Attachment3-PriceProposalFormat.xls
XLS spreadsheet 57 KB Posted
- Solicitation number
- S-WHARC-09-R-0005
About this file
Revised Attachment 3 - Price Proposal Format
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd04-AttachmentA-MSGQproject.doc | DOC document | |
| SF30-Amd04-MSGQproject.doc | DOC document | |
| MSGQ Project - Amendment 04 Files.zip | ZIP file | |
| SF30-Amd03-MSGQproject.doc | DOC document | |
| Amd03-AttachmentA-MSGQproject.doc | DOC document | |
| SF30-Amd02-MSGQproject.doc | DOC document | |
| Amd02-AttachmentA-MSGQproject.doc | DOC document | |
| Summary of Contract Terms and Conditions - MSGQ Project.doc | DOC document | |
| Amd01-AttachmentA-MSGQproject.doc | DOC document | |
| SF50-Amd01-MSGQproject.doc | DOC document | |
| Solicitation-MSGQproject.zip | ZIP file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal Format
| ATTACHMENT #3 - PRICE PROPOSAL FORMAT | ||||||
| Project: | Renovation & Expansion of Marine Security Guard Quarters | |||||
| Location: | Calle Loreley - La Reina | |||||
| UNIT | TOTAL | |||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | PRICE | PRICE | |
| A. | PRELIMINARY TASKS | |||||
| a) | Permits (aprox. 1.5% of hard costs) | GL | 1 | $0.00 | ||
| b) | Temporary facilities and utilities | GL | 1 | $0.00 | ||
| c) | Site cleaning and removal | M2 | 1,250 | $0.00 | ||
| d) | Project Lines and Levels | GL | 1 | $0.00 | ||
| TOTAL OF ITEM A (PRELIMINARY TASKS): | $0.00 | |||||
| B. | RESIDENCE | |||||
| 1.- | Demolition & Removal | |||||
| 1.1 | Existing roof | M2 | 188 | $0.00 | ||
| 1.2 | Existing drywalls | M2 | 10 | $0.00 | ||
| 1.3 | Existing mid-floor | M2 | 53 | $0.00 | ||
| 1.4 | Existing floor and wall finishes | M2 | 167 | $0.00 | ||
| 1.5 | Existing sanitary and electrical components | GL | 1 | $0.00 | ||
| 1.6 | Existing doors (to re-use) | UN | 18 | $0.00 | ||
| 1.7 | Masonry and concrete structures | M3 | 9 | $0.00 | ||
| Sub-Total (Demolition & Removal): | $0.00 | |||||
| 2.- | Foundation | |||||
| 2.1 | Excavations | M3 | 14 | $0.00 | ||
| 2.2 | Sub-foundations | M2 | 18 | $0.00 | ||
| 2.3 | Concrete (H-20 includes formwork) | M3 | 7 | $0.00 | ||
| 2.4 | Reinforcing steel | KG | 201 | $0.00 | ||
| 2.5 | Waterproofing (IGOL) | GL | 1 | $0.00 | ||
| Sub-Total (Foundation): | $0.00 | |||||
| 3.- | Concrete Floors | |||||
| 3.1 | Sub-soil improvements | M2 | 73 | $0.00 | ||
| 3.2 | Soil improvements | M3 | 24 | $0.00 | ||
| 3.3 | Concrete slab (included in 4.-) | M2 | 0 | $0.00 | ||
| 3.4 | Finish slab (mortar, 5 cm thick) | M2 | 152 | $0.00 | ||
| Sub-Total (Concrete Floors): | $0.00 | |||||
| 4.- | Reinforced-Steel Concrete | |||||
| 4.1 | Concrete H-25 | M3 | 82 | $0.00 | ||
| 4.2 | Formwork | M2 | 667 | $0.00 | ||
| 4.3 | Reinforcing steel | KG | 8,171 | $0.00 | ||
| Sub-Total (Reinforced-Steel Concrete): | $0.00 | |||||
| 5.- | Masonry and Drywalls | |||||
| 5.1 | Drywalls 12cm | M2 | 108 | $0.00 | ||
| 5.2 | Masonry | M2 | 33 | $0.00 | ||
| 5.3 | Stucco 2.5 cm | M2 | 604 | $0.00 | ||
| Sub-Total (Masonry & Drywalls): | $0.00 | |||||
| 6.- | Trusses and Roofing | |||||
| 6.1 | Trusses and roofing (includes sheet metal work and gutters) | M2 | 268 | $0.00 | ||
| 6.2 | Ceilings (gyp boards and ceiling structures) | M2 | 180 | $0.00 | ||
| Sub-Total (Trusses & Roofing): | $0.00 | |||||
| 7.- | Floors | |||||
| 7.1 | Common areas (ceramic or stone tiles) | M2 | 190 | $0.00 | ||
| 7.2 | Service areas (ceramic tiles) | M2 | 27 | $0.00 | ||
| 7.3 | Bedroom areas (carpet or laminate floor) | M2 | 64 | $0.00 | ||
| 7.4 | Bathroom areas (ceramic tiles) | M2 | 32 | $0.00 | ||
| 10.5 | Exterior slab | M2 | 33 | $0.00 | ||
| Sub-Total (Floors): | $0.00 | |||||
| 8.- | Walls and Ceilings | |||||
| 8.1 | Common areas (latex water based paint) | M2 | 569 | $0.00 | ||
| 8.2 | Service areas (ceramic tiles / oil based paint) | M2 | 144 | $0.00 | ||
| 8.3 | Bedroom (latex water based paint) | M2 | 470 | $0.00 | ||
| 8.4 | Bathroom areas (ceramic tiles / oil based paint) | M2 | 206 | $0.00 | ||
| Sub-Total (Walls & Ceilings): | $0.00 | |||||
| 9.- | Exterior Painting or Coating (oil based paint) | M2 | 300 | $0.00 | ||
| 10.- | Cabinets and Counters | ML | 15 | $0.00 | ||
| 11.- | Doors (new) | UN | 13 | $0.00 | ||
| 11.- | Doors (refurbished) | UN | 18 | $0.00 | ||
| 12.- | Security Door (Safe Haven) | UN | 1 | $0.00 | ||
| 13.- | Windows (glass, frame and sashes) | M2 | 58 | $0.00 | ||
| 14.- | Electrical | GL | 1 | $0.00 | ||
| 15.- | Gas Plumbing | GL | 1 | $0.00 | ||
| 16.- | Water Plumbing | GL | 1 | $0.00 | ||
| 17.- | Sanitary and Rain Plumbing | GL | 1 | $0.00 | ||
| 18.- | HVAC | GL | 1 | $0.00 | ||
| 19.- | Landscape and Exteriors | |||||
| 19.1 | Deck roof | M2 | 33 | $0.00 | ||
| 19.2 | Deck floor | M2 | 33 | $0.00 | ||
| 19.3 | Pool fence | ML | 53 | $0.00 | ||
| 19.4 | Landscape (roads & walks, lawns & planting) | M2 | 1,400 | $0.00 | ||
| Sub-Total (Landscape & Exteriors): | $0.00 | |||||
| TOTAL OF ITEM B (RESIDENCE): | $0.00 | |||||
| C. | GYM | |||||
| 1.- | Demolition and Removal | |||||
| 1.1 | Existing roof | M2 | 38 | $0.00 | ||
| 1.2 | Existing drywalls | M2 | 28 | $0.00 | ||
| 1.3 | Existing garage door | UN | 4 | $0.00 | ||
| 1.4 | Masonry and concrete structures | M3 | 8 | $0.00 | ||
| Sub-Total (Demolition & Removal): | $0.00 | |||||
| 2.- | Foundation | |||||
| 2.1 | Excavations | M3 | 27 | $0.00 | ||
| 2.2 | Sub-foundations | M2 | 24 | $0.00 | ||
| 2.3 | Concrete (H-20 includes formwork) | M3 | 17 | $0.00 | ||
| 2.4 | Reinforcing steel | KG | 753 | $0.00 | ||
| 2.5 | Waterproofing (IGOL) | GL | 1 | $0.00 | ||
| Sub-Total (Foundation): | $0.00 | |||||
| 3.- | Concrete Floors | |||||
| 3.1 | Sub-soil improvements | M2 | 70 | $0.00 | ||
| 3.2 | Soil improvements | M3 | 5 | $0.00 | ||
| 3.3 | Concrete slab (H20, 10 cm thick) | M2 | 70 | $0.00 | ||
| Sub-Total (Concrete Floors): | $0.00 | |||||
| 4.- | Reinforced-Steel Concrete | |||||
| 4.1 | Concrete H-25 | M3 | 5 | $0.00 | ||
| 4.2 | Formwork | M2 | 59 | $0.00 | ||
| 4.3 | Reinforcing steel | KG | 639 | $0.00 | ||
| Sub-Total (Reinforced-Steel Concrete): | $0.00 | |||||
| 5.- | Masonry and Drywalls | |||||
| 5.1 | Drywalls 12cm | M2 | 52 | $0.00 | ||
| 5.2 | Masonry | M2 | 70 | $0.00 | ||
| 5.3 | Stucco 2.5 cm | M2 | 168 | $0.00 | ||
| Sub-Total (Masonry & Drywalls): | $0.00 | |||||
| 6.- | Trusses and Roofing | |||||
| 6.1 | Metal structure | KG | 1,057 | $0.00 | ||
| 6.2 | Roofing | M2 | 89 | $0.00 | ||
| 6.3 | Ceilings (gyp boards and ceiling structures) | M2 | 69 | $0.00 | ||
| Sub-Total (Trusses & Roofing): | $0.00 | |||||
| 7.- | Floors | |||||
| 7.1 | Gym | M2 | 43 | $0.00 | ||
| 7.2 | Service areas (ceramic tiles) | M2 | 5 | $0.00 | ||
| 7.3 | Waiting room (carpet or laminate floor) | M2 | 14 | $0.00 | ||
| 7.4 | Bathroom areas (ceramic tiles) | M2 | 7 | $0.00 | ||
| Sub-Total (Floors): | $0.00 | |||||
| 8.- | Walls and Ceilings | |||||
| 8.1 | Gym (latex water based paint) | M2 | 112 | $0.00 | ||
| 8.2 | Service areas (ceramic tiles / oil based paint) | M2 | 42 | $0.00 | ||
| 8.3 | Waiting room (latex water based paint) | M2 | 61 | $0.00 | ||
| 8.4 | Bathroom areas (ceramic tiles / oil based paint) | M2 | 51 | $0.00 | ||
| Sub-Total (Walls & Ceilings): | $0.00 | |||||
| 9.- | Exterior Painting or Coating (oil based paint) | M2 | 34 | $0.00 | ||
| 10.- | Doors (new) | UN | 4 | $0.00 | ||
| 11.- | Windows (glass, frame and sashes) | M2 | 34 | $0.00 | ||
| TOTAL OF ITEM C (GYM): | $0.00 | |||||
| D. | GUARD BOOTH | |||||
| 1.- | Foundation | |||||
| 1.1 | Excavations | M3 | 1 | $0.00 | ||
| 1.2 | Sub-foundations | M3 | 1 | $0.00 | ||
| 1.3 | Concrete (H-20 includes formwork) | M3 | 1 | $0.00 | ||
| 1.4 | Waterproofing (IGOL) | GL | 1 | $0.00 | ||
| Sub-Total (Foundation): | $0.00 | |||||
| 2.- | Concrete Floors | |||||
| 2.1 | Sub-soil improvements | M2 | 18 | $0.00 | ||
| 2.2 | Concrete slab (H20, 10 cm thick) | M2 | 18 | $0.00 | ||
| Sub-Total (Concrete Floors): | $0.00 | |||||
| 3.- | Drywalls | |||||
| 3.1 | Drywalls 12cm | M2 | 6 | $0.00 | ||
| Sub-Total (Drywalls): | $0.00 | |||||
| 4.- | Trusses and Roofing | |||||
| 4.1 | Roofing | M2 | 18 | $0.00 | ||
| 4.2 | Metal structure | KG | 385 | $0.00 | ||
| 4.3 | Ceilings (gyp boards and ceiling structures) | M2 | 18 | $0.00 | ||
| Sub-Total (Trusses & Roofing): | $0.00 | |||||
| 5.- | Floors | |||||
| 5.1 | Common areas (ceramic or stone tiles) | M2 | 18 | $0.00 | ||
| Sub-Total (Floors): | $0.00 | |||||
| 6.- | Walls and Ceilings | |||||
| 6.1 | Common areas (latex water based paint) | M2 | 12 | $0.00 | ||
| Sub-Total (Walls & Ceilings): | $0.00 | |||||
| 7.- | Exterior Painting or Coating (oil based paint) | M2 | 42 | $0.00 | ||
| 8.- | Cabinets and Counters | ML | 3 | $0.00 | ||
| 9.- | Doors (new) | UN | 2 | $0.00 | ||
| 10.- | Exterior Fence | KG | 280 | $0.00 | ||
| 11.- | Windows (glass, frame and sashes) | M2 | 8 | $0.00 | ||
| TOTAL OF ITEM D (GUARD BOOTH): | $0.00 | |||||
| E. | OTHER - Any Items Not Covered Above (If Applicable) | |||||
| a) | GL | 1 | $0.00 | |||
| b) | GL | 1 | $0.00 | |||
| c) | GL | 1 | $0.00 | |||
| d) | GL | 1 | $0.00 | |||
| e) | GL | 1 | $0.00 | |||
| f) | GL | 1 | $0.00 | |||
| g) | GL | 1 | $0.00 | |||
| h) | GL | 1 | $0.00 | |||
| i) | GL | 1 | $0.00 | |||
| j) | GL | 1 | $0.00 | |||
| TOTAL OF ITEM E (OTHERS -- if applicable): | $0.00 | |||||
| SUMMARY OF ALL CONSTRUCTION ITEMS | ||||||
| TOTAL | ||||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | PRICE | ||
| A. | PRELIMINARY TASKS | GL | 1 | $0.00 | ||
| B. | RESIDENCE | GL | 1 | $0.00 | ||
| C. | GYM | GL | 1 | $0.00 | ||
| D. | GUARD BOOTH | GL | 1 | $0.00 | ||
| E. | OTHERS if applicable) | GL | 1 | $0.00 | ||
| TOTAL DIRECT COSTS (A THROUGH E): | $0.00 | |||||
| General & Administrative Expenses AND Overhead: | 0.00% | |||||
| Profit: | 0.00% | |||||
| TOTAL COSTS (Direct + Indirect): | $0.00 | |||||
| Value Added Taxes (VAT or IVA): | $0.00 | 0.00% | ||||
| PROJECT TOTAL PRICE: | ||||||
| NOTE: | The quantities in the spreadsheet are estimates only, and it’s up to each offeror to verify the quantities. | |||||
| This will be a firm fixed price contract, and no additional sums will be payable for any escalation in the | ||||||
| cost of materials, equipment or labor, or because of the offeror’s failure to properly estimate or accurately | ||||||
| predict the cost or difficulty of achieving the results required. |