERS
TABLE OF CONTENTS 000110 - 6
262416 PANELBOARDS
262726 WIRING DEVICES
262813 FUSES
262816 DISCONNECT SWITCHES
262818 CIRCUIT BREAKERS
262923 VARIABLE FREQUENCY MOTOR CONTROLLERS
265100 LIGHTING
DIVISION 27 - COMMUNICATIONS
270526 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS
271513 COMMUNICATIONS COPPER HORIZONTAL CABLING
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
283101 VOICE EVAC FIRE ALARM SYSTEMS
DIVISION 31 – EARTHWORK
NOT USED
DIVISION 32 – EXTERIOR IMPROVEMENTS
NOT USED
DIVISION 33 – UTILITIES
NOT USED
FY15 Update Oct. 1, 2014 Summary 011000 - 1
Do not remove this notice – Properly destroy documents when no longer needed
SECTION 011000 – SUMMARY
PART 1 - GENERAL
1.1 PROJECT INFORMATION
A. Project Name and Location:
B. Project Summary Description:
C. Architect: The term Architect refers to the project designer. The Architect's status relative to the construction will be stated in writing by the Contracting Officer prior to the pre-construction conference. The project was designed by: DLR Group, 701 8th Street, Suite 700, NW
Washington, DC 20001.
D. Project Delivery Method: traditional design/bid/build.
E. [Identify key consultants on the team, some are listed below, edit further:]
F. [Coordinate with section 013100 part 1.6 C and identify partnering consultant here.
Partnering is required for all construction projects in excess of $10 million estimated construction cost (ECC). Projects under $ 10 million are encouraged to use partnering.]
See GSA’s Partnering with the Public Building Service Policy dated March 5, 2014.
G. [Identify Commissioning Agent here if applicable.]
H. The Contracting Officer for the project is: <Insert name and contact information for CO>.
1.5 MISCELLANEOUS PROVISIONS
A. Work in existing facilities shall correspond in all respects with the existing conditions to which it connects, or to similar existing conditions, in materials, workmanship and finish.
B. Alterations to Existing Conditions: Existing conditions shall be cut, drilled, removed, temporarily removed, or removed and replaced, as necessary for performance of Work under the Contract.
Work out of alignment where exposed by removal of existing work shall be called to the attention of GSA. Necessary corrective work shall be as directed.
1. Replacements of existing conditions that are removed shall match similar existing conditions.
2. Unless otherwise indicated, existing structural members shall not be cut or altered without authorization by the Contracting Officer.
3. Conditions remaining in place, which are damaged or defaced during the Work, shall be restored to the condition existing at time of award of Contract.
4. Discolored or unfinished surfaces exposed by removal of existing conditions, that are indicated to be final exposed surfaces, shall be refinished or replaced as necessary to produce uniform and harmonious contiguous surfaces.
FY15 Update Oct. 1, 2014 Summary 011000 - 2
C. Existing structures will remain in place.
D. Existing utility services with related meters and equipment will remain in place.
E. Removed items indicated to remain the property of the Government shall be stored on site where directed by the Contracting Officer.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 011000
FY15 Update Oct. 1, 2014 Work Restrictions 011400 - 1
SECTION 011400 - WORK RESTRICTIONS
PART 1 - GENERAL
1.1 CONTRACTOR USE OF PREMISES
A. The Contractor will review and document the existing conditions surrounding the project premises.
Provide documentation to the Government prior to the commencement of any construction activity.
B. During the construction period, the Contractor shall have full use of the designated premises for construction operations, including full use of the indicated work site, limited only by the Government's right to perform work or retain other contractors to perform work on portions of the project.
C. The Contractor shall limit use of the premises to the work in areas indicated, and to allow for Government occupancy and public use.
1. Confine operations at the site to areas indicated. Do not disturb portions of the site beyond the areas in which Work is indicated.
2. Keep driveways and entrances serving the premises clear and available at all times to the
Government, Government employees and to visitors. Do not use these areas for parking or storage of materials.
3. Schedule deliveries to minimize space and time requirements for storage of material and equipment on site.
4. Maintain existing building in a safe and weather-tight condition throughout the construction period. Repair damage caused by construction operations to the satisfaction of the government.
Take precautions to protect the building, its occupants and the public during the construction period. A representative of the Contractor shall be available to arrive on site within one (1) hour of notice should an emergency occur.
5. Keep public areas, such as hallways, stairs, lobbies and toilet rooms, free from accumulation of waste material, rubbish, construction debris and construction materials.
6. Space on the premises will be made available for the Contractor's storage and related activities, provided that its use will not interfere with operations of the Government. Arrange and gain approval for use of this space through the Contracting Officer.
7. Use of the existing loading dock facilities will be shared with Government activities on a first-come-first-served, wait-your-turn basis. The loading dock is available for the delivery of materials, tools, and supplies between the hours of [Insert hours]:[Insert minutes] a.m. to [Insert hours]:[Insert minutes] p.m.
8. [Coordinate with 017419 Construction Nonhazardous et al and 018111 on any recycling requirements: ] Existing materials and equipment that are removed as part of the construction operations, and that are not reused or designated to be salvaged as Government property, shall become the property of the Contractor and shall be removed from the site. Storage or sale of excess salvageable materials and equipment is not permitted on site.
9. Pollution producing equipment shall not be located near air intakes where airborne smoke or fumes could be drawn into the building. When not required for powering unloading operations, turn off engines when docked.
10. Smoking is not permitted in or around the building, see Facilities Management Regulation (FMR)
Case 2008-102—3. Also see Code of Federal Regulations (CFR) 41 CFR Part 102-74.
11. No parking will be available on site during working hours for building occupants. The Contractor and Contractor's employees shall make their own arrangements for vehicle parking off site.
12. Cell Phones: Contractor is to provide company cell phone during this contract. All cell phones to be “on vibrate” at all times. If a telephone begins audibly ringing, the building guards will take
FY15 Update Oct. 1, 2014 Work Restrictions 011400 - 2 the cell phone and hold until the end of the working day prior to the con-tractor leaving the property. Cell phones are only permitted in construction area and contractor’s office space.
13. No apparatus with an open flame is allowed to be used within the facility without the prior receipt of a burn permit. Contact the Field Office to obtain burn permits. Burn permits are required for each separate occurrence.
14. Permits: Refer to FAR 52.236-7
15. The work shall be sequenced to minimize disruption to building occupants, visitors, and maintenance activities. To the greatest extent feasible, demolition work should not take place until supplies are on hand to perform new work.
16. Coordinate with the GSA Building Manager and the COR for site access.
17. Coordinate with the GSA Building Manager and the COR on correct response procedures for any building system alarms occurring during or resulting from the construction process.
18. All building systems outside the immediate construction area shall be kept fully operational during normal working hours.
19. Protect building site from flying debris.
20. [Coordinate with your building manager and/or security office as to the use of cameras in the building.]
1.2 GOVERNMENT OCCUPANCY
A. The Government will occupy the site and the existing building during the entire period of construction.
Cooperate with the Government's representatives during construction operations to minimize conflicts, mitigate noise, and facilitate Government usage. Perform the Work in a manner that does not interfere with the Government's operations.
B. The Government reserves the right to occupy, place, and install equipment in completed areas of the building prior to Substantial Completion, provided such occupancy does not interfere with completion of the Work. The Government's installation of equipment and partial occupancy shall not constitute acceptance of the total Work.
1. Prior to partial Government occupancy, mechanical and electrical systems for the space shall be fully operational, and required inspections and tests shall be successfully completed. Upon occupancy, the Government will operate and maintain mechanical and electrical systems serving the occupied portions of the building.
2. Upon occupancy, the Government will assume responsibility for maintenance and custodial service for the occupied portions of the building.
1.3 WORKING HOURS [Coordinate with Facilities / Building Manager and Tenants to ensure when & what work can occur in occupied buildings. Describe in detail the hours, locations and any specific security requirement by the tenants (i.e. FBI, IRS, etc.) Also determine additional security guard service provided by GSA as required by the tenants will be required. Determine who shall pay and required begin budgeting for it now. If tenant is required to pay then obtain an RWA from them.]
A. Government Occupied Hours: Government personnel are scheduled to occupy the building during the following hours on weekdays, Monday through Friday, except for established Government Holidays
[Insert time-AM] to [Insert time-PM].
B. Government Unoccupied Hours: Government personnel are not scheduled to occupy the building during times not indicated as Government Occupied Hours.
C. Contractor's General Working Hours: The Contractor working hours shall be generally established to occur during Government Occupied Hours.
FY15 Update Oct. 1, 2014 Work Restrictions 011400 - 3
D. Contractor's Required Working Hours: The following work shall be performed during Government
Unoccupied Hours:
1. Noisy and/or odor-producing work that may disrupt tenant operations in adjacent spaces.
2. While U.S. Courts are in session.
3. [GSA Team: Part D must be edited for your specific project. Coordinate with tenants and
GSA field office manager during design to identify such noise or odor producing work and how much work must happen at after hours for bidding purposes.]
E. Work accomplished during Government Unoccupied Hours shall be performed at no additional cost to the Government. Contractor shall submit a proposed schedule and gain the Contracting Officer's approval at least 48 hours before proceeding with any work during Government Unoccupied Hours.
1. [GSA Team: Part D must be edited for your specific project. Coordinate with tenants and
GSA field office manager during design to identify temporary security and escort requirements for bidding purposes. Coordinating with Tenants to provide RWAs for security escorts. Ensure tenants include escort costs in the fiscal year(s) budget planning over the life of the project.]
F. Temporary Suspension of Work: The Contractor shall suspend work during the period of [Insert date] and [Insert date]. Contractor shall not be entitled to an adjustment of the Contract price or time of performance as a result of this suspension of work.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 011400
FY15 Update Oct. 1, 2014 Work Restrictions 011400 - 4
FY15 Update Oct. 1, 2014 Allowances 012100 - 1
SECTION 012100 - ALLOWANCES
1.1 RELATED DOCUMENTS
A. The Government is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents. Drawings and general provisions of the Contract, including Federal
Acquisition Regulations (FAR) and General Services Administration Acquisition Regulations (GSAR) contract clauses, and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements governing allowances.
1. Certain items are described in the Contract Documents as allowance items. The purpose of allowance items is to defer selection of actual products and systems to a later date when direction will be provided to the Contractor. [Allowances must be part of the total evaluated price and the award amount. Work with your Contracting Officer during the procurement phase.
See Agreement section 2b and pricing sheet.] The Contracting Officer will issue Modifications to incorporate allowance items in the Work after actual products and systems have been determined.
B. Types of allowance items may include the following :
1. Lump-sum allowance items.
2. Unit-price allowance items.
3. Quantity allowance items.
1.3 SELECTION AND PURCHASE [Coordinate with schedule specifications and edit as needed for your specific project requirements.]
A. At the earliest practical date after award of the Contract, advise the contracting officer of the date when final selection and purchase of each product or system described by an allowance item must be completed to avoid delaying the Work. Allowances must be included in all schedule submissions
1.4 ACTION SUBMITTALS
A. Submit proposals for products or systems described by allowance items in the form specified for Change
Orders.
1.5 INFORMATIONAL SUBMITTALS
A. Submit copies of invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each unit-price and quantity allowance item.
B. Coordinate and process submittals for allowance items in same manner as for other portions of the Work.
FY15 Update Oct. 1, 2014 Allowances 012100 - 2
1.6 COORDINATION
A. Coordinate allowance items with other portions of the Work. Furnish templates as required to coordinate installation.
B. Modifications based on an allowance item shall include cost to Contractor of specific products and systems selected by the contracting officer under allowance and shall include taxes, freight, delivery to
Project site, Contractor's costs for receiving and handling at Project site, labor, installation, overhead, and profit.
1. If requested by the contracting officer, purchase additional quantities under unit-price or quantity allowances and prepare unused material for storage by Contracting officer. Deliver unused material to Contracting officer's storage space as directed.
1.7 ADJUSTMENT OF ALLOWANCE ITEMS
A. Modifications to an allowance item shall comply with the changes clauses and any other contract modifications procedures found in the Contract Documents.
B. Contracting officer reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance item promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.
3.2 PREPARATION
A. Coordinate materials and their installation for each allowance item with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.
3.3 SCHEDULE OF ALLOWANCE ITEMS [Add more if needed. Be specific and quantifiable.
Coordinate with contracting officer any time element as how long the allowances are valid during the contract period. Coordinate with solicitation.]
A. Allowance Item No. 01: Unit-Price [Coordinate with 012700 Unit Prices] Allowance: [Be specific and quantifiable. Define here.]
B. Allowance Item No. 02: Lump Sum Allowance (not to exceed): [Team must carefully define the scope of this allowance. Check with your Contracting Officer to see if lump sum pricing is still permitted.]
C. Allowance Item No. 03: Quantity Allowance: [Be specific and quantifiable. Define here.]
FY15 Update Oct. 1, 2014 Allowances 012100 - 3
END OF SECTION 012100
FY15 Update Oct. 1, 2014 Allowances 012100 - 4
FY15 Update Oct. 1, 2014 Alternates 012300 - 1
SECTION 012300 - ALTERNATES GENERAL
1.1 SUMMARY
A. An alternate provides an amount proposed by the Contractor and stated on the pricing form for certain work that will adjust the Base Contract Amount if the Government decides to accept the corresponding scope of work products, materials, equipment, systems or installation methods described in the Contract
Documents.
B. The amount for an alternate is the total net adjustment to the Base Bid to incorporate the alternate work into the project. .
C. Alternate work shall include miscellaneous devices, accessory objects and similar items incidental to or required for a complete installation, whether or not mentioned as part of the alternate description.
1.2 PROCEDURES [note to mike: check older version to see if Procedures is the title for 1.2]
A. Selection: Acceptance or rejection of each alternate will be made by the Government prior to award of the Contract, and the Base Bid amount will be adjusted accordingly for accepted alternates to establish the contract price.
B. Coordination: The Contractor shall modify or adjust affected work as necessary to completely and fully integrate the accepted alternate work into the project Work.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES [Coordinate with solicitation, add more if needed. Align with your
RFP pricing or bid sheet and contract documents.]
A. Alternate No. 1: Substitute [Describe substitute work], specified in Division [Insert Division no.]
Section [Insert Section no.], for [Describe substitute work], specified in Division [Insert Division no.]
Section [Insert Section no.], located in [Insert location], as indicated on the Drawings, labeled
"Alternate No.1".
B. Alternate No. [X]: Substitute [Describe substitute work], specified in Division [Insert Division no.]
Section [Insert Section no.], for [Describe substitute work], specified in Division [Insert Division no.]
Section [Insert Section no.], located in [Insert location], as indicated on the Drawings, labeled
"Alternate No.X".
C. [Add or delete as needed.]
END OF SECTION 012300
FY15 Update Oct. 1, 2014 Alternates 012300 - 2
FY15 Update Oct. 1, 2014 Options 012300 - 1
SECTION 012400 – OPTIONS
PART 1 - GENERAL [See FAR 2.101, GSAM clauses and Contract Agreement for more information. Decide whether to keep 1.1 Summary or remove since in the template/Agreement.]
1.1 SUMMARY
A. “Option” means a unilateral right in a contract by which, for a specified time, the Government may elect to purchase additional scope of work, products, materials, equipment, systems or installation methods described in the Contract Documents.
B. The amount for an option is the total adjustment from the Base Bid to incorporate the option work into the project .
C. Option work shall include miscellaneous devices, accessory objects and similar items incidental to or required for a complete installation, whether or not mentioned as part of the option description.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION [Coordinate further with your Contracting Officer, pricing sheet or proposal form in the solicitation.]
3.1 SCHEDULE OF OPTIONS
A. Option No. 1: Additional [Describe additional work], specified in Division [Insert Division no.] Section
[Insert Section no.], for [Describe additional work], specified in Division [Insert Division no.] Section
[Insert Section no.], located in [Insert location], as indicated on the Drawings, labeled "Option No.1".
[Coordinate with bid forms and contract documents on the active award period. For example, Option
X will be awarded within Y days of the contract award.]
B. Option No. 2: Additional [Describe additional work], specified in Division [Insert Division no.] Section
[Insert Section no.], for [Describe additional work], specified in Division [Insert Division no.] Section
[Insert Section no.], located in [Insert location], as indicated on the Drawings, labeled "Option No.2".
[Coordinate with bid forms and contract documents on the active award period. For example, Option
X will be awarded within Y days of the contract award.]
C. Option No. 3: Additional [Describe additional work], specified in Division [Insert Division no.] Section
[Insert Section no.], for [Describe additional work], specified in Division [Insert Division no.] Section
[Insert Section no.], located in [Insert location], as indicated on the Drawings, labeled "Option No.3".
[Coordinate with bid forms and contract documents on the active award period. For example, Option
X will be awarded within Y days of the contract award.]
D. [If needed add more options.]
END OF SECTION 012400
FY15 Update Oct. 1, 2014 Options 012300 - 2
FY15 Update Oct. 1, 2014 Substitution Procedures 012500-1
SECTION 012500 - SUBSTITUTION PROCEDURES
1.1 RELATED DOCUMENTS
A. The Government is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents. Drawings and general provisions of the Contract and other
Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for substitutions.
B. Related Sections:
1. Division012100 Section "Allowances" for products selected under an allowance.
2. Division012300Section "Alternates" for products selected under an alternate.
3. Division 012400 Section “Options” for products selected under an option.
4. Division016000 Section "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.
5. Divisions02 through 49 Sections for specific requirements and limitations for substitutions.
1.3 DEFINITIONS
A. Substitutions: Proposed changes to the Contract Documents by the Contractor for products, materials, equipment, and methods of construction.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed
Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms
2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required in order to meet other Project requirements but may offer advantage to Contractor or Owner
1.4 SUBMITTALS for Cause or Convenience:
A. Substitution Requests: Per Submittal Procedures Section 013300 submit electronic copies through ePM of each request for consideration. Identify product or fabrication or installation method to be replaced.
Include Specification Section number and title and Drawing numbers and titles.
1. Substitution Request Form: [Coordinate with ePM.] [Region shall insert form].
2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:
FY15 Update Oct. 1, 2014 Substitution Procedures 012500-2
a. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by the Government and separate contractors that will be necessary to accommodate proposed substitution.
b. Detailed comparison of significant qualities of proposed substitution with those of the
Work specified. Include annotated copy of applicable specification section. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, energy and resource performance goals, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.
c. Product Data, including drawings and descriptions of products and fabrication and installation procedures.
d. Samples, where applicable or requested.
e. Certificates and qualification data, where applicable or requested.
f. List of similar installations for completed projects with project name, location and contact information of owner and architect/engineer of record.
g. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.
h. Research reports evidencing compliance with building code in effect for project, when applicable for the proposed substitution.
i. Detailed comparison of Contractor's construction schedule using proposed substitution with products specified for the Work. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery. Provide a schedule fragnet with a time impact analysis to allow the Government to consider the proposed substitution.
j. Cost information, including a proposal of change, if any, in the Contract Sum.
k. Proposed substitution complies with requirements in the Contract Documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.
l. The Contracting Officer may require the Contractor to provide a contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
3. The Contracting Officer or Contracting Officer’s Representative (CO) or (COR) Action: If necessary, the Contracting Officer or COR will request additional information or documentation for evaluation. The Contractor shall be entitled to receive notice of action on submittals within a reasonable time, given the volume or complexity of the submittals and the criticality of the affected activities to Substantial Completion as may be indicated in the Project Schedule. The
Contractor shall not be entitled to receive notice of action on submittals containing variations from
Contract requirements in less than twenty working days. [Coordinate further with 013300
Submittals.]
1.5 Failure by the government to respond does not constitute acceptance of the proposed substitution.
1.6 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage qualified testing agency to perform compatibility tests recommended by manufacturers.
FY15 Update Oct. 1, 2014 Substitution Procedures 012500-3
1.7 PROCEDURES
A. Coordination: Modify or adjust affected work as necessary to integrate work of the approved substitutions.
PART 2 - PRODUCTS
2.1 SUBSTITUTIONS
A. Substitutions for Cause: Submit requests for substitution immediately upon discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.
1. Conditions: The Contracting Officer (CO) will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, the Contracting
Officer (CO) will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution is consistent with the Contract Documents and will produce indicated results.
b. Substitution request is fully documented and properly submitted.
c. If requested substitution involves schedule impact Contractor has identified time impact and a mitigation plan. .
d. Requested substitution has received necessary approvals of authorities having jurisdiction.
e. Requested substitution is compatible with other portions of the Work.
f. Requested substitution has been coordinated with other portions of the Work.
g. Requested substitution provides specified warranty.
h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
B. Substitutions for Convenience: The Contracting Officer (CO) will consider requests for substitution if received within 60 days after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of the Contracting Officer (CO) or the Contracting Officer Representative (COR).
1. Conditions: The Contracting Officer will consider Contractor's request for substitution when the following conditions are satisfied. [Revise conditions in subparagraphs below. If required, insert more restrictive conditions to limit consideration of proposed substitutions. Ensure schedule is not affected adversely by substitution.]
a. Requested substitution offers the Government a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional obligations the
Government incurs..
b. Requested substitution does not require extensive revisions to the Contract Documents.
c. Requested substitution is consistent with the Contract Documents and will produce indicated results.
d. Substitution request is fully documented and properly submitted.
If requested substitution involves schedule impact Contractor has identified time impact and a mitigation plan.
e. Requested substitution has received necessary approvals of authorities having jurisdiction.
f. Requested substitution is compatible with other portions of the Work.
g. Requested substitution has been coordinated with other portions of the Work.
FY15 Update Oct. 1, 2014 Substitution Procedures 012500-4
h. Requested substitution provides specified warranty.
i. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
PART 3 EXECUTION (Not Used)
END OF SECTION 012500
FY15 Update Oct. 1, 2014 Unit Prices 012700 - 1
SECTION 012700 - UNIT PRICES
PART 1 - GENERAL
A. Unit price is defined in the Agreement.
1.1 PROCEDURES [Line Item quantity and unit pricing shall be reviewed for accuracy and completeness relative to applicable work scope and specifications.]
A. Measurement: Method of measurement for each unit price is specified in the section applicable to the work.
B. Verification: The Government reserves the right to reject the Contractor's measurement of work in place that involves use of an established unit price, and to have this work measured at the Government's expense by an independent surveyor.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 UNIT PRICE ITEM SCHEDULE [PM, A/E: Ensure a well defined scope for each unit price item.
Quantities must be provided for pricing purposes. Coordinate with RFP Pricing Sheet.]
A. Unit Price Item No. 1: [Insert unit price item].
1. Description: [Insert unit price item description—be specific and measurable and coordinate with agreement] according to Division [Insert Division number] Section [Insert Section title].
2. Measurement: [Insert unit of measurement] of [Insert materials or service to be measured].
3. Base Bid Quantity included in the Contract Documents: [Insert Base Bid Quantity].
END OF SECTION 012700
FY15 Update Oct. 1, 2014 Unit Prices 012700 - 2
FY15 Update Oct. 1, 2014 Payment Procedures 012900 - 1
PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICIAL USE ONLY
Do not remove this notice – Properly destroy documents when no longer needed
SECTION 012900 - PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section specifies administrative and procedural requirements necessary to prepare and to process Requests for Payment.
1.2 DEFINITIONS
A. Schedule of Values: A detailed written statement (masterformat/uniformat) furnished by the Contractor outlining the portions of the contract sum, which allocates values (price & percentage) for the various parts of the work and used as the basis for payment application and reviewing progress payments. The Agreement provides further details.
B. Request for Payment: A contractor’s invoice and request for progress payment with substantiating information consistent with approved schedule of values.
1.3 SCHEDULE OF VALUES
1. Coordination: Submit completed Schedule of Values no later than [14] calendar days prior to scheduled date of initial Requests for Payment. What about cost loaded schedules?
2. Schedules for Phased Work: Where the work is separated into phases, provide Schedules showing values correlated with each phase using the standard format referenced below.
A. Format and Content: Contractor shall be responsible to complete the GSA Schedule of Values Workbook and compile the values into electronic Project Management (ePM) System. Contractor will enter values into workbook prior to ePM input and provide associated electronic baseline copy to contracting officer for record.
Contractor will follow guidelines in the Schedule of Values workbook to support ePM upload.
1. Identification: Complete the following Project Identification fields in the Schedule of Values:
a. Project Name
b. Project Number
c. Project Location, City, State
d. Base Contract Number
e. Task Order Number
f. Modification Number
g. GSA Project Manager
h. Contractor's Name and contact information
i. Date of submittal
2. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Requests for Payment and progress reports.
a. Work activity – (by division or specific work activity)
b. Dollar value of each specific work activity – both with an amount in dollars and whole cents, and as a percentage of the Contract Sum to nearest one-hundredth percent. Adjust the amounts to total to the Contract Sum and the percentages to total 100 percent.
c. Each item in the schedule of values and Requests for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item. (i.e. no stand alone item for Overhead, and Profit)
d. Modifications that affect value.
e. Update affected work branches and subordinate line items and
FY15 Update Oct. 1, 2014 Payment Procedures 012900 - 2
PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICIAL USE ONLY
Do not remove this notice – Properly destroy documents when no longer needed
f. resubmit the schedule of values before the next Request for Payment when Modifications result in a change in the Contract Sum
g. Line item for mobilization and de-mobilization
h. Line item for close out (% to be negotiated with GSA COR)
3. Options: Provide a separate Schedule of Values for each exercised Option.
4. Each item in the Schedule of Values and Requests for Payment shall be complete. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the schedule of values or distributed as general overhead expense, at the government's option.
5. Revise and update workbook in ePM with all items affecting scope, schedule or cost and resubmit within
14 calendar days as coordinated with project manager or contracting officer. Contractor shall provide a final as-built schedule at project completion. Update affected work branches and subordinate line items and resubmit the schedule of values before the next Request for Payment when Modifications result in a change in the Contract Sum
1.4 REQUESTS FOR PAYMENT
B. Requirements for Requests for Payment are in Section III, Terms and Conditions of the Agreement.
C. Each Request for Payment following the initial Request for Payment shall be consistent with previous
Requests.
1. Initial Request for Payment, Request for Payment at time of Substantial Completion, and final Request for Payment involve additional requirements.
D. Payment Request Times: Submit Request for Payment to GSA by the [Insert day] of the month. The period covered by each Request for Payment is one month, ending on the [last day of the month] [Insert specific day of the month].
1. Submit one paper draft copy (aka pencil copy) of Request for Payment to the CO or enter in ePM along with construction progress report [seven] [Insert number] days prior to due date for review by GSA.
Provide documentation evidencing the cost of work performed to be included in the Request for
Payment. Resolve questions resulting from GSA review of draft Request for Payment and construction progress report prior to submitting Request for Payment.
E. Request Preparation: All payments must be executed by a person authorized to legally bind the Contractor.
1. Entries shall match data on the schedule of values and Contractor's construction schedule. Use updated schedules if revisions were made.
2. Include amounts for work completed following effective date of previous Request for Payment, whether or not payment has been received. Include only amounts for work completed as of effective date of current Request for Payment.
3. Include amounts of Modifications issued before last day of construction period covered by Request.
F. Stored Materials: Differentiate between items stored on-site and items stored off-site.
1. Provide certificate of insurance, and consent of surety to payment, for stored materials.
2. Provide supporting documentation that verifies amount requested, such as paid invoices. Match amount requested with amounts indicated on documentation.
3. Provide summary documentation for stored materials indicating the following:
a. Value of materials previously stored and remaining stored as of effective date of previous
Request for Payment.
FY15 Update Oct. 1, 2014 Payment Procedures 012900 - 3
PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICIAL USE ONLY
Do not remove this notice – Properly destroy documents when no longer needed
b. Value of previously stored materials put in place after effective date of previous Request for
Payment and on or before effective date of current Request for Payment.
c. Value of materials stored since effective date of previous Request for Payment and remaining stored as of effective date of current Request for Payment.
G. Initial Request for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Request for Payment include the following:
1. List of subcontractors.
2. Schedule of values.
3. Contractor's construction schedule per Agreement (startup if not final).
4. Products list (preliminary if not final).
5. Sustainable design submittal for project materials cost data.
6. Sustainable design action plans.
7. Schedule of unit prices.
8. Submittal schedule (preliminary if not final).
9. List of Contractor's staff assignments.
10. List of Contractor's principal consultants.
11. Copies of building permits.
12. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.
13. Initial progress report.
14. Report of preconstruction conference.
H. Request for Payment at Substantial Completion: After GSA issues the Notice of Substantial Completion, submit a Request for Payment less previous payments made for portion of the Work claimed as substantially complete.
1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.
2. This Request shall reflect Notices of Substantial Completion issued previously for GSA occupancy of designated portions of the Work.
I. Final Payment Request: The Agreement provides further details
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 012900
FY15 Update Oct. 1, 2014 Payment Procedures 012900 - 4 ePM Updated June 2020 ELECTRONIC PROJECT MANAGEMENT 013000 - 1
SECTION 013000 - ELECTRONIC PROJECT MANAGEMENT (ePM) SYSTEM
1.1 PURPOSE
A. The Contractor shall use GSA’s web-based electronic Project Management (ePM) system, which is a fully configured version of Meridian Systems’ Proliance Construction Management Software.
https://insite.gsa.gov/services-and-offices/public-buildings-service/design-and-construction/odc-resources/project-information-systems/epm-epmxpress/guidance ]
1.2 DEFINITION
A. ePM is a web-based project management tool which provides GSA’s Public Buildings Service with an automated workflow, collaboration, document management and project management solution to help manage GSA design and construction projects. ePM is integrated with GSA’s gBUILD (Green
Building Upgrade Information Lifecycle Database ) to share project creation and data storage information.
1.3 PROJECT COLLABORATION AND DOCUMENTATION
A. General
1. The Contractor shall effectively manage the ePM database including maintaining adequate staffing levels and ensuring that personnel attend the mandatory GSA-provided training sessions.
2. The Contractor shall use ePM to upload, store, capture, preserve, record, maintain, update, and route all project-related documentation to comply with GSA's Document Security Requirements.
Classified material is not permitted to be stored in this system.
3. The Contractor shall use the workflow processes contained within ePM to submit and receive approval for all project deliverables.
4. The Contractor shall continuously monitor and review ePM to ensure the Contractor data is current through completion of the Close-out Phase of Construction.
5. The Contractor is required to store documents from their subcontractors and vendors in ePM. If a subcontractor or vendor does not obtain an ePM license, the contractor will be responsible for uploading and processing documents in ePM on their behalf.
B. Contents of ePM https://insite.gsa.gov/services-and-offices/public-buildings-service/design-and-construction/odc-resources/project-information-systems/epm-epmxpress/guidance https://insite.gsa.gov/services-and-offices/public-buildings-service/design-and-construction/odc-resources/project-information-systems/epm-epmxpress/guidance ePM Updated June 2020 ELECTRONIC PROJECT MANAGEMENT 013000 - 2
1. The Contractor shall use…