This is a construction plan and specifications document from the Delaware Department of Transportation (DelDOT) for Contract T202504902.02, titled "Subdivision Paving, New Castle County II, 2025." The project involves general improvements to roads and streets within New Castle County, including 2" mill and overlay work across 22 different location sites. The scope includes pavement milling, bituminous concrete paving, concrete curb and sidewalk replacement, drainage improvements, and associated work. Key quantities include 115,980 SY-IN of pavement milling, 7,835 tons of Superpave Type C, 5,014 SY of concrete pavement removal, and over 21,000 LF of saw cutting. The contract includes specifications for maintenance of traffic, erosion control, and pedestrian accessibility requirements. The plans were approved for advertisement on November 14, 2024.
The contract includes provisions for quantity adjustments based on fund availability, with DelDOT reserving the right to add or delete locations and quantities without changing unit bid prices. Work orders will be issued with specific "Start By" dates and completion timeframes, with liquidated damages applying for delays. The contract requires detailed progress schedules and two-week look-ahead schedules. Specific work restrictions include limitations on lane closures (9:00 AM to 3:00 PM Monday-Friday on 3-digit maintenance roads), requirements for completing paving within seven days of milling, and coordination requirements with various utilities and stakeholders. The document includes detailed material specifications and construction requirements across multiple sections (100-900).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(CAD) PAGE 1 OF 60
THE STATE OF DELAWARE
DEPARTMENT OF TRANSPORTATION
MAINTENANCE AND OPERATIONS
CONSTRUCTION PLANS AND SPECIFICATIONS FOR
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
CONTRACT NUMBER - T202504902.02 UNIFIER PROJECT ID – 2025-00039
FEDERAL AID NUMBER - NONE COUNTY: NEW CASTLE
PLANS PREPARED BY:______________________________________________
DESIGNER
DELDOT – PUBLIC WORKS ENGINEER/PM II DATE
MAINTENANCE AND OPERATIONS - (CAD)
THIS SEAL APPLIES TO ALL SHEETS
BEARING THE “CAD” SECTION
DESIGNATION
APPROVED FOR ADVERTISEMENT
DIRECTOR OF MAINTENANCE AND OPERATIONS DATE
11/13/24
11/14/2024
DEPARTMENT OF
TRANSPORTATION CONTRACT NUMBER- T202504902.02 (CAD) PAGE 2 OF 60
Contract is for various locations throughout New Castle County.
LOCATION MAP
TRANSPORTATION CONTRACT NUMBER- T202504902.02 (CAD) PAGE 3 OF 60
TRANSPORTATION CONTRACT NUMBER- T202504902.02 (CAD) PAGE 4 OF 60
TRANSPORTATION CONTRACT NUMBER- T202504902.02 (CAD) PAGE 5 OF 60
TRANSPORTATION CONTRACT NUMBER- T202504902.02 (CAD) PAGE 6 OF 60
TRANSPORTATION CONTRACT NUMBER- T202504902.02 (CAD) PAGE 7 OF 60
TRANSPORTATION CONTRACT NUMBER- T202504902.02 (CAD) PAGE 8 OF 60
TRANSPORTATION CONTRACT NUMBER- T202504902.02 (CAD) PAGE 9 OF 60
(CAD) PAGE 10 OF 60
DEPARTMENT OF TRANSPORTATION
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
SECTION 100
1. THIS PROJECT IS TO BE CONSTRUCTED IN ACCORDANCE WITH THE DELAWARE DEPARTMENT
OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
DATED JANUARY 2024 AND THE DELAWARE DEPARTMENT OF TRANSPORTATION STANDARD
CONSTRUCTION DETAILS DATED 2024, INCLUDING ALL REVISIONS UP TO THE DATE OF
ADVERTISEMENT.
2. THE PURPOSE OF THIS CONTRACT IS TO MAKE GENERAL IMPROVEMENTS TO ROADS AND/OR
STREETS WITHIN THE DISTRICT HEREIN SPECIFIED. DEPENDING ON FUND AVAILABILITY, THE
DEPARTMENT RESERVES THE RIGHT TO ADD OR DELETE LOCATIONS AND/OR QUANTITIES FOR
THIS CONTRACT. SUCH ADDITIONS OR DELETIONS SHALL NOT BE CAUSE FOR AN INCREASE OR
DECREASE IN ANY CONTRACT UNIT BID PRICES. NO ITEM PRICES ARE TO BE RENEGOTIATED DUE TO EITHER AN INCREASE OR DECREASE IN QUANTITY USAGE RESULTING FROM SAID ADDITIONS
OR DELETIONS.
3. THE CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO RESIDENTS AND BUSINESSES AT
LEAST 48 HOURS, BUT NO MORE THAN 96 HOURS, PRIOR TO ALL PHASES OF CONTRACT WORK
INCLUDING BUT NOT LIMITED TO: SAWCUTTING FOR P.C.C. OPERATIONS, P.C.C. REMOVAL AND
REPLACEMENT, PAVEMENT MILLING, AND PAVING. THIS NOTICE SHALL BE GIVEN TO ALL
RESIDENTS AND BUSINESSES WHOSE PROPERTY IS ADJACENT TO THE STREET ON WHICH WORK
IS TO BE PERFORMED. FAIILURE TO GIVE PROPER NOTICE WILL RESULT IN A SUSPENSION OF
WORK REQUIRING NOTICE, UNTIL PROPER NOTICE IS PROVIDED. UPON COMPLETION OF
DISTRIBUTING WRITTEN NOTICES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE
ENGINEER.
4. LOCATION LISTINGS INDICATE GENERAL LIMITS OF CONSTRUCTION, MAJOR TYPES OF
IMPROVEMENTS, AND ESTIMATED QUANTITIES. DURING THE BIDDING PERIOD, ANY QUESTIONS
PERTAINING TO LOCATIONS SHALL BE DIRECTED TO THE CONTRACT ADMINISTRATOR. AFTER
THE AWARD, SUCH QUESTIONS SHALL BE REFERRED TO THE APPROPRIATE DISTRICT ENGINEER
OR HIS REPRESENTATIVE.
5. THIS CONTRACT WILL HAVE CLEAR “START BY” DATE AND TIME ALLOCATED FOR
COMPLETION. FAILURE TO COMPLETE THE CONTRACT IN THE SPECIFIED TIME SHALL
CONSTITUTE “FAILURE TO PURSUE THE WORK” AND SUBJECTS THE CONTRACTOR TO
LIQUIDATED DAMAGES AS OUTLINED IN SUBSECTION 108.8 OF THE STANDARD SPECIFICATIONS.
6. THE CONTRACTOR SHALL SUBMIT THE REQUIRED COPIES OF A DETAILED PROGRESS
SCHEDULE (PSC) AS OUTLINED IN STANDARD SPECIFICATION 108.4 PRIOR TO THE
PRECONSTRUCTION MEETING. DETAILS SHALL INCLUDE A DESCRIPTION OF EACH WORK
ACTIVITY, THE PLANNED DAYS OF WORK, MULTIPLE CREWS OR SHIFTS, AND SCHEDULED
WORKING HOURS. DURING THE CONTRACT, THE CONTRACTOR SHALL SUBMIT TWO-WEEK (OR
(CAD) PAGE 11 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
AS REQUIRED) "LOOK AHEAD" SCHEDULES TO THE AREA ENGINEER/ MANAGER NO LATER THAN
NOON OF EACH THURSDAY. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL
CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
ADDITIONAL WORK:
7. THE DEPARTMENT RESERVES THE RIGHT TO INCREASE OR DECREASE THE QUANTITIES OF
THE ITEMS SPECIFIED IN THIS CONTRACT. SUCH ADDITIONS SHALL NOT BE CAUSE FOR AN
INCREASE OR DECREASE IN ANY CONTRACT UNIT BID PRICES AND/OR LUMP SUM ITEMS IF THE
INCREASE IN QUANTITES DOES NOT REQUIRE REMOBILZATON.
8. THE DEPARTMENT RESERVES THE RIGHT TO ADD LOCATONS TO THIS CONTRACT. SPECIFIC
WORK WILL BE ASSIGNED BY THE DEPARTMENT VIA WORK ORDERS AND THE DEPARTMENT
WILL MAKE EVERY ATTEMPT TO MINIMIZE THE DISTANCE BETWEEN SUCCESSIVE LOCATIONS.
THE CONTRACTOR MAY SUBMIT A REQUEST FOR ADDITIONAL MOT AND MOBILIZATION IN
CONJUNCTION WITH ADDED LOCATIONS. THIS REQUEST WILL BE CONSIDERED ON THE BASIS OF
EACH ADDITIONAL LOCATION. THE REQUEST FOR INITIAL EXPENSE/MOBILIZATION SHALL NOT
EXCEED THE AMOUNT OF THE BID PRICE FOR 763000, DIVIDED BY THE NUMBER OF ORIGINAL
CONTRACT LOCATIONS. THE REQUEST FOR MOT SHALL NOT EXCEED THE AMOUNT OF THE BID
PRICE FOR 801500, DIVIDED BY THE NUMBER OF ORIGINAL CONTRACT LOCATIONS. FOR OPEN
END CONTRACTS WITHOUT ORIGINAL LOCATIONS, BID ITEMS 763544-763552 SHALL BE FULL
COMPENSATION FOR MOBILIZATION AND MOT.
EACH WORK ORDER ISSUED WILL HAVE CLEAR “START BY” DATE AND TIME ALLOCATED TO
COMPLETE SAID WORK ORDER. ONCE TIME (CALENDAR DAYS) HAS BEEN ASSIGNED TO A WORK
ORDER AND ISSUED, THE CONTRACTOR HAS 2 BUSINESS DAYS, NOT INCLUDING THE DAY OF
ISSUANCE, TO DISPUTE THE TIME QUANTITY AND PROVIDE ADDITIONAL BACKUP
DOCUMENTATION FOR WHY THE TIME QUANTITY IS NOT SUFFICIENT. A DETAILED BREAKDOWN
OF LABOR/MATERIALS/EQUIPMENT ALONG WITH THE CONTRACTORS TIME ESTIMATE WILL BE
REQUIRED; THIS INFORMATION MUST BE RECEIVED BY THE DEPARTMENT BY THE END OF THE
2ND BUSINESS DAY OR THE DEPARMENT WILL CONSIDER THE CONTRACTOR IN AGREEMENT WITH
THE TIME ESTIMATE. THE ENGINEER WILL EVALUATE ANY REQUEST FOR MODIFICATION TO THE TIME ESTIMATE AND AT THEIR SOLE DISCRETION DETERMINE IF ADDITIONAL TIME IS GRANTED.
DISPUTING TIME QUANTITY DOES NOT CONSTITUTE A DELAY IN COMMENCEMENT OF A WORK
ORDER. ISSUANCE OF EACH WORK ORDER CONSTITUTES THE NOTICE TO PROCEED WITH THE
WORK DESCRIBED. FAILURE TO COMPLETE A WORK ORDER IN THE SPECIFIED TIME SHALL
CONSTITUTE “FAILURE TO PURSUE THE WORK” AND SUBJECTS THE CONTRACTOR TO
LIQUIDATED DAMAGES AS OUTLINED IN SUBSECTION 108. 9 OF THE STANDARD SPECIFICATIONS
BASED ON THE TOTAL VALUE OF THAT PARTICULAR WORK ORDER.
(CAD) PAGE 12 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
UPON ISSUANCE OF EACH WORK ORDER, THE CONTRACTOR SHALL SUBMIT THE REQUIRED
COPIES OF A DETAILED PROGRESS SCHEDULE AS OUTLINED IN STANDARD SPECIFICATION 108.4
WITHIN 5 CALENDAR DAYS OF THE ISSUANCE OF WORK ORDER. DURING THE CONTRACT, THE
CONTRACTOR SHALL SUBMIT TWO‐WEEK (OR AS REQUIRED) “LOOK AHEAD” SCHEDULES TO THE
AREA ENGINEER NO LATER THAN NOON OF EACH THURSDAY. DETAILS SHALL INCLUDE A
DESCRIPTION OF EACH WORK ACTIVITY, THE PLANNED DAYS OF WORK, MULTIPLE CREWS OR
SHIFTS, AND SCHEDULED WORKING HOURS. FAILURE TO COMPLY WILL RESULT IN A
SUSPENSION OF ALL CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED. THE
PROGRESS SCHEDULE MUST ALSO BE UPDATED AND SUBMITTED TO THE DEPARTMENT AS
CHANGES OR DELAYS OCCUR IN THE CONTRACT.
SECTION 400
9. UNLESS SPECIFIED, OVERLAY WIDTHS SHALL MATCH EXISTING WIDTHS.
10. THE COST OF CLIPPING BACK THE EDGES OF THE ROADWAY, SHOULDERS, AND THE FIRST 3'
OF UNPAVED DRIVEWAY ENTRANCES, PICKING UP AND DISPOSING OF WASTE AND EXCESS
MATERIAL, AND CLEANING THE EXISTING PAVEMENT PRIOR TO AN OVERLAY SHALL BE
INCIDENTAL TO SECTION 401XXX. PREPARING UNPAVED DRIVEWAY ENTRANCES BEYOND THE
FIRST 3' SHALL BE PAID UNDER THE APPROPRIATE CONTRACT ITEMS: 202000 AND/OR 30100X.
11. ALL PAVING, INCLUDING TURN LANES AND INTERSECTIONS, IS TO BE COMPLETED CURB TO
CURB WITHIN SEVEN (7) CALENDAR DAYS FROM THE TIME THE AREA WAS MILLED. THIS
RESTRICTION APPLIES TO EACH DAYS PAVEMENT MILLING OPERATION, NOT AN ENTIRE PROJECT
LOCATION. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT
WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
12. IN ADDITION TO ITEM 401506 SPEED HUMP BEING UTILIZED FOR NEW SPEED HUMPS, IT SHALL
ALSO INCLUDE REMOVE AND REPLACE SPEED HUMPS. UNLESS NOTED OTHERWISE, SPEED
HUMPS SHALL BE MEASURED AND REPLACED AT THE SAME HEIGHT PRIOR TO CONSTRUCITON
BUT SHALL NOT EXCEED 4”. ALL SIGNING AND STRIPING SHALL CONFORM TO THE LATEST
EDITION OF THE DE MUTCD.
AT REMOVE AND REPLACE LOCATIONS, 401506 SHALL BE PAID AND THE REMOVAL SHALL BE
INCIDENTAL TO THIS ITEM. SPEED HUMPS REMOVED AS PART OF THE MILLING/PAVING
OPERATION, SCHEDULED TO BE PUT BACK, SHALL BE REPLACED WITHIN SEVEN (7) DAYS OF
COMPLETION OF PAVING. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER
CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED. PAYMENT FOR THIS ITEM
(CAD) PAGE 13 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
SHALL INCLUDE PERMANENT STRIPING AND DELINEATOR POSTS. IF PERMANENT STRIPING
CANNOT BE PLACED THE SAME DAY AS THE SPEED HUMP PLACEMENT, TEMPORARY STRIPING
SHALL BE APPLIED THE SAME DAY.
13. PAVING WILL INCLUDE INTERSECTING STREETS FROM P.C. TO P.C.: MILLING AND PAVING OF
INTERSECTING STREETS WILL NOT BE CONSIDERED FOR ENTRANCE, DRIVEWAY AND
INTERSECTING STREET PAVEMENT SURCHARGE, NOR WILL DRIVEWAYS AND ENTRANCES.
14. FOR BITUMINOUS CONCRETE PATCH:• FOR DRIVEWAY APRONS (BEHIND CURB) PLACE 2 LIFTS OF 2” BITUMINOUS CONCRETE TYPE C.• FOR FINISHED PATCHES IN FRONT OF CURB, PLACE 2 LIFTS OF 2” BITUMINOUS CONCRETE TYPE C.• FOR TEMPORARY PATCHES IN FRONT OF CURB, PLACE 2 LIFTS OF 2” OF BITUMINOUS CONCRETE TYPE C OR AS DIRECTED BY THE AREA ENGINEER.• THE ENGINEER MAY CHANGE TYPE OF BITUMINOUS CONCRETE AND DEPTHS AT THEIR
DISCRETION.
SECTION 500
15. ITEM 501001 PCC PAVEMENT, 8” IS DESIGNATED FOR NOW-DEFUNCT ITEM 701004 PCC VALLEY
GUTTER-8”. WHEN REPLACING VALLEY GUTTERS, PLEASE REFER TO CONTRACT PLAN DETAILS.
DOWEL BARS, WIRE MESH REINFORCEMENT, BITUMINUOUS SEAL, AND EXPANSION, PCC
SAWCUTS, AND GABC UNDER THE PCC ARE INCIDENTAL TO VALLEY GUTTER ITEM (501001).
SECTION 600
16. DRAINAGE INLET GRATES ADJACENT TO THE ROAD, WITHIN THE PROJECT LIMITS, WHICH
ARE NOT TYPE 1 SHALL BE REPLACED WITHIN 7 DAYS OF PAVING. THE NEED FOR ANY GRATE
MODIFICATIONS OR FOR NEW FRAMES SHALL BE DETERMINED BY THE ENGINEER. ALL
REPLACED GRATES/ FRAMES SHALL BE DELIVERED TO THE CANAL DISTRICT MAINTENANCE
YARD, OR AS DIRECTED WITH THE COST OF DELIVERY INCIDENTAL TO 602100/602101, REPLACING
DRAINAGE INLETS GRATES/FRAMES. FINAL PAYMENT FOR REPLACED GRATES/ FRAMES SHALL
NOT BE MADE UNTIL RECEIPT OF DELIVERED MATERIALS IS PRODUCED, SIGNED BY A DELDOT
MAINTENANCE YARD SUPERVISOR.
17. CATCH BASINS WITH A MANHOLE SHALL BE CONVERTED TO A STANDARD CATCH BASIN AT
THE DISCRETION OF THE ENGINEER. A 6” COVERSLAB WITH REBAR 6-8” ON CENTER AND
(CAD) PAGE 14 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
MINIMUM OF 6” OF TOPSOIL ON TOP SHALL REPLACE MANHOLE. PAYMENT FOR ADDITIONAL
WORK SHALL BE PAID AN ADDITIONAL QUANTITY OF 0.5 THE BID AMOUNT FOR ITEM 602130 OR 602131.
18. WHEN ENCOUNTERING DELDOT STORMWATER MANHOLES WITHIN LIMITS OF PAVING,
THOSE MANHOLES WILL BE ADJUSTED AND UPDATED AT THE DISCRETION OF THE ENGINEER.
ITEMS 602102/602103 SHALL BE FULL COMPENSATION (FURNISH AND INSTALLING) THE NEW LIDS
AND FRAMES.
19. WHEN ENCOUNTERING NEW CASTLE COUNTY SANITARY MANHOLES WITHIN THE LIMITS OF
PAVING, THOSE MANHOLES WILL BE ADJUSTED AND UPDATED AT THE DISCRETION OF THE
ENGINEER. THE LIDS AND FRAMES ARE PROVIDED BY NEW CASTLE COUNTY AT NO COST TO THE CONTRACTOR. OBTAINING, STORING, DELIVERING, AND PLACING THESE NEW LIDS AND FRAMES
SHALL BE INCIDENTAL TO THE ADJUSTMENT ITEM 602132.
ANY ADJUSTMENTS TO THE AFOREMENTIONED MUNICIPALLY OWNED FACILITIES SHALL BE
DONE IN ACCORDANCE WITH THE RESPECTIVE AGENCIES STANDARD SPECIFICATIONS, AS
CONSTRUCTION WARRANTS.
• THE COUNTY REQUIRES A FULL BEARING OF BRICK BENEATH ALL ADJUSTED SANITARY
MANHOLE CASTINGS.• THE COUNTY ACCEPTS THE USE OF 1-1/2” TO 3” PRECAST P.C.C. RINGS FOR THEIR MANHOLE
ADJUSTMENTS, UPON APPROVAL OF THE CONTRACTOR’S SOURCE OF MATERIALS
SUBMISSION.
SECTION 700
20. BUTT JOINTS SHALL BE CONSTRUCTED AT ALL INTERSECTING BITUMINOUS CONCRETE
ROADS AND ANY OTHER LOCATIONS AS DIRECTED BY THE ENGINEER. BUTT JOINTS AT
RAILROAD CROSSINGS AND AT BRIDGE OR DRAINAGE STRUCTURES NOT TO BE RESURFACED
SHALL BE AS PER THE INCLUDED PLAN DETAIL. BUTT JOINTS CUT PRIOR TO THE DAY OF
PAVEMENT OVERLAY SHALL BE RAMPED WITH BITUMINOUS CONCRETE TRM, IN MILLING AREAS,
INCIDENTAL TO THE ITEM 762004 BUTT JOINT. ONLY BITUMINOUS CONCRETE WILL BE ALLOWED FOR THIS PURPOSE. BUTT JOINTS IN FULL MILL AREAS SHALL BE INCIDENTAL TO THE PAVEMENT MILLING ITEM (760010). SAWCUTS FOR BUTT JOINTS SHALL BE INCIDENTAL TO THE BUTT JOINT ITEM. ALL BITUMINOUS CONCRETE TRM SHALL BE REMOVED PRIOR TO THE PAVING OPERATION.
21. THE USE OF MILLINGS AND GABC IN THE TRAVEL WAY, TEMPORARY TRAVEL WAY, HIGH
VOLUME ENTRANCES AND ACCESS RAMP FOR THE PURPOSE OF PROVIDING A TEMPORARY
ROADWAY SURFACE, POTHOLE REPAIR, TAPERED EDGE FOR UTILITIES, BUTT JOINTS, AND
LONGITUDINAL DROP-OFFS (MILLING AND PAVING OPERATIONS) IS PROHIBITED UNLESS IT IS OTHERWISE DESIGNATED TO BE USED IN THE CONTRACT PLANS. USE COLD PATCH, BITUMINOUS
CONCRETE, BITUMINOUS CONCRETE WEDGE, OR TAPER MILL, AS NOTED IN THE CONTRACT
(CAD) PAGE 15 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
DOCUMENTS OR APPROVED BY THE ENGINEER. PAYMENT FOR COLD PATCH, BITUMINOUS
CONCRETE, OR BITUMINOUS CONCRETE WEDGE SHALL BE INCIDENTAL TO THE BITUMINOUS
CONCRETE MILLING ITEM.
MILLINGS OR GABC SHALL BE USED AT THE FOLLOWING LOCATIONS WHERE ACCESS TO A
BUSINESS RESIDENCE, OR EDGE DROP OFF NEEDS TO BE MAINTAINED UNLESS OTHERWISE
NOTED IN THE PLANS OR DIRECTED BY THE ENGINEER TO USE BITUMINOUS CONCRETE OR COLD
PATCH. ALL MILLING AND GABC WILL BE ROLLED AND COMPACTED TO HELP PREVENT THE
MATERIAL FROM UNRAVELING.
A. DRIVEWAYS
B. ENTRANCES
C. LOW VOLUME ACCESS RAMPS (IDENTIFIED IN THE CONTRACT DOCUMENTS)
D. EDGE DROP-OFFS ADJACENT TO LIVE ROADWAY (LANE, SHOULDER, OR TURN LANE)
AND THE PROPOSED ROAD CONSTRUCTION
E. EDGE OF ROADWAY DROP-OFF
GRADING AND MAINTAINING BASE COURSE THAT IS BEING USED FOR ROADWAY WEDGE/FILLET
BETWEEN TRAVEL LANES AND PAVEMENT BOX, EDGE OF TRAVEL WAY, DRIVEWAY OR
ENTRANCE ACCESS SHALL BE INCIDENTAL TO ITEM NO. 801XXX - MAINTENANCE OF TRAFFIC.
THE BASE COURSE MATERIAL SHALL BE PLACED AT NO GREATER THAN THE SLOPE SPECIFIED IN
TABLE 6G-1 AND SHALL BE COMPACTED. EXCESS BASE COURSE MATERIAL SHALL BE PUSHED
AHEAD AND USED IN THE NEXT SEGMENT AND SHALL BE INCIDENTAL TO THE PARTICULAR BASE
COURSE PAY ITEM. NO SEPARATE PAYMENT SHALL BE MADE FOR MILLINGS OR GABC
TEMPORARY ROADWAY MATERIAL (TRM) USED TO PROTECT EDGE DROP-OFFS, UNLESS THE
MATERIAL IS EVENTUALLY UTILIZED AS PART OF A PERMANENT ROADWAY AT WHICH TIME THE
MATERIAL WOULD BE PAID FOR UNDER THE RESPECTIVE CONTRACT MATERIAL ITEM. VERTICAL
DIFFERENCES SHALL BE CORRECTED IN ACCORDANCE WITH TABLE 6G-1 OF THE DELAWARE
MUTCD.
22. AFTER PAVEMENT MILLING, ALL TRANSVERSED VERTICAL DIFFERENCES, RAISED EDGES OF
MANHOLES, DRAINAGE INLETS, WATER VALVE BOXES, ETC. SHALL BE RAMPED WITH
BITUMINOUS CONCRETE TRM AT A 20:1 OR FLATTER SLOPE PRIOR TO OPENING THE ROADWAY
TO TRAFFIC AND SHALL BE INCIDENTAL TO PAVEMENT MILLING. PAVEMENT MILLINGS OR COLD
PATCH MATERIAL WILL NOT BE ALLOWED FOR THIS PURPOSE.
ALL ADJUSTMENTS SHALL BE MADE NOT MORE THAN SEVEN (7) CALENDAR DAYS PRIOR TO THE
PLACEMENT OF THE FINAL COURSE OF BITUMINOUS CONCRETE, UNLESS DIRECTED BY THE
(CAD) PAGE 16 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
ENGINEER. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT
WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
ALL BITUMINOUS CONCRETE TRM SHALL BE REMOVED PRIOR TO THE PAVING OPERATIONS. IF
THE CONTRACTOR ELECTS TO ADJUST MANHOLES, DRAINAGE INLETS AND WATER VALVES
AFTER THE FINAL COURSE OF PAVING, THIS WORK MUST BE COMPLETED WITHIN SEVEN (7)
CALENDAR DAYS OF THE FINAL COURSE OF BITUMINOUS CONCRETE. FAILURE TO COMPLY WILL
RESULT IN A SUSPENSION OF ALL OTHER CONTRACT WORK WITH TIME CHARGES CONTINUING
TO BE ASSESSED.
23. THE CONTRACTOR SHALL TAKE CARE IN REMOVING PAVEMENT AROUND UTILITIES, BUTT
JOINTS, CURBS, ETC. SO THAT EXISTING PAVEMENT BEYOND THE SPECIFIED DEPTHS IS NOT
DAMAGED. ANY DAMAGE CAUSED BY THE CONTRACTOR'S OPERATIONS MAY RESULT IN
PLACING LEVELING COURSES AT THE CONTRACTOR'S EXPENSE. THE REMOVAL AND CLEAN UP
OF THE HOT MIX RESIDUE WEDGE REMAINING AFTER MILLING OPERATIONS SHALL BE
INCIDENTAL TO THE MILLING ITEM. THE REMOVAL OF EXISTING RAISED PAVEMENT MARKERS
(RPM'S) SHALL BE INCIDENTAL TO THE APPLICABLE MILLING AND/OR RECLAMATION ITEMS.
24. TAPER MILLING IS INTENDED FOR MILLING IN THE AREA OF FIXED STRUCTURES (I.E. CURBS, MANHOLES, ETC.) THE MILLED DEPTH AT THE STRUCTURE SHALL BE THE DEPTH OF THE
PROPOSED OVERLAY AND 0” AT A DISTANCE OF +/- 6 ½ FEET FROM THE STRUCTURE. THE
COMPUTED DEPTH FOR PAYMENT PURPOSES IS THE AVERAGE OF THE TWO DEPTHS.
25. ON THIS CONTRACT FULL MILL AREAS WILL UTILIZE ITEM 760010 PAVEMENT MILLING,
BITUMINUOUS CONCRETE PAVEMENT (SY-IN). UNLESS OTHERWISE NOTED, ALL MILLING
LOCATIONS ARE EXPECTED TO BE MILLED AT A 2” DEPTH. FOR AVERAGE MILLING DEPTHS OF
0.5”TO AN AVERAGE MILLING DEPTH OF 2.25”, THE FULL MILL AREAS WILL BE PAID AT AN
AVERAGE 2”.
26. MILLING OF BITUMINOUS PAVEMENT IN PREPARTION FOR OVERLAY IS TO INCLUDE MILLING
EXISTING CONCRETE PATCHES AND/OR COMPOSITE PAVING AND SHOULD BE CONSIDERED
INCIDENTAL TO ITEM 760010, PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT.
27. ALL MILLED MATERIAL SHALL REMAIN THE PROPERTY OF THE CONTRACTOR UNLESS
OTHERWISE STATED.
28. AT LOCATIONS THAT HAVE PCC REPLACEMENT, PAVING MUST BE COMPLETED WITHIN 90
(CAD) PAGE 17 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
CALENDAR DAYS FROM THE START OF THE PCC REPLACEMENT. BETWEEN OCTOBER 15TH AND
NOVEMBER 30TH, PAVING MUST BE COMPLETED WITHIN 30 CALENDAR DAYS FROM THE START OF
THE PCC REPLACEMENT. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER
CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
29. UPRIGHT PCC CURB UTILIZED FOR GRADE RETENTION 8” OR HIGHER WILL BE PAID AS 701013, TYPE 1-8 CURB.
30. EXCAVATION UP TO 2' IN FRONT OF CURB, ADA FACILITIES, AND DRAINAGE INLETS WILL BE INCIDENTAL TO THE CORRESPONDING ITEMS (701XXX, 705XXX, AND 602XXX). HOT MIX PLACED IN FRONT OF CURB WILL BE PAID UNDER ITEM 401XXX. USE OF CONCRETE AS FILL IN FRONT OF
CURB WILL NOT BE ACCEPTED UNLESS DIRECTED BY THE ENGINEER. AT EACH LOCATION,
BACKFILLING SHALL BE PERFORMED IMMEDIATELY UPON REMOVAL OF FORMS FOR CURB OR
SIDEWALK. TOPSOIL, SEEDING, SEALING OF VALLEY GUTTERS, REMOVING OF FORMS, AND
PARGING OF CATCH BASINS, SHALL BE COMPLETED WITHIN SEVEN (7) CALENDAR DAYS OF
COMPLETION OF THE ITEM OF WORK. ITEM 908001, TOPSOIL, SHALL BE USED AS BACKFILL
MATERIAL BEHIND CURB AND AROUND SIDEWALK OR/AS DIRECTED BY THE ENGINEER. TOPSOIL
SHALL BE SCREENED/SIFTED SO AS NO MATERIAL GREATER THAN .5" SHOULD BE PRESENT IN
MATERIAL USED FOR BACKFILL. EXCAVATED MATERIAL, NOT NEEDED ON THE PROJECT, SHALL
BE REMOVED FROM THE CONTRACT AT THE CONTRACTORS EXPENSE. FAILURE TO COMPLY
WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT WORK WITH THE CHARGES
CONTINUING TO BE ASSESSED.
31. AS DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL PARTIALLY SAW AND FILL
EXISTING CRACKED CURB AND/OR SIDEWALK WITH AN APPROVED SEALER. THIS WORK WILL BE
INCIDENTAL TO ITEM 762001 SAWCUT - CONCRETE FULL DEPTH.
32. PERTAINING TO PCC CURB REMOVAL & PATCHING, SAWCUTTING IS TO BE PERFORMED
PRIOR TO THE REMOVAL OF BITUMINOUS CONCRETE UNLESS APPROVAL IS GIVEN BY THE
ENGINEERS REPRESENTATIVE.
33. BEFORE THE START OF A DAY’S PAVEMENT MILLING OR PAVING OPERATIONS AND WHERE
THERE IS EXISTING STRIPING, THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE PROOF THAT SUFFICIENT APPROVED STRIPING MATERIALS ARE ON HAND TO ENSURE STRIPING IS COMPLETE
BEFORE TRAFFIC IS RETURNED TO THE ROADWAY.
34. LANE CLOSURES ON 3-DIGIT MAINTENANCE ROADS ARE PERMITTED ONLY BETWEEN THE
HOURS OF 9:00 AM AND 3:00 PM, MONDAY - FRIDAY. ANY VARIANCE SHALL REQUIRE DISTRICT
SAFETY OFFICERS APPROVAL.
(CAD) PAGE 18 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
35. ITEM 710370 STEEL CASING PIPE-4” IS DESIGNATED FOR NOW-DEFUNCT ITEM 718000 ROOF DRAIN. WHEN REPLACING OR EXTENDING ROOF DRAINS, SUMP PUMP DRAINS, ETC. FROM RIGHT- OF-WAY TO CURBLINE, ITEM 710370 WILL BE UTILIZED REGARDLESS OF PIPE MATERIAL OR SIZE.
36. GAS VALVE, MONUMENT BOX, AND LAMPHOLE ADJUSTMENTS WILL BE PAID AS 710002,
WATER VALVE ADJUSTMENTS.
37. REMOVAL OF ANY UNSUITABLE MATERIALS INCLUDING ROOTS AND VEGETATIVE MATTER
DISCOVERED WITHIN OR DIRECTLY BELOW THE TEMPLATE OF PCC / GRANITE CURB, PEDESTRIAN FACILITIES, AND/OR PCC / BRICK SIDEWALKS SHALL BE INCIDENTAL TO THE CORRESPONDING
ITEM.
38. TRASH, RUBBISH, DEBRIS, OR BRUSH THAT HAMPERS REPAIR/MAINTENANCE WORK IN THIS
CONTRACT (AS DETERMINED BY THE ENGINEER), SHALL BE REMOVED WITHIN THE PROJECT
LIMITS AND SHALL BE INCIDENTAL TO PAY ITEM 763000 (INITIAL EXPENSE/DEMOBILATION).
39. CLEARING AND GRUBBING INCLUDES OBTAINING WIDTH AND HEIGHT REQUIREMENTS FOR
PAR AND CLEARING OF SIGHT DISTANCE (INCLUDING EXISTING FACILITIES AND SIGNS).
CLEARING AND GRUBBING OF TREES, SHRUBS AND OTHER VEGETATION LESS THAN 6” IN
DIAMETER SHALL BE INCIDENTAL TO ITEM 763000 (INITIAL EXPENSE/DEMOBILIZATION).
40. GRASS AND SOIL AREAS WITHIN THE STATE RIGHT-OF-WAY AND ADJACENT PRIVATE
PROPERTY THAT HAS BEEN DAMAGED DURING CONTRACT OPERATIONS SHALL BE RESTORED
WTH TOPSOIL, SEED AND MULCH AT THE CONTRATOR’S EXPENSE. WORK SHALL BE EXECUTED
IN ACCORDANCE WITH THE REQUIREMENTS FOR ITEM 908001 (TOPSOIL), ITEM 908016
(PERMANENT GRASS SEEDING SUBDIVSION), AND ITEM 908020 (EROSION CONTROL BLANKET
MULCH). REPAIRS MUST BE COMPLETED WITHIN SEVEN (7) CALENDAR DAYS OF NOTIFICAITON.
FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT WORK WITH
TIME CHARGES CONTINUING TO BE ASSESSED.
SECTION 800
41. MESSAGE BOARDS SHALL BE PLACED 10 DAYS IN ADVANCE OF THE WORK AND SHALL
REMAIN IN PLACE FOR 5 DAYS AFTER THE START OF WORK. LOCATIONS OF MESSAGE BOARDS
AND MESSAGES DISPLAYED SHALL BE REVIEWED AND APPROVED BY THE DISTRICT SAFETY
OFFICER.
42. AT EACH LOCATION, THE CONTRACTOR SHALL NOTE ALL EXISTING PAVEMENT MARKINGS
AND SUBMIT A DRAWING WHICH DEPICTS THE STRIPING PATTERN TO THE DEPARTMENT PRIOR
TO THE START OF ANY WORK AT THE LOCATION.
(CAD) PAGE 19 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
AT THE END OF EACH DAY’S OPERATION AND BEFORE TRAFFIC IS RETURNED TO UNRESTRICTED
ROADWAY USE, TEMPORARY MARKINGS SHALL BE UTILIZED AT LOCATIONS THAT REQUIRE
PERMANENT MARKING. TEMPORARY PAVEMENT STRIPING MUST MATCH PERMANENT
PAVEMENT STRIPING IN ALL REGARDS.
TEMPORARY PAVEMENT MARKINGS SHALL BE PAID AT THE APPLICABLE CONTRACT UNIT PRICE.
THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE TEMPORARY MARKINGS IN GOOD
CONDITION SUCH THAT THE PAVEMENT IS PROPERLY DELINEATED AT ALL TIMES. ANY
REFRESHING OF THE TEMPORARY MARKINGS WILL BE AT THE CONTRACTOR’S EXPENSE.
FINAL PAVEMENT MARKINGS SHALL CONFORM TO ALL EXISTING PATTERNS AND SHALL BE
PLACED WITHIN FIVE (5) CALENDER DAYS (MAXIMUM) AFTER PLACEMENT OF THE FINAL
COURSE OF BITUMINOUS CONCRETE. IF THE CONTRACTOR FAILS TO DOCUMENT THE EXISTING
PAVEMENT MARKINGS IN AN ACCEPTABLE MANNER, HE SHALL BE REQUIRED TO PROVIDE AT
HIS OWN EXPENSE, A NEW PAVEMENT MARKING PLAN SIGNED AND SEALED BY A PROFESSIONAL
ENGINEER REGISTERED IN THE STATE OF DELAWARE.
ANY ERRONEOUS MARKING WILL NOT BE PAID FOR AND SHALL BE CORRECTED IMMEDIATELY
AT THE CONTRACTOR’S EXPENSE. ERRONEOUS MARKINGS OR SHADOWS THAT EXCEED ONE (1)
INCH IN WIDTH SHALL BE REMOVED BY EITHER SAND OR WATER BLASTING. NO OTHER
REMOVAL METHODS WILL BE ALLOWED. A FLAT BLACK PAINT OR DRIVEWAY SEALER SHALL BE
APPLIED IN THE AREA OF THE REMOVED MARKING TO MASK THE REPAIR. ANY DAMAGE TO THE
PAVEMENT CAUSED BY REMOVAL OF ERRONEOUS MARKINGS SHALL BE REPAIRED / REPLACED
TO THE SATISFACTION OF THE ENGINEER. FAILURE TO COMPLY WILL RESULT IN SUSPENSION OF
ALL OTHER CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
43. THE CONTRACTOR, WITH THE ENGINEER, SHALL INVENTORY ALL SIGNS ON ALL ROADS
SUBJECT TO IMPROVEMENTS. NECESSARY SIGNS SHALL BE MAINTAINED IN OPERATION DURING
CONSTRUCTION AND ANY OTHER SIGNS SHALL BE PROPERLY STORED WITH THE CONTRACTOR,
WHO SHALL BE RESPONSIBLE FOR LOSS OR DAMAGE. IMMEDIATELY PRIOR TO FINAL
INSPECTION, THE CONTRACTOR AND ENGINEER SHALL AGAIN INVENTORY THE TRAFFIC SIGNS
AND ACCOUNT FOR ANY LOST OR DAMAGED SIGNS. LOST OR DAMAGED SIGNS, AT THE
DISCRETION OF THE ENGINEER SHALL BE REPLACED IN KIND AT THE CONTRACTOR’S EXPENSE.
44. REGULATORY SIGNS REMOVED MUST BE REINSTALLED THE SAME DAY. IN ABSENCE OF A
(CAD) PAGE 20 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
SIGN SCHEDULE, INSTALLATION OR REMOVAL OF TRAFFIC SIGN(S) AND SIGN POST(S) WILL BE PAID AS 819018. THIS ITEM WILL BE PAID ONE TIME PER POST AFTER FINAL INSTALLATION.
45. A FORMAL DETOUR WILL NOT BE NECESSARY ON THIS CONTRACT. THE CONTRACTOR MUST
MAINTAIN LOCAL TRAFFIC WITHIN THE PROJECT LIMITS UTILIZING FLAGGERS. MAINTENANCE
OF TRAFFIC DURING LANE CLOSURES AND/OR LANE SHIFTS SHALL CONFORM TO TYPICAL
APPLICATIONS OF THE DELAWARE MUTCD. ANY VARIANCE SHALL REQUIRE DISTRICT SAFETY
OFFICERS APPROVAL.
46. BEFORE WORK IS DONE AT ANY LOCATION, THE APPROPRIATE DISTRICT SAFETY OFFICER
MUST APPROVE THE MOT FOR THAT LOCATION TWO WEEKS IN ADVANCE. ANY ANTICIPATED
IMPACT TO TRAFFIC SIGNALS MUST BE REVIEWED BY THE DELDOT TRAFFIC SECTION PRIOR TO
CONSTRUCTION. THEY CAN BE CONTACTED AT 302-659-4061.
47. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN, INCLUDING PEDESTRIAN AND
BICYCLE FACILITIES, AS WELL AS THE NECESSARY NCHRP 350, THE MANUAL FOR ASSESSING
SAFETY HARDWARE (MASH) CERTIFICATIONS, OR DELDOTS APPROVED PRODUCTS LIST (APL) FOR ALL DEVICES THAT WILL BE UTILIZED, FOR EACH LOCATION BEFORE THE START OF THE PRE-
CONSTRUCTION MEETING. WRITTEN APPROVAL MUST BE RECEIVED BEFORE THE START OF
WORK AT EACH AND EVERY LOCATION.
48. ALL TRAFFIC CONTROL DEVICES SHALL BE IN NEW OR REFURBISHED CONDITION AND SHALL
BE IN COMPLIANCE WITH THE NCHRP 350, THE MANUAL FOR ASSESSING SAFETY HARDWARE
(MASH) CERTIFICATIONS, OR DELDOTS APPROVED PRODUCTS LIST (APL). THE DEVICES SHALL BE
APROVED BY THE SAFETY SECTION PRIOR TO USE AND SHALL BE MAINTAINED IN GOOD
CONDITION FOR THE DURATION OF THE CONTRACT.
49. ALL WORK SHALL BE PERFORMED IN A MANNER THAT WILL REASONABLY PROVIDE THE
LEAST PRACTICABLE OBSTRUCTION TO ALL ROAD USERS, INCLUDING VEHICULAR, PEDESTRIAN
AND BICYCLE TRAFFIC, AND SHALL CONFORM TO THE REQUIREMENTS OF THE 2011 DELAWARE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, PART 6, INCLUDING ALL REVISIONS UP TO
THE DATE OF ADVERTISEMENT FOR BIDS.
50. CURB RAMP AND/OR SIDEWALK CONSTRUCTION (NOT INCLUDING MEDIAN ISLANDS) SHALL
BE COMPLETED DURING A SINGLE OPERATION. THE RAMP/SIDEWALK SHALL BE REMOVED AND
PLACED BACK THE SAME NIGHT/DAY AND OPEN TO PEDESTRIAN TRAFFIC THE FOLLOWING DAY.
THE USE OF A MONOLITHIC POUR SHALL BE PERMITTED WITH A BOND BREAKER TO BE PLACED
AT THE BACK OF THE CURB AND EDGE OF SIDEWALK. IF THE CURB RAMP/SIDEWALK CANNOT BE
COMPLETED IN A SINGLE OPERATION THE EXCAVATED AREA MUST BE TEMPORARILY
BACKFILLED TO GRADE WITH COMPACTED MILLING MATERIAL ONLY. THIS TEMPORARY
MATERIAL WILL BE INCIDENTAL TO THE CURB RAMP ITEM. THE DRESSING UP OF THE AREA
BEING PAID AS A CURB RAMP WITH TOPSOIL AND SEED WILL BE PAID AT CONTRACT UNIT
(CAD) PAGE 21 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
PRICES. THE CONTRACTOR SHALL MAINTAIN ACCESS TO AND ALONG PEDESTRIAN FACILITIES
AT ALL TIMES DURING CONSTRUCTION. EARTH, STONE AND GRAVEL SURFACES ARE NOT
ACCEPTABLE FOR PROVIDING PEDESTRIAN ACCESS. IF CURB RAMP CANNOT BE COMPLETED IN A
SINGLE OPERATION AND PEDESTRIAN ROUTES ARE CLOSED OR BLOCKED, ALTERNATE
PEDESTRIAN ACCESS SHALL BE PROVIDED USING TA-28 AND/OR TA-29 OF THE 2011 DELAWARE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES OR TO THE SATISFACTION OF THE ENGINEER.
PEDESTRIAN DETOUR ROUTES OR ALTERNATE PEDESTRIAN FACILITIES SHALL CONSIST OF ADA
COMPLIANT FACILITIES TO THE LEVEL OF WHICH EXISTS ON THE PEDESTRIAN ROUTE. THE COST FOR ANY PROVISIONS SHALL BE INCIDENTAL TO ITEM 801500 - MAINTENANCE OF TRAFFIC - ALL
INCLUSIVE.
PEDESTRIAN MAINTENANCE OF TRAFFIC: THIS WORK SHALL CONSIST OF PROVIDING AND
MAINTAINING AN ACCESSIBLE PEDESTRIAN ROUTE THROUGHOUT THE PROJECT’S LIMITS IN
ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT OF 1990 (ADA) TITLE II, PARAGRAPH 35.130.
THE CONTRACTOR SHALL BE REQUIRED TO REVIEW EACH CURB RAMP LOCATION AND SUBMIT
THE APPROPRIATE MAINTENANCE OF TRAFFIC DETAIL AND DEVICES TO THE ENGINEER FOR
EACH LOCATION AT LEAST 2-WEEKS BEFORE CONSTRUCTION FOR REVIEW, COMMENT, AND
APPROVAL BY THE DISTRICT SAFETY OFFICER.
THE FOLLOWING CONSIDERATIONS SHALL BE TAKEN INTO ACCOUNT WHEN ADDRESSING
ACCESSIBLE PEDESTRIAN MAINTENANCE OF TRAFFIC:
• ALL PEDESTRIANS, INCLUDING PERSONS WITH DISABILITIES, SHALL BE PROVIDED WITH A
REASONABLY SAFE, CONVENIENT AND ACCESSIBLE PATH THAT REPLICATES AS MUCH AS
PRACTICABLE THE EXISTING PEDESTRIAN FACILITIES.• MAINTAIN ACCESS TO ALL BUSINESS AND RESIDENTS AT ALL TIMES.• PROVIDE PEDESTRIAN ACCESS THRU OR AROUND THE WORK ZONE. IF A DETOUR IS
CHOSEN THE CONTRACTOR MUST SUBMIT THE DETOUR ROUTE TO THE ENGINEER FOR
REVIEW AND APPROVAL. THE DETOUR ROUTE MUST MEET OR EXCEED THE CURRENT
CONDITIONS.• WORK SHOULD BE PHASED SO THAT ALL AREAS OF AN INTERSECTION/SIDEWALK PATH
ARE NOT UNDER CONSTRUCTION AT THE SAME TIME UNLESS A CLEAR PATH IS PROVIDED
AND IDENTIFIED.• TRAFFIC CONTROL DEVICES AND OTHER CONSTRUCTION MATERIALS AND FEATURES
SHALL NOT INTRUDE INTO THE USABLE WIDTH OF THE SIDEWALK, TEMPORARY
PATHWAY OR OTHER PEDESTRIAN FACILITY.• SIGNS AND OTHER DEVICES MOUNTED LOWER THAN 7 FT ABOVE THE TEMPORARY
(CAD) PAGE 22 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
PEDESTRIAN PATHWAY SHALL NOT PROJECT MORE THAN 4 IN. INTO ACCESSIBLE
PEDESTRIAN ROUTE. • A SMOOTH, CONTINUOUS HARD SURFACE SHALL BE PROVIDED THROUGHOUT THE ENTIRE
LENGTH AND WIDTH OF THE PEDESTRIAN ROUTE THROUGHOUT CONSTRUCTION. THERE
SHALL BE NO CURBS OR VERTICAL ELEVATION CHANGES GREATER THAN ¼ IN. IN GRADE
OR TERRAIN THAT COULD CAUSE TRIPPING OR BE A BARRIER TO WHEELCHAIR USE.
SECTION 900
51. EROSION CONTROL MULCH BLANKET SHALL BE USED IN ALL DISTURBED AREAS UNLESS
DIRECTED OTHERWISE BY THE ENGINEER.
ADDITIONAL PROJECT NOTES
52. UNDERGROUND UTILITIES MAY BE PRESENT AT ALL LOCATIONS. THEREFORE, ALL
STANDARD PRACTICES AND PROCEDURES REGARDING UTILITIES SHALL BE FOLLOWED. THE
CONTRACTOR SHALL CONTACT MISS UTILITY OF DELAWARE PRIOR TO STARTING WORK. THE
CONTRACTOR IS RESPONSIBLE FOR THE SUPPORT AND PROTECTION OF ALL UTILITIES WHEN
EXCAVATING WHICH SHALL BE INCIDENTAL TO THE RESPECTIVE EXCAVATION ITEM(S). THE
CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER CLEARANCES, INCLUDING SAFETY
CLEARANCES, FROM OVERHEAD UTILITIES FOR CONSTRUCTION EQUIPMENT. THE CONTRACTOR
IS ADVISED TO CHECK THE SITE FOR ACCESS PURPOSES FOR THEIR EQUIPMENT AND MAKE
ARRANGEMENTS DIRECTLY WITH THE UTILITY COMPANIES FOR FIELD ADJUSTMENTS FOR
ADEQUATE CLEARANCES, IF NECESSARY.
53. NO UTILITY RELOCATION INVOLVEMENT IS ANTICIPATED. SHOULD ANY CONFLICTS BE
ENCOUNTERED DURING CONSTRUCTION REQUIRING ADJUSTMENT AND/OR RELOCATION OF THE
AGENCIES’ EXISTING FACILITIES, THE NECESSARY RELOCATION WORK SHALL BE
ACCOMPLISHED BY THE RESPECTIVE AGENCIES’ FORCES, AS DIRECTED BY THE DISTRICT
ENGINEER. ANY ADJUSTMENTS AND/OR RELOCATIONS OF MUNICIPALLY OWNED FACILITIES
SHALL BE DONE BY THE STATE’S CONTRACTOR IN ACCORDANCE WITH THE RESPECTIVE
AGENCIES’ STANDARD SPECIFICATIONS AS DIRECTED BY THE DISTRICT ENGINEER.
54. NO ENVIRONMENTAL PERMITS ARE REQUIRED FOR THIS WORK PROVIDED NO
JURISDICTIONAL WETLANDS OR WATERS ARE IMPACTED. IF THERE IS ANY QUESTION AS TO
WHETHER OR NOT A WATER OR WETLAND IS JURISDICTIONAL, CONTACT THE DEL DOT
ENVIRONMENTAL SECTION AT 302-760-2264.
(CAD) PAGE 23 OF 60
CONTRACT NUMBER- T202504902.02 CANAL
SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
GENERAL CONTRACT PLAN NOTES
55. IT IS ANTICIPATED THAT ALL WORK WILL OCCUR WITHIN DELDOT’S EXISTING RIGHT OF
WAY OR EASEMENT AREAS. SHOULD THE NEED OCCUR TO TRESPASS ONTO PRIVATE PROPERTY;
IT WILL BE THE RESPONSIBILITY OF THE PROJECT MANAGER TO SECURE SUCH TRESPASS NEEDS.
56. NO WORK NEAR OR WITHIN RAILROAD RIGHT-OF-WAY IS ANTICIPATED. IF ANY RAILROAD
PROPERTY OR FACILITIES ARE NEAR OR WITHIN THE PROPOSED LIMITS OF WORK OR IF THE
PROPOSED WORK ENCROACHES UPON THE RAILROAD’S RIGHT-OF-WAY, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR OBTAINING THE REQUIRED CLEARANCES AND INSURANCES FOR
EACH INVOLVED RAILROAD IN ACCORDANCE WITH THE APPROPRIATE DELDOT MAINTENANCE
OF RAILROAD TRAFFIC ITEM. DELDOT’ S RAILROAD SECTION MANAGER MUST BE CONTACTED
AT (302) 760-2183 TO COORDINATE THE EXECUTION OF THE APPROPRIATE AGREEMENTS AND
AUTHORIZATIONS REQUIRED FROM ANY RAILROAD COMPANY INVOLVED, INCLUDING
COORDINATION FOR RAILROAD FLAGGING, IF NECESSARY.
57. THE PROJECT MANAGER SHALL BE RESPONSIBLE FOR COORDINATING WITH THE TRAFFIC
SECTION RELATING TO ANY IMPACTS TO TRAFFIC SECTION FACILITIES (INCLUDING BUT NOT
LIMITED TO TRAFFIC LOOPS, JUNCTION WELLS ETC.) AT LEAST 4 WEEKS IN ADVANCE OF THE START OF THE ACTIVITY. PRIOR TO INITIATING ANY WORK ON THIS CONTRACT (OR SITES), THE
PROJECT MANAGER SHALL BE RESPONSIBLE FOR PREPARING AND SUBMITTING FOR APPROVAL
OF THE SAFETY SECTION, A MAINTENANCE OF TRAFFIC PLAN. SUFFICIENT TIME SHALL BE
PROVIDED FOR THE REVIEW AND APPROVAL OF THE PLAN. THE MAINTENANCE OF TRAFFIC PLAN
SHALL INCLUDE PROPOSED TIME RESTRICTIONS ON THE CLOSURE OF TRAVEL LANES SUBJECT
TO THE APPROVAL OF THE SAFETY SECTION. TRAFFIC LOOPS MUST BE PUT BACK WITHIN 7 DAYS
OF PAVING, FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT
WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
58. THE DEPARTMENT RESERVES THE RIGHT TO REQUEST AN EXTENSION OF THIS CONTRACT,
WITH THE AGREEMENT OF THE CONTRACTOR, AT THE CURRENT CONTRACT PRICES.
October 2024
DELAWARE DEPARTMENT OF
TRANSPORTATION CONTRACT NUMBER- T202504902.02 (CAD) PAGE 24 OF 60
CANAL Contract is for various locations throughout New Castle County.
DETAILS SHEET
A
5 - 3/4 " (19mm) Diam. x 16" (400mm) DOWELS; FOR 8' (2.4m) WIDE VALLEY GUTTER. 2 - 3/4
" (19mm) Diam. x 16" (400mm) DOWELS; FOR 4' (1.2m) WIDE VALLEY GUTTER. PLAN
A
W
DUMMY
JOINT
S
JOINT
CONSTRUCTION
SECTION A-A
W
D
W/2
CONSTRUCTION JOINT
DUMMY JOINT
BUTT JOINT
BITUM. SEAL
BITUM. SEAL
C L
4" (100mm)
8" (20
0m m)
3" (75 mm
R 1/
8) "
(3m m
1/)8 " (3mm R
THIS HALF OF DOWEL
PAINTED AND GREASED.
3" (75mm) 3/8 "
(10mm)
8" (20
0m m)
2 5 /8
(67 mm
3/8 " (9mm)
R 1)/8
(3m m
5/8 " (15mm) CORK
EXPANSION
MATERIAL
DUMMY
JOINT
36"(900mm) R
36"
(900mm) R
5/8 " (15mm) CORK
EXPANSION
MATERIAL
WIDTH
W
DEPTH
D
OFFSET
S
8' (2.4m)
4' (1.2m)
3" (75mm)
1 1/2 " (38mm)
16" (405mm)
23 1/2 " (585mm)
6" (150mm) x 12" (300mm) W6 x W6
WIRE MESH REINFORCEMENT.
3" (75mm) 3"
(75 mm
) 3" (75mm)
8" (200mm) P.C.C.
6" (150mm) G.A.B.C.TYPE B
P.C.C. VALLEY GUTTER
STREET
3/4 " (19mm) Diam. x 16" (400mm) DOWEL 20" (500mm) O.C.
DELAWARE DEPARTMENT OF
TRANSPORTATION CONTRACT NUMBER- T202504902.02 (CAD) PAGE 25 OF 60
CANAL Contract is for various locations throughout New Castle County.
DETAILS SHEET
SPEED HUMP
DELAWARE DEPARTMENT OF TRANSPORTATION
(CAD) PAGE 26 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 1 AUGUSTINE HILLS - CANTERA ROAD FROM AUGUSTINE CUT OFF TO
STONE HILL ROAD
LENGTH 167.6400 m 550.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
MATERIAL ESTIMATE FOR LOCATION 1
202000 EXCAVATION AND EMBANKMENT 30.00 C.Y.
211001 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDEWALK 137.00 S.Y.
301001 GABC 10.00 C.Y.
301002 GABC, PATCHING 25.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 190.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 67.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 50.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WIDE 160.00 L.F.
504001 CRACK AND JOINT SEALING LESS THAN 3/4 INCH WIDE 11.00 L.F.
602102 MANHOLE COVER(S) 1.00 EACH
602103 MANHOLE FRAME(S) 1.00 EACH
602132 ADJUSTING AND REPAIRING EXISTING MANHOLE 4.00 EACH
701018 I.PCC CURB AND GUTTER, TYPE 1-8 250.00 L.F.
701019 I.PCC CURB AND GUTTER, TYPE 2 80.00 L.F.
705001 PCC SIDEWALK, 4" 132.00 S.F.
705002 PCC SIDEWALK, 6" 264.00 S.F.
710002 ADJUST WATER VALVE BOXES 4.00 EACH
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 3,000.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 515.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 62.00 L.F.
802003 ARROW PANELS TYPE C 6.00 EA-DY
808002 PROVIDE AND MAINTAIN TRUCK MOUNTED ATTENUATOR, TYPE II 6.00 EA-DY
811001 FLAGGER, NEW CASTLE COUNTY 145.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 16.00 HOUR
819018 INSTALLATION OR REMOVAL OF TRAFFIC SIGN(S) ON SINGLE SIGN POST 1.00 EACH
(CAD) PAGE 27 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 1 AUGUSTINE HILLS - CANTERA ROAD FROM AUGUSTINE CUT OFF TO
STONE HILL ROAD
LENGTH 167.6400 m 550.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
MATERIAL ESTIMATE FOR LOCATION 1
908001 TOPSOIL 13.00 TON
908016 PERMANENT GRASS SEEDING, SUBDIVISION 79.00 S.Y.
908020 EROSION CONTROL BLANKET MULCH 79.00 S.Y.
(CAD) PAGE 28 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 2 BEECHWOLD - BEECHWOLD AVENUE FROM TALLEY ROAD EXT TO END
LENGTH 257.5560 m 845.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY
COMMENTS:
MATERIAL ESTIMATE FOR LOCATION 2
202000 EXCAVATION AND EMBANKMENT 10.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 260.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 1.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 35.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WIDE 94.00 L.F.
602102 MANHOLE COVER(S) 1.00 EACH
602103 MANHOLE FRAME(S) 1.00 EACH
602132 ADJUSTING AND REPAIRING EXISTING MANHOLE 3.00 EACH
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 4,140.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 160.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 40.00 L.F.
811001 FLAGGER, NEW CASTLE COUNTY 104.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 12.00 HOUR
(CAD) PAGE 29 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 3 BLUE ROCK MANOR - BRYN MAWR AVENUE FROM ALDERS DRIVE TO
PROSPECT DRIVE
LENGTH 179.8320 m 590.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
MATERIAL ESTIMATE FOR LOCATION 3
202000 EXCAVATION AND EMBANKMENT 30.00 C.Y.
211001 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDEWALK 180.00 S.Y.
301001 GABC 13.00 C.Y.
301002 GABC, PATCHING 30.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 165.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 101.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 50.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WIDE 110.00 L.F.
602100 DRAINAGE INLET GRATE(S) 2.00 EACH
602101 DRAINAGE INLET FRAME(S) 1.00 EACH
602130 ADJUSTING AND REPAIRING EXISTING DRAINAGE INLET 2.00 EACH
701019 I.PCC CURB AND GUTTER, TYPE 2 500.00 L.F.
705001 PCC SIDEWALK, 4" 200.00 S.F.
705002 PCC SIDEWALK, 6" 400.00 S.F.
710002 ADJUST WATER VALVE BOXES 3.00 EACH
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 3,960.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 750.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 75.00 L.F.
811001 FLAGGER, NEW CASTLE COUNTY 182.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 21.00 HOUR
817002 PERMANENT PAVEMENT STRIPING, SYMBOL/LEGEND, ALKYD-THERMOPLASTIC 33.00 S.F.
817004 TEMPORARY MARKINGS, PAINT, SYMBOL/LEGEND 33.00 S.F.
905004 INLET SEDIMENT CONTROL, DRAINAGE INLET 2.00 EACH
908001 TOPSOIL 20.00 TON
908016 PERMANENT GRASS SEEDING, SUBDIVISION 120.00 S.Y.
(CAD) PAGE 30 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 3 BLUE ROCK MANOR - BRYN MAWR AVENUE FROM ALDERS DRIVE TO
PROSPECT DRIVE
LENGTH 179.8320 m 590.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
MATERIAL ESTIMATE FOR LOCATION 3
908020 EROSION CONTROL BLANKET MULCH 120.00 S.Y.
(CAD) PAGE 31 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 4 BRANDON - DONS LANE FROM SMITH LANE TO THOMAS LANE
LENGTH 182.8800 m 600.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY
COMMENTS:
ESTIMATE INCLUDES INTERSECTION W/ THOMAS
MATERIAL ESTIMATE FOR LOCATION 4
202000 EXCAVATION AND EMBANKMENT 20.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 175.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 1.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 25.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WIDE 90.00 L.F.
602102 MANHOLE COVER(S) 1.00 EACH
602103 MANHOLE FRAME(S) 1.00 EACH
602132 ADJUSTING AND REPAIRING EXISTING MANHOLE 2.00 EACH
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 2,800.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 160.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 40.00 L.F.
811001 FLAGGER, NEW CASTLE COUNTY 71.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 10.00 HOUR
(CAD) PAGE 32 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 5 BRANDYWOOD - MARHILL DRIVE FROM BRANDYWOOD DRIVE TO
PENNINGTON DRIVE
LENGTH 289.5600 m 950.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
MATERIAL ESTIMATE FOR LOCATION 5
202000 EXCAVATION AND EMBANKMENT 50.00 C.Y.
211001 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDEWALK 396.00 S.Y.
301001 GABC 28.00 C.Y.
301002 GABC, PATCHING 66.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 295.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 221.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 35.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WIDE 202.00 L.F.
602130 ADJUSTING AND REPAIRING EXISTING DRAINAGE INLET 3.00 EACH
602132 ADJUSTING AND REPAIRING EXISTING MANHOLE 2.00 EACH
701019 I.PCC CURB AND GUTTER, TYPE 2 1,100.00 L.F.
705001 PCC SIDEWALK, 4" 440.00 S.F.
705002 PCC SIDEWALK, 6" 880.00 S.F.
710370 STEEL CASING PIPE, 4" 30.00 L.F.
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 4,660.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 1,650.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 165.00 L.F.
811001 FLAGGER, NEW CASTLE COUNTY 309.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 34.00 HOUR
905004 INLET SEDIMENT CONTROL, DRAINAGE INLET 5.00 EACH
908001 TOPSOIL 44.00 TON
908016 PERMANENT GRASS SEEDING, SUBDIVISION 264.00 S.Y.
908020 EROSION CONTROL BLANKET MULCH 264.00 S.Y.
(CAD) PAGE 33 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 6 CENTREVILLE RESERVE - CENTRENEST LANE FROM OWLS NEST ROAD TO
END
LENGTH 603.5040 m 1980.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY
COMMENTS:
MATERIAL ESTIMATE FOR LOCATION 6
202000 EXCAVATION AND EMBANKMENT 35.00 C.Y.
401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) 670.00 TON
401029 SUPERPAVE TYPE C, PG 64-22, PATCHING 1.00 TON
401030 SUPERPAVE TYPE B, PG 64-22, PATCHING 120.00 TON
404001 BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WIDE 70.00 L.F.
760010 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT 9,600.00 SY-IN
760011 PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT, TAPER CUT 560.00 SY-IN
762000 SAW CUTTING, BITUMINOUS CONCRETE 260.00 L.F.
762001 SAW CUTTING, CONCRETE, FULL DEPTH 20.00 L.F.
802003 ARROW PANELS TYPE C 4.00 EA-DY
808002 PROVIDE AND MAINTAIN TRUCK MOUNTED ATTENUATOR, TYPE II 4.00 EA-DY
811001 FLAGGER, NEW CASTLE COUNTY 242.00 HOUR
811013 FLAGGER, NEW CASTLE COUNTY, OVERTIME 27.00 HOUR
(CAD) PAGE 34 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 7 CHALFONTE - BONA ROAD FROM BARLOW ROAD TO BERWYN ROAD
LENGTH 313.9440 m 1030.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
2 RAMPS @ BARLOW
202000 35.00 C.Y.
211001 231.00 S.Y.
301001 17.00 C.Y.
301002 39.00 C.Y.
401005 315.00 TON
401029 130.00 TON
401030 50.00 TON
404001 180.00 L.F.
602130 4.00 EACH
602132 5.00 EACH
701013 4.00 L.F.
701019 640.00 L.F.
705001 256.00 S.F.
705002 512.00 S.F.
705013 20.00 S.F.
705008 60.00 S.F.
705009 400.00 S.F.
710370 10.00 L.F.
760010 5,040.00 SY-IN
762000 960.00 L.F.
762001 96.00 L.F.
811001 273.00 HOUR
811013 29.00 HOUR
905004 5.00 EACH
908001 34.00 TON
908016
MATERIAL ESTIMATE FOR LOCATION 7
EXCAVATION AND EMBANKMENT
REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDEWALK
GABC
GABC, PATCHING
SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE)
SUPERPAVE TYPE C, PG 64-22, PATCHING
SUPERPAVE TYPE B, PG 64-22, PATCHING
BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WIDE
ADJUSTING AND REPAIRING EXISTING DRAINAGE INLET
ADJUSTING AND REPAIRING EXISTING MANHOLE
PCC CURB, TYPE 1-8
I.PCC CURB AND GUTTER, TYPE 2
PCC SIDEWALK, 4"
PCC SIDEWALK, 6"
TRUNCATED DOME DETECTABLE WARNING SURFACE
PEDESTRIAN CONNECTION, TYPE 1
PEDESTRIAN CONNECTION, TYPE 2, 3, AND/OR 4
STEEL CASING PIPE, 4"
PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT
SAW CUTTING, BITUMINOUS CONCRETE
SAW CUTTING, CONCRETE, FULL DEPTH
FLAGGER, NEW CASTLE COUNTY
FLAGGER, NEW CASTLE COUNTY, OVERTIME
INLET SEDIMENT CONTROL, DRAINAGE INLET
TOPSOIL
PERMANENT GRASS SEEDING, SUBDIVISION 202.00 S.Y.
(CAD) PAGE 35 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 7 CHALFONTE - BONA ROAD FROM BARLOW ROAD TO BERWYN ROAD
LENGTH 313.9440 m 1030.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
2 RAMPS @ BARLOW
MATERIAL ESTIMATE FOR LOCATION 7
908020 EROSION CONTROL BLANKET MULCH 202.00 S.Y.
(CAD) PAGE 36 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 8 CLERMONT - CLERMONT ROAD FROM WILSON ROAD TO END
LENGTH 243.8400 m 800.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
202000 40.00 C.Y.
211001 304.00 S.Y.
301001 24.00 C.Y.
301002 47.00 C.Y.
401005 310.00 TON
401029 153.00 TON
401030 30.00 TON
404001 290.00 L.F.
501001 48.00 S.Y.
602131 1.00 EACH
602132 4.00 EACH
701019 710.00 L.F.
705001 284.00 S.F.
705002 568.00 S.F.
760010 3,920.00 SY-IN
760011 560.00 SY-IN
762000 1,209.00 L.F.
762001 121.00 L.F.
802003 6.00 EA-DY
808002 6.00 EA-DY
811001 252.00 HOUR
811013 26.00 HOUR
905004 2.00 EACH
MATERIAL ESTIMATE FOR LOCATION 8
EXCAVATION AND EMBANKMENT
REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDEWALK
GABC
GABC, PATCHING
SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE)
SUPERPAVE TYPE C, PG 64-22, PATCHING
SUPERPAVE TYPE B, PG 64-22, PATCHING
BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WIDE
PCC PAVEMENT, 8"
ADJUSTING AND REPAIRING EXISTING DOUBLE DRAINAGE INLET
ADJUSTING AND REPAIRING EXISTING MANHOLE
I.PCC CURB AND GUTTER, TYPE 2
PCC SIDEWALK, 4"
PCC SIDEWALK, 6"
PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT
PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT, TAPER CUT
SAW CUTTING, BITUMINOUS CONCRETE
SAW CUTTING, CONCRETE, FULL DEPTH
ARROW PANELS TYPE C
PROVIDE AND MAINTAIN TRUCK MOUNTED ATTENUATOR, TYPE II
FLAGGER, NEW CASTLE COUNTY
FLAGGER, NEW CASTLE COUNTY, OVERTIME
INLET SEDIMENT CONTROL, DRAINAGE INLET
(CAD) PAGE 37 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 8 CLERMONT - CLERMONT ROAD FROM WILSON ROAD TO END
LENGTH 243.8400 m 800.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
908001
908016
908020
MATERIAL ESTIMATE FOR LOCATION 8
TOPSOIL
PERMANENT GRASS SEEDING, SUBDIVISION
EROSION CONTROL BLANKET MULCH
32.00 TON
193.00 S.Y.
193.00 S.Y.
(CAD) PAGE 38 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 9 DREXEL - DREXEL DRIVE FROM SHIPLEY ROAD TO END
LENGTH 121.9200 m 400.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
202000 20.00 C.Y.
211001 108.00 S.Y.
301001 28.00 C.Y.
301002 18.00 C.Y.
401005 145.00 TON
401029 61.00 TON
401030 15.00 TON
404001 100.00 L.F.
602130 1.00 EACH
602132 2.00 EACH
701019 300.00 L.F.
705001 120.00 S.F.
705002 240.00 S.F.
705505 100.00 S.F.
760010 1,680.00 SY-IN
760011 315.00 SY-IN
762000 450.00 L.F.
762001 45.00 L.F.
802003 6.00 EA-DY
808002 6.00 EA-DY
811001 159.00 HOUR
811013 18.00 HOUR
905004 1.00 EACH
MATERIAL ESTIMATE FOR LOCATION 9
EXCAVATION AND EMBANKMENT
REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SIDEWALK
GABC
GABC, PATCHING
SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE)
SUPERPAVE TYPE C, PG 64-22, PATCHING
SUPERPAVE TYPE B, PG 64-22, PATCHING
BITUMINOUS CRACK AND JOINT SEALING LESS THAN 3/4-INCH WIDE
ADJUSTING AND REPAIRING EXISTING DRAINAGE INLET
ADJUSTING AND REPAIRING EXISTING MANHOLE
I.PCC CURB AND GUTTER, TYPE 2
PCC SIDEWALK, 4"
PCC SIDEWALK, 6"
RESET STONE/BRICK SIDEWALK AND/OR STONE/BRICK ROADWAY
PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT
PAVEMENT MILLING, BITUMINOUS CONCRETE PAVEMENT, TAPER CUT
SAW CUTTING, BITUMINOUS CONCRETE
SAW CUTTING, CONCRETE, FULL DEPTH
ARROW PANELS TYPE C
PROVIDE AND MAINTAIN TRUCK MOUNTED ATTENUATOR, TYPE II
FLAGGER, NEW CASTLE COUNTY
FLAGGER, NEW CASTLE COUNTY, OVERTIME
(CAD) PAGE 39 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 9 DREXEL - DREXEL DRIVE FROM SHIPLEY ROAD TO END
LENGTH 121.9200 m 400.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
908001
908016
908020
MATERIAL ESTIMATE FOR LOCATION 9
TOPSOIL
PERMANENT GRASS SEEDING, SUBDIVISION
EROSION CONTROL BLANKET MULCH
12.00 TON
72.00 S.Y.
72.00 S.Y.
(CAD) PAGE 40 OF 60CONTRACT T202504902.02
CANAL SUBDIVISION PAVING, NEW CASTLE COUNTY II, 2025
LOCATION 10 FOULK WOODS - FOULK WOODS ROAD FROM FOULK ROAD TO OLDWOOD
ROAD
LENGTH 455.6760 m 1495.0000 L.F.
GENERAL IMPROVEMENTS
2" MILL AND OVERLAY(CURB WHERE NECESSARY)
COMMENTS:
4 RAMPS @ DEEPWOOD
202000 55.00 C.Y.
211001 324.00 S.Y.
301001 24.00 C.Y.
301002 44.00 C.Y.
401005 525.00 TON
401029 196.00 TON
401030 75.00 TON
404001 434.00 L.F.
501001 48.