- REPAIR OR REPLACEMENT OF SEVEN GRADE CROSSINGS ON THE CENTREVILLE AND CHESTERTOWN FREIGHT LINES
- Solicitation number
- BPM026274
- Issued by
- Maryland
About this file
This document is an Invitation for Bid issued by the Maryland Department of Transportation Maryland Transit Administration (MDOT MTA) for the repair or replacement of seven highway-railroad at-grade crossings on the Centreville Freight Line and Chestertown Freight Line. The project scope includes construction work at six crossings on the Centreville Freight Line and one crossing on the Chestertown Freight Line. Bids are due on October 13, 2021, and a mandatory pre-bid meeting is scheduled for September 22, 2021. The contract award is anticipated by November 2021, and the work is expected to be completed within 270 calendar days after the notice to proceed is issued.
The bid requires pricing for lump sum items, unit prices, and allowances. There are no set-aside requirements noted. The project is funded through MDOT MTA capital funds, and the total estimated project cost is not provided in the document. Contractors must be pre-qualified with MDOT to be eligible to bid on this project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MARYLAND
REPAIR OR REPLACEMENT OF SEVEN GRADE CROSSINGS
ON THE CENTREVILLE AND CHESTERTOWN FREIGHT
LINES
INVITATION FOR BIDS (IFB)
IFB NUMBER T-1926-0150
ISSUE DATE: OCTOBER 13, 2021
NOTICE
A Prospective Bidder that has received this document from a source other than eMarylandMarketplace
(eMMA) https://procurement.maryland.gov should register on eMMA. See Section 4.2.
MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO
RESPOND TO THIS SOLICITATION.
MARYLAND DEPARTMENT OF TRANSPORTATION
MARYLAND TRANSIT ADMINSTRATION
KEY INFORMATION SUMMARY SHEET
Invitation for Bids Construction- REPAIR OR REPLACEMENT OF SEVEN
GRADE CROSSINGS ON THE CENTREVILLE AND
CHESTERTOWN FREIGHT
Solicitation Number: T-01926-0150
IFB Issue Date: October 13, 2021
IFB Issuing Office: Maryland Department of Transportation Maryland Transit Administration ( MDOT MTA)
Procurement Officer: Darica Lawson
MDOT MTA
6 St. Paul St., 7th Floor Baltimore, Maryland e-mail:
Office Phone:
dlawson@mdot.maryland.gov 410-767-3763
Bids are to be sent to: Submit Via eMMA
Pre-Bid Conference: Thursday, October 21, 2021 at 10:00 AM via Microsoft Teams. Please email Procurement Officer for invitation
Questions Due Date and Time Monday , October 25, 2021 at 12pm
Bid Due (Closing) Date and Time:
Thursday, November 11, 2021 at 12:00 pm Local Time (EST)
Public Bid Opening Date, Time and Location see eMMA for bid tabulation ( results should be available no later than 12:30pm)
MBE Subcontracting Goal: 19.9%
Contract Type : Fixed Price
Contract Duration: 6 months
Classification Cost Group: “C” $500,000.00 -$1,000,000.00
Place of Performance: Queen Anne 's County and Kent County mailto:dlawson@mdot.maryland.gov
T-1926-0150 TOC 1 of 3
REPAIR OR REPLACEMENT OF SEVEN GRADE CROSSINGS
ON THE CENTREVILLE AND CHESTERTOWN
FREIGHT LINES
CONTRACT NO. T-1926-0150
CONTRACT SPECIFICATIONS BOOK
TABLE OF CONTENTS
DESCRIPTION PAGE NO.
TABLE OF CONTENTS ....................................................................................... TOC 1-3
NOTICE TO CONTRACTORS. ............................................................................NTC 1–8
NO BID NOTICE ..................................................................................................... NBN 1
BID FORM INCLUDING UNIT PRICE SCHEDULE ......................................... BF 1–10
CONTRACTOR QUESTIONNAIRE ..................................................................... CQ 1–6
SUBCONTRACTOR UTILIZATION INFORMATION FORM .......................... SUI 1–2
INSURANCE REQUIREMENTS…………………………………………………...IR 1-4
PAYMENT TO CONTRACTORS BY ELECTRONIC FUNDS TRANSFER ... EFT 1–3
BID/PROPOSAL AFFIDAVIT ............................................................................. BPA 1–6
BID BOND FORM .................................................................................................. BB 1–2
BUY AMERICA CERTIFICATE ............................................................................ BAC 1
CONTRACT AGREEMENT ............................................................................... CAG 1–2
CONTRACT AFFIDAVIT ....................................................................................... CA 1-4
SURETY BOND ASSISTANCE PROGRAM ........................................................SBAP 1
PAYMENT BOND ................................................................................................... PA1–3
PERFORMANCE BOND ......................................................................................... PE 1–3
BID PROTEST ............................................................................................................. BP 1
INVESTMENTS IN IRAN ……………………………………………………...IRAN 1-2
CONFLICT OF INTREST ……………………………………………………………CI 1
T-1926-0150 TOC 2 of 3
MECURY AFFIDAVIT……………………………………………………………. MA 1
CONTRACTOR SAFETY AND HEALTH PLAN GUIDE ……………CPSHG i-iv, 1-33
GENERAL PROVISIONS FOR CONSTRUCTION CONTRACTS
(MARYLAND DOT) .............................................................................................. GP1–68
ADDENDA TO GP………………………………………………………..…….ADGP 1-5
SUPPLEMENTAL GENERAL PROVISIONS FOR CONSTRUCTION
CONTRACTS (MTA) ......................................................................................... SGP 1–57
ADDENDA TO SGP……………………………………………………………. ADSGP 1
OWNER CONTROLLED INSURANCE PROGRAMS…………………………….1-36
SPECIAL PROVISIONS
01 11 00 SUMMARY OF WORK................................................................................. SP-1
01 13 00 CONTRACT TERMS AND CONDITIONS.................................................. SP-8
01 15 00 CONSTRUCTION PROCEDURES ............................................................. SP-13
01 18 13 INTERFACE REQUIREMENTS ................................................................. SP-21
01 21 00 MISCELLANEOUS WORK ALLOWANCE .............................................. SP-26
01 31 15 COORDINATION AND MEETINGS ......................................................... SP-28
01 33 00 SUBMITTALS ............................................................................................. SP-31
01 43 00 QUALITY ASSURANCE QUALITY CONTROL ..................................... SP-43
01 50 00 TEMPORARY FACILITIES AND CONTROLS ....................................... SP-59
01 52 13.04 ENGINEER’S OFFICE 4 ........................................................................ SP-64
01 55 26 MAINTENANCE OF TRAFFIC .................................................................. SP-65
01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL ......................... SP-75
01 61 00 PRODUCTS .................................................................................................. SP-78
01 78 00 CLOSE OUT ................................................................................................. SP-80
02 24 00 ENVIRONMENTAL ASSESSMENT ......................................................... SP-84
T-1926-0150 TOC 3 of 3
02 41 13.01 SELECTIVE SITE DEMOLITION – GRADE CROSSINGS .............. SP-104
03 80 00 SAW CUTTING ......................................................................................... SP-111
10 14 53 TRAFFIC SIGNAGE.................................................................................. SP-113
31 05 19.14 GEOTEXTILES FOR TRACK WORK ................................................ SP-117
31 23 00 EXCAVATION AND FILL ....................................................................... SP-122
32 01 16.71 COLD MILLING ASPHALT PAVING ................................................ SP-133
32 11 23 AGGREGATE BASE COURSES .............................................................. SP-135
32 12 16.13 PLANT MIX ASPHALT PAVING ....................................................... SP-138
32 12 16.15 ASPHALT GRADE CROSSING .......................................................... SP-146
32 17 23 PAVEMENT MARKINGS ........................................................................ SP-151
34 05 17 COMMON WORK RESULTS FOR TRACKWORK ............................... SP-153
34 11 13 TRACK RAIL ............................................................................................. SP-163
34 11 16 RAIL WELDING ........................................................................................ SP-167
34 11 19 TRACK RAIL JOINTS .............................................................................. SP-178
34 11 26 BALLASTED TRACK RAIL .................................................................... SP-184
34 11 26.13 TRACK RAIL BALLAST ..................................................................... SP-192
34 11 33.15 COMPOSITE TIES ............................................................................... SP-198
34 11 33.17 TIMBER TIES ....................................................................................... SP-205
34 11 93 TRACK APPURTENANCES AND ACCESSORIES ............................... SP-213
APPENDICES
APPENDIX A – PREVAILING WAGE ........................................................................... A
APPENDIX B-- MDOT MTA MBE FORMS.................................................................... B
APPENDIX C - CONTRACT DATA REQUIREMENT LIST (CDRL) ........................... C
APPENDIX D – PERMITS/WAIVERS ............................................................................. D
T-1926-0150 TOC 4 of 3
APPENDIX E – MTA PROJECT SAFETY PLAN ........................................................... E
APPENDIX F—INSURANCE COST WORKSHEET ...................................................... F
Contract No. T-1926-0150 NTC 1 of 9
STATE OF MARYLAND DEPARTMENT OF TRANSPORTATION
MARYLAND TRANSIT ADMINISTRATION
NOTICE TO CONTRACTORS
REPAIR OR REPLACEMENT OF SEVEN GRADE CROSSINGS ON THE
CENTREVILLE AND CHESTERTOWN FREIGHT
CONTRACT NO.: T-1926-0150 DATE: October 13, 2021
1. DESCRIPTION OF WORK
A This Contract is for the construction of repairs to, and replacement of six (6) highway-railroad at-grade crossings on the MDOT MTA Centreville Freight Line, and one (1) crossing on the Chestertown Freight Line.
The work involves:
1. Installation and maintenance of traffic control measures on roadways in accordance with Section 01 55 26 - Maintenance of Traffic and maintenance of railroad operation in accordance with Section 01 18 83 - Interface Requirements for the duration of construction at each crossing.
2. Installation, maintenance and removal of erosion and sediment control measures in accordance with Maryland Department of the Environment (MDE) requirements.
3. Saw cutting of existing asphalt paving; removal and disposal of existing timber crossing panels and asphalt; removal and disposal of excavated ballast, timber ties, track spikes and anchors within the designated limits at each crossing.
4. Perform surface milling and overlay at the asphalt approaches of two
(2) railroad crossings.
5. Construction of three (3) grade crossings using asphalt pavement and rubber rail seals.
6. Construction of one (1) grade crossing using asphalt pavement, only.
7. Removal of defective timber panels as directed by the Engineer at two (2) grade crossings and replacement with like materials.
8. Furnishing and installation of new 115 RE running rails including fasteners within the limits designated at two (2) grade crossings and installation of new ties and ballast in both track approaches to the crossings.
9. Removal of defective ties as directed by the Engineer and replacement with new ties and additional ballast as needed within the designated limits of two (2) grade crossings.
10. Removal and reconstruction of the bituminous pavement at roadway approaches to the grade crossings, and miscellaneous repairs as necessary to facilitate installation of new rail grade crossings.
11. Installation of new pavement markings on the reconstructed pavements.
12. Installation and removal and replacement of crossbucks, yield signs
Contract No. T-1926-0150 NTC 2 of 9 emergency notification signs, “Track Out Of Service” signs, and sign posts as necessary at all grade crossing sites, to meet FRA regulations.
13. Removal of two concrete center panels in one module of one grade crossing, assessing the condition of the concrete module under the panels, making any repairs to the modules as necessary using epoxy grout, and replacing the existing center panels with new center panels
B. Estimated value for this work is in the range of Maryland DOT Terms & Conditions TC-2:01 Project Classification Cost Group “C” ($500,000- $1,000,000).
2. DEADLINE FOR QUESTIONS
Questions regarding the scope should be directed in writing to Darica Lawson, the Procurement Officer , via email address dlawson@mta.maryland.gov .
Questions directed to this office must be received no later than October 25, 2021 at 12pm. No interpretations other than written shall be binding on the Administration.
3. PRE-BID MEETING
A Pre-Bid meeting for the purpose of explaining the Project will be held on October 21, 2021 at 10:00 AM Local Time, via Microsoft Teams, Please email the Procurement Officer at dlawson@mdot.maryland.gov for access.
It is strongly suggested that the person(s) responsible for the preparation of bid documents for bidders attend the Pre-Bid Meeting and the site visit.
INSTRUCTIONS CRITICAL TO THE PREPARATION OF THE CONTRACT
DOCUMENTS WILL BE PRESENTED AT THE PRE-BID MEETING.
4. BID DUE DATE & TIME
Bids must be submitted via eMMA (emma.maryland.gov)
Bids must be received by the Procurement Officer no later than the Bid due date and time indicated on the Key Information Summary Sheet in order to be considered. Requests for extension of this date or time shall not be granted.
Bidders submitting Bids should allow sufficient delivery time to ensure timely receipt by the Procurement Officer. Except as provided in COMAR 21.05.02.10, Bids received after the due date and time listed in the Key Information Summary Sheet will not be considered.
Bids may be modified or withdrawn by written notice received by the Procurement Officer before the time and date set forth in the Key Information Summary Sheet for receipt of Bids.
Potential Bidders not responding to this solicitation are requested to submit the “No Bid Notice/Vendor Feedback” form, which includes company information and the reason for not responding (e.g., too busy, cannot meet mandatory requirements).
mailto:dlawson@mta.maryland.gov mailto:dlawson@mdot.maryland.gov https://emma.maryland.gov/page.aspx/en/usr/login?ReturnUrl=%2fpage.aspx%2fen%2fbuy%2fhomepage
Contract No. T-1926-0150 NTC 3 of 9
5. MULTIPLE OR ALTERNATE BIDS
Multiple and/or alternate Bids will not be accepted.
6. BASIS FOR AWARD
The Contract shall be awarded to the responsible Bidder submitting a responsive Bid with the most favorable Total Bid Price (as referenced in COMAR 21.05.02.13) for providing the services as specified in this IFB. The most favorable Total Bid Price will be the lowest price total on the Bid Form.
7. TIE BIDS
Tie Bids will be handled in accordance with COMAR 21.05.02.14.
8. DURATION OF BID
Bids submitted in response to this IFB are irrevocable for 90 days following the closing date of the Bids. This period may be extended at the Procurement Officer’s request only with the Bidder’s written agreement.
9. BID SUBMISSION
Each BID package must bear the following information:
a. Contract number and title;
b. Name and address of the Bidder;
c. Price Bid: Requirements & Evaluation
The Price Bid shall consist of the following documents, fully executed:
a. Bid Form, Bid Affidavit
b. Bid Bond in the amount of five percent (5%) of the bid price OR an Individual Surety Bid Bond in the amount of five percent (5%) and an Affidavit of Individual Surety (Attachment A) & Surety Affidavit (Attachment B); and
c. Completed Insurance Cost Worksheet.
d. MDOT MTA State -Funded MBE forms
Bids are due at 12pm on November 10, 2021; Bids will be opened publicly AT 12:30 P.M. through a bid tabulation visible to the public via eMMA. Please include this as line item 10 (total bid pricing) as requested via eMMA. Please also submit the required bid form with your package. Do not alter your bid form, as this can result in a rejection of your bid.
10. ELECTRONIC VERSION OF BID DOCUMENTS
The bid documents will be available by electronic means. The Bidder acknowledges and accepts full responsibility to ensure that the Bidder has made no changes to the Administration’s bid documents. In the event of a conflict between the versions of the bid documents in the bidder’s possession and the version
Contract No. T-1926-0150 NTC 4 of 9 maintained by the Procurement Officer, the version maintained by the Procurement Officer shall govern.
11. AVAILABILITY OF DOCUMENTS
Specifications may be downloaded from eMaryland Marketplace Advantage located at https://emma.maryland.gov
Bidders will be required to register the first-time specifications are downloaded and a login number will be assigned. This number should be used every time the bidder downloads the documents for this contract.
Bidders must supply accurate information in order to receive notice of all subsequent addenda.
TO OBTAIN THE SPECIFICATIONS:
Please visit eMaryland Marketplace Advantage (https://emma.maryland.gov) and download the Specifications for this procurement.
12. ADDENDA
Bidders are required to acknowledge all addenda with their bid package. Although the MTA endeavors to send out all addenda to this solicitation in a timely manner, it is the responsibility of the contractors to make sure they received all appropriate documents prior to the bid due date.
13. EMARYLAND MARKETPLACE REGULATIONS
Use of “e-Maryland Marketplace Advantage”
“e-Maryland Marketplace” is an electronic commerce system administered by the Maryland Department of General Services. Registration is free and will provide a means for your business to receive e-mail notifications of upcoming contracting opportunities in specified areas of interest and expertise. This means that all such information is immediately available to subscribers to e-Maryland Marketplace.
Because of the instant access afforded by e-Maryland Marketplace, it is recommended that all Bidders interested in doing business with Maryland State agencies subscribe to e-Maryland Marketplace. For more eMM registration information, visit the website:
https://emma.maryland.gov/ .
14. BID BOND
Each bid exceeding $100,000 must be accompanied by a Bid Bond in the amount of five percent (5%) of the Bid Price. Bid, payment, and performance security may be in the form of: (1) a bond executed by a surety company authorized to do business in the State; (2) a bond executed by an individual surety that meets certain criteria; (3) another form of security required by State or federal law; or (4) another form of https://emma.maryland.gov/ https://emma.maryland.gov/ https://emma.maryland.gov/
Contract No. T-1926-0150 NTC 5 of 9 security satisfactory to the unit awarding the contract. Sections 13-207, 13-216, 17- 104 of the State Finance and Procurement Article, Annotated Code of Maryland.
15. PAYMENT AND PERFORMANCE BONDS
A performance and payment bond shall be required for all construction contracts valued over $100,000. The performance bond shall be in an amount equal to one hundred percent (100%) of the contract price. The payment bond shall be in an amount equal to one hundred percent (100%) of the contract price. The Bond shall be on a form furnished by the MTA, underwritten by a surety authorized to do business in the State of Maryland, and in the amount specified by this solicitation.
Upon receiving notification of contract award, the Contractor shall deliver the bond to the MTA no later than the time the Contractor executes the contract. Bid, payment, and performance security may be in the form of: (1) a bond executed by a surety company authorized to do business in the State; (2) a bond executed by an individual surety that meets certain criteria; (3) another form of security required by State or federal law; or (4) another form of security satisfactory to the unit awarding the contract. Sections 13-207, 13-216, 17-104 of the State Finance and Procurement Article, Annotated Code of Maryland.
16. ELECTRONIC FUNDS TRANSFER
On every solicitation for a contract expected to exceed $200,000, the bidder will be required to accept payments by electronic funds transfer (EFT) unless the State Comptroller’s Office grants an exemption.
17. MINORITY BUSINESS ENTERPRISE PROGRAM
A. MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO
RESPOND TO THIS SOLICITATION NOTICE.
B. The Maryland Transit Administration hereby notifies all bidders that, in regard to any Contract entered into pursuant to this advertisement, Minority Business Enterprises will be afforded full opportunity to submit Bids in response to this Notice, and will not be subjected to discrimination on the basis of political or religious opinion or affiliation, race color, creed, sex, age or national origin in consideration for an award.
C. It is the goal of the Administration that Minority Business Enterprises participate in all Contracts. Each Contract will contain goals for Minority Business Enterprise participation on a contract-to-contract basis. A subcontracting goal of 19.9% has been established for this procurement. All bidders must submit with their bid a fully executed copy of the Certified MBE Utilization and Fair Solicitation Affidavit (MDOT MBE FORM A) and MBE Participation Schedule (MDOT DBE FORM B). If the bidder fails to submit these completed forms with the bid as required, the procurement officer shall deem the bid non-responsive or shall determine that the offer is not reasonably susceptible of being selected for award. ALL MBE FIRMS MUST BE CERTIFIED BY THE
Contract No. T-1926-0150 NTC 6 of 9
MARYLAND DEPARTMENT OF TRANSPORTATION. NO OTHER
CERTIFICATIONS WILL BE ACCEPTED.
D. A contractor may count toward its MBE goal sixty percent (60%) of its expenditures for materials and supplies required under the contract and obtained from a MBE regular dealer, and 100 percent of such expenditures to a MBE manufacturer. The MBE credited supplies may not exceed 60 percent of the entire contract goal.
E. New versions of Sections 13-103, 13-104 and 14-303 of the State Finance and
Procurement Article of the Maryland Code, relating to increased bid/proposal documentation of DBE commitments, are effective as of October 1, 2004. The Contract under this solicitation will be awarded in accordance with these new requirements. As a result, new bid submission requirements, including certain revised DBE documents, are in effect for this solicitation. These new requirements are set forth elsewhere in this solicitation.
F. As a result of the revisions to Sections 13-103, 13-104 and 14-303, certain existing portions of the Code of Maryland Regulations (COMAR) relating to post bid/proposal submission of MBE subcontractors are inconsistent with the revised statute. To the extent the provisions of COMAR relating to post bid identification of MBE subcontractors are inconsistent with the requirements of this solicitation, the requirements of this solicitation shall control the award of a Contract. Questions or concerns regarding the MBE requirements of this solicitation must be raised prior to the opening of bids or receipt of initial proposals
G. Effective on October 1, 2009, Minority Business Enterprise (MBE) firms may elect to be dually certification as woman-owned businesses and as members of an ethnic or racial category. For purposes of achieving any gender or ethnic/racial MBE participation subgoals in a particular contract, an MBE firm that has dual certification may participate in the contract either as a woman-owned business or as a business owned by a member of a racial or ethnic minority group, but not both.
WARNING – PLEASE READ:
A firm must be listed in the MDOT MBE/DBE Directory with the gender category in order to be used to meet the gender subgoal.
A firm must be listed in the MDOT MBE/DBE Directory with an ethnic/racial category in order to be used to meet the ethnic/racial subgoal.
A firm must be listed in the MDOT MBE/DBE Directory with both the gender and ethnic/racial categories in order for a contractor to have the option of selecting which of those categories it will use for the firm on a State contract.
Contractors should designate whether the MBE firm will be used as a woman-owned business or as a business owned by a member of a
Contract No. T-1926-0150 NTC 7 of 9 racial/ethnic group before calculating the percentage of MBE participation goals and subgoals they intend to meet.
Maryland’s MBE/DBE Directory will reflect the dual certification status beginning October 1, 2009. You can access the MBE/DBE Directory at http://mbe.mdot.state.md.us. Firms with dual certification will now be listed as follows:
Example:
ABC Corporation, Inc.
123 Corporate Circle Hanover, MD 21076 Female/African American 00-000
18. AFFIRMATIVE ACTION REQUIREMENTS
Bidders on this Work will be required to comply with MTA Affirmative Action Requirements and all applicable Equal Employment Opportunity Laws and Regulations.
19. SUSPENSION AND DEBARMENT CERTIFICATION
All bidders will be required to certify that they are not on the GSA List of Parties Excluded from Procurement and the List of Contractors Suspended or Debarred from Contracting with the State of Maryland. All bidders must also be in good standing with the State Assessment & Taxation Department.
20. CONTRACTOR’S QUESTIONNAIRE
All Bidders shall submit a fully executed copy the Contractor’s Questionnaire Pre- Award Evaluation Data Form with the bid package.
20. INSURANCE REQUIREMENTS
The Administration has chosen to provide Workers’ Compensation, General Liability, Excess Liability, Builders Risk, Pollution Liability and Railroad Protective coverage on behalf of Contractors and subcontractors working on this project. This approach to project insurance is commonly called a wrap-up or owner-controlled insurance program (OCIP). Specific information regarding Liability Insurance Requirements is contained in the IFB.
Please note that an Insurance Cost Worksheet must be included with each bid package.
21. USE OF BIDDER’S OWN FORCES
The bidder with his own forces shall perform not less than fifty percent (50%) of the http://mbe.mdot.state.md.us/
Contract No. T-1926-0150 NTC 8 of 9 work at the project site.
22. PROTESTS/DISPUTES
Any protest or dispute related, respectively, to this solicitation or the resulting Contract shall be subject to the provisions of COMAR 21.10 (Administrative and Civil Remedies).
23. INVESTMENT ACTIVITIES IN IRAN ACT
State Finance & Procurement, §§17-701 – 17-707, Annotated Code of Maryland [Chapter 447, Laws of 2012].
A company listed on the Investment Activities In Iran list is ineligible to bid on, submit a proposal for, or renew a contract for goods and services with a State agency or any public body of the State. Also ineligible are any parent, successor, subunit, direct or indirect subsidiary of, or any entity under common ownership or control of, any listed company.
Agencies must obtain a certification regarding investments in Iran from each bidder or offeror for new contracts and from each Contractor seeking to renew an existing contract. Specifically, bidders, offerors, and renewing Contractors have to certify that at the time the bid/proposal is submitted or the contract renewed that the company is neither identified on the Investment Activities In Iran list nor engaging in investment activities in Iran.
A company that cannot make the certification must supply the agency, under penalty of perjury, with a detailed written description of its investment activities in Iran.
False Certifications: If an agency, using credible information, determines that a company has submitted a false certification regarding its investments in Iran, the agency must notify the company and provide the company 90 days to demonstrate in writing that it is not engaged in investment activities in Iran. If the company fails to demonstrate that it is not engaged in investment activities in Iran in that time, the agency shall report the company to the Attorney General and to the Board of Public Works.
24. CANCELLATION OR REJECTION OF BIDS
The “Notice to Contractors” may be canceled in accordance with State Procurement Regulations. The State (Administration) reserves the right to cancel this IFB, or accept or reject any and all Bids, in whole or in part and/or waive technical defects if, in its judgment, the interests of the Administration so require.
Contract No. T-1926-0150 NTC 9 of 9
T-1926-0150 NBN 1
VENDOR COMMENTS
To help us improve the quality of State solicitations, and make our procurement process more responsive and business-friendly, we ask that you take a few minutes to complete this form.
Thank you for your assistance.
Bid/Proposal No.: T-1926-0150
Contract Title: REPAIR OR REPLACEMENT OF SEVEN GRADE CROSSINGS
ON THE CENTREVILLE AND CHESTERTOWN FREIGHT
I. If you are not bidding, please indicate why:
Other commitments preclude our participation at this time.
The subject of the contract is not in our business line.
We lack experience in the work/commodities required.
The scope of work is beyond our current capacity.
We cannot be competitive. (Please explain below.)
The specifications are either unclear or too restrictive. (Please explain below.)
Bid/proposal requirements, other than specifications, are unreasonable or too risky. (Please explain below.)
Time for completion is insufficient.
Bonding/insurance requirements are prohibitive. (Please explain below.)
Doing business with government is simply too complicated.
Prior experience with State of Maryland contracts was unprofitable or otherwise unsatisfactory. (Please explain below.)
Other:
II. Please explain your response further, offer suggestions, or express concerns. (use the back for additional information.
Remarks:
OPTIONAL:
Vendor Name: Date:
Contact: Phone:
Address or e-mail:
THANK YOU !!!!!!!
CONTRACT NO. T-1926-0150 BID FORM
UNIT PRICE SCHEDULE
BF 4 OF 10
Item Section Description Estimate of Quantity
Unit Unit Price Total Price
001 011500 Mobilization 1 LS $32,000.00 $32,000.00
002 012100 Miscellaneous Work Allowance 1 ALLOW $40,000.00 $40,000.00
003 014300 Quality Assurance and Quality Control 1 ALLOW $12,000.00 $12,000.00
004 015213 .04
Engineer’s Field Office 1 ALLOW $25,000.00 $25,000.00
005 015526 Maintenance of Traffic (MOT) 1 ALLOW $45,000.00 $45,000.00
006 015526 Temporary Traffic Signs 1683 SF
007 015526 Type III Barricades for Maintenance of
Traffic
21 EA
008 015526 Portable Variable
Message Signs
(PVMS)
126 UD
009 015526 Traffic Drums for Maintenance of
Traffic
27 EA
010 015713 Filter Bag 5 EA
BF 5 OF 10
Item Section Description Estimate of Quantity
Unit Unit Price Total Price
011 015713 Temporary Seeding 20 SY
012 024113 .01
Asphalt Grade Crossing
Demolition
98 SY
013 024113 .01
Timber Grade Crossing
Demolition
177 SY
014 024113 .01
Removal of Existing Ballasted
Track
155 TF
015 024113 .01
Contingent Removal and
Replacement of Defective Existing Timber Crossties
21 EA
016 024113 .01
Remove and Replace Selected
Timber Grade Crossing Panels
13 EA
017 024113 .01
U.S. 301 Concrete Crossing
Assessment and Repair
1 LS
018 024113 .01
Supplemental Removal of
Existing Pavement
100 SY
019 024113 .01
Contingent Asphalt Pavement Removal 31 SY
020 101453 Sheet Aluminum Signs 32 SF
BF 6 OF 10
Item Section Description Estimate of Quantity
Unit Unit Price Total Price
021 101453 Remove and
Reinstall Sheet Aluminum Signs
5 EA
022 101453 Square Perforated Tubular Steel Posts 4 EA
023 101453 Square Tubular Steel Anchor Bases 4 EA
024 310519 .14
Geotextile for Track Work 550 SY
025 312300 Test Pit Excavation 4 EA
026 312300 Class 1-A Excavation 10 CY
027 320116 .71
Mill Asphalt Pavement – 2
Inches
292 SY
028 321123 Base Course Using Graded Aggregate 11 CY
029 321216 .13
2-Inch Hot Mix Asphalt Overlay
Paving
292 SY
030 321216 .13
Supplemental Hot Mix Asphalt
Superpave Surface Course
14 TON
BF 7 OF 10
Item Section Description Estimate of Quantity
Unit Unit Price Total Price
031 321216 .13
Supplemental Hot Mix Asphalt
Superpave Base Course
45 TON
032 321216 .15
Hot Mix Asphalt Grade Crossing 240 SY
033 321216 .15
Contingent Hot Mix Asphalt
Superpave Base Course
11 TON
034 321723 5-Inch Yellow Thermoplastic
Pavement Markings
222 LF
035 321723 5-Inch White Thermoplastic
Pavement Markings
139 LF
036 321723
24-Inch White Preformed
Thermoplastic Pavement Marking
Lines
80 LF
037 341113 Furnish 115 RE Rail 258 LF
038 341116 Furnishing and Installing Rail
Welds
4 EA
039 341119 Furnish Compromise Joints 8 EA
040 341119 Furnish Contingent Replacement Joint
Bars
4 EA
BF 8 OF 10
Item Section Description Estimate of Quantity
Unit Unit Price Total Price
041 341119
Furnish and Install Contingent
Compromise Joint Welds
8 EA
042 341126 Ballasted Track Construction 155 TF
043 341126 .13
Furnish and Install Ballast 110 TON
341126
.13
Furnish and Install Contingent Ballast 20 TON
045 341133 .15
Furnish Composite Ties 90 EA
046 341133 .17
Furnish Contingent Timber Crossties 21 EA
Basis of Award: Total amount of items 001 thru 046 ______________________(figures)
(words) This amount will only be added to the base bid in the event that the bidder is excluded from the wrap-up insurance program or the program is terminated mid-term. The Insurance Premium Worksheet must be attached to the bid.
Insurance Premium (Contingency)
LS
Contract No. T-1926-0150 CQ 1 OF 6
STATE OF MARYLAND DEPARTMENT OF TRANSPORTATION
MARYLAND TRANSIT ADMINISTRATION
CONTRACTORS QUESTIONNAIRE
PRE-AWARD EVALUATION DATA
IMPORTANT
This questionnaire is intended as a basis of establishing the qualifications of contractors for undertaking Construction, Maintenance and Repair Work under the jurisdiction of the Maryland Transit Administration.
THIS QUESTIONNAIRE FORM IS A PART OF THE CONTRACTOR’S BID
AND FAILURE TO SUBMIT IT MAY BE THE BASIS FOR REJECTION OF A
BID.
I. General
(a) Legal Title and Address of Organization
(b) Contractor’s Local Representative’s Name, Title and Address
(c) ___Corporation ___Partnership ___Individual (Check One)
(d) Date your Firm was organized or started:
(e) Federal I.D. No. _________________________
(f) If a Corporation, state:
Capital Paid in Cash: $_____________________ Date of Incorporation: _____________________ State in which Incorporated: ________________
(g) Other than persons listed above, number of full-time office employees:
(h) Number of full-time permanent field employees:__________________
(i) Subsidiary of another company? Yes _____ No _____
1. Parent Company Name and Federal I.D. No.:
2. Sister Company in related business? Yes _____ No _____
3. Sister Company Name and Federal I.D. No.:
Contract No. T-1926-0150 CQ 2 OF 6
(j) In what States, if any, are you licensed to do business?
1. License Number in each State in which you are licensed to do business:
(k) Names of officers, owners, partners and principals. Identify relationship of each to firm, extent of activity in firm and projected involvement of each on this contract:
II. If yes to any of the following questions, please attach a brief explanation and include the names, addresses and phone numbers of the person who may be contacted for additional information.
(a) Are there any claims, judgments, arbitration proceedings or suits pending against your organization? Yes___ No___
(b) Within the last five years, has your organization ever filed any lawsuit or requested arbitration related to a construction contract? Yes___ No___
(c) Within the last five years has your organization ever failed to complete any work awarded to it? Yes___ No___
(d) Has your organization ever been adjudged a bankruptcy or filed a petition in bankruptcy? Yes___ No___
(e) In the last five years has your organization been assessed liquidated damages for failure to complete a project by the contracted date? Yes___ No__
(f) Have any Performance or Payment Bond claims ever been paid by any surety on behalf of your organization? Yes___ No___
(g) Does your organization have a Quality Control Program? Yes ___No___
(h) Is a copy of this program available upon request? Yes ____ No___
(i) Has your organization ever been barred from performing work for any
Federal, State or other governmental agency? Yes ____ No ___
(j) Is any member of your organization employed by the State of Maryland, a member of any State institutional board, management board or board of trustees, or in any way officially connected with the government of the State of Maryland? Yes ____ No ____
Contract No. T-1926-0150 CQ 3 OF 6
(k) Has your organization or any of its directors, officers, partners or supervisory personnel ever been indicated and/or found guilty for criminal action relating in any way to the conduct of your organization’s business?
Yes ____ No ____
III. Financial
(a) Enclose your most recent audited financial statement. If, and only if, you do not have an audited financial statement, enclose your most recent Federal tax return and unaudited financial statement.
(b) Who is your bonding Company?
(c) Who is your bonding agent?
(d) Has your bonding company changed in the past three years? If yes, why?
(e) What is the total bonding capacity of your firm?
(f) What is your current bond amount in use?
(g) What is the maximum you have bonded on any single project?
(h) What is your policy on bonding subcontractors?
(i) Do you have any outstanding claims from any subcontractors?
(j) Within the past five years, has any bonding company refused to write you a bond on any construction work? If yes, explain.
IV. Experience
(a) Indicate type of Contracting undertaken by your organization and years of experience:
General _____________________years Sub_____________years Type________________________ _____________ years Type ________________________ _____________years
(b) State construction experience of principal members of your organization:
Enclose resumes of all key personnel who may staff this project.
Contract No. T-1926-0150 CQ 4 OF 6
Construction Experience
Name and Title (Vice Pres., Mgr., etc.)
Construction Experience (Years)
Type of Work (Such as Hospitals, Apts, Etc.)
In what capacity?
(Foreman, Supt., etc.)
(c) List some principal projects completed by your organization:
Name of Work __________________________________ General or Sub __________________________________ Type of work___________________________________ Percentage of work performed by your firm (attach separate sheet if needed)_________________________
(d) If a General Contractor, list some sub contractors in various fields who have worked under you:________________________________________________________
(e) If Sub-Contractor, list some General Contractors for whom you have worked:_____________________________________________________
Contract No. T-1926-0150 CQ 5 OF 6
(f) List major projects that involved the work of boiler replacement in the last three (3) years:
A. Project Name: _____________________________________
Project Description:_________________________________
Contact: __________________________________________
Phone No.__________________________________________
Email: _____________________________________________
B. Project Name: _____________________________________
Contact: __________________________________________
Email: ____________________________________________
C. Project Name: _____________________________________
Contact: __________________________________________
Email: _____________________________________________
V. Safety
(a) Does your organization have a written Safety program? Yes ___ No ___
(b) Is a copy of this program available upon request? Yes ___ No ___
(c) Within the past ten years, has your organization received any order for violations from the United States Occupational Safety and Health Administration (OSHA) or the Maryland Occupation Safety and Health Administration? Yes ___ No ___
Contract No. T-1926-0150 CQ 6 OF 6
If yes, explain. _________________________________________
The above statements are certified to be true and accurate.
Dated at ________________________this _________day of ________________, 20__.
By: ____________________________________________________________
(Title of Person signing)
(Name of Organization)
State of ____________________________________________________________
County (City) of__________________________________________________________:
On this _______________day of ______________________, 20____, before me, _______________________________, the undersigned officer, personally appeared and acknowledged that he (she) executed the foregoing Contractor’s Questionnaire in the capacity therein stated and for the purpose therein contained.
In witness whereof, I hereunto set my hand and official seal.
Notary Public
(SEAL)
My commission expires: ___________________________
Contract No. T-1926-0150 SUI 1 OF 2
SUBCONTACTOR UTILIZATION FORM
The attached form is for informational purposes only. It will only have to be completed by the successful bidder on the project. A copy of the form will be sent to the successful bidder along with the contract and Notice of Intent and should be returned to MTA with the other required paperwork within ten (10) days of receipt of the letter.
Contract No. T-1926-0150 SUI 2 OF 2
Maryland Department of Transportation Sub-Contractor Utilization Information Form
Prime Contractor (Name of Firm):
Telephone: Fax: E-Mail:
Prime Contractor: (Address-Number, Street, City, State, Zip)
FEIN Number: Contract Number: Contract Amount: (Dollars)
Sub -Contractor (Name of Firm):
Sub - Contractor: (Address-Number, Street, City, State, Zip)
FEIN Number: MDOT-DBE Certified (y/n):
If yes, give MDOT Cert.#
Annual Gross Income:
List Years in Business:
List Description of Service You Provide:
NOTE: Please copy this sheet if additional sub-contractors are used.
INSURANCE REQUIREMENTS
T-1452-0640 IR 1 of 4
In lieu of General Provision GP-7.14, Liability Insurance, the following shall prevail:
A. The Contractor shall forward to the Maryland Transit Administration prior to the execution of the Contract, a certificate of insurance issued by the insurer(s) and/or broker(s), including special endorsements. If requested by the Engineer, the Contractor shall provide a certified copy of the actual policies and endorsements in addition to certificates. The contractor shall procure and pay for insurance specified herein issued by companies licensed and authorized to do business in the State of Maryland and who have a minimum acceptable Best and/or S&P rating.
The Contractor shall furnish policies satisfactory to the Administration (hereinafter "Administration" refers to Maryland Transit Administration, Maryland Department of Transportation and the State of Maryland inclusively) as to contents and carrier, such insurance will contain the following provisions:
I . Thirty (30) days prior notice to the Administration of cancellation.
2. Inclusion of the Administration, Engineer and their directors, officers, representatives, agents and employees as additional Insured as respects work or operations in connection with the Contract.
3. Endorsement providing that such insurance is primary insurance and no insurance of the Administration will be called in to contribute to a loss.
4. The Certificate of Insurance shall include the Contract Name and Number for identification purposes.
5. The Contractor agrees to indemnify, defend, and hold harmless the
Administration from and against all loss or expense (including costs and attorney's fees) by reason of liability imposed by law upon the Administration for damages because of bodily injury, including death, at any time arising there from, sustained by any person or persons or on account of damage to property, including loss of use thereof arising out of or in consequence of the performance of this contract, whether such injuries to person(s) or damage to property are due or claimed to be due to the negligence of the Contractor, the Administration, their agents and employees, except only such injury or damage as shall have been occasioned by the sole negligence of the Administration. The above provisions are to be included in all subcontracts as specified herein under Paragraph D below.
B. If at any time above-required insurance policies should be canceled, terminated, or modified so that the insurance is not full force and effect as required herein, the Administration may terminate this Contract for default or obtain insurance coverage equal to the required herein, the cost of which shall be charged to the Contractor and deducted from any payments to the Contractor.
T-1452-0640 IR 2 of 4
C. Insurance Coverage: The coverage of insurance under such policy or policies shall be at policy limits not less than as specified herein.
1. Worker's Compensation and Employers' Liability (Coverage B): Providing statutory coverage in the State of Maryland, to include all States endorsement, United States Longshoremen and Harbor-Workers' Compensation Act, and employer's Liability (Coverage B), with a minimum limit of $500,000.00.
2. An occurrence form Comprehensive General Liability: To include
Contractual Liability, Broad Form Property damage, Explosion, Collapse, and Underground Coverage, and Products/Completed Operations Coverage. The Completed Operations Coverage shall remain in effect until two (2) years after the work has been accepted by the Administration. The Comprehensive General Liability Insurance shall have a mm1mum combined single limit of $2,000,000.00 and shall at no time have a aggregate limit of less than $2,000,000.00.
3. Owners Protective Liability: Provide and maintain during the life of this
Contract an Owners Protective Liability policy, insuring the Administration, their agents, servants, and employees from loss and liability to a combined single limit of $2,000,000.00 for Personal Injury and Property Damage and shall at not time have an aggregate limit of less than $2,000,000.00.
4. All Builder's Risk Insurance: To include fire, extended coverage, vandalism, and malicious mischief, flood, and earthquake. This policy is to be written to completed value plus ten (I0) percent of the contract price. The policy shall included the Administration as a name insured as their interest may appear.
5. Comprehensive Business Automobile Liability: The policy or policies shall cover all automobiles defined as motor vehicles, whether owned, non-owned leased, or hired, to a minimum combined single limit for Bodily Injury and Property Damage of $2,000,000.00 and shall include, by endorsement, a waiver of subrogation with respect to the Administration.
Pollution liability coverage at least as broad as that provided under the ISO pollution liability - broadened coverage for covered autos endorsement (CA 99 48) shall be provided, and the Motor Carrier Act endorsement (MCS90) shall be attached.
T-1452-0640 IR 3 of 4
Loading and unloading of any motor vehicle must be covered by endorsement to the automobile liability policy or policies.
6. Excess and/or Umbrella Liability insurance containing coverage no less restrictive than that required in the underlying policies specified above. The required primary insurance shall be listed as underlying coverage in the first layer umbrella policy. The umbrella policies shall contain a minimum total occurrence and aggregate limit of: $5,000,000.
7. A. Contractor shall maintain in force for the full period of this contract insurance covering losses caused by pollution conditions that arise from the operations of the contractor described under the scope of services of this contract. Insurance shall apply to bodily injury;
property damage, including loss of use of damaged property or of property that has not been physically injured; cleanup costs; and defense, including costs and expenses incurred in the investigation, defense, or settlement of claims. The policy of insurance affording these required coverage's shall be written in an amount of at least $5,000,000 per loss, with an annual aggregate of at least $5,000,000.
B. The policy of insurance shall be endorsed to include as insured the MTA, its officers, and employees.
C. The policy of insurance as required in paragraph 1 shall be written by an insurer acceptable to the MTA.
D. If coverage is written on a claims-made basis, the Contractor warrants that any retroactive date applicable to coverage under the policy precedes the effective date of this contract; and that continuous coverage will be maintained or an extended discovery period will be exercised for a period of five years beginning from the time that work under this contract is completed.
E. The existence of coverage must be documented on the certificate of insurance signed by a person authorized by the insurer to bind on its behalf coverage as described in the certificate. Such certificate shall be delivered to MTA before work under this contract commences.
8. lf the scope of services as defined in this contract includes the disposal of any hazardous or non-hazardous materials from the job site, the Contractor must furnish to the MTA evidence of pollution legal liability insurance maintained by the disposal site operator for losses arising from the insured facility accepting waste under this contract. Coverage certified to the MTA under this paragraph must be maintained in minimum amounts of $5,000,000 per loss, with an annual aggregate of at least $5,000,000.
T-1452-0640 IR 4 of 4
9 RAILROAD PROTECTIVE LIABILITY INSURANCE MAY BE
REQUIRED PER TASK ORDER IF THE WORK IS DONE WITHIN
FIFTY (50) FEET OF THE TRACK.
Maryland Transit Administration (MTA) will utilize an Owner Controlled Insurance Program (OCIP) for the Railroad Protective Liability Insurance only on this construction project. The amount should not be included in your base bid. This amount will only be added to the base bid in the event that the bidder is excluded from the wrap-up insurance program or the progran1is terminated mid-term.
Railroad Protective Insurance written on occurrence for CG00351093 for construction work performed on, over, or under a railroad right of way or within Fifty (50) feet of railroad property. The coverage limits are $5,000,000 per Occurrence and $10,000,000 aggregate.
MTA's Insurance Representative must be notified prior to any contractor or subcontractor beginning work within fifty (50) feet of the track.
Contract No. T-1926-0150 EFT 1 OF 3
PAYMENTS TO CONTRACTORS BY ELECTRONIC FUNDS TRANSFER
Every solicitation for a contract expected to exceed $200,000 is required to contain the following provision:
The Bidder agrees to accept payments by electronic funds transfer unless the State Comptrollers Office grants an exemption. The selected Bidder shall register using the attached form COT/GAD X-10 Vendor Electronic Funds (EFT) Registration Request Form. Any request for an exemption must be submitted to the State Comptroller’s Office for approval at the address specified on the COT/GAD X-10 form and must include the business identification information as stated on the form and include the reason for the exemption.
Once a contractor registers to receive payments electronically, all State payments to the contractor (including payments under other State contracts regardless of value) will be disbursed via electronic funds transfer.
Contract No. T-1469-0440 EFT 2 OF 3
Vendor Electronic Funds Transfer (EFT) Registration Request Form
Date of request
Business identification information (Address to be used in case of default to check):
Bus…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .