This technical specifications and geotechnical engineering report document, prepared by Pegasus Engineering for the City of DeBary, Florida, outlines the requirements for Bid Package No. 2 of the Small Scale Stormwater Improvement Project (Bid No. 0115). The project encompasses six distinct drainage improvement sites within the city limits: 44 Seminole Drive, 54 & 58 Shell Road, Barwick Road Maintenance Facility, 250 Adelaide Street, Rob Sullivan Park, and 294 DeLeon Road, along with Lower Lake Outfall improvements. The bid package includes technical specifications for closed-circuit television (CCTV) inspection of installed storm pipes, aluminum access hatches, and sluice gates. Contractors must submit applications for payment, schedules of values, and as-built plans certified by a Florida-registered professional land surveyor within specified timeframes. Payment will be made on a unit price basis for actual quantities of work performed or on a percentage-complete basis for lump sum items, with 10 percent retainage held until substantial completion.

The project includes mobilization and demobilization costs not to exceed 10 percent of the total bid price, with 75 percent payable upon project initiation and 25 percent upon completion. Contractors must furnish bonds, permits, shop drawings, field engineering, CCTV inspections, and quality control measures. Four geotechnical engineering investigations prepared by Devo Engineering and Geotechnical and Environmental Consultants, Inc. between 2012 and 2014 support the design, with corresponding permits issued by the St. Johns River Water Management District (SJRWMD) and Florida Department of Environmental Protection (DEP) between 2013 and 2014. The soil conditions along the proposed alignments consist of very loose to loose fine sands 5 to 10 feet thick, underlain by silty and clayey fine sands, with seasonal high water tables estimated between 2 and 13 feet below ground surface depending on location. Equipment manufacturers approved for this project include U.S.F. Fabrication, Inc. for aluminum access hatches and GatorDock for aluminum sluice gates.

View the file

Other files

File Type Posted
BID_FORM.pdf PDF
P7_Lower_Lake_Plans.pdf PDF
Advertisement.pdf PDF
Instruction-Proposal.pdf PDF
P4_Adelaide_Plans.pdf PDF
Contract-Bonds.pdf PDF
Contract-Title_Page.pdf PDF
P1_P2_Seminole_Shell.pdf PDF
P5_Sullivan_Pk_Plans.pdf PDF
Special_Provisions.pdf PDF
Table_of_Contents.pdf PDF
P3_Barwick_Plans.pdf PDF
P6_DeLeon_Rd_Plans.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDNO.01‐15
CityofDeBary

Small Scale Stormwater Bid Package No. 2

TECHNICAL SPECIFICATIONS

Prepared For:

CityofDeBary
16ColombaRoad

DeBary, Florida 32713‐3264 407‐668‐2040

Prepared By:

PegasusEngineering
301WestSR434,Suite309
WinterSprings,Florida32708

407‐992‐9160

City of DeBary Small Scale Stormwater Bid Package No. 2

PART 1: TECHNICAL SPECIFICATIONS

Section Description Beginning Page Number

01025 Measurement and Payment

01400 Closed Circuit Television Inspection (CCCTV) of Installed Storm Pipes

08350 Aluminum Access Hatches

11285 Sluice Gates

PART 2: GEOTECHNICAL ENGINEERING INVESTIGATIONS

Project Report Title

Geotechnical Engineering Report for “44 Seminole Drive Drainage Improvements”

Prepared by Devo Engineering in March 2013

Geotechnical Engineering Report for “54 & 58 Shell Road Drainage Improvements”

Prepared by Devo Engineering in May 2013

Geotechnical Engineering Investigation – Barwick Road Maintenance Facility Stormwater Pond

Prepared by Geotechnical and Environmental Consultants, Inc. in September 2012

Geotechnical Engineering Investigation – Adelaide Street Drainage Improvements

Prepared by Geotechnical and Environmental Consultants, Inc. in September 2014

PART 3: APPROVED PERMITS

Project Permit Reference

44 Seminole Drive Drainage Improvements

SJRWMD Permit No. 29790‐4 issued on August 19, 2014

54 & 58 Shell Road Drainage Improvements

SJRWMD Permit No. 105706‐3 issued on November 24, 2014

Barwick Road Maintenance Facility Stormwater Pond

DEP Self Certification No. 0317771001EG issued on April 2, 2013

Q u a i l L a k e K i n g s L a k e

K o n a m a c L a k e

D G C C P o n d

D e B a r y F r e e d o m

L a k eS o a r i n g E a g l e L a k e

L a k e A n n a M a r i a

L a k e M a u d

N o N a m e L a k e

L a k e O l i v i a

G e m L a k eL a k e H i b i s c u s

L a k e M a r i e H a l f

M o o n L a k eE a g l e s

E y e L a k e

M i r r o r L a k e L a k e

L o u i s e L a g o L i n d a L a k e o f t h e W o o d s

E y e o f t h e E a g l e L a k e

J a m e s P o n d

G a s l i n e L a k e

P e a c e f u l E a g l e L a k e

B a s s L a k e

W o o d b o u n d L a k e

B o n i t a L a k e

L a k e C h a r l e s

A n g e l e s L a k e

T r o p i c L a g o o n

S t J o h n s R i v e r

M u l l e t L a k e

D e B a r y B a y o u

T u r t l e P o n d

L a k e M o n r o e

U p p e r L a k e L o w e r

L a k e

§̈¦4

DIRKSEN DR

DEBARY AV

N

CH

AR

LE

S R B

EA

LL

B

LV

D

S C

HA

RL

ES

R

BE

AL

L B

LV

D

ENTERPRISE RDCR 4158 (HIGHBANKS RD W)

CI

TY

O F

DE

BA

RY

DYC-001

MAR CH 2015

NOT TO SCALE

BI

D

NO

. 0

1-1

SM

AL

L

SC

AL

E

ST

OR

MW

AT

ER

IM

PR

OV

EM

EN

T

PR

OJ

EC

T

NO

. 2

JOB NO.:

DATE:

1 W

ES

T S

TA

TE

R

OA

D 4, SU

ITE

W

IN

TE

R

SP

RI

NG

S, F L

TE

L:

7- 2-9

FA

X:

7- 8-

W

EB

: W W W.

PE

GA

SU

SE

NG

IN

EE

RI

NG

.N

ET

FIGURECITY OF DEBARY CITY LIMITS

5 R OB SULLIVAN PAR K

DR AINAGE IMPR OVEMENTS

2 54 AND 58 SHELL R OAD

DR AINAGE IMPR OVEMENTS

77 LOWER LAKE OUTFALL

IMPR OVEMENTS

4 250 ADELAIDE STR EET

DR AINAGE IMPR OVEMENTS

1 44 SEMINOLE DR IVE

DR AINAGE IMPR OVEMENTS

3 BAR WICK R OAD MAINTENANCE FACILTY

PHASE 1 SITE IMPR OVEMENTS

6 294 DELEON R OAD

DR AINAGE IMPR OVEMENTS

BID NO. 01‐15

SMALL SCALE STORMWATER BID PACKAGE NO. 2

PART 1

TECHNICAL SPECIFICATIONS

Small Scale Stormwater Bid Package No. 2 01025-1

SECTION 01025

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.01 GENERAL PROVISIONS

A. Unit Price Contracts: The quantities of work to be done and materials to be furnished under a unit price contract, as given in the Bid Form, are to be considered as approximate only and are to be used solely for the comparison of Bids received and determining an initial Contract Price. The Owner does not expressly, or by implication, represent that the actual quantities involved will correspond exactly therewith; nor shall the Contractor plead misunderstanding or deception because of such estimate or quantities or of the character, location or other conditions pertaining to the Work.

Payment to the Contractor will be made only for the actual quantities of work performed or material furnished in accordance with the Drawings and other Contract Documents, and it is understood that the quantities may be increased or diminished as provided in the General Conditions without in any way invalidating any of the unit prices bid.

B. Lump Sum Contracts: The quantities of work to be done and materials to be furnished, including all labor, equipment and incidentals required to complete the Work, are specified in the Contract Specifications and shown in the Contract Drawings. Payment to the Contractor of the lump sum price bid for the Work will be made and shall fully compensate the Contractor for the construction of the Work, completed and ready for continuous operation and use, in the manner contemplated by the Contract Documents.

C. Unit Price and Lump Sum Contracts:

1. All schedules are given for the convenience of the Engineer and the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for the making of estimates of the size, kind, and quantity of materials and equipment included in Work to be done under this Contract.

2. Where fittings are noted on the Drawings, such notation is for the Contractor's convenience and does not relieve him from laying and jointing different or additional items where required.

3. All Contracts shall be subject to retainage as defined in the General Conditions and the

Agreement.

1.02 ALLOWANCES

A. The Contractor’s Total Bid Amount shall include all cash allowances stated hereinafter. Items covered by these allowances shall be supplied for such amounts and by such persons as the Owner may direct.

B. The amount of the allowance shall be adjusted accordingly by Change Order to recognize the actual cost incurred by the Contractor. The Contractor shall submit appropriate documentation to validate the actual cost of the item.

C. For bidding purposes, cash allowances shall be reflected in the Bid Form for the designated item.

Small Scale Stormwater Bid Package No. 2 01025-2

1.03 SCHEDULE OF VALUES

A. Scope of Work

1. Submit to the Engineer a Schedule of Values within twenty (20) days after the Notice to

Proceed.

2. A Schedule of Values shall be submitted for both lump sum and unit price contracts and the sum of the values in the schedule shall equal the Total Bid amount.

3. The Schedule of Values shall establish the actual value of the component parts of the Work and, unless objected to by the Engineer, shall be used as the basis for the Contractor's Applications for Payment.

B. Form and Content

1. Type the schedule on the Owner's 8-1/2" x 11" standard form. Contractor's standard forms and computer printout will be considered for approval by the Owner upon Contractor's request.

2. The values listed shall be the installed values of the component parts of the Work, including material, labor, overhead and profit, and all other costs associated with the installed value of each item.

C. Unit Price Contracts: For unit price contracts, the Bid Form shall be used as the basis for the

Schedule of Values. The Contractor shall resubmit the Bid Form in the format described herein, and may, at his option, divide the items in the Schedule of Values into sub-items to provide a more detailed basis of payment.

D. Lump Sum Contracts: For lump sum contracts, the cost of the Work shall be separated into major items and sub-items as outlined below:

1. General Requirements

a. Mobilization, Demobilization, Bonds and Permits

b. Shop Drawing Preparation / Submittal

c. Field Engineering, Exploratory Excavation, Survey and Construction Layout

d. As-built Plans and / or Record Drawing Preparation

e. Indemnification

f. Quality Control (including CCTV inspection of installed storm pipes)

2. Site Work: The cost of the site work, with the exception of earthwork for structures and underground piping, shall be separated by task, with estimated quantities where applicable.

3. Structures: The cost of each structure shall be given separately, and each structure, at a minimum, shall be further separated into the following sub-items: earthwork, concrete forming, concrete reinforcement, concrete, equipment, piping and appurtenances (to a point 5 feet outside of the structure), miscellaneous metals, electrical work (to a point 5 feet outside of the structure) and finishes.

4. Yard Piping: The cost of yard piping shall be separated by pipe size and type, valves and appurtenances. The Contractor's estimated quantities and unit prices shall be included for each sub-item.

5. Electrical Work: The cost of electrical work outside of the structures shall be separated, at a minimum, into the following sub-items: conduit, wire, duct bank, pull boxes, and yard lighting.

E. The Owner reserves the right to delete any item included in the Schedule of Values and decrease the

Contract Price by the scheduled amount for the item deleted.

Small Scale Stormwater Bid Package No. 2 01025-3

1.04 APPLICATIONS FOR PAYMENT

A. Applications for Payment shall be submitted by the Contractor to the Owner in accordance with the schedule established by the General Conditions and Agreement between the Owner and the Contractor.

B. Format

1. Submit applications typed on forms provided by the Owner. The Contractor shall prepare itemized continuation sheets using the accepted Schedule of Values and attach them to the Application. Each item shall have an assigned dollar value for the current pay period, and a cumulative value for the project to date. Change Orders executed prior to the date of submission shall be listed at the end of the continuation sheets and shall be totaled separately.

2. The following items shall be included with each copy of the application for payment:

a. Progress Schedule

b. Stored Material Log

c. Partial Release of Liens (for payment for stored material)

d. Consent of Surety

e. Invoices for Stored Material

3. The Contractor shall certify, for each current pay request, that all previous payments received from the Owner, under his Contract, have been applied by the Contractor to discharge in full all obligations of the Contractor in connection with Work covered by prior applications for payment, and all materials and equipment incorporated into the Work are free and clear of all liens, claims, security interest and encumbrances. Contractor shall attach affidavits from all Subcontractors and Suppliers to each application for payment. Contractor shall also attach a "Consent of Surety" to each application for payment. Additionally, a "Partial Release of Lien" from each subcontractor and supplier shall be attached to each application for payment.

4. Submit the required number of copies to the Owner with the required number of original signatures. The Owner shall review the application and verify quantities of installed work and stored materials. When the Owner finds the application properly completed and correct, payment will be made to the Contractor.

C. Work not installed in accordance with the requirements of the Contract Documents or materials not conforming to the Contract Documents will not be approved by the Owner or Engineer for payment.

D. The Application for Final Payment shall be prepared in accordance with the General Conditions and

Agreement between the Owner and the Contractor.

1.05 MEASUREMENT AND PAYMENT

A. Methods of Payment

1. Unit Price Contracts/Items: Payment will be made for actual quantities of work properly installed as approved by the Owner unless otherwise indicated herein.

2. Lump Sum Contracts/Items: Payment will be made for each individual item on a percentage complete basis as estimated by the Contractor and approved by the Owner. Quantities provided in the Schedule of Values are for the purpose of estimating the completion status for progress payments. Adjustments to costs provided in the accepted Schedule of Values may be made only by Change Order.

Small Scale Stormwater Bid Package No. 2 01025-4

B. Methods of Measurement

1. Units of measurement shall be defined in general terms as follows:

a. Linear Feet (LF) e. Each (EA)

b. Square Feet (SF) f. Sacks (SK)

c. Square Yards (SY) g. Lump Sum (LS)

d. Cubic Yards (CY) h. Ton (TN)

2. Unit Price Contracts/Items

a. Linear Feet (LF) shall be measured along the horizontal length of the centerline of the installed material, unless otherwise specified. Utility Pipe shall be measured along the length of the completed pipeline, regardless of the type of joint required, without deduction for the length of valves or fittings. Utility Pipe included within the limits of lump sum items will not be measured.

b. Square Feet (SF), Square Yards (SY), Cubic Yards (CY), Each (EA), Sacks (SK) and

Ton (TN) shall be measured as the amount of the unit of measure installed within the limits specified and shown in the Specifications and Drawings. Slope angles and elevations shall be measured using land surveying equipment. Contractor shall provide supporting documentation (i.e. drawings, truck tickets, invoices, etc.) to verify actual installed quantities.

c. No measurement is required for Lump Sum (LS) items.

3. Lump Sum Contracts/Items

a. The Measurement of Work for lump sum contracts and/or items shall be based on the information provided in the Contract Documents and compiled through the Contractor's own field verifications, investigations and testing prior to Bidding.

C. The following describes the specific work and methods of measurement for the items listed in the Bid

Form. Measurement and payment for each Bid Item shall include all labor, materials and equipment required to perform the work included for that respective item to provide a complete and operable installation. Related work not specifically listed or identified, but evidently necessary for satisfactory completion of the item, shall be considered to be included.

D. No separate payment will be made for the following work, and its cost shall be included in the appropriate payment item:

Applications and pulling of all utility and construction permits;

Shop drawings, working drawings and samples;

Field engineering;

Trench excavation, sheeting, shoring and bracing;

Structural fill, backfill, compaction and grading;

Restraining devices for pipe fittings and bends;

Cleanup;

Testing materials and apparatus;

Maintenance of utility service;

Appurtenant work; and Close-out documentation (other than as-built surveys and/or record drawings).

Small Scale Stormwater Bid Package No. 2 01025-5

E. The following descriptions will clarify and more specifically define some of the work included for various items as shown in the Bid Form. More specifically, the following descriptions pertain only to Utility Work and those bid items that are not fully encompassed and/or sufficiently described within the FDOT Standard Specifications.

Item 1 – Mobilization

a. Measurement: The lump sum price for Mobilization shall not exceed ten (10) percent of the Total Bid price.

b. Payment: Payment of seventy-five (75) percent of the applicable lump sum price for

Mobilization shall be full compensation for the preparatory work and operations in mobilizing for beginning Work on the project including, but not limited to, those operations necessary for the movement of personnel, equipment, supplies and incidentals to the project site, and for the establishment of field offices, storage sheds, safety equipment and first aid supplies, sanitary and other facilities, as required by these Specifications, and State and local laws and regulations; and any other preconstruction expense necessary for the start of the Work; the cost of bonds, permits and fees, construction schedules, project signs, shop drawings, temporary facilities, laydown storage area, construction aids, erosion control, traffic control including devices and personnel, work associated with the Contractor support during Owner reviews and inspection, reinspections and any rework resulting from same. Payment of the remaining twenty-five (25) percent of the applicable lump sum price for Mobilization shall be full compensation for finalization of this project including demobilization of personnel, equipment, supplies, and incidentals from the project site, project and contract close-out documents, removal of field offices and storage and final site clean-up. The Contractor shall submit invoices substantiating the cost of Mobilization with each pay request. Ten (10) percent of the cost for Mobilization will be withheld until substantial completion, which at that time the Owner may elect to release a portion of that retainage.

Item 2 – Survey and Construction Layout

a. Measurement: The Work for this item shall include all labor, materials and equipment necessary to construct the proposed improvements to the lines and grades shown on the Drawings.

b. Payment: The Contractor shall furnish all labor, materials, equipment and services necessary to complete the survey, layout and project construction to the satisfaction of the Engineer and in accordance with the following minimum requirements.

This work shall include providing all lines, grades, boundaries and required survey and/or layout necessary to construct and inspect the project.

All right-of-way and easement boundaries and centerline control points shall be established and maintained throughout the Contract period by the Contractor.

The Contractor shall employ or retain the services of a Florida registered Professional Land Surveyor to satisfy all the requirements of these specifications.

The Contractor shall be responsible to perform all layouts in acceptable standard methods and shall thoroughly familiarize themselves with the plans, specifications and on-site field conditions to submit a lump sum bid that will include all means and methods necessary to satisfy the survey and layout requirements of this project.

All field books and calculations, related to layout, shall be available to the Engineer upon request, for a period of one year after construction completion.

Small Scale Stormwater Bid Package No. 2 01025-6

Item 3 – As-Built Plans

a. Measurement: The Work for this item shall include all labor, materials and equipment necessary to document that the proposed improvements were constructed to the lines and grades shown on the Drawings.

b. Payment: The Contractor shall furnish all labor, materials, equipment, and services necessary for developing as-built plans to provide the Owner with factual information regarding all aspects of the work, both concealed and visible, to enable future location, identification and modification of the work without lengthy and expensive site measurement, investigation or examination.

During the entire construction operation, the Contractor shall maintain records of all deviations from the Drawings and Specifications, and shall prepare “as-built” drawings showing correctly and accurately all changes and deviations from the work made during construction to reflect the work as it was actually constructed. As-built improvements shall be superimposed over the engineering drawings, certified by a State of Florida Registered Professional Land Surveyor (currently licensed), and of neat and legible quality subject to review and approval by the Owner.

A minimum of two (2) signed and sealed prints are required along with one (1) compact disc that contains the as-built plans in both PDF and Autocad formats. The engineering drawings will be provided to the Contractor in Autocad format for use in depicting the as-built information and preparing the as-built plans.

Item 4 – Indemnification

a. Payment for Indemnification: In consideration of the Contractor’s Indemnity Agreement as set out in the Contract Documents, Owner specifically agrees that such specific consideration shall be $100.00 and other good and valuable consideration, receipt of which is acknowledged upon signing of the Agreement.

Item 5 – General (CCTV Inspection)

a. Measurement: The Work for this item shall include all labor, materials and equipment to provide a complete CCTV Inspection of Installed Storm Pipes in accordance with the applicable Technical Specifications.

b. Payment: Payment of the applicable lump sum price shall be full compensation for furnishing all labor, materials, and equipment necessary for a complete CCTV visual inspection and subsequent report including: qualified personnel; DVD; and all incidentals related to the video inspection.

Small Scale Stormwater Bid Package No. 2 01025-7

Item 6 – Landscaping Allowance

a. Measurement: The Contractor is responsible for restoring all disturbed areas inside or outside the limits of construction, including demolition activities or damage as a result of construction activities that are not specially accounted for by other bid items. The disturbed areas shall be returned to a condition equal to or better than the condition that existed prior to beginning construction. The Work for this item shall include the installation of additional landscaping if so directed by the Owner.

all labor, materials, and equipment necessary for installing landscaping materials including but not limited to: shrubs; trees; ornamentals; etc. In the event that additional landscaping work is not required, the Contractor is not entitled to any payment for any portion of the Landscaping Allowance.

Item 7 – Repair or Replacement of Existing Irrigation Systems Contingency

a. Measurement: The Contractor shall comply with the specific requirements identified in the Special Provisions.

all labor, materials, and equipment necessary for repair or replacement of existing irrigation systems. In the event that irrigation repairs of replacements are not required, the Contractor is not entitled to any payment for any portion of the Contingency Allowance.

Item 8 – Connect Existing Pipe to Proposed Drainage Structure provide a complete connection of an existing drainage pipe to the proposed drainage structure.

b. Payment: Payment of the applicable unit price (lump sum or each as shown on the Bid Form) shall be full compensation for furnishing all labor, materials, and equipment necessary for a complete connection, including: core drilling; wall seals; stainless steel offset pipe clamps;

restraints; fittings / bends; concrete benching; any other structure modifications as may be required; traffic control; sheeting and shoring; backfilling; compaction; and final grading.

Item 9 – Connect Proposed Pipe to Existing Drainage Structure provide a complete connection of the proposed drainage pipe to an existing drainage structure.

b. Payment: Payment of the applicable unit price (lump sum or each as shown on the Bid Form) shall be full compensation for furnishing all labor, materials, and equipment necessary for a complete connection, including: core drilling; wall seals; stainless steel offset pipe clamps;

restraints; fittings / bends; concrete benching; any other structure modifications as may be required; traffic control; sheeting and shoring; backfilling; compaction; and final grading.

Small Scale Stormwater Bid Package No. 2 01025-8

Item 10 – Utility Relocations / Adjustments

a. Measurement: The quantity for payment shall be the actual linear feet of pipe of each size, type, and service satisfactorily furnished and laid, as measured along the centerline length of the completed pipeline, regardless of the joint type required, without deduction for the length of valves, fittings and structures. Pipe included within the limits of lump sum pay items will not be measured for payment under this item.

b. Payment: Payment of the applicable unit price shall be full compensation for furnishing all labor, materials and equipment; and constructing the respective pipeline's complete installation including protection of existing utilities, excavation, sheeting, shoring and bracing, dewatering, backfill, compaction, grading, temporary erosion control, all testing (when applicable) and clean-up. Unless a specific line item is provided on the Bid Form, this item also includes all necessary fittings, reducers, bends, tees, wyes, plugs, restraining devices, polyethylene encasement (where required), installation of electronic disc markers (and locator sets), tree protection, connection to (and mechanical restraint of) existing pipes or structures and all other items incidental to the construction of the pipelines.

Item 11 – Concrete Saddles at Utility Conflicts adequately support storm pipes at proposed utility crossings with the required vertical separations between pipe crossings as shown on the Drawings. Where applicable, the Work for this item shall also include construction of steel reinforced concrete saddles each of the locations listed in the Bid Form.

b. Payment: Payment of the applicable unit price shall be full compensation for furnishing all labor, materials and equipment, including: maintenance of traffic; exploratory excavation;

protection of existing utilities; excavation; sheeting; shoring and bracing; dewatering;

concrete forming and placement; backfill; installing pipe; installing fittings / bends with mechanical restraining devices; compaction; grading; visual leak inspection; pressure testing (when applicable); disinfection (when applicable); and clean-up.

END OF SECTION

Small Scale Stormwater Bid Package No. 2 01400-1

SECTION 01400

CLOSED CIRCUIT TELEVISION INSPECTION (CCTV) OF INSTALLED STORM PIPES

1. DEFINITIONS

NASSCO - National Association of Sewer Service Companies

PACP - Pipeline Assessment and Certification Program

2. SCOPE OF WORK

The Contractor shall be responsible for completing a CCTV inspection of all newly installed storm pipe as specified within the project bid documents, including both the construction plan general notes sheet and the Bid Form. Unless specified otherwise, CCTV inspection of newly installed storm pipe will be limited to pipelines with inside dimensions of at least 15-inches for round pipe and 12-inches for elliptical pipe.

If the Contractor does not have the qualified personnel and equipment to perform the CCTV inspection, a CCTV sub-contractor shall be hired at the Contractor’s sole expense and of the Contractors choosing. Although not a requirement for compliance with the specification for this SBI, it is recommended that the CCTV inspection be performed by personnel who are trained and certified in the use of NASSCO’s Pipeline Assessment and Certification Program (PACP).

3. EXECUTION

3.1 Storm sewer pipes, including catch basin leads and catch basin structures, shall be cleaned and flushed prior to video inspection.

3.2 After cleaning, the manhole sections shall be visually inspected by means of closed-circuit television.

The inspection will be done one manhole section at a time and the flow in the section being inspected will be suitably controlled. For the purposes of complying with the specification for this SBI, flow depth within the pipeline during the CCTV inspection should not exceed 25% of the inside pipe diameter.

3.3 All CCTV inspections shall be performed in accordance with PACP program standards including the specific date and time of inspection.

3.4 The Contractor shall notify the Owner at least two (2) working days in advance of the anticipated date of televising so that a designated representative of the Owner may observe the inspection operations.

The Contractor shall video inspect all proposed storm pipes with the Owner, Owner's representative, and/or Engineer of Record present, or with the Owner's permission to proceed in the absence of the Owner's designated representative.

3.5 The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Owner and/or Engineer of Record; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection.

3.6 The camera shall be moved through the pipeline in either direction at a moderate rate, stopping when necessary to permit proper documentation of the pipeline condition. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation of the internal conditions shall be used to move the camera through the pipeline.

If, during the inspection operation, the television camera will not pass through the entire manhole

Small Scale Stormwater Bid Package No. 2 01400-2 section, the Contractor shall set up his equipment so that the inspection can be performed from the opposite manhole. If, again, the camera fails to pass through the entire manhole section, the inspection shall be considered complete, noted as "Survey Abandoned" and no additional inspection will be required.

The camera operator shall slow or stop the camera at potential or actual imperfections in the pipeline to obtain a high quality video image. Each location where a potential obstruction or structural deficiency exists shall be identified with accurate distance measurements above ground from the manhole or access hole.

Structural cracking, excessively deflected joints, protruding joint sealing material, corrosion, evidence of reverse slope by ponding of water or dips in pipe alignment and any other defect revealed by the CCTV inspection shall be repaired to the satisfaction of the Owner and/or Engineer of Record at the Contractor’s sole expense.

3.7 When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communication shall be set up between the two manholes of the section being inspected to insure good communications between members of the crew.

3.8 The importance of accurate distance measurements is emphasized. Measurement for location of defects shall be above ground by means of a meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Owner and/or Engineer of Record.

4. SUBMITTALS

At a minimum, documentation of the CCTV inspection shall include the following:

4.1 Television Inspection Logs: Electronic media location records shall be kept by the Contractor and will clearly show the location, by distance in 1/10 of a foot or nearest mm, from the manhole wall, in relation to an adjacent manhole of each defect point observed during inspection. In addition, other points of significance such as: unusual conditions; roots; cracks; fractures; broken pipe; presence of scale and corrosion; and other discernible features; as defined in the PACP defect codes, will be recorded on electronic media and a copy of such records will be supplied to the Owner.

4.2 Digital Photographs: Digital photographs shall be taken by the Contractor to document the pipe condition including any defects. Photographs shall be located by distance in 1/10 of a foot or nearest mm, from the manhole wall, in relation to an adjacent manhole.

4.3 Electronic Media Recordings: The purpose of electronic media recording shall be to supply a visual and audio record of problem areas of the pipelines that may be replayed by the Owner.

Videotape shall be high-quality color VHS format. The capacity of the videotape shall be adequate to record inspection of at least one (1) complete pipe segment. Recording of a single segment shall not extend to more than one (1) videotape.

Recording shall be performed using a four (4) head VHS format VCR recorded in SP or LP modes only.

CCTV inspections may be recorded onto digital media such as DVD with the prior permission of the Owner and/or Engineer of Record.

Small Scale Stormwater Bid Package No. 2 08350-1

SECTION 08350

ALUMINUM ACCESS HATCHES

PART 1 – GENERAL

1.1 DESCRIPTION

A. Scope of Work: This Section includes providing all labor, materials and equipment necessary to install factory fabricated vault access doors as indicated on the Drawings and/or specified herein.

1.2 QUALITY ASSURANCE

A. References

1. ASTM A 36-93a: Standard Specification for Structural Steel

B. Standards

The access doors shall meet the standards of the following:

1. Standard Building Code

2. OSHA Requirements

C. Manufacturers: Manufacturer shall be selected from one of the specified "Manufacturers" in the "List of

Materials and Approved Manufacturers" as presented as appended to these technical specifications.

1.3 SHOP DRAWINGS AND SUBMITTALS

A. Product Data: Provide manufacturer’s product data for all materials in this specification.

B. Shop Drawings: Shop Drawings shall be submitted to the Owner for approval. Shop Drawings shall show profiles, accessories, location, dimensions, connections and other required details to illustrate a complete operating access door.

C. Samples: Manufacturer to provide upon request. Samples shall be sized to adequately represent material.

D. Contract Closeout: Vault access door manufacturer shall provide the manufacturer’s Warranty prior to the contract closeout.

1.4 PRODUCT HANDLING

A. All materials shall be delivered in manufacturer’s original packaging.

B. Store materials in a dry, protected, well-vented area. The contractor shall thoroughly inspect product upon receipt and report damaged material immediately to delivering carrier and note such damage on the carrier’s freight bill of lading.

C. Remove protective wrapping immediately after installation.

1.5 SUBSTITUTIONS

A. Proposals for substitution products shall be accepted only from bidding contractors and not less than (10) working days before the bid due date. Contractor shall guarantee that proposed substitution shall meet the performance and quality standards of this specification.

Small Scale Stormwater Bid Package No. 2 08350-2

1.6 JOB CONDITIONS

A. Mounting surfaces shall be straight and secure; substrates shall be of proper width.

B. Refer to the construction documents, shop drawings, and manufacturer’s installation instructions.

C. Observe all appropriate OSHA safety guidelines for this work.

1.7 WARRANTY / GUARANTEE

A. Manufacturer’s standard warranty: Materials shall be free of defects in material and workmanship for a period of (10) ten years from the date of purchase. Should a part fail to function in normal use within this period, the manufacturer shall furnish a new part at no charge.

PART 2 – PRODUCTS

2.1 GENERAL REQUIREMENTS

A. The aluminum access hatch and doors shall have overall dimensions as shown on the Drawings. The

Contractor shall verify that all dimensions are correct before submitting shop drawings.

B. Equipment furnished shall include the necessary aluminum access frames, complete with hinged and slide bar equipped doors, stainless steel upper guide holder and level sensor cable holder. Doors shall be of aluminum diamond plate with a minimum load rating of 300 pounds per square foot. The access frame and door(s) shall have stainless steel hardware. Each door shall be equipped with a recessed hasp enclosure.

2.2 MANUFACTURER

A. U.S.F. Fabrication, Inc.

3200 West 84 Street

Hialeah, FL 33018 Toll Free: 800.258.6873 Fax: 305.882.1577 E-mail: service@usffab.com

Website: www.usffab.com

2.3 ACCESS DOORS

A. The vault access door shall be type APS (single leaf). The entire assembly shall be manufactured and assembled in the USA.

B. Performance characteristics:

1. Cover: Shall be reinforced to support 300 PSF pedestrian loads only.

2. The cover shall be opened using the flush lifting handle to insure controlled operation throughout the entire arc of opening and closing.

C. Cover: Shall be 1/4” (6.3 mm) aluminum diamond plate reinforced to support 300 PSF pedestrian loads.

D. Frame: Angle frame shall be minimum 1/4” (6.3 mm) extruded aluminum with a continuous anchor flange around the entire perimeter of the frame.

E. Hinges: Shall be through bolted to the cover with tamperproof type 316 stainless steel bolts and locknuts and shall be through bolted to the frame with Type 316 stainless steel bolts and locknuts.

Small Scale Stormwater Bid Package No. 2 08350-3

F. A flush lifting handle shall be provided.

G. Lifting mechanisms: Manufacturer shall provide the proper amount of lift assist to insure that the cover can be opened by one person with no more than 40lbs of lifting force required.

H. Hardware:

1. Hinges Type 316 stainless steel hinges shall be provided.

2. Cover shall be equipped with a 316 stainless steel hold open arm, with secondary latch which locks the cover in its full upright and open position.

3. A staple for a padlock shall be provided.

4. Hardware: Shall be Type 316 stainless steel throughout.

I. Finishes:

1. Factory finish shall be mill finish aluminum with bituminous coating applied to the exterior of the frame.

2. An adhesive backed vinyl material, that protects the product during shipping and installation, shall cover the entire top of the door.

PART 3 – EXECUTION

A. The installer shall check field conditions and verify the manufacturer’s vault access door details for accuracy to fit the application prior to fabrication. The installer shall comply with the vault access door manufacturer’s installation instructions. Installer shall insure that the entire unit is installed level and square to insure proper performance.

B. The access hatches and doors shall be installed as recommended by the manufacturer and adjusted for proper operation without binding.

C. Verify that the substrate is dry, clean, and free of foreign matter. Report and correct any defects prior to installation.

D. The installer shall furnish mechanical fasteners consistent with the vault access door manufacturer’s instructions.

Small Scale Stormwater Bid Package No. 2 11285-1

SECTION 11285

SLUICE GATES

PART 1 – GENERAL

1.01 SCOPE OF WORK

This section covers Aluminum Sluice Gates and Operators. The equipment provided under this section shall be fabricated, assembled, erected, and placed in proper operating condition in full conformity with the drawings, specifications, engineering data, instructions and recommendations of the equipment manufacturer.

Gates and operators shall be supplied with all the necessary parts and accessories indicated on the drawings, specified, or otherwise required for a complete, properly operating installation, and shall be the latest standard product of a manufacturer regularly engaged in the production of fabricated gates.

1.02 APPROVED MANUFACTURERS

Gates supplied under this section shall be Model GH-25 Aluminum Sluice Gates as manufactured by GatorDock or engineer approved equivalent.

1.03 GOVERNING STANDARDS

Except as modified or supplemented herein, all gates and operators shall conform to the applicable requirements of AWWA-C561 standards.

1.04 QUALITY ASSURANCE

The manufacturer shall have 5 years experience in the production of substantially similar equipment, and shall show evidence of satisfactory operation in at least 10 installations. The manufacturer's shop welds, welding procedures and welders shall be qualified and certified in accordance with the requirement of the latest edition of AWS Sections D1.1, 1.2 and 1.6. The fully assembled gates shall be shop inspected, tested for operation and leakage, and adjusted before shipping. There shall be no assembling or adjusting on the job sites other than for the lifting mechanism.

1.05 SUBMITTALS

1. The manufacturer shall submit for approval by the purchaser, drawings showing the principal dimensions, general construction and materials used in the gate and lift mechanism.

2. The manufacturer shall submit for approval by the purchaser, complete engineering design calculations in compliance with AWWA standards latest edition.

1.06 PERFORMANCE

Leakage: Sluice gates shall be substantially watertight under the design head conditions. Under the design seating head, the leakage shall not exceed 0.005 US gallons per minute per foot of seating perimeter. Under the design unseating head, leakage shall not exceed 0.01 US gallons per minute per foot of perimeter.

Small Scale Stormwater Bid Package No. 2 11285-2

PART 2 – MATERIALS AND CONSTRUCTION

2.01 GENERAL DESIGN

Gates shall be either self-contained or non self-contained of the rising stem or non-rising configuration as indicated on the gate schedule. All parts of the gate shall have a minimum thickness of 1/4 inch.

2.02 FRAME

The gate frame shall be aluminum and designed for maximum rigidity. The frame configuration shall allow the replacement of the top and side seals without removing the gate frame.

2.03 SLIDE

The slide shall consist of aluminum plate reinforced to limit its deflection to 1/720 of the gate's span under the design head. The head guide angles shall be attached to the slide in such a way to place the slide in an angle corresponding to the seating surface of the spigot.

2.04 GUIDES AND SEALS

The guides shall be provided with ultra high molecular weight polyethylene seats on both sides of the slide and shall be of such length as to retain and support at least two thirds (2/3) of the vertical height of the slide in the fully open position. Guide frame shall not weigh less than 13 lbs. per foot.

The seating face of the frame shall be oriented at an angle to the plane of the mounting flange to effect a wedging action upon closure.

Side and top seals shall be frame mounted. Seals shall be EDPM or neoprene D-seal with a stainless steel retainer bar and shall be fully adjustable. The flush bottom resilient neoprene seal shall be mounted to bottom of disc and seal against the invert portion of the frame. Frame mounted invert seals will not be considered.

2.05 YOKE AND PEDESTAL

The yoke, to support the operating bench stand, shall be formed by two structural members welded at the top of the guides to provide a one piece rigid frame. Self-contained gates shall be provided with a yoke to support the operating bench stand. The yoke shall be formed by two structural members welded at the top of the guides to provide a one piece rigid frame. The maximum deflection of the yoke shall be 1/720 of the gate's span. Non-self contained gates shall be provided with pedestal mounted lifts. Pedestal shall be cast iron or mild steel and provided with shop coating

2.06 LIFTING ASSEMBLIES, STEM AND COUPLINGS

The operating stem shall be of stainless steel or aluminum designed to transmit in compression at least 2 times the rated output of the operating manual mechanism with a 40 lb effort on the crank or handwheel. The stem shall have a slenderness ratio (L/R) less than 200. The threaded portion of the stem shall have Acme type cold rolled threads with a maximum surface of 16 micro-inches.

Where a hydraulic, pneumatic or electric operator is used, the stem design force shall not be less than 1.25 times the output thrust of the hydraulic or pneumatic cylinder with a pressure equal to the maximum working pressure of the supply, or 1.25 times the output thrust of the electric motor in the stalled condition.

Stems in more than one piece shall be joined together by solid couplings.

Gates having a width equal to or greater than two times their height shall be provided with two lifting mechanisms connected by a tandem shaft.

Small Scale Stormwater Bid Package No. 2 11285-3

2.07 STEM GUIDES

Stem guides shall be fabricated from aluminum. Stem guides shall be equipped with a UHMWPE bushing. Guides shall be adjustable and spaced in accordance with the manufacturer's recommendation. The L/R ratio shall not be greater than 200.

2.08 STEM COVER

Rising stem gates shall be provided with a clear polycarbonate stem cover. The stem cover shall have a cap and condensation vents and a clear mylar position indicating tape. The tape shall be field applied to the stem cover after the gate has been installed and positioned.

2.09 LIFTING MECHANISM

Operators of the types listed in the schedule shall be provided by the gate manufacturer. Each manual operator shall be designed to operate the gate under the maximum specified seating and unseating heads by using a maximum effort of 40 lb on the crank or handwheel, and shall be able to withstand, without damage, an effort of 80 lb.

Gearboxes shall be provided when required to maintain the operating force below 40 lb. All bearings and gears shall be totally enclosed in a weather tight housing. Operator housing shall be cast steel or cast iron. The pinion shaft of crank-operated mechanisms shall be supported by roller bearings. The operating shaft shall be fitted with a 2 inch square operating nut and removable crank. The crank shall be fitted with a corrosion-resistant rotating handle. The maximum crank radius shall be 15 inches and the maximum handwheel diameter shall be 24 inches.

2.10 MATERIALS SUMMARY

A. Disc Skin Plate Aluminum B209 6061-T6

B. Disc Stiffener Aluminum B308 6061-T6

C. Frame and Guides Aluminum B308 6061-T6

D. Yoke Aluminum B308 6061-T6

E. Seals 1) J Side Seal - Rubber D2000 Grade 2BC 615

2) Hy-Q Flat Bottom Seal - Neoprene

F. Retainer Bars and Fasteners for Seals A276 Type 316 Stainless Steel

G. Thrust Nut Aluminum B26-356

H. Stems A276 Type 304 Stainless Steel

I. Stem Couplings Bronze B584 Alloy 86500

J. Stem Guides Aluminum B26-356

K. Fasteners (studs, anchors, bolts) A276 Type 304 Stainless Steel

Small Scale Stormwater Bid Package No. 2 11285-4

PART 3 – DRAWINGS FOR APPROVAL

Drawings showing dimensions and essential details required to locate and install the gate, stem, lift, and accessories shall be submitted for the engineer's approval.

PART 4 – INSTALLATION

Installation of all parts shall be done by the construction contractor in a workmanlike manner and in accordance with detailed technical installation procedures supplied by the gate manufacturer. It shall be the contractor's responsibility to handle, store, and install the gate operating mechanism and accessories in strict accordance with the manufacturer's drawings and recommendations.

BID NO. 01‐15

SMALL SCALE STORMWATER BID PACKAGE NO. 2

PART 2

GEOTECHNICAL ENGINEERING INVESTIGATIONS

Project Number

ProjectName
GeotechReport

Yes or No

1 44 Seminole Drive Drainage Improvements

2 54 and 58 Shell Road Drainage Improvements

3 Barwick Road Maintenance Facility Phase 1 Site Improvements

4 250 Adelaide Street Drainage Improvements

5 Rob Sullivan Park Drainage Improvements

6 294 Deleon Road Drainage Improvements

7 Lower Lake Outfall Improvements

DEVO SEEREERAM, PH.D., P.E., LLC

CONSULTING GEOTECHNICAL ENGINEER

FLORIDA REGISTRATION NO. 48303

Geotechnical Engineering • Ground Water Modeling • Software Development • Subcontract Drilling

5500 Alhambra Drive ‡ Orlando, Florida 32808 ‡ phone: 407-290-2371 ‡ fax: 407-298-9011 e-mail: devo@devoeng.com www.devoeng.com

Date: March 1, 2013 (updated 03-14-13) Devo’s Project No: 13-836.13

To:

PEGASUS ENGINEERING, INC.

301 West State Road 434, Suite 309 Winter Springs, FL 32708 phone: 407-992-9160 x 309; fax: 407-358-5155 david@pegasusengineering.net attention:

David W. Hamstra, P.E.

Re:

GEOTECHNICAL ENGINEERING REPORT

44 SEMINOLE DRIVE DRAINAGE IMPROVEMENTS

SEMINOLE DRIVE, CITY OF DEBARY, VOLUSIA COUNTY, FLORIDA [Section 33, Township 18 South Range 30 East]

Dear Mr. Hamstra, Attached is our geotechnical engineering report for the above-captioned project. We trust that this report contains the geotechnical data, evaluation, and recommendations to support your design of the proposed drainage infrastructure for the Seminole Drive Drainage Improvements Project.

We appreciate the opportunity to provide continuing geotechnical engineering services to Pegasus Engineering and to support their design efforts on the stormwater capital improvement projects within the City of DeBary. Feel free to contact us if there are any questions.

Sincerely, Vijay Boodhoo Project Geotechnical Engineer

Devo Seereeram, Ph.D., P.E.

Florida Registration No. 48303 Date: March 14, 2013

DEVO ENGINEERING

CONSULTING GEOTECHNICAL ENGINEERS 44 SEMINOLE DR. DRAINAGE IMPROVEMENTS - PAGE 1

TABLE OF CONTENTS

Page #

1.0 BACKGROUND INFORMATION

2.0 OBJECTIVES

3.0 FIELD AND LABORATORY TEST PROGRAMS

4.0 NRCS SOILS MAP

5.0 GEOTECHNICAL DATA

5.1 Presentation of Data

5.2 General Description of Soil Stratigraphy

5.3 Water Table Measurements

6.0 ASSESSMENT AND RECOMMENDATIONS

6.1 General Assessment

6.2 Storm Sewer Structures

6.3 Storm Sewer Trenches

List of Exhibits Exhibit 1. Layout Of 44 Seminole Drive Drainage Improvements

List of Tables Table 1. Key NRCS Characterization Data for Orsino fine sand, 0 to 5% slopes Table 2. Correlation Between Hand Cone Penetrometer Readings & Compactness Table 3. Water Table Elevations & Estimated Seasonal High Levels Table 4. Recommendations for Demucking & Backfill (If Necessary) Table 5. Earthwork Recommendations for Pipe Trench

DEVO ENGINEERING

CONSULTING GEOTECHNICAL ENGINEERS 44 SEMINOLE DR. DRAINAGE IMPROVEMENTS - PAGE 2

TABLE OF CONTENTS (CONTINUED)

List of Attached Figures

Base Maps Figure 1.1 Site Vicinity Map Figure 1.2 Site Aerial Image Figure 1.3 NRCS Soils Map Figure 1.4 Boring Location Plan

Soil Profiles Figure 2.1 Soil Profiles for HP-1 to HP-5 Figure 2.2 Soil Profiles for HP-6 to HP-9

DEVO ENGINEERING

CONSULTING GEOTECHNICAL ENGINEERS 44 SEMINOLE DR. DRAINAGE IMPROVEMENTS - PAGE 3

1.0 Background Information

The residences at 43, 45 and 47 Volusia Drive, as well as 42, 44 and 46 Seminole Drive, have experienced significant localized flooding within the past 8 years due to Hurricanes Charley, Frances, and Jeanne (Aug-Sep 2004), Tropical Storm "Fay" (August 2008), and the Gulf Gale (May 2009). These flood events required the City of DeBary to deploy a portable pump in an effort to remove the floodwaters from the rear yards to avoid structural flooding in the City of DeBary, Florida.

Approximately 9 acres of single-family residential land cover and public rights-of-way drain into these topographically low areas. In addition, a topographically low area also exists at the west end of Seminole Drive that receives stormwater runoff from approximately 7 acres. The proposed drainage improvements include a storm sewer and inlet system to properly capture and convey the floodwaters to an existing dry bottom stormwater pond at the intersection of Shell Road and Spring Vista Drive.

Figure 1.1 (attached)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .