(T) Randolph WWTF Bid Drawings.pdf
PDF 23 MB Posted
- Attached to
- Town of Randolph WWTF Improvements
- Solicitation number
- C9-6708-02-00
- Issued by
- Cattaraugus County, Poughkeepsie City, New York
About this file
This document appears to be the bid drawings for the Town of Randolph Wastewater Treatment Facility (WWTF) Improvements project, which consists of two contracts. Contract No. 1A generally involves upgrades to the final clarifier and the installation of a chlorination/dechlorination treatment process. Contract No. 1B generally involves electrical improvements associated with the WWTF improvements and the construction of a new chemical building. The project is located at 6 Jamestown Street, Randolph, NY 14772 in Cattaraugus County, New York. The bid is due on 03/12/2024 at 11:00 AM, and the contract term is 1 year. There are no set-asides, but the total MWBE participation goal is 20%. The county has not awarded any identical or substantially similar procurement contracts within the past five years.
The project does not have any pricing terms, incumbents, or specific funding requirements and sources mentioned in the provided information. The total contract amount is not specified. The document indicates that this is a state and local contract opportunity in the state of New York, involving Cattaraugus County as the jurisdiction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (T) Randolph WWTF Bid Spec.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Number
Project Number
PREPARED AND APPROVED BY
PROFESSIONAL ENGINEERS LICENSE NO.
DATE SIGNEDERIC A. POND, P.E.
NEW YORK STATE
077487
G-001
2405.002.001
FEBRUARY 2024
TOWN OF RANDOLPH
TOWN OF RANDOLPH WASTEWATER
TREATMENT FACILITY IMPROVEMENTS PROJECT
CONTRACT NO. 1A - GENERAL CONSTRUCTION
CONTRACT NO. 1B - ELECTRICAL CONSTRUCTION
TOWN OF RANDOLPH
CATTARAUGUS COUNTY, NEW YORK
PROJECT LOCATION MAP
NOT TO SCALE
TOWN OFFICIALS
DALE SENN, SUPERVISOR
GRETCHEN HIND - CLERK
AMBER FRAME
ROBERT LEARN
NATE ROOT
TIMOTHY BEACH
DONALD McELWAIN - WATER/SEWER
PROJECT LOCATION
SUPERINTENDENT
2/15/2024
IN
DE
X O
F
DR
AW
IN
GS
G-002
EA
P
INDEX
SHEET NO. SHEET TITLE
G-001 COVER SHEET
G-002 INDEX OF DRAWINGS
G-003 GENERAL NOTES AND LEGEND
CONTRACT NO. 1A - GENERAL CONSTRUCTION (CIVIL)
SHEET NO. SHEET TITLE
C-101 WWTF SITE - EXISTING PLAN
C-102 WWTF SITE - IMPROVEMENTS PLAN
C-500 MISCELLANEOUS DETAILS 1
C-501 MISCELLANEOUS DETAILS 2
C-700 EROSION AND SEDIMENT CONTROL DETAILS 1
C-701 EROSION AND SEDIMENT CONTROL DETAILS 2
CONTRACT NO. 1A - GENERAL CONSTRUCTION (ARCHITECURAL)
SHEET NO. SHEET TITLE
A-001 STANDARD SYMBOLS, NOTES & ABBREVIATIONS
A-002 FIRST FLOOR LIFE SAFETY PLAN & CODE REVIEW
A-101 FIRST FLOOR & ROOF NEW WORK PLANS & DETAILS
A-201 EXTERIOR ELEVATIONS
A-301 WALL SECTIONS
CONTRACT NO. 1A - GENERAL CONSTRUCTION (STRUCTURAL)
SHEET NO. SHEET TITLE
S-001 GENERAL STRUCTURAL NOTES
S-100 FOUNDATION PLAN AND ROOF FRAMING PLAN
S-101 CLARIFIER TANK FOUNDATION PLAN AND SECTION
S-501 TYPICAL FOUNDATION DETAILS
S-502 TYPICAL FRAMING DETAILS
S-503 TYPICAL CLARIFIER TANK DETAILS, SLUDGE PUMP BUILDING PLAN AND SECTION
S-504 FOUNDATION AND FRAMING DETAILS
S-505 CLARIFIER SECTION
CONTRACT NO. 1B - ELECTRICAL CONSTRUCTION
SHEET NO. SHEET TITLE
E-001 ELECTRICAL REFERENCE SHEET
E-002 ELECTRICAL DEMOLITION SITE PLAN
E-003 ELECTRICAL DEMOLITION DIAGRAM
E-100 ELECTRICAL SITE PLAN
E-200 DISINFECTION BUILDING PLANS
E-500 ELECTRICAL ONE-LINE DIAGRAM
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL SCHEDULES
Sheet Number
Project Number
Ch ec ke d by Dr aw n by De sig ne d by
In c ha rg e of
Scale
Date
TO
W
N O
F
RA
N
DO
LP
H
W
AS
TE
W
AT
ER
T
RE
AT
EM
EN
T
FA
CI
LI
TY
IM
PR
O
VE
M
EN
TS
CO
N
TR
AC
T
N O
. 1 A
- G
EN
ER
AL
C O
N
ST
RU
CT
IO
N
TO
W
N O
F
RA
N
DO
LP
H
CA
TT
AR
AU
GU
S
CO
U
N
TY
, N
EW
Y O
RK
FEBRUARY 2024
AS SHOWN
2405.002.001
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
L S
REVISIONS
CONTRACT NO. 1A - GENERAL CONSTRUCTION (PROCESS)
SHEET NO. SHEET TITLE
D-101 PROCESS FLOW DIAGRAM & HYDRAULIC PROFILE
D-110 CHLORINE CONTACT TANK & DECHLORINATION TANK - PLAN AND SECTION
D-111 FINAL CLARIFIER - PLAN AND SECTION
D-112 SLUDGE PUMP STATION - PLAN AND SECTIONS
D-113 BLOWERS - PLAN AND SECTION AND ULTRASONIC TRANSMITTER DETAIL
D-114 DISINFECTION BUILDING - PLAN
CONTRACT NO. 1A - GENERAL CONSTRUCTION (PLUMBING)
SHEET NO. SHEET TITLE
P-101 FIRST FLOOR PLUMBING PLAN
CONTRACT NO. 1A - GENERAL CONSTRUCTION (MECHANICAL)
SHEET NO. SHEET TITLE
M-101 FIRST FLOOR HVAC PLAN
GE
N
ER
AL
N O
TE
S
AN
D
LE
GE
N D
G-003
EA
P
Sheet Number
Project Number
Ch ec ke d by Dr aw n by De sig ne d by
In c ha rg e of
Scale
Date
TO
W
N O
F
RA
N
DO
LP
H
W
AS
TE
W
AT
ER
T
RE
AT
EM
EN
T
FA
CI
LI
TY
IM
PR
O
VE
M
EN
TS
CO
N
TR
AC
T
N O
. 1 A
- G
EN
ER
AL
C O
N
ST
RU
CT
IO
N
TO
W
N O
F
RA
N
DO
LP
H
CA
TT
AR
AU
GU
S
CO
U
N
TY
, N
EW
Y O
RK
FEBRUARY 2024
AS SHOWN
2405.002.001
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
L S
REVISIONS
1. ALL CONSTRUCTION OPERATIONS SHALL BE ACCOMPLISHED IN ACCORDANCE WITH APPLICABLE STATE STATUTES AND U.S. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION REGULATIONS (O.S.H.A.) COPIES OF O.S.H.A.'S STANDARDS MAY BE PURCHASED FROM THE U.S. GOVERNMENT PRINTING OFFICE. THE CONTRACTOR ALONE WILL BE RESPONSIBLE FOR THE EXECUTION OF THE WORK IN ACCORDANCE WITH ALL APPLICABLE HEALTH AND SAFETY REQUIREMENTS, NEITHER THE OWNER NOR THE ENGINEER SHALL INSPECT THE WORK OR THE METHODS OF
CONSTRUCTION FOR COMPLIANCE WITH THESE REQUIREMENTS.
2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS BEFORE COMMENCING WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REPORT ANY DISCREPANCIES TO ENGINEER AND OWNER IN A TIMELY MANNER.
FAILURE TO PROSPECT IN ADVANCE OF WORK OR VERIFY DIMENSIONS SHALL NOT BE CAUSE FOR DELAY OR
ADDITIONAL COSTS TO THE OWNER.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS WHICH ARE REQUIRED FOR THE WORK PRIOR TO
CONSTRUCTION, EXCEPT AS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS.
4. EQUIPMENT, PIPING, AND ORIENTATION/DESIGN AS SHOWN IN THE DRAWINGS IS BASED ON THE SPECIFIED MANUFACTURER'S EQUIPMENT. CONTRACTOR SHALL VERIFY INSTALLATION BASED ON SELECTED EQUIPMENT.
MODIFICATIONS TO THE DESIGN TO ACCOMMODATE SELECTED EQUIPMENT SHALL BE AT CONTRACTOR'S EXPENSE.
5. SCALES SHOWN HEREIN ARE FOR FULL SIZE PLOTS ON 22x34 INCH SHEETS. THE CONTRACTOR IS RESPONSIBLE FOR
CONVERTING SCALES ON REDUCED OR ENLARGED PLOTS.
6. THE CONTRACTOR IS CAUTIONED THAT THE RANDOLPH WASTEWATER TREATMENT PLANT IS AN ACTIVE PLANT WITH NUMEROUS UTILITY, PROCESS, CHEMICAL, AND ELECTRICAL SYSTEMS IN USE AT ALL TIMES. REQUIRED SERVICE OUTAGES NECESSARY FOR THE CONSTRUCTION OF THIS PROJECT SHALL BE PROSECUTED IN STRICT CONFORMANCE WITH THE CONTRACT AND SHALL REQUIRE PRIOR APPROVAL BY THE OWNER. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY PIPING AND OTHER WORK NECESSARY TO COMPLY WITH THIS REQUIREMENT. ALL DAMAGE TO SERVICES OR UNAPPROVED INTERFERENCE WITH THE FACLIITY'S OPERATIONS SHALL BE IMMEDIATELY CORRECTED BY CONTRACTOR AT ITS OWN EXPENSE. NO FURTHER CONTRACT WORK MAY BE PERFORMED UNTIL
CORRECTIONS SATISFACTORY TO OWNER HAVE BEEN MADE.
7. CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, TOOLS, TRANSPORTATION, INCIDENTALS, AND APPURTENANCES TO COMPLETE IN EVERY DETAIL AND LEAVE IN WORKING ORDER ALL ITEMS OF WORK CALLED FOR AND/OR SHOWN ON THE DRAWINGS AND SPECIFICATIONS. MATERIALS OR WORK NOT SPECIFICALLY MENTIONED OR SHOWN ON THE DRAWINGS OR SPECIFICATIONS, BUT NECESSARY TO COMPLETE THE WORK SHALL BE PROVIDED.
8. CONTRACTOR SHALL ERECT DIRECTIONAL SIGNS FOR THE DELIVERY OF MATERIAL AND SUPPLIES. NO SIGNS SHALL BE SET ON PRIVATE PROPERTY. SIGNS ON PRIVATE PROPERTY ARE SUBJECT TO PROPERTY OWNER APPROVAL.
9. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR OFF-SITE DISPOSAL OF SURPLUS EXCAVATED MATERIAL AND WASTE CONSTRUCTION MATERIALS. IN ADDITION, TREES, LIMBS, BRUSH, AND STUMPS REMOVED BY CONTRACTOR'S OPERATION SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND DISPOSED BY CONTRACTOR
ACCORDING TO LOCAL, STATE, AND FEDERAL REGULATIONS.
10. GOVERNING BUILDING CODES: ALL CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING CODES AND
AMENDMENTS PER THEIR ADOPTING ORDINANCES:
NEW YORK STATE BUILDING CODE.
INTERNATIONAL PLUMBING CODE.
INTERNATIONAL MECHANICAL CODE.
11. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND INCIDENTAL ITEMS REQUIRED TO REPLACE ANY UNDERGROUND UTILITIES DISTURBED DURING THE CONSTRUCTION OF THE TREATMENT FACILITIES.
12. THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER IF UNDERGROUND UTILITIES ARE DISTURBED AND THE CONTRACTOR SHALL IMMEDIATELY REPAIR THE UTILITY. NO FURTHER CONTRACT WORK MAY PROCEED UNTIL
THE DAMAGED UTILITY IS ACCEPTABLY REPAIRED AND PLACED BACK INTO SERVICE.
13. INSTALLATION OF NEW EQUIPMENT AND PIPING MAY REQUIRE ADDITIONAL MODIFICATIONS NOT SPECIFICALLY SHOWN. CONTRACTOR SHALL FIELD VERIFY THE INSTALLATIONS TO ACCOUNT FOR ANY NECESSARY WORK NOT SHOWN. ALL WORK NECESSARY FOR A COMPLETE OPERATIONAL SYSTEM FOR THE INSTALLATION OF THE EQUIPMENT AND SYSTEMS SHOWN AND/OR SPECIFIED SHALL BE INCLUDED IN THE APPLICABLE BID PRICE FOR THAT ITEM. INCIDENTAL ADDITIONAL WORK NECESSARY SHALL BE AT NO ADDITIONAL COST TO THE OWNER.
14. CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF EQUIPMENT AND COORDINATE THE WORK WITH APPROVED
SHOP DRAWINGS PRIOR TO INSTALLATION.
15. UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE ONLY IN LOCATION. THE CONTRACTOR SHALL CONTACT THE UTILITY OWNERS AND OBTAIN A DIG SAFE NEW YORK STAKE OUT PRIOR TO COMMENCING CONSTRUCTION.
DAMAGE TO UTILITIES RESULTING FROM NEGLIGENCE OR FAILURE ON THE PART OF THE CONTRACTOR TO MAKE
ACCURATE LOCATION IS THE RESPONSIBILITY OF THE CONTRACTOR.
16. EXISTING UTILITIES, INCLUDING BUT NOT LIMITED TO WATER, UNDERGROUND ELECTRICAL AND GAS SERVICES SHALL BE LOCATED AND PROTECTED BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING OR REPAIRING ANY DAMAGED UTILITY TO THE SATISFACTION OF THE ENGINEER AND OWNER AT
HIS/HER OWN EXPENSE.
17. PROVIDE 5'-0” MINIMUM COVER OVER TOP OF ALL BURIED PIPING, UNLESS OTHERWISE NOTED IN THE CONTRACT
DOCUMENTS.
18. THE CONTRACTOR SHALL RESTORE ALL SURFACES WITHIN THE TREATMENT PLANT SITE TO AS GOOD OR BETTER
CONDITION THAN BEFORE CONSTRUCTION FOLLOWING COMPLETION OF THE WORK.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL SURVEY OR RIGHT-OF-WAY MONUMENTS DISTURBED DURING CONSTRUCTION. THE CONTRACTOR SHALL EMPLOY A LICENSED LAND SURVEYOR TO RESTORE
ALL DISTURBED MONUMENTS TO THEIR ORIGINAL LOCATION.
20. THE CONTRACTOR SHALL FAMILIARIZE HIM/HER SELF WITH SITE CONDITIONS AND SHALL INCLUDE PROVISIONS TO AVOID CONFLICTS WITH AND/OR RESTORE SITE FEATURES IN THE BID. NO SEPARATE OR ADDITIONAL PAYMENT WILL BE MADE FOR WORK REQUIRED TO AVOID CONFLICTS WITH EXISTING SURFACE FEATURES OR RESTORE THOSE
WHICH ARE NOT SHOWN.
21. ALL PIPE TRENCHES BENEATH OR WITHIN 5 FEET OF ROADWAYS, DRIVEWAYS AND OTHER AREAS OF VEHICULAR
LOAD SHALL BE BACKFILLED WITH STRUCTURAL FILL AT SPECIFIED DEPTHS.
22. CONTRACTOR SHALL COORDINATE LOCATIONS OF ON-SITE FIELD OFFICE TRAILERS AND MATERIALS AND EQUIPMENT STOCKPILES WITH THE OWNER AND SHALL MAINTAIN FULL ACCESS TO THE TREATMENT FACILITY.
23. FOR CLARITY, EXISTING FACILITIES AND PIPING GENERALLY SHOWN LIGHT. NEW FACILITIES AND PIPING GENERALLY
SHOWN HEAVY. DEMO WORK GENERALLY SHOWN RED.
24. THE GENERAL, ELECTRICAL, AND MECHANICAL CONTRACTORS SHALL COORDINATE EXISTING EQUIPMENT REMOVALS TO ENSURE THAT ALL ELECTRICAL EQUIPMENT IS ELECTRICALLY DISCONNECTED PRIOR TO DEMOLITION.
25. ALL BURIED PIPING ENTERING/LEAVING A STRUCTURE SHALL HAVE A JOINT WITHIN FOUR (4) FEET OF THE
STRUCTURE'S WALL OR FOUNDATION.
26. PIPE BENDS ARE NOT GENERALLY CALLED OUT ON THE DRAWINGS. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIRED FITTINGS TO CONSTRUCT THE PIPING AS SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH
APPLICABLE STANDARDS.
27. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING PIPING ELEVATIONS, LOCATIONS, SIZES AND MATERIALS WITH NEW INSTALLATIONS. DIFFERENCES NOT SHOWN ON THE CONTRACT DRAWINGS SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER PRIOR TO REMOVAL.
28. REMOVALS WHERE SHOWN SHALL CONSIST OF ALL EQUIPMENT, EQUIPMENT BASES, PADS, ELECTRICAL PANELS, WIRING, CONDUITS, PIPING, AND APPURTENANCES. AFTER THE REMOVAL OF ANY EQUIPMENT BASES, THE SURFACE SHALL BE CLEANED AND GROUTED WITH NON-SHRINK GROUT TO A SMOOTH FINISH AS APPLICABLE.
29. PIPE SUPPORTS GENERALLY NOT SHOWN. PROVIDE PER STANDARD DETAILS, SPECIFICATIONS AND/OR PER
MANUFACTURER RECOMMENDATIONS.
30. THE CONTRACTOR IS RESPONSIBLE FOR ALL SURVEY AND STAKEOUT FOR THIS PROJECT AS REQUIRED TO COMPLETE
THEIR WORK. PAYMENT SHALL BE INCLUDED IN THE PRICE OF THE ASSOCIATED WORK ITEM.
31. THE CONTRACTOR WILL BE REQUIRED TO REMOVE ALL SNOW AND ICE AS NEEDED TO COMPLETE THE WORK AT NO
ADDITIONAL COST TO THE OWNER.
32. ALL BURIED NON-METALLIC PIPING SHALL BE INSTALLED WITH TRACER WIRE AFFIXED TO THE TOP OF THE PIPE.
COMPLY WITH SECTION 33 05 97.
33. THE CONTRACTOR SHALL SECURE, MAINTAIN, AND RESTORE ANY STAGING OR STORAGE AREAS AT NO ADDITIONAL
COST TO THE OWNER.
34. THE CONTRACTOR SHALL PROVIDE EQUIPMENT AS NECESSARY TO COMPLETE EXCAVATIONS AS SHOWN. THESE PLANS DO NOT SHOW SPECIFIC EXCAVATION SUPPORTS AND THE CONTRACTOR SHALL SUBMIT HIS/HER EXCAVATION AND DEWATERING PLAN FOR EACH LOCATION INCLUDED IN THE PROJECT. NO ADDITIONAL PAYMENT WILL BE MADE FOR SHEETING OR BRACING LEFT IN PLACE. CONTRACT 1A GENERAL SHALL SUBMIT TO ENGINEER AN EXCAVATION AND DEWATERING PLAN FOR REVIEW PRIOR TO EXCAVATING FOR FOUNDATIONS OF PROPOSED
STRUCTURES.
35. CONTRACT 1A TO PROVIDE AND MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES AT THE SITE IN
ACCORDANCE WITH THE EROSION AND SEDIMENT CONTROL NOTES AND DETAILS.
36. CONTRACTOR SHALL FURNISH AND APPLY WATER FOR DUST CONTROL, AS NEEDED. NO SEPARATE PAYMENT FOR
DUST CONTROL SHALL BE MADE.
37. TEMPORARY ELECTRICAL SERVICES AT THE PROJECT SITE SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL
CONTRACTOR (CONTRACT NO. 1B).
38. NO CLEARING OR TRIMMING OF TREES 3" OR GREATER IN DIAMETER IS PERMITTED.
39. A NYS DEPARTMENT OF ENVIRONMENTAL (NYSDEC) ARTICLE 24 FRESHWATER WETLANDS PERMIT WILL BE OBTAINED BY THE TOWN FOR THE PROPOSED DISTURBANCE WITHIN THE 100-FOOT ADJACENT AREA OF NYSDEC WETLAND RA-3. THE CONTRACTOR SHALL COMPLY WITH ALL CONDITIONS OF THE NYSDEC PERMIT. NO DISTURBANCES OR DISCHARGE OF FILL TO WETLANDS OR SURFACE WATER ADJACENT TO THE WWTF ARE
PERMITTED.
THE FOLLOWING IS THE ENGINEER'S PROPOSED SEQUENCE OF CONSTRUCTION FOR THE PROJECT. THE SEQUENCE OF CONSTRUCTION IS GENERAL IN NATURE AND DOES NOT INCLUDE EVERY WORK ITEM CONTAINED ON THE DRAWINGS AND IN THE TECHNICAL SPECIFICATIONS. THE CONTRACTOR(S) SHALL DEVELOP HIS/HER OWN DETAILED SEQUENCE OF CONSTRUCTION AND SHALL SUBMIT THE PROPOSED SEQUENCE WITH THE PROJECT SCHEDULE PRIOR TO STARTING WORK. THE CONTRACTOR MAY CHANGE THE PROPOSED SEQUENCE OF CONSTRUCTION LISTED BELOW WITH APPROVAL FROM THE OWNER/ENGINEER. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER A MINIMUM OF FOURTEEN (14) DAYS IN ADVANCE OF PERFORMING ANY COMPONENT OF THE PROPOSED WORK. THE OWNER SHALL OPERATE THE FACILITY AT ALL TIMES DURING THE CONSTRUCTION PERIOD, INCLUDING VALVES AND
PROCESS EQUIPMENT.
IT IS IMPERATIVE THAT THE WASTEWATER TREATMENT PLANT MAINTAIN CONTINUOUS OPERATIONS DURING THE PROJECT AND MAINTAIN FULL COMPLIANCE WITH THE STATE POLLUTION DISCHARGE ELIMINATION SYSTEM (SPDES) PERMIT REQUIREMENTS AT ALL TIMES DURING THE CONTRACT PERIOD. DURING PROGRESSION OF THE WORK, IT IS IMPERATIVE THAT THE CONTRACT 1A GENERAL CONTRACTOR COORDINATE AT ALL TIMES WITH THE CONTRACT 1B ELECTRICAL AND CONTRACT 1C MECHANICAL CONTRACTORS, OWNER, AND ENGINEER DURING ALL PHASES OF THE WORK TO ENSURE MINIMUM DISRUPTION AND DOWNTIME OF THE UNIT PROCESSES WITHIN THE WASTE WATER
TREATMENT PLANT.
THE CONTRACT 1A GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL INCIDENTAL BYPASS PUMPING REQUIRED FOR THE IMPROVEMENTS. THE CONTRACT 1A GENERAL CONTRACTOR SHALL PROVIDE BYPASS PUMPING CAPACITIES EQUIVALENT TO EQUIPMENT BEING BYPASSED. COORDINATE WITH OWNER AND ENGINEER AS WORK PROGRESSES.
DUE TO THE NATURE OF THE WASTEWATER TREATMENT PLANT IMPROVEMENTS, PORTIONS OF THE WORK SHALL BE SUBJECT TO BENEFICIAL OCCUPANCY BY THE OWNER PRIOR TO SUBSTANTIAL COMPLETION OF THE PROJECT. THE CONTRACTOR SHALL REFERENCE THE ENGINEER'S SUPPLEMENTAL INSTRUCTIONS FOR DEFINITIONS AND PROCEDURES RELATING TO BENEFICIAL OCCUPANCY INCLUDING EQUIPMENT PERFORMANCE PERIODS.
SUGGESTED SEQUENCE OF CONSTRUCTION NOTES:
1. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE CONTRACT DOCUMENTS AND AS
ORDERED BY THE ENGINEER.
2. CONSTRUCT THE NEW DISINFECTION BUILDING AND TANKAGE OFFLINE FROM EXISTING FACILITY OPERATIONS.
3. CONSTRUCT THE NEW FINAL CLARIFIER AND SLUDGE PUMP STATION OFFLINE FROM EXISTING PLANT
OPERATIONS.
4. CONSTRUCT BACKUP GENERATOR HOOKUP FOR THE DISINFECTION BUILDING.
5. DECOMMISSION AND BYPASS EXISTING FINAL CLARIFIER.
6. COMPLETE START-UP AND TESTING OF NEW CLARIFIER AND DISINFECTION FACILITIES. PLACE INTO SERVICE FOR
14-DAY PERIOD. OBTAIN ENGINEER'S APPROVAL FOR PLACING INTO PERMANENT SERVICE.
PROPOSED SEQUENCE OF CONSTRUCTION:
SURVEY NOTES (TERRA POINTE LAND SURVEYING, PLLC):
1. NORTH AS SHOWN ON MAP IS TRUE NORTH AT 78°35' MERIDIAN WEST LONGITUDE, AS BASED ON THE NEW YORK STATE PLANE COORDINATE SYSTEM NAD 83, WEST ZONE 3103, AS ESTABLISHED FROM A GPS STATIC
SURVEY PERFORMED BY TERRA POINTE LAND SURVEYING, PLLC.
2. ELEVATIONS AS SHOWN ON MAP OF SURVEY ARE BASED ON NAVD 88 DATUM.
3. THE UTILITIES SHOWN HAVE BEEN LOCATED FROM SURFACE MARKING, VISIBLE STRUCTURES AND INFORMATION FROM EXISTING DRAWINGS. TERRA POINTE LAND SURVEYING, PLLC MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN ARE ALL OF THE UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE UNDERSIGNED SURVEY DOES NOT GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ON MAP OF SURVEY. ALTHOUGH UTILITIES ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION PROVIDED BY PUBLIC UTILITY COMPANIES. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES UPON INSTALLATION. EACH CONTRACTOR MUST
CALL DIG SAFELY NEW YORK AT 1-800-962-7962 THREE DAYS PRIOR TO ANY EXCAVATION.
4. CONTOUR INTERVAL IS 1.0 FOOT.
GENERAL SYMBOLS:
EXISTING FEATURE
NEW FEATURE
EXISTING FEATURE TO BE DEMOLISHED
PROPOSED LEGEND:
PROPOSED CONTOURS392
(N.0.)
(N.C.)
NORMALLY OPEN
NORMALLY CLOSED
WASTEWATER GRAVITY PIPING
AIR PIPING
WASTEWATER FORCE MAIN
PLUG VALVE
PUMP
BALL VALVE
CAP
BLOWER
DIRECTION OF FLOW
MANHOLE
WATER PIPING
8''SA
8''FM
S
INVERT
ELEVATION
CONCRETECONC.
DUCTILE IRON PIPE
EXISTING
HIGH DENSITY POLYETHYLENEHDPE
MANHOLE
POLYVINYL CHLORIDE
FLANGED
X123
SECTION
SCALE: X/X" = 1'-0"X123
1 SECTION TITLE
ANNOTATION SYMBOLS
UPPER NUMBER DISPLAYS SECTION NUMBER
LOWER LETTER/NUMBER DISPLAYS SHEET
WHERE SECTION IS SHOWN
SECTION MARKER
LOWER LETTER/NUMBER DISPLAYS SHEET
WHERE SECTION WAS TAKEN
UPPER NUMBER DISPLAYS SECTION NUMBER
SCALE: X/X" = 1'-0"
DETAILA
DETAIL
SCALE: X/X" = 1'-0"X123
A DETAIL TITLE
LOWER LETTER/NUMBER DISPLAYS SHEET
WHERE DETAIL WAS TAKEN
UPPER LETTER DISPLAYS DETAIL LETTER
DETAIL MARKER
LOWER LETTER/NUMBER DISPLAYS SHEET
WHERE DETAIL WAS TAKEN
UPPER LETTER DISPLAYS DETAIL LETTER
APPROXIMATE DETAIL AREA
X123
GENERAL NOTES (CONT.)
LOW DENSITY POLYETHYLENE
MECHANICAL JOINT
ABBREVIATIONS
GENERAL NOTES
ALL EXPOSED PIPE SHALL BE PAINTED AND LABELED AS SHOWN BELOW IN
ACCORDANCE WITH TEN-STATES RECOMMENDED STANDARDS FOR WASTEWATER
FACILITIES, 2014 EDITION:
NOTES:
1. (*) WHERE STAINLESS STEEL PIPE IS USED, DO NOT PAINT. PROVIDE
LABELS AND FLOW ARROWS ONLY.
2. FLOW ARROWS SHALL ALSO BE INCLUDED WITH LABELS.
SERVICE LABEL PAINTING SCHEME
RAW SLUDGE LINE GRAY
SLUDGE RECIRCULATION SUCTION LINE BROWN WITH YELLOW BANDS
SLUDGE DRAW OFF LINE BROWN WITH ORANGE BANDS
SLUDGE RECIRCULATION DISCHARGE LINE BROWN
DIGESTED SLUDGE LINE BLACK
SLUDGE GAS LINE * RED
NATURAL GAS LINE RED
NONPOTABLE WATER LINE PURPLE
POTABLE WATER LINE BLUE
FIRE MAIN RED
CHLORINE LINE YELLOW
SEWAGE (WASTEWATER) LINE GRAY
COMPRESSED AIR LINE * DARK GREEN
PROCESS AIR LINE LIGHT GREEN
WATER LINES FOR HEATING DIGESTERS BLUE WITH A 6-INCH (150 MM) RED BAND
OR BUILDINGS SPACED 30 INCHES (760 MM) APART
DIESEL RED
PLUMBING DRAINS AND VENTS BLACK
POLYMER UNPAINTED PVC
ALUM. ALUMINUM
BGS. BELOW GROUND SURFACE
CORRUGATED PLASTIC PIPECPP
DIP
EL.
EX.
FL.
INV.
LDPE
DIP
MH
MJ
SCHEDULE
POLYVINYL CHLORIDE
NEW YORK STATE ELECTRIC & GAS
STEEL
NYSE&G
PVC
SCH.
STL.
TOP OF WALL
TYPICAL
STAINLESS STEEL (304 UNLESS OTHERWISE SHOWN)S.S.
TYP.
TOW.
EXISTING LEGEND:
G
ST
W
SANITARY MANHOLE
POWER POLE
FIRE HYDRANT
OHE OVERHEAD ELECTRIC WIRES
CONTOUR LINE
CENTERLINE OF DITCH
PROPERTY LINE
X"A AERATION LINE
GAS LINE
WATER LINE
STORM SEWER
SANITARY SEWER
COMBINED SEWERCS
ELECTRIC METER
GAS METER
ELECTRIC TRANSFORMER
X"SA
SANITARY FORCE MAINX"FM
VALVE
EXISTING CONCRETE
METAL GARAGE
FRAME GARAGE
W W
TF
S
IT
E
- E
XI
ST
IN
G
PL
AN
C-101
TRUE
NORTH
10' 1"=10'
0 10' 20'
INFLUENT PUMP STATION
RIM: ±1276.40'
INV. S: ±1266.78'
INV. NW: ±1273.00'
EXISTING WWTF SITE PLAN
SCALE: 1" = 10'-0"
FLOW SPLITTER BOX
TOP OF BOX: 1283.10'
INV. N: ±1280.32'
EQUALIZATION / AERATION TANK
TOP OF TANK: ±1281.70
INV. SE: 1274.90'
ROTATING BIOLOGICAL CONTACTORS
TOP OF STEEL TANK: 1280.67'
WATER LEVEL: ±1279.09'
INV. SW: ±1276.64'
INV. NE ±1274.90'
2" OVERHEAD SECONDARY
EFFLUENT RECIRCULATION
AEROBIC DIGESTER
TOP OF TANK: 1283.70'
SLUDGE REMOVAL INV. 1276.90'
LAB AREA
FINISHED FLOOR ELEV.: 1276.45'
FINAL CLARIFIER
RIM: 1280.45'
WATER LEVEL: ±1279.45'
INV. SW: ±1274.30'
INV. S: ±1277.83'
BOTTOM OF TANK: 1270.30'
EMERGENCY GENERATOR
ON CONCRETE PAD
4" FORCE MAIN FROM
INFLUENT PUMP STATION
BLOWER (TYP.)
OUTFALL TO LITTLE
CONEWANGO CREEK
FLOW METERING FLUME
RIM: 1279.00'
INV. NW: 1275.10'
INV. SE: 1274.86'
ELECTRICAL
CONTROL ROOM
RECIRCULATION PIT
INV. N: 1275.78'
INV. NW: 1276.40'
INV. SE: 1275.25'
BALL VALVE (TYP.)
Sheet Number
Project Number
Ch ec ke d by Dr aw n by De sig ne d by
In c ha rg e of
Scale
Date
TO
W
N O
F
RA
N
DO
LP
H
W
AS
TE
W
AT
ER
T
RE
AT
EM
EN
T
FA
CI
LI
TY
IM
PR
O
VE
M
EN
TS
CO
N
TR
AC
T
N O
. 1 A
- G
EN
ER
AL
C O
N
ST
RU
CT
IO
N
TO
W
N O
F
RA
N
DO
LP
H
CA
TT
AR
AU
GU
S
CO
U
N
TY
, N
EW
Y O
RK
FEBRUARY 2024
AS SHOWN
2405.002.001
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
L S
REVISIONS
CONCRETE SAMPLE PIT
INV. NW: 1274.51'
INV. E: 1274.50'
POLE BARN STRUCTURE
(70' x 100')
HYDRANT (TYP.)
ACCESS HATCH (TYP.) 12
76 1276
2" OVERHEAD
SCUM LINE
3" OVERHEAD
AIR LIFT
WETLAND BOUNDARYWETLAND BOUNDARY
WETLAND BOUNDARY
METAL GARAGE
FRAME GARAGE
BUILDING COORDINATES
POINT #
NORTHING
788734.0625
788749.0071
788761.2695
788746.3249
EASTING
1041900.7839
1041910.8167
1041892.5511
1041882.5182
W W
TF
S
IT
E
- I M
PR
O
VE
M
EN
TS
P
LA
N
C-102
TRUE
NORTH
10' 1"=10'
0 10' 20'
WWTF IMPROVEMENTS SITE PLAN
SCALE: 1" = 10'-0"
EXISTING EMERGENCY
GENERATOR
Sheet Number
Project Number
Ch ec ke d by Dr aw n by De sig ne d by
In c ha rg e of
Scale
Date
TO
W
N O
F
RA
N
DO
LP
H
W
AS
TE
W
AT
ER
T
RE
AT
EM
EN
T
FA
CI
LI
TY
IM
PR
O
VE
M
EN
TS
CO
N
TR
AC
T
N O
. 1 A
- G
EN
ER
AL
C O
N
ST
RU
CT
IO
N
TO
W
N O
F
RA
N
DO
LP
H
CA
TT
AR
AU
GU
S
CO
U
N
TY
, N
EW
Y O
RK
FEBRUARY 2024
AS SHOWN
2405.002.001
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
L S
REVISIONS
FINAL CLARIFIER
SLUDGE PUMP
STATION
ELECTRICAL
ROOM
2500 GALLON
CHLORINATION TANK
190 GALLON
DECHLORINATION TANK
SODIUM
BISULFITE ROOM
DISINFECTION BUILDING
EX. INFLUENT PUMP STATION
EX. FLOW SPLITTER BOX
EX. EQUALIZATION / AERATION TANK
EX. ROTATING BIOLOGICAL
CONTACTORS
EX. AEROBIC DIGESTER
EX. FINAL CLARIFIER
EX. 4" FORCE MAIN FROM
INFLUENT PUMP STATION
REPLACE EXISTING
BLOWERS
EX. OUTFALL TO LITTLE
CONEWANGO CREEK
REPLACE ULTRASONIC
TRANSMITTER IN-KIND
EX. ELECTRICAL
CONTROL ROOM
EX. RECIRCULATION PIT
EX. POLE BARN STRUCTURE
EX. HYDRANT (TYP.)
EX. ACCESS HATCH (TYP.)
SODIUM HYPOCLHORITE
ROOM
SODIUM HYPOCHLORITE
DOSING LOCATION
SEE SHEET D-110
1/2" SCH. 80 PVC
DOSING LINE (TYP.)
SODIUM BISULFITE
DOSING LOCATION
SEE SHEET D-110
CONNECTION NO. 1
SEE SHEET C-5016" SCH. 80 PVC
4" SCH. 80
FORCE MAIN
SLUDGE LINE CONNECTION
TO EX. AEROBIC DIGESTER
SAMPLE POINT
WETLAND BOUNDARY
TEMPORARY SILT FENCE
WETLAND BOUNDARY
WETLAND BOUNDARY
EX. SLIDING
DOOR OPENING
TEMPORARY SILT FENCE
TEMPORARY SILT FENCE
EX. SLIDING
DOOR OPENING
BOLLARD (2 TYP.) SEE
DETAIL SHEET C-503
NEW EMERGENCY GENERATOR
ON NEW CONCRETE PAD. SEE
ELECTRICAL SHEETS FOR DETAILS.
M
IS
CE
LL
AN
EO
U S
DE
TA
IL
S
C-500
18" MIN. TOP OF SEWER TO
BOTTOM OF WATER MAIN
WATER MAIN
SANITARY/STORM SEWER
SANITARY OR STORM SEWER
D
NOTE:
1. IF 18" VERTICAL SEPARATION CAN NOT BE ACHIEVED AT LOCATIONS OF WATER MAIN & SEWER CROSSINGS, CONTRACTOR SHALL ENCASE SEWER PIPE IN CONCRETE, 4' DISTANCE ON EACH SIDE
OF WATER MAIN/ STORM SEWER CROSSING. CONCRETE ENCASEMENT SHALL BE MINIMUM 6"
ALL AROUND PROPOSED SEWER PIPE.
18" MIN. TOP OFWATER MAIN TOINVERT OF SANITARY
OR STORM SEWER
SDR-35 SEWER PIPE
EXISTING MANHOLE
LINK SEAL OR EQUALSEAL FLUSH WITH
NON-SHRINK GROUT
CORE
DRILLED
HOLE
REMOVE BELL END
ON EXISTING PIPE
FLEXIBLE COMPRESSION
COLLAR (TYP.)
NEW PVC PIPE
NOTES:
1. NEWLY INSTALLED REPAIR PIPING SHALL BE BEDDED
IN PIPE BEDDING MATERIAL (CLEAN NO.1), AND
COMPACTED TO 90%.
2. FLEXIBLE COMPRESSION COLLAR SHALL NOT BE
INSTALLED WITHIN 1-FOOT OF A PIPE JOINT.
3. FLEXIBLE COMPRESSION COLLAR SHALL BE EQUIPPED
WITH A STAINLESS STEEL BAND SHIELD PER
SPECIFICATION SECTION 33 31 11.
4. CONTRACTOR SHALL ALLOW CONCRETE TO CURE FOR
A MINIMUM OF 24 HOURS PRIOR TO BACKFILLING.
5. CONCRETE SHALL BE AIR ENTRAINED WITH A MIN. 28
DAY COMPRESSIVE STRENGTH OF 3,000 PSI.
6. UNLESS OTHERWISE SPECIFIED, ALL CONNECTIONS
TO EXISTING SANITARY MAIN SHALL BE INCLUDED
UNDER THE "GENERAL CONSTRUCTION" BID ITEM.
EXISTING MANHOLE
INSIDE WALL
LINK SEAL OPTION
SDR-35
SEWER PIPE
EXISTING MANHOLE
KOR-N-SEAL OR
EQUAL
CORE
DRILLED
HOLE
EXISTING MANHOLE
INSIDE WALL
FLEXIBLE BOOT OPTION
ENCASE CONNECTION IN
CONCRETE TYP.. MIN.
ENCASEMENT 8-INCHES ON
ALL SIDES OF COLLAR.
NOTE:
1. UNLESS OTHERWISE SPECIFIED, ALL CONNECTIONS TO EXISTING SEWER MANHOLES
SHALL BE INCLUDED UNDER THE "GENERAL CONSTRUCTION" BID ITEM.
CONNECTION TO EXISTING SEWER MAIN DETAIL
NOT TO SCALE
CONNECTION TO EXISTING SEWER MANHOLE DETAIL
NOT TO SCALE
PIPE CROSSING DETAIL
NOT TO SCALE
CONNECTION NO. 1 DETAIL
NOT TO SCALE
Sheet Number
Project Number
Ch ec ke d by Dr aw n by De sig ne d by
In c ha rg e of
Scale
Date
TO
W
N O
F
RA
N
DO
LP
H
W
AS
TE
W
AT
ER
T
RE
AT
EM
EN
T
FA
CI
LI
TY
IM
PR
O
VE
M
EN
TS
CO
N
TR
AC
T
N O
. 1 A
- G
EN
ER
AL
C O
N
ST
RU
CT
IO
N
TO
W
N O
F
RA
N
DO
LP
H
CA
TT
AR
AU
GU
S
CO
U
N
TY
, N
EW
Y O
RK
FEBRUARY 2024
AS SHOWN
2405.002.001
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
L S
REVISIONS
6"
4"
6"
6" CROSS
6" PVC
SEWER MAIN
RESTRAINED CONNECTION TO
EXISTING 6" WATER MAIN (2 TYP.)
EXISTING 6" PVC SEWER MAIN
TO EXISTING RBCs
6"
6" PVC SEWER MAIN
FROM CLARIFIER
6"
6" PVC SEWER MAIN
TO CLARIFIER
EXISTING 6" PVC SEWER MAIN
TO EXISTING CLARIFIER
6" BALL VALVE
(4 TYP.)
PLANDUCTILE IRON PIPE.
SIZE PER PLAN.
DUCTILE IRON WYE.
MATCH SIZE PER PLAN.
6" x XHCI
(ASTM A-74)
SOIL PIPE
"TYPE C" CONCRETE
LONG SWEEP 1/8 BEND
OR (2) 1/16 BENDS (TYP.)
DI x XHCI TRANSITION
COUPLING
2'
2'
2'
2'
COUNTERSUNK
CLEANOUT. SENEW
FERRULE (BRASS)
SECTION
DI x XHCI TRANSITION
COUPLING
6" GATE VALVE
W/ VALVE BOX
6" GATE VALVE
W/ VALVE BOX
COUNTERSUNK
CLEANOUT. SINEW
FERRULE (BRASS)
FINISHED GRADE
NOTES:
1. WHERE A 90° BEND IS NEEDED, CONTRACTOR SHALL INSTALL
A 45° WYE WITH CLEANOUT, FOLLOWED BY A 45° BEND.
SEWER CLEANOUT DETAIL
NOT TO SCALE
GRIND STEEL SMOOTH TO
ROUND EDGE ALL AROUND
ROUND CONC. TO SHED WATER
4' -0
6" MIN.
4' -0
CLASS "C" CONCRETE
1'-4"Ø
MIN.
8" 8"
FINISHED SURFACE
LC
YELLOW LDPE POST SLEEVE
6"Ø SCH. 40 STL. PIPE
BOLLARD DETAIL
NOT TO SCALE
4" SCH. 80 PVC FORCE
MAIN FROM SLUDGE
PUMP STATION
AEROBIC DIGESTER CONNECTION DETAIL
NOT TO SCALE
EXISTING GRADE
4"
EXISTING AEROBIC DIGESTER
TOP EL. 1283.70'
CONNECTION TO
EXISTING DIGESTER
M
IS
CE
LL
AN
EO
U S
DE
TA
IL
S
C-501
1'-0"
(TYP.)
LIMITS OF
TRENCH
EXCAVATION
NOTE:
TOP SOIL AND SEEDING SHALL BE IN ACCORDANCE WITH
SECTION 32 92 00
1'-0"
(TYP.)
EXIST. GROUND
4" TOPSOIL (AFTER
COMPACTION) W/ SEEDING
PROPOSED PIPE
LIMITS OF TRENCH
EXCAVATION
SAWCUT PARALLEL TO
PROPOSED PIPE, TACK COAT
AND SEAL IF ASPHALT OR
CONCRETE (TYP.)
EXIST. EXIST.
1'-0"
(TYP.)
PIPE BEDDING
PROPOSED PIPE
RESTORE TO EXISTING SURFACE TYPE. PROVIDE MINIMUM SPECIFIED
THICKNESS OR MATCH EXISTING CONDITION WHICHEVER IS GREATER:
· ASPHALT
1 1/2" ASPHALT TOP COURSE - ITEM 402.098203
2" ASPHALT BINDER COURSE - ITEM 402.198903
· GRAVEL
8" STONE/ GRANULAR DRIVEWAY MATCH EXISTING
(SHALL BE PAID FOR AS CY UNDER GRANULAR BACKFILL ITEM)
· CONCRETE
6" CEMENT CONCRETE (W/WWF 6X6X2.9X2.9)
6" GRAVEL SUBBASE (TYPE 2) NOT
REQUIRED UNDER STONE/GRAVEL
DRIVEWAY
MATCH EXIST. SLOPE
8'-0" MAX. PAVEMENT RESTORATION
NOTES:
1. DETAIL GIVES MINIMUM REQUIREMENTS FOR RESTORATION. ALL PRIVATE ROADS, DRIVEWAYS, AND PARKING LOTS
SHALL BE RESTORED TO MATCH ORIGINAL CONSTRUCTION AS NECESSARY.
2. THE MINIMUM SPECIFIED THICKNESS OF ALL ASPHALT DRIVEWAYS AND PARKING LOTS WITHIN NYSDOT R.O.W.
WHICH ARE DISTURBED SHALL BE 3" BASE COURSE (ITEM NO. 402.378903), 2" BINDER COURSE (ITEM NO.
402.198903), AND 1 1/2" TOP COURSE (ITEM NO. 402.098203).
GRANULAR FILL (FULL DEPTH)
COMPACTED TO 95%
LIMITS OF TRENCH
EXCAVATION
(TYP.)
1'-0"
SAWCUT AND TACK
COAT IF ASPHALT OR
CONCRETE (TYP.)
8'-0" MAX. PAVEMENT RESTORATION
PROPOSED PIPE
PIPE BEDDING
TYP. SECTION
EXIST.
PAV'T.
EXIST.
PAV'T.
NOTES:
1. ALL MATERIALS USED SHALL MEET THE REQUIREMENTS OF THE CURRENT NYSDOT STANDARD AND
SPECIFICATIONS AND ANY ADDENDUM.
2. IN ADDITION TO PROVIDING A TACK COAT BETWEEN LAYERS OF ASPHALT, PROVIDE FULL TACK COAT COVERAGE
ON ALL EXISTING PAVEMENT VERTICAL SURFACES.
3. UNLESS OTHERWISE APPROVED BY THE TOWN, CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE LANE TRAFFIC DURING WORKING HOURS AND TWO LANES, INCLUDING SHOULDER, DURING NON-WORKING HOURS FOR ANY OPEN CUT OPERATIONS. OPEN CUT SHALL BE PLATED WITH 1" STEEL PLATES UNTIL BACKFILL MATERIAL
IS CURE SUFFICIENTLY TO TRAFFIC LOADING.
GRANULAR FILL SUBBASE
(TYPE 2, ITEM 304.12).
COMPACTED TO 95%.
PROVIDE MINIMUM SPECIFIED THICKNESS OR MATCH
EXISTING CONDITION WHICHEVER IS GREATER:
- 1" ASPHALT TOP - ITEM 402.098203- 9.5 F2 TOP
COURSE HMA, 80 SERIES COMPACTION
- 2" ASPHALT BINDER - ITEM 402.198903- 19 F9
BINDER COURSE HMA, 80 SERIES COMPACTION
- 3" ASPHALT BASE - ITEM 402.378903- 37.5 F9
BASE COURSE HMA, 80 SERIES COMPACTION
- 12" GRAVEL SUBBASE (TYPE 2, ITEM 304.12)
BACKFILL AND BEDDING
PER TYPICAL SEWER MAIN
TRENCH DETAIL . SEWER MAIN
6" M
IN
NOTES:
1. DETAIL SHALL APPLY WHEN POOR OR UNSTABLE SOILS ARE ENCOUNTERED DURING EXCAVATION AND AS
APPROVED BY ENGINEER.
2. EXACT LOCATION AND QUANTITY OF UNSUITABLE SOILS ARE UNKNOWN. CONTRACTOR SHALL IMMEDIATELY INFORM ENGINEER IF IT IS BELIEVED THAT UNSUITABLE TRENCH SUBGRADES ARE BEING ENCOUNTERED.
3. AFTER UNSUITABLE SOILS ARE ENCOUNTERED, ENGINEER WILL DETERMINE FINAL DEPTH OF OVER-EXCAVATION.
CONTRACTOR SHALL FURNISH AND INSTALL GRANULAR FILL COMPACTED TO 95% WITH TRIAXIAL GEOGRID TO
SPAN TRENCH BOTTOM AND SUPPORT UTILITY INSTALLATION.
4. PAYMENT FOR "UNSUITABLE SUBBASE REMOVAL AND FILL" SHALL ONLY BE CONSIDERED WHEN THE CONTRACTOR IS DIRECTED BY THE ENGINEER TO COMPLY WITH THIS DETAIL. PAYMENT WILL BE PROVIDED ON A PER CUBIC YARD BASIS MEASURED BASED ON THE AMOUNT OF COMPACTED GRANULAR FILL PLACED AND INCLUDE FURNISHING AND INSTALLING GRANULAR FILL, TRIAXIAL GEOGRID, AND THE EXCAVATION AND DISPOSAL OF UNSUITABLE SUBBASE. PAYMENT WILL BE MADE UNDER THE "GENERAL CONSTRUCTION" BID ITEM.
UNSUITABLE SUBBASE TO BE
REMOVED. DEPTH OF
REMOVAL TO BE DETERMINED
BY THE ENGINEER
SUITABLE SUBGRADE AS
DETERMINED BY ENGINEER
X X X X X X X X X X X X X X X X X X X X
FURNISH GRANULAR FILL.
COMPACT IN 6-INCH LIFTS
TRIAXIAL GEOGRID (TENSAR TRIAX GEOGRID)
OR APPROVED EQUAL (TYP.). INSTALL FULL
WIDTH OF TRENCH AND UP TRENCH WALLS.
12-INCH MAXIMUM VERTICAL SPACING
BETWEEN GEOGRID LAYERS.
4" M
IN
4" M
IN
.X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
3' + PIPE OD
UNSUITABLE SUBBASE REMOVAL AND FILL
NOT TO SCALE
LAWN RESTORATION DETAIL
NOT TO SCALE
FULL DEPTH - ROAD RESTORATION DETAIL
NOT TO SCALE
FULL DEPTH - DRIVEWAY RESTORATION DETAIL
NOT TO SCALE
BEDDING
ZONE
BACKFILL. FURNISH
TO GRADE.
COMPACTED TO 95%
IN 12" LIFTS.
MAX. TRENCH TOP WIDTH =
3' + PIPE OD
GENERAL FILL
/ NATIVE MAT. GRANULAR FILL
SEWER MAIN
PAVEMENT
6" M
IN
1'-0"
FURNISH PIPE BEDDING TO 6"
ABOVE CROWN OF THE PIPE
MIN., COMPACTED TO 95% IN 6"
LIFTS. MORE OR LESS AS
DIRECTED
NOTES:
1. CONTRACTOR SHALL COMPLY WITH OSHA RULES OR OTHER APPLICABLE SAFETY REGULATIONS ON TRENCH EXCAVATION AND BACKFILL. CONTRACTOR SHALL STEP TRENCH, SLOPE TRENCH, USE SHEETING, OR USE A TRENCH BOX AS REQUIRED BY OSHA STANDARDS OR OTHER APPLICABLE SAFETY REGULATIONS . THIS DETAIL SHALL NOT BE CONSTRUED AS PERMITTING OR REQUIRING OPERATIONS WHICH MAY VIOLATE FEDERAL, STATE OR LOCAL SAFETY REGULATIONS. REFER TO SECTION 31 23 16 AND 31 23 16.13 FOR TRENCHING AND EXCAVATION
SPECIFICATIONS.
2. AT NEW OR EXISTING PAVED AREAS, PROVIDE 12" SHOULDER AT EACH SIDE OF TRENCH FOR PAVEMENT BASE
MATERIAL.
3. PAVEMENT MATERIALS TO BE REMOVED SHALL BE NEATLY SAW-CUT ALONG ALL EDGES. PAVEMENT OVER TRENCH SHALL BE CUT ON A LINE PARALLEL TO AND 12" BEYOND THE EDGE OF THE TRENCH. ALL EXISTING PAVEMENT MATERIALS REMOVED OR DAMAGED BY TRENCH OPERATIONS SHALL BE REPLACED AS INDICATED OR BY SAME MATERIALS IF NOT SPECIFICALLY INDICATED. ANY PAVEMENT LESS THAN 4 FEET IN WIDTH SHALL ALSO
BE REMOVED AND REPLACED IN ITS ENTIRETY UNLESS OTHERWISE DIRECTED BY ENGINEER.
4. WHEN A TRENCH IS ADJACENT TO THE EDGE OF PAVEMENT AREAS, COMPACTED GRANULAR BACKFILL SHALL EXTEND FROM 12" ABOVE THE TOP OF THE PIPE UPWARD TO A PLANE SLOPING DOWN AND OUTWARD AT A 45°
ANGLE FROM A POINT 3 FEET OUTSIDE THE EDGE OF PAVEMENT.
5. PIPE BEDDING AND GRANULAR FILL MATERIAL SHALL CONFORM TO SECTION 31 05 16 AGGREGATES FOR
EARTHWORK.
6"
6" MIN. AND 1'-0" MAX.
AT TRENCH BOTTOM
TOP SOIL
NOTE: GRANULAR FILL
SHALL BE PROVIDED
UNDER ALL ROADWAYS,
DRIVEWAYS, PARKING
AREAS, OR AS DIRECTED
BY ENGINEER
TYPICAL SANITARY SEWER TRENCH DETAIL
NOT TO SCALE
Sheet Number
Project Number
Ch ec ke d by Dr aw n by De sig ne d by
In c ha rg e of
Scale
Date
TO
W
N O
F
RA
N
DO
LP
H
W
AS
TE
W
AT
ER
T
RE
AT
EM
EN
T
FA
CI
LI
TY
IM
PR
O
VE
M
EN
TS
CO
N
TR
AC
T
N O
. 1 A
- G
EN
ER
AL
C O
N
ST
RU
CT
IO
N
TO
W
N O
F
RA
N
DO
LP
H
CA
TT
AR
AU
GU
S
CO
U
N
TY
, N
EW
Y O
RK
FEBRUARY 2024
AS SHOWN
2405.002.001
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
L S
REVISIONS
6" 6"
MIN.
3'-8" (MIN.)
MIN. MIN.
6"
"IF REQUIRED
SHEETING
M
IN
PIPE DIAMETER
VARIES (TYP.)
1'-0"
PI
PE
B
ED
DI
N
G
SET FLUSH W/ GRADE
OR AS DIRECTED BY
THE ENGINEER
VALVE BOX INSTALLED
PLUMB AND OVER
OPERATING NUT
VALVE WATER/SEWER PIPE
WORD ``SEWER' FOR
SEWER PIPE AND WORD
"WATER'' FOR WATER
PIPE ON COVER
NOTE:
1. FOR VALVES BURIED IN EXCESS OF 5' OF COVER, VALVE
STATIONARY ROD SHALL BE INSTALLED TO GRADE
FROM OPERATION NUT TO JUST BELOW COVER.
VALVE BOX DETAIL
NOT TO SCALE
MULTIPLE PIPE TRENCH TYPICAL DETAIL
NOT TO SCALE
1' -0
" M
IN
2' -0
" M
AX
CATCH BASIN RIM
GRATE
SEDIMENT
SEE NOTE 2
CONCRETE
BLOCK (TYP)
FINE GRAVEL. SEE NOTE 3.
TEMPORARY
SEDIMENT POOL
NOTES:
1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE FOR DEWATERING.
FOUNDATION SHALL BE 2 INCHES MINIMUM BELOW REST OF INLET.
2. HARDWARE CLOTH OR WIRE MESH SHALL BE PLACED OVER BLOCK OPENINGS TO SUPPORT
STONE.
3. USE CLEAN STONE OR GRAVEL 1/2"-3/4" IN DIAMETER PLACED 2 INCHES BELOW TOP OF BLOCK
ON A 2:1 SLOPE OR FLATTER.
4. MAXIMUM DRAINAGE AREA: 1 ACRE.
Sheet Number
Project Number
Ch ec ke d by Dr aw n by De sig ne d by
In c ha rg e of
Scale
Date
TO
W
N O
F
RA
N
DO
LP
H
W
AS
TE
W
AT
ER
T
RE
AT
EM
EN
T
FA
CI
LI
TY
IM
PR
O
VE
M
EN
TS
CO
N
TR
AC
T
N O
. 1 A
- G
EN
ER
AL
C O
N
ST
RU
CT
IO
N
TO
W
N O
F
RA
N
DO
LP
H
CA
TT
AR
AU
GU
S
CO
U
N
TY
, N
EW
Y O
RK
FEBRUARY 2024
AS SHOWN
2405.002.001
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
L S
REVISIONS
FLOW
FLOW
10'-0" MAX. C. TO C.
HE
IG
HT
8"
M
IN
PERSPECTIVE VIEW
SECTION
CONSTRUCTION NOTES FOR FABRICATED SILT FENCE
POSTS:
FENCE:
FILTER CLOTH:
PREFABRICATED UNIT:
STEEL EITHER "T" OR
"U" TYPE OR 2" HARDWOOD
WOVEN WIRE, 14 1/2 GA.
6" MAX. MESH OPENING
FILTER X,
MIRAFI 100X, STABILINKA
T140N OR APPROVED EQUAL
GEOFAB,
ENVIROFENCE, OR
APPROVED EQUAL
FLOW EXISTING GROUND
1. WOVEN WIRE FENCE TO BE FASTENED
SECURELY TO FENCE POSTS WITH WIRE TIES
OR STAPLES.
2. FILTER CLOTH TO BE FASTENED SECURELY TO
WOVEN WIRE FENCE WITH TIES SPACED EVERY
24" AT TOP AND MID SECTION.
3. WHEN TWO SECTIONS OF FILTER CLOTH
ADJOIN EACH OTHER THEY SHALL BE
OVERLAPPED BY SIX INCHES AND FOLDED.
4. MAINTENANCE SHALL BE PERFORMED AS
NEEDED AND MATERIAL REMOVED WHEN
"BULGES" DEVELOP IN THE SILT FENCE.
1-1/2"x1-1/2" HARD WOOD POST 2"x4"
SOFT WOOD POST OR STEEL POSTS.
10'-0" MAX. SPACING
MESH REINFORCEMENT 28" HT.
GEOTEXTILE
30" HT.
4"
8"
COMPACTED SOIL
FILTER FABRIC TO BE
BURIED IN GROUND
6"
16" MIN. FOR
POSTS
20" MIN.
O F
FI
LT
ER
" M
IN
36" MIN. FENCE POSTS, DRIVEN MIN.
16" INTO GROUND
WOVEN WIRE FENCE (MIN. 14 1/2 GAUGE,
MAX. 6" MESH SPACING)
SECTION 404 OF THE CLEAN WATER ACT (33 U.S.C. 1344) PROHIBITS THE DISCHARGE OF
DREDGED OR FILL MATERIALS INTO THE WATERS OF THE UNITED STATES WITHOUT A
PERMIT FROM THE U.S. ARMY CORPS OF ENGINEERS.
U.S. ARMY CORPS OF ENGINEERS
CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND MAINTAINING ADDITIONAL PRACTICES
NOT INCLUDED IN THE SWPPP AS NECESSARY TO PREVENT WATER QUALITY VIOLATIONS.
GENERAL NOTE
NOTES:
1. PAYMENT FOR ALL EROSION AND SEDIMENT CONTROL SHALL BE INCLUDED IN
"GENERAL CONSTRUCTION" PAYMENT ITEM.
2. ALL NECESSARY PRECAUTIONS SHALL BE TAKEN TO PREVENT CONTAMINATION OF
ANY STREAMS, WATERWAYS, OR DRAINAGE STRUCTURES. BY SILT, SEDIMENTS,
FUEL SOLVENTS, LUBRICANTS, EPOXY COATINGS, CONCRETE LEACHATE OR ANY
OTHER POLLUTANT ASSOCIATED WITH CONSTRUCTION AND CONSTRUCTION
PROCEDURES.
3. DURING CONSTRUCTION, NO WET OR FRESH CONCRETE SHALL BE ALLOWED TO
ESCAPE INTO ANY WATERS OR DRAINAGE STRUCTURES, NOR SHALL WASHINGS
FROM CONCRETE TRUCKS, MIXERS, OR OTHER DEVICES BE ALLOWED TO ENTER
ANY WATERS OR DRAINAGE STRUCTURES.
4. ANY DEBRIS OR EXCESS MATERIALS FROM CONSTRUCTION SHALL BE IMMEDIATELY
AND COMPLETELY REMOVED FROM THE BED OF AND BANKS OF ALL WATER AREAS
TO APPROPRIATE UPLAND AREAS FOR DISPOSAL.
5. ALL DREDGED AND EXCAVATED MATERIAL SHALL BE DISPOSED OF ON AN UPLAND
SITE AND BE SUITABLY STABILIZED SO THAT IT CANNOT REASONABLY RE-ENTER
ANY BODY OF WATER OR WETLAND.
6. INSPECTION, PERIODIC CLEANING AND MAINTENANCE OF TEMPORARY SOIL
EROSION AND WATER POLLUTION CONTROL DEVICES SHALL BE CONDUCTED AT
LEAST ONCE PER 7 CALENDAR DAYS.
7. ALL CONTROLS SHALL BE PLACED PRIOR TO STARTING EARTHWORK OPERATIONS
AND SHALL REMAIN IN PLACE UNTIL THE NEW SLOPES ARE STABILIZED WITH
SEEDING AND/OR SLOPE PROTECTION AND A.O.B.E.
8. SEDIMENT CONTROL FENCE SHALL NOT BE USED IN AREAS OF CONCENTRATED
FLOW.
9. HEAVY EQUIPMENT SHALL NOT BE DIRVEN IN THE WATER OR WETLANDS
10. ALL AREAS OF SOIL DISTURBANCES RESULTING FROM THIS PROJECT SHALL BE
SEEDED WITH AN APPROPRIATE PERENNIAL GRASS SEED AND MULCHED WITH HAY
OR STRAW WITHIN ONE WEEK OF FINAL GRADING. MULCH SHALL BE MAINTAINED
UNTIL A SUITABLE COVER IS ESTABLISHED.
11. IN THE EVENT A DEWATERING OPERATION BECOMES NECESSARY, A SETTLING
BASIN WILL BE REQUIRED UNLESS THE PUMP DISCHARGE IS AS CLEAN AND FREE OF
SEDIMENT AS THE FLOWING STREAM. ALL EFFORTS SHALL BE COORDINATED THRU
THE ENGINEER. DELAYS OR EXTRA COSTS ASSOCIATED WITH SECURING APPROVALS,
OR ADDITIONAL PERMITS, FOR DEWATERING WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
12. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED,
MAINTAINED, AND INSPECTED IN ACCORDANCE WITH THE NYS STANDARDS AND
SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL AND SITE SPECIFIC
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) PREPARED FOR THIS
PROJECT. THE CONTRACTOR SHALL REMOVE CONTROL MEASURES UPON
CONSTRUCTION COMPLETION AND FINAL STABILIZATION.
13. THE COST OF INSTALLING, CLEANING, AND REMOVING TEMPORARY SOIL EROSION
AND WATER POLLUTION CONTROL DEVICES SHALL BE INCLUDED UNDER THE
GENERAL CONSTRUTION BID ITEM. NO SEPARATE PAYMENT SHALL BE MADE FOR
WORK ON THIS SHEET.
14. IN AREAS WHERE TRENCH MUST BE CONSTRUCTED ADJACENT TO A WETLAND,
WATER COURSE, OR DRAINAGE CONVEYANCE, STOCK PILES AND OPEN SOIL AREAS
SHALL BE SEPARATED FROM THE ABOVE DRAINAGE FEATURES BY A ROW OF SILT
FENCE. WHERE TRENCHES ARE LOCATED WITHIN A DRAINAGE DITCH, STONE
CHECK DAMS SHALL BE INSTALLED TO CONTROL EROSION.
15. ROLLED EROSION CONTROL PRODUCT INSTALLATION SHALL FOLLOW NYSDOT, OR
APPROVED EQUAL, PRODUCT INSTALLATION SPECIFICATIONS FOR SLOPE OR
CHANNEL INSTALLS.
16. DUST CONTROL MEASURES SHALL BE USED ON CONSTRUCTION ROADS, ACCESS
POINTS, AND OTHER DISTURBED AREAS. VEGETATION SHOULD BE LEFT WHERE
PRACTICAL, AND TEMPORARY OR PERMANENT STABILIZATION MEASURES SHALL BE
INSTALLED. NON-GRAVEL DRIVING AREAS SHALL BE SPRAYED WITH WATER UNTIL
WET, OR GEOTEXTILE OR STONE MAY BE PLACED ON THE DRIVING SURFACE TO
REDUCE DUST.
17. CARE SHALL BE TAKEN TO RETAIN VEGETATION AND PREVENT DAMAGE TO TREES
AND ORNAMENTAL PLANT MATERIAL WITHIN AND OUTSIDE THE LIMITS OF
CONSTRUCTION, AND NOT SCHEDULED FOR REMOVAL. ANY DAMAGE CAUSED TO
THIS VEGETATION SHALL BE RESTORED AT THE EXPENSE OF THE CONTRACTOR AS
DIRECTED BY THE ENGINEER.
18. INSTALL CATCH BASIN INLET PROTECTION AROUND ALL BASINS THAT RECEIVE
DRAINAGE FROM DISTURBED AREAS.
19. THE TRAINED CONTRACTOR ONSITE SHALL REGULARLY INSPECT EROSION AND
SEDIMENT CONTROL PRACTICES. THE CONTRACTOR SHALL BEGIN IMPLEMENTING
CORRECTIVE ACTIONS FOR IDENTIFYING DEFICIENCIES WITHIN ONE BUSINESS DAY.
20. ROLLED EROSION CONTROL PRODUCT SHALL BE INSTALLED IN ALL DISTURBED
AREAS LOCATED WITHIN 50 FEET OF A SURFACE WATER FEATURE, AREAS
CORRESPONDING TO CONSTRUCTED STORMWATER CHANNELS, AND AREAS
CORRESPONDING TO A SLOPE OF 15% OR GREATER.
21. LEVEL SPREADERS SHALL BE INSTALLED IN ACCORDANCE WITH THE NEW YORK
STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL.
1' -0
M
IN
. CATCH BASIN RIM
GRATE
2"x4" WOOD FRAME
POST
(SEE NOTE 6)
BURIED FABRIC
(SEE NOTE 3)
FABRIC
(SEE NOTE 3)
3' -0
" M
IN
NOTES:
1. CUT FABRIC FROM A CONTINUOUS ROLL TO
ELIMINATE JOINTS. IF JOINTS ARE REQUIRED,
FABRIC SHALL BE OVERLAPPED TO THE NEXT
STAKE.
2. SPACE STAKES EVENLY AROUND INLET 3 FEET
APART AND DRIVE A MINIMUM 18 INCHES DEEP.
SPANS GREATER THAN 3 FEET MAY BE BRIDGED
WITH THE USE OF WIRE MESH BEHIND THE FILTER
FABRIC FOR SUPPORT.
3. FABRIC SHALL BE EMBEDDED 1 FOOT MINIMUM
BELOW GROUND AND BACKFILLED. IT SHALL BE
SECURELY FASTENED TO THE STAKES AND FRAME.
4. A 2"x4" WOOD FRAME SHALL BE COMPLETED
AROUND THE CREST OF THE FABRIC FOR OVER
FLOW STABILITY.
5. MAINTENANCE SHALL BE PERFORMED AS NEEDED
AND MATERIAL REMOVED WHEN "BULGES"
DEVELOP IN THE SILT FENCE.
6. POSTS: STEEL "T" OR "U" TYPE OR 2" HARDWOOD;
7. FENCE: WOVEN WIRE, 14 12 GAUGE, 6" MAX. MESH
OPENING;
8. FILTER CLOTH: FILTER X, MIRAFI 100X, STABILINKA
T140N OR APPROVED EQUAL.
SAME ELEVATION
4"MIN (TYP.)
1 1
MIRAFI 500X OR EQUAL
CUT-OFF TRENCH
CUT-OFF
TOE (TYP.)
MIRAFI 500X OR EQUAL
CUT-OFF TRENCH
SEE NOTE 1
SEE NOTE 1
TRENCH (TYP)
CONSTRUCTION SPECIFICATIONS FOR STONE CHECK DAM
A
A
B
B
SECTION A SECTION B
PROFILE
NOTES:
1. NYSDOT ITEM NO. 733.2101 STONE FILLING (FINE) WILL BE PLACED ON A FILTER FABRIC FOUNDATION 2' UPSTREAM
AND DOWNSTREAM OF TOE TO A MINIMUM (MIN) DEPTH OF 4".
2. SET SPACING OF CHECK DAMS SUCH THAT THE ELEVATIONS OF THE CREST OF THE DOWNSTREAM DAM IS AT THE
SAME ELEVATION OF THE TOE OF THE UPSTREAM DAM.
3. EXTEND THE STONE A MINIMUM 0F 18" BEYOND THE DITCH BANKS TO PREVENT CUTTING AROUND THE DAM.
4. PROTECT THE CHANNEL DOWNSTREAM OF THE LOWEST CHECK DAM FROM SCOUR AND EROSION WITH STONE AND
LINER AS DIRECTED BY ENGINEER.
5. ENSURE THAT CHANNEL APPURTENANCES SUCH AS CULVERT ENTRANCES BELOW CHECK DAMS ARE NOT SUBJECTED
TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES.
6. MAXIMUM DRAINAGE AREA 2 ACRES.
7. PERIODIC INSPECTION AND MAINTENANCE (E.G. REPLACEMENT OF DISPLACED STONE) SHALL BE PROVIDED AFTER
EACH RAIN.
8. DURING CONSTRUCTION, SEDIMENT SHALL BE REMOVED FROM THE CHECK DAMS WHEN IT HAS ACCUMULATED TO
ONE-HALF THE DESIGN CAPACITY.
NYSDOT ITEM NO.
733.2101 STONE
FILLING (FINE)
OVER FILTER
FABRIC
18"
" M
AX
C
EN
TE
R
18" MIN.
TYP
2'-0" (TYP.)
6"
9" M
IN
" M
AX
SPACING VARIES DEPENDING ON SLOPE OF CHANNEL
SILT FENCE DETAIL
NOT TO SCALE
STONE CHECK DAM DETAIL
NOT TO SCALE
CATCH BASIN INLET
PROTECTION (SILT FENCE) DETAIL
NOT TO SCALE
IMPERVIOUS SURFACE CATCH
BASIN INLET PROTECTION DETAIL
NOT TO SCALE
EXIST. GROUND
SURFACE
TYPE I RIP-RAP 12"
MIN. DEEP
GEOTEXTILE FABRIC
SECTION
3'-0"
MIN
2'-0"
MIN
RIPRAP SLOPE PROTECTION DETAIL
NOT TO SCALE
10'
SLOPE 1%ENTRANCE
ENTRANCE
SIDE VIEW
FRONT VIEW
PLAN VIEW
1.5'
HAY BALES
(TYP)
WATERPROOF
GEOTEXTILE
METAL
STAKE
(TYP)
CONCRETE WASHOUT NOTES:
1. GEOTEXTILE SHALL BE INSPECTED DAILY TO ENSURE THAT IT REMAINS WATERPROOF.
2. GEOTEXTILE SHALL BE SECURED TO GROUND WITH METAL STAKES OUTSIDE OF HAY BALE.
3. CONCRETE WASHOUT AREA(S) SHALL BE INSTALLED PRIOR TO CONCRETE PLACEMENT ON
SITE. THE CONCRETE WASHOUT AREA SHALL BE ENTIRELY SELF-CONTRAINED.
SIZE: THE WASHOUT MUST HAVE SUFFICIENT VOLUME TO CONTAIN ALL LIQUID AND
CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS INCLUDING, BUT NOT LIMITED
TO, OPERATIONS ASSOCIATED WITH GROUT AND MORTAR.
4. SIGNS SHOULD BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE CONCRETE AREA(S)
AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE
WASHOUT TO OPERATORS OF THE CONCRETE TRUCKS AND PUMP RIGS. WASHOUT
AREA(S) SHOULD BE FLAGGED WITH SAFETY FENCING OR OTHER APPROVED METHOD.
5. WASHOUT AREA(S) ARE TO BE INSPECTED AT LEAST ONCE A WEEK FOR STRUCTURAL
INTEGRITY, ADEQUATE HOLDING CAPACITY AND CHECK FOR LEAKS, TEARS, OR
OVERFLOWS. (AS REQUIRED BY THE CONSTRUCTION SITE ENVIRONMENTAL INSPECTION
REPORT) WASHOUT AREA(S) SHOULD BE CHECKED AFTER HEAVY RAINS.
6. HARDENED CONCRETE WASTE SHOULD BE REMOVED AND DISPOSED OF WHEN THE
WASTE HAS ACCUMULATED TO HALF OF THE CONCRETE WASHOUT'S HEIGHT. THE WASTE
CAN BE STORED AT AN UPLAND LOCATION, AS APPROVED BY THE ENGINEER. ALL
CONCRETE WASTE SHALL DE DISPOSED OF IN A MANNER CONSISTENT WITH ALL
APPLICABLE LAWS, REGULATIONS, AND GUIDELINES.
CONCRETE WASHOUT AREA DETAIL
NOT TO SCALE
ER
O
SI
O
N A
N D
SE
DI
M
EN
T
CO
N
TR
O L
DE
TA
IL
S
C-700
Sheet Number
Project Number
Ch ec ke d by Dr aw n by De sig ne d by
In c ha rg e of
Scale
Date
TO
W
N O
F
RA
N
DO
LP
H
W
AS
TE
W
AT
ER
T
RE
AT
EM
EN
T
FA
CI
LI
TY
IM
PR
O
VE
M
EN
TS
CO
N
TR
AC
T
N O
. 1 A
- G
EN
ER
AL
C O
N
ST
RU
CT
IO
N
TO
W
N O
F
RA
N
DO
LP
H
CA
TT
AR
AU
GU
S
CO
U
N
TY
, N
EW
Y O
RK
FEBRUARY 2024
AS SHOWN
2405.002.001
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
L S
REVISIONS
ER
O
SI
O
N A
N D
SE
DI
M
EN
T
CO
N
TR
O L
DE
TA
IL
S
C-701
NOTES:
1. ITEMS IN DETAILS MAY APPEAR EXAGGERATED TO SHOW DETAIL.
2. IF SLOPE IS BROUGHT TO FINISHED GRADE, PERMANENT TOP SOIL AND SEEDING SHALL BE
INSTALLED PRIOR TO INSTALLING ITEM 209.1803 - ROLLED EROSION CONTROL PRODUCT
(RECP).
3. ROLLED EROSION CONTROL PRODUCT (RECP) MUST BE SELECTED FROM THE NYSDOT
APPROVED MATERIALS LIST FOR CLASS I TYPE C RECP AND HAVE A LONGEVITY OF AT LEAST
TWELVE (12) MONTHS.
4. RECP MUST BE FLUSH AND IN CONTACT WITH THE SOIL AND NOT RAISED BY CLUMPS,
WEEDS, STICKS, ETC. AND MUST BE STAPLED SECURELY.
5. ALL RECP DAMAGED BY CONTRACTOR AND/OR SUBCONTRACTORS SHALL BE REPAIRED
WITHIN THREE (3) CALENDAR DAYS OF THE DAMAGE OCCURRENCE AT NO ADDITIONAL COST
TO THE OWNER.
6. AS PART OF FINAL STABILIZATION, WOODEN STAKES SHALL BE REMOVED FROM FIBER LOGS
AND DISPOSED OF IN RURAL AREAS. FIBER LOGS MAY BE CUT ALONG THEIR LENGTH FOR
FINAL STABILIZATION. IN RESIDENTIAL OR BUSINESS AREAS, OR AS DIRECTED BY THE
ENGINEER, CONTRACTOR SHALL REMOVE AND DISPOSE OF FIBER LOGS.
7. ROLLED EROSION CONTROL PRODUCTS (RECP) SHALL BE INSTALLED WITHIN DISTURBED
AREAS WITH SLOPES OF 3H:1V OR GREATER, OR AS DIRECTED BY THE ENGINEER.
EMBED EDGE OF ROLLED EROSION CONTROL
PRODUCT (RECP) AT TOP OF SLOPE AT LEAST 3"
TO PREVENT WATER FLOW UNDER THE RECP.
CAN BE INSTALLED UNDER AND ANCHORED BY
THE SHOULDER BACKUP MATERIAL.
SEDIMENT FILTER LOG - TEMPORARY, 12"
(NYSDOT ITEM NO. 209.2301) FOR SLOPES 0-5%
SEDIMENT FILTER LOG - TEMPORARY, 18"-20"
(NYSDOT ITEM NO. 209.2302) FOR SLOPES 5-10%
SEDIMENT FILTER LOG - TEMPORARY, 24"
(NYSDOT ITEM NO. 209.2303) FOR SLOPES 10-15%
ANCHOR RECP AT EDGE
OF UNDISTURBED
AREA
EXISTING
UNDISTURBED
VEGETATED AREA
SPACING (S) VARIES WITH SLOPE SEE NOTES
ON THIS SHEET
STAPLES, INSTALLED AS PER AND PROVIDED BY THE
EROSION CONTROL PRODUCT MANUFACTURER (SEE
NOTES) (TYP.)
N.Y.S.D.O.T. ITEM 209.1803 - ROLLED EROSION
CONTROL PRODUCT CLASS I, TYPE C
VEGETATED OR
STABILIZED AREA
ITEMS 610.0203
AND 613.02 ADD
SEED AND TOP SOIL
IF SLOPE IS
BROUGHT TO
FINISHED GRADE
REMOVE SEDIMENT BUILD UP
WHEN REACHES 6" (TYP.)
WOODEN
POST
INTERMEDIATE FIBER
LOG DIKE (AS REQUIRED)
LIMIT OF EXPOSED OR DISTURBED SOIL
DISTURBED AREA WITH EXPOSED SOIL
12"
S
" 6"
WOOD STAKE
FIBER ROLL
WOOD STAKE TO ONLY
PENETRATE NETTING,
NOT MATERIAL
FIBER ROLL
TOP OF
BLANKET
1' -4
" M
IN
WOOD STAKE
SLOPE SURFACE
DOWN SLOPE
FIBER ROLL
WOOD STAKE TO ONLY
PENETRATE NETTING, NOT
MATERIAL
1' -4
" M
IN
S
PIPE TRENCH
MINIMUM 1"
EMBEDMENT
FIBER ROLL
SCARIFY IN A MANNER THAT
MINIMIZES DAMAGE TO
EXISTING VEGETATION
WOOD STAKE EVERY 4'-0"
2' -0
" M
IN
DOWN
SLOPE
SDOWN
SLOPE
S
12'-0" MAX.
FIBER ROLL APPLICATION NOTES:
1. THE PRIMARY PURPOSE OF A FIBER ROLL DIKE IS TO REDUCE RUNOFF VELOCITY AND TRAP SEDIMENT; VELOCITY IS REDUCED, WATER IS IMPOUNDED
BEHIND THE MEASURE, AND SEDIMENT FALLS OUT OF SUSPENSION.
2. FIBER ROLL DIKES CAN USED IN SENSITIVE AREAS WHERE CONTROL OF WEEDS AND INVASIVE PLANT SPECIES IS DESIRED.
3. FIBER ROLL DIKE SHALL BE INSTALLED ON A LINE OF EQUAL ELEVATION (CONTOUR). THEY MAY BE INSTALLED AT INTERMEDIATE POINTS UP SLOPES AS WELL AS AT THE BOTTOM, AS SHOWN IN THE DETAIL. THE ENDS SHALL CURVE UP SLIGHTLY (6") TO IMPOUND RUNOFF.
4. FIBER ROLLS SHALL NOT BE USED IN OR ACROSS A FLOWING NATURAL CHANNEL.
5. FIBER ROLLS ARE NOT TO BE INSTALLED SO THAT RUNOFF WILL FLOW ALONG THE FIBER ROLL IN A CONCENTRATED MANNER.
FIBER ROLL GENERAL NOTES:
1. FIBER ROLL DIKE SHALL BE PLACED A MINIMUM OF 2 FEET FROM TOE OF SLOPE, (5 FEET PREFERRED), TO PROVIDE ADEQUATE AREA FOR SEDIMENT
STORAGE AND TO FACILITATE MAINTENANCE OF THE SEDIMENT CONTAINMENT AREA.
2. POSTS MAY BE 1.5" x 1.5" (MINIMUM) HARDWOOD, 1.5" x 3.5" (MINIMUM) SOFTWOOD, OR 2kg/m (MIN) STEEL. SPACING SHALL BE 36" (MAXIMUM)
BETWEEN STAKES.
3. MEASURES SHALL BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS, AFTER EACH RAINFALL OF 0.5" OR MORE WITHIN A 12 HOUR PERIOD, OR DAILY
DURING PROLONGED RAINFALL. MEASURES SHALL BE CLEANED AND REPAIRED AS REQUIRED.
4. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATION REACHES ONE-HALF OF THE MEASURE HEIGHT. SEDIMENT SHALL BE DISPOSED OF AS
UNSUITABLE MATERIAL.
5. DRAINAGE AREAS:
MAXIMUM DRAINAGE AREA TRIBUTARY TO 100' OF FIBER ROLL SHALL BE 0.5 ACRE.
6. THE FOLLOWING ARE MAXIMUM SLOPE LENGTHS TO FIBER ROLL MEASURES:
SLOPE
1:2 25' 1:3 80' 1:4 130' 1:5 200'
7. INSTALLATION, I.E. EXCAVATION, BACKFILL, COMPACTION, FIBER ROLLS SHALL BE INCLUDED IN THE GENERAL CONSTRUCTION BID ITEM.
EROSION AND SEDIMENT CONTROL
FOR SLOPES DETAIL REQUIRING RECP
NOT TO SCALE
TEMPORARY FIBER ROLL DETAIL
NOT TO SCALE
FIBER ROLL STAKE SECTION
(ON BARE SOIL) DETAIL
NOT TO SCALE
FIBER ROLL STAKE
FRONT ELEVATION DETAIL
NOT TO SCALE
50'-0" MIN.
6" M
IN
50'-0" MIN.
24'-0"
MIN.
CONSTRUCTION SPECIFICATIONS FOR STABILIZED
CONSTRUCTION ENTRANCE
1. GEOTEXTILE SHALL BE PLACED OVER ENTIRE AREA OF STABILIZED
CONSTRUCTION ENTRANCE PRIOR TO PLACING STONE. STONE SHALL MEET
THE REQUIREMENTS OF NYSDOT ITEM 623.12, CRUSHED STONE #3.
2. ALL SURFACE WATER SHALL BE DIVERTED AWAY FROM CONSTRUCTION
ENTRANCE. A MOUNTABLE BERM WITH 5:1 SLOPE IS REQUIRED.
3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL
PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-
WAY. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC
RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY.
4. WHEN WASHING IS REQUIRED IT SHALL BE DONE ON AN AREA WITH STONE
AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE.
5. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE DONE
REGULARLY AND FOLLOWING EACH RAINFALL.
EXISTING
PAVEMENT
EXISTING
PAVEMENT
3'-0"
EXISTING
GROUND 24
'-0
M
IN
'-0
M
IN
PROFILE
PLAN
MOUNTABLE BERM
5:1
GEOTEXTILE FABRIC
PER SITE PLAN
STABILIZED CONSTRUCTION ENTRANCE DETAIL
NOT TO SCALE
2"x4"
LUMBER
(TYP)
WIRE
TREE PROTECTION NOTES:
IN SITUATIONS WHERE A PROTECTED TREE
REMAINS IN THE IMMEDIATE AREA OF
INTENDED CONSTRUCTION AND THE TREE
MAY BE IN DANGER OF BEING DAMAGED BY
CONSTRUCTION EQUIPMENT OR OTHER
ACTIVITY, THE CONTRACTOR OR
SUBCONTRACTOR SHALL PROTECT THE TREE
WITH 2"x4" LUMBER ENCIRCLED WITH WIRE
OR OTHER MEANS THAT DO NOT DAMAGE
THE TREE. THE INTENT IS TO PROTECT THE
TRUNK OF THE TREE AGAINST INCIDENTAL
CONTACT BY LARGE CONSTRUCTION
EQUIPMENT.
TREE PROTECTION DETAIL
NOT TO SCALE
PR
O
CE
SS
F
LO
W D
IA
GR
AM
H
YD
RA
U
LI
C
PR
O
FI
LE
D-101
M
ER
(OUT) INV. ±1274.90'
(EX.) RBC TANK (2 TYP.)
(EX.) METERING
FLUME
CHLORINE CONTACT TANK DECHLORINATION TANK
TOP OF STEEL TANK 1280.67'
FINAL CLARIFIER
(EX.) OUTFALL
INV. 1271.20'
SAMPLING PORT
RIM 1275.5'
(IN) INV. ~1274.15'
TOP 1281.45'
(IN) INV. ±1276.64'
CONEWANGO CREEK HWL 1273.96
WSE 1279.57'
HYDRAULIC PROFILE
HORIZONTAL SCALE: NOT TO SCALE
VERTICAL SCALE: 1" = 10'-0"
Sheet Number
Project Number
Ch ec ke d by Dr aw n by De sig ne d by
In c ha rg e of
Scale
Date
TO
W
N O
F
RA
N
DO
LP
H
W
AS
TE
W
AT
ER
T
RE
AT
EM
EN
T
FA
CI
LI
TY
IM
PR
O
VE
M
EN
TS
CO
N
TR
AC
T
N O
. 1 A
- G
EN
ER
AL
C O
N
ST
RU
CT
IO
N
TO
W
N O
F
RA
N
DO
LP
H
CA
TT
AR
AU
GU
S
CO
U
N
TY
, N
EW
Y O
RK
FEBRUARY 2024
AS SHOWN
2405.002.001
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
LS
IN
IT
IA
L S
REVISIONS
CONNECTION
INV. ~1274.47'
(IN) INV. 1276.40'
(OUT) INV. 1275.25'
(EX.)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .