Rehabilitate the Peaks View Parking Area, NPS-PINN
Solicitation number
140P8420R0003
Issued by

About this file

This synopsis of proposed contract action announces a requirement for the National Park Service at Pinnacles National Park to rehabilitate the Peaks View Parking Area. Work includes regrading, repaving, and restriping the parking lot, constructing various walkways, and installing a vault toilet and drinking fountain. Base line items are mobilization, site preparation, demolition, grading, paving, amenities, a drinking fountain/bottle filling station, and a standard precast vault toilet. An additive item is a custom built vault toilet building. The estimated price range is $250,000 to $500,000. The NAICS code is 237310 with a $39.5 million size standard. The acquisition is a total small business set-aside, with offers solicited only from small businesses. The request for proposal will be available on May 1st via SAM.gov and close 30 days later. Award will be a single, fixed price contract determined by best value considering price and factors such as experience, technical competence, scheduling, licensing, and past performance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL PARK SERVICE

PINNACLES NATIONAL PARK

RFP No. 140P8420R0003 Rehabilitate the Peaks View Parking Area

PRE-SOLICITATION ANNOUNCEMENT

The National Park Service at Pinnacles National Park has a requirement to rehabilitate the Peaks View Parking Area. The parking lot is located on the East side of Pinnacles National Park, along the Park Entrance Road, approximately 3.3 miles west of Highway 25. The Work includes the regrading, repaving, and restriping of the Peaks View parking lot area, the construction of various walkways, and the installation of a vault toilet among other amenities.

Base line item work includes Mobilization, Site Prep, and Demolition (this item consists of all costs associated with the contractors pre and post construction activities including mobilization, demobilization, completion of all required site clearing, material disposal, and removal and disposal of swing gate at entrance of parking lot); Grading, Paving, and Amenities (this item consists of all labor, materials, and equipment required for the construction of a fully functional trailhead parking area in accordance with the project plans and specifications, including, but not limited to, the installation of all required traffic control, temporary stormwater pollution prevention measures, completion of all rough and fine grading inclusive of any necessary soil import or export, furnish, place and compact all base materials, asphalt concrete paving surfaces and appurtenances, the construction all concrete surfacing improvements, installation of all necessary signage and striping, relocation of various boulders, relocation of existing periscopes, and relocation of picnic benches); Drinking Fountain/Bottle Filling Station (this item consists of all labor, materials, and equipment required for the installation of the specified freeze resistant tri-head water fountain and associated new water service lateral and leach line in the locations shown on the plans, including, but not limited to, the completion of all required trenching, installation of all required bedding material, installation of all aggregate fill, installation of all sanitary sewer appurtenances, installation of all water appurtenances and fittings, trench backfill and compaction, and installation of the specified freeze resistant tri-head water fountain in accordance with the manufacturer’s recommendations); and Vault Toilet-Standard Precast with No Porch (this item consists of all labor, materials, and equipment required for the installation of a double fully precast building - CXT Double Cascadian or equivalent - in the location shown on the plans, including, but not limited to, the completion of all required excavation, the installation of all required bedding material, installation of the vault toilet tankage and structure in accordance with the manufacturer’s recommendations, completion of the building improvements for a fully functional vault toilet facility, completion of all required backfilling around the tank and structure, and completion of all finish grading necessary to incorporate the vault toilet into the adjoining concrete pathways and parking lot ensuring that the installation meets accessibility requirements).

Bid additive line item work includes Vault Toilet-Custom Built Building in Lieu of Standard (this item is a bid additive to base line item for Vault Toilet-Standard Precast with No Porch and includes providing all labor, materials, and equipment required for the installation of the specified Vault Toilet facility in the location shown on the plans, including, but not limited to, the completion of all required excavation, the installation of all required bedding material, installation of the vault toilet tankage and structure in accordance with the manufacturer’s recommendations, completion of the building improvements for a fully functional vault toilet facility with custom timber framed porch, completion of all required backfilling around the tank and structure, and completion of all finish grading necessary to incorporate the vault toilet into the adjoining concrete pathways and parking lot ensuring that the installation meets accessibility requirements).

Per the general price ranges established in FAR 36.204, the estimated project price is between $250,000 and $500,000. The North American Industry Classification System (NAICS) Code for this requirement is 237310, with a corresponding size standard of $39.5 million in annual gross receipts for the past three years.

This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.

The Request for Proposal (RFP) will be available on/about May 1, 2020 by electronic means only and can be downloaded along with all related attachments from the Contracting Opportunities website at https://beta.sam.gov/. The RFP will close 30 days from the actual date of issuance. The Contractor is responsible for periodically checking the website for any Amendments that may be issued prior to the closing date of the RFP.

The Government intends to award a single, fixed price contract. Award selection will be made on a Best Value determination made after consideration of price and factors other than price (relevant experience, technical competence of key personnel, scheduling and project management, California contractor state license classification, and past performance) as listed in the Request for Proposal.

See Section L of the RFP (when issued) for more information on availability and scheduling of a Site Visit.

Interested parties may explore the Pinnacles National Park website to acquaint themselves with the general area and to view park maps at http://www.nps.gov/PINN.