SWPPP.pdf
PDF 260 KB Posted
- Attached to
- Ten Mile Road and Deer Flat Road
- Solicitation number
- CT227-10
- Issued by
- Ada County, Idaho
About this file
This is a Stormwater Pollution Prevention Plan (SWPPP) document for the Ten Mile Road and Deer Flat Road roundabout construction project in Idaho. The SWPPP outlines environmental protection measures and stormwater management protocols required during construction activities at the intersection where a roundabout will be installed. The document establishes best management practices (BMPs) for erosion and sediment control, pollution prevention, and stormwater quality protection throughout the project duration. The plan addresses site-specific conditions, potential pollutant sources, and mitigation strategies to comply with federal and state stormwater regulations and environmental permits required for the infrastructure project.
The SWPPP document serves as a mandatory environmental compliance tool for contractors and construction personnel responsible for implementing stormwater control measures on-site. It specifies responsibilities for plan maintenance, inspection schedules, and corrective actions required during construction phases. The document establishes monitoring and reporting requirements to ensure adherence to stormwater discharge permits and to minimize impacts to receiving waters and nearby environmental resources. Implementation of the SWPPP is a contractual obligation for all construction work associated with the roundabout installation, including concrete and asphalt paving, drainage infrastructure, pathway construction, and utility installations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACHD Supplied SWPPP Information This information is provided to the Contractor to aid in the preparation of the SWPPP Report and NOI.
1. Project/Site Information
i. Project Name: Deer Flat and Ten Mile Road Intersection
ii. Project Street/Location: Deer Flat road between Wasabi Road and Knowles Way; Ten
Mile Road between Ingo Street and Crenshaw Street.
iii. Project Latitude/Longitude: 43º30’10” N / 116º26’01” W
i. Method for determining latitude/longitude:
USGS topographic map (specify scale: ) EPA Web site GPS
Other (please specify): Google Earth
iv. Additional Project Information:
i. Is the project/site located on Indian country lands, or located on a property of religious or cultural significance to an Indian tribe? Yes No
ii. If yes, provide the name of the Indian tribe associated with the area of Indian country (including the name of Indian reservation if applicable), or if not in Indian country, provide the name of the Indian tribe associated with the property: INSERT
TEXT HERE
2. Discharge Information
i. Does your project/site discharge stormwater into a Municipal Separate Storm Sewer
System (MS4)? Yes No
ii. Are there any surface waters that are located within 50 feet of your construction disturbances? Yes No
iii. Names of Receiving Waters:
Name(s) of the first surface water that receives stormwater directly from your site and/or from the MS4 (note: multiple rows provided where your site has more than one point of discharge that flows to different surface waters)
1.
2.
3.
Is this surface water listed as
“impaired”?
If you answered yes, then answer the following:
What pollutant(s) are causing the impairment?
Has a TMDL been completed?
Title of the
TMDL
document
Pollutant(s) for which there is a
TMDL
1. YES NO YES NO
2. YES NO YES NO
3. YES NO YES NO
iv. Describe the method(s) you used to determine whether or not your project/site discharges to an impaired water: N/A
v. Are any of the surface waters to which you discharge designated by the state or tribal authority under its antidegradation policy as a Tier 2 (or Tier 2.5) water (water quality exceeds levels necessary to support propagation of fish, shellfish, and wildlife and recreation in and on the water) or as a Tier 3 water (Outstanding Natural Resource
Water)? (See Appendix F). Yes No If yes, name(s) of receiving water(s) and its designation (Tier 2, Tier 2.5 or Tier 3): N/A
3. Nature of the Construction Activity
i. Size of Construction Project: What is the size of the property (in acres), the total area expected to be disturbed by the construction activities (in acres), and the maximum area expected to be disturbed at any one time?
9.06 Acres
9.06 Acres
5.93 Acres
4. Endangered Species Protection:
i. Eligibility Criterion: ☒A ☐B ☐C ☐D ☐E
ii. Include documentation supporting your determination of eligibility.
Supporting Documentation
Provide documentation for the applicable eligibility criterion you select in Appendix D, as follows:
For criterion A, indicate the basis for your determination that no federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site’s action area (as defined in Appendix A of the permit). Check the applicable source of information you relied upon:
Specific communication with staff of the U.S. Fish & Wildlife Service or National Marine
Fisheries Service. INSERT DATE OF COMMUNICATION AND WHO YOU SPOKE WITH
Publicly available species list. USFWS official species list issued for the project by IPaC in August, Other source: INSERT SPECIFIC SOURCE
For criterion B, provide the Tracking Number from the other operator’s notification of permit authorization: INSERT AUTHORIZATION TRACKING NUMBER FROM OTHER OPERATOR'S NOTIFICATION
LETTER/EMAIL
Provide a brief summary of the basis used by the other operator for selecting criterion A, B, C, D, E, or F: INSERT TEXT HERE
For criterion C, provide the following information:
▪ INSERT LIST OF FEDERALLY-LISTED SPECIES OR FEDERALLY-DESIGNATED CRITICAL HABITAT LOCATED IN
YOUR ACTION AREA
▪ INSERT DISTANCE BETWEEN YOUR SITE AND THE LISTED SPECIES OR CRITICAL HABITAT (in miles)
Also, provide a brief summary of the basis used for determining that your site’s discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat: INSERT TEXT HERE
For criterion D, E, or F, attach copies of any letters or other communication between you and the U.S. Fish & Wildlife Service or National Marine Fisheries Service concluding consultation or coordination activities. INSERT COPIES OF LETTERS OR OTHER COMMUNICATIONS HERE
5. Historic Preservation:
Step 1
Do you plan on installing any of the following stormwater controls at your site? Check all that apply below, and proceed to Appendix E, Step 2.
Dike
Berm
Catch Basin
Pond
Stormwater Conveyance Channel (e.g., ditch, trench, perimeter drain, swale, etc.)
Culvert
Other type of ground-disturbing stormwater control: Four sub-surface seepage beds
(Note: If you will not be installing any ground-disturbing stormwater controls, no further documentation is required for
Section 3.2 of the Template.)
Step 2
If you answered yes in Step 1, have prior surveys or evaluations conducted on the site already determined that historic properties do not exist, or that prior disturbances at the site have precluded the existence of historic properties? YES NO
▪ If yes, no further documentation is required for Section 3.2 of the Template.
▪ If no, proceed to Appendix E, Step 3.
Step 3
If you answered no in Step 2, have you determined that your installation of subsurface earth-disturbing stormwater controls will have no effect on historic properties?
YES NO
If yes, provide documentation of the basis for your determination. National Register of Historic Places
(NRHP) database (NPS 2024) for Ada County, Idaho
If no, proceed to Appendix E, Step 4.
Step 4
If you answered no in Step 3, did the State Historic Preservation Officer (SHPO), Tribal Historic
Preservation Office (THPO), or other tribal representative (whichever applies) respond to you within 15 calendar days to indicate whether the subsurface earth disturbances caused by the installation of stormwater controls affect historic properties? YES NO
If no, no further documentation is required for Section 3.2 of the Template.
If yes, describe the nature of their response:
Written indication that adverse effects to historic properties from the installation of stormwater controls can be mitigated by agreed upon actions. INSERT COPIES OF LETTERS, EMAILS, OR OTHER COMMUNICATION BETWEEN YOU AND THE APPLICABLE SHPO, THPO, OR OTHER TRIBAL
REPRESENTATIVE
No agreement has been reached regarding measures to mitigate effects to historic properties from the installation of stormwater controls. INSERT COPIES OF LETTERS, EMAILS, OR
OTHER COMMUNICATION BETWEEN YOU AND THE APPLICABLE SHPO, THPO, OR OTHER TRIBAL REPRESENTATIVE
Other: INSERT COPIES OF LETTERS, EMAILS, OR OTHER COMMUNICATION BETWEEN YOU AND THE APPLICABLE
SHPO, THPO, OR OTHER TRIBAL REPRESENTATIVE
http://water.epa.gov/polwaste/npdes/stormwater/upload/cgp2012_finalpermit.pdf http://water.epa.gov/polwaste/npdes/stormwater/Stormwater-Pollution-Prevention-Plans-for-Construction-Activities.cfm http://water.epa.gov/polwaste/npdes/stormwater/upload/cgp2012_finalpermit.pdf http://water.epa.gov/polwaste/npdes/stormwater/Stormwater-Pollution-Prevention-Plans-for-Construction-Activities.cfm
File details come from the government source that posted it. Updated .