SWGR Elec. Dwg.pdf

PDF 611 KB Posted

Attached to
GPO 5th Floor SID Smartcard Room Design/Build Construction Federal contract opportunity
Solicitation number
040ADV-25-R-0001-06
Issued by
Government Publishing Office

About this file

This file contains electrical single-line diagrams (sheets E-602, E-603, and E-604) for the GPO Main Building electrical upgrade project. The diagrams show the power distribution system including transformers, switchgear, circuit breakers, and associated equipment specifications.

Key technical details include: Two 1000/1500kVA transformers (XFMR-12B1 and XFMR-12B2) rated at 13.2kV-480/277V with 110kV BIL and Z=7.0%; switchgear USG-12B rated at 4000A located in the third floor switchgear room; a 75HP fire pump and 1HP jockey pump system with 2-hour fire rated feeders; UPS systems rated at 300kVA with VRLA batteries; and multiple distribution panels and switchboards throughout the building. The drawings include detailed specifications for circuit breakers, surge protection devices, grounding requirements, and conductor sizes. General notes emphasize coordination of shutdowns with the owner and proper separation of power and control wiring.

View the file

Other files for this federal contract opportunity

Other files attached to GPO 5th Floor SID Smartcard Room Design/Build Construction, newest first.
File Type Posted
040ADV-25-R-0001-006 SF-30 (Signed).pdf PDF
Layout by Floor Type.pdf PDF
Additional Questions_040ADV-25-R-0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2500AT

2500AF

2500AT

2500AF

'XFMR-12B2'

1000 / 1500kVA, 13.2kV-480/277V, 110kV BIL, Z=7.0%, CAST COIL

SPD

SPD

500AT

1600AF

1600AT

1600AF

500AT

1600AF

3456789

2000A G

SWITCHGEAR 'USG-12A'

(THIRD FLOOR SWITCHGEAR ROOM)

SWITCHGEAR 'USG-12B'

(THIRD FLOOR SWITCHGEAR ROOM)

2000A G

TYPE 1 SURGE

PROTECTION DEVICE

TYPE 1 SURGE

PROTECTION DEVICE

4000A, 480V, 3Ø, 3W, 100KAIC 4000A, 480V, 3Ø, 3W, 100KAIC

1 2 3 4 5 6 7 8 9

DMR

DMM

PLC

DMR

DMM

PLC

'XFMR-12A1'

1000 / 1500kVA, 13.2kV-480/277V, 110kV BIL, Z=7.0%, CAST COIL

'XFMR-12A2'

1000 / 1500kVA, 13.2kV-480/277V, 110kV BIL, Z=7.0%, CAST COIL

ELECTRICAL DISTRIBUTION SINGLE LINE

SCALE: NOT TO SCALE

A1

REFER TO

SHEET E-603 FOR

CONTINUATION

B1

REFER TO

SHEET E-603 FOR

CONTINUATION

400AT

800AF

800AT

1600AF

SPARE

800AT

1600AF

SPARE

800AT

1600AF

SPARE

800AT

1600AF

SPARE

800AT

1600AF

SPARE

1600AT

1600AF

500AT

1600AF

500AT

1600AF

400AT

800AF

800AT

1600AF

SPARE

800AT

1600AF

SPARE

800AT

1600AF

SPARE

800AT

1600AF

SPARE

800AT

1600AF

SPARE

2500AT

2500AF

2500AT

2500AF

N.O.

52-TA

4000AT

4000AF

N.C.

52-TB

'MCB-12A1'

1200A, 15kV, 750MVA, 3Ø, 3W

'MCB-12B1'

1200A, 15kV, 750MVA, 3Ø, 3W

'MCB-12B2'

1200A, 15kV, 750MVA, 3Ø, 3W

4000A, 480/277V, 3Ø, 4W, 100KAIC 4000A, 480/277V, 3Ø, 4W, 100KAIC

4000A N

2000A G

11 SETS - (3)#500KCMIL,

#500KCMIL GND, IN 3-1/2"C 11 SETS - (3)#500KCMIL,

#500KCMIL GND, IN 3-1/2"C

A2

REFER TO

SHEET E-603 FOR

CONTINUATION

B2

REFER TO

SHEET E-603 FOR

CONTINUATION

2 S

ET

S

3) #2

KC

MI

L, #2

GN

D, IN

2- 1/2

"C

4000AT

4000AF

4000A N

2000A G

4000AT

4000AF

'NP-12A1'

60KAIC

'NP-12A2'

60KAIC

'NP-12B1'

60KAIC

'NP-12B2'

60KAIC

SWITCHGEAR 'LV-12A'

(FOURTH FLOOR SUBSTATION ROOM)

SWITCHGEAR 'LV-12B'

(FOURTH FLOOR SUBSTATION ROOM)

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE ALL SHUTDOWNS WITH OWNER.

CONTRACTOR SHALL HAVE A THOROUGH UNDERSTANDING OF THE EXISTING

POWER DISTRIBUTION SYSTEM AND ITS LOADS AND BE ABLE TO

IDENTIFY/DISCUSS ALL IMPACTS OF REQUESTED SHUTDOWNS/CUTOVERS

WITH THE OWNER. ALL OWNER CONCERNS MUST BE ADDRESSED

SATISFACTORILY PRIOR TO APPROVAL OF EACH SHUTDOWN / CUTOVERS.

2. REFER TO FLOOR PLANS FOR ACTUAL LOCATION OF EQUIPMENT.

3. ANY CONTROL, COMMUNICATIONS, MONITORING, ETC. WIRING SHALL BE RUN

IN DEDICATED RACEWAYS, INDEPENDENT OF POWER WIRING.

4. PROVIDE CORE DRILL THROUGH FLOOR SLABS FOR CONDUIT RUNS AS

REQUIRED. CORE DRILL LOCATIONS SHALL BE COORDINATED WITH AND

APPROVED BY THE STRUCTURAL ENGINEER.

DRAWING NOTES:

SURGE PROTECTION DEVICE SHALL BE LOCATED IN A SEPARATE BARRIER

WITHIN THE SWITCHGEAR. RUN (1)#2 DISCHARGE GROUND TO SWITCHGEAR

GROUND BUS.

PROVIDE PROVISIONS FOR FUTURE SWITCHGEAR BUSBAR CONNECTIONS.

REFER TO GROUNDING RISER DIAGRAM ON DRAWING E-506 FOR ADDITIONAL

INFORMATION ON NEUTRAL TO GROUND BONDING.

REFER TO ELECTRICAL CONDUIT PLANS FOR CONDUIT ROUTING FROM INCOMING

13.2kV SWITCHGEARS TO 'SUBSTATION-12A' AND 'SUBSTATION-12B'.

FIRE PUMP, FIRE PUMP CONTROLLER, AND JOCKEY PUMP LOCATED IN BUILDING

'A' BASEMENT FIRE PUMP ROOM. REFER TO DRAWING E-401 FOR EQUIPMENT

FLOOR PLAN LOCATIONS.

FIRE PUMP FEEDER ASSEMBLY SHALL HAVE A MINIMUM 2 HOUR FIRE RATING PER

UL 2196.

BUS TAP CONNECTION FOR FIRE PUMP SHALL BE PROVIDED IN A DEDICATED

SECTION OF THE SUBSTATION LINE-UP.

PROVIDE POWER CONNECTION TO JOCKEY PUMP INTERNAL FUSED DISCONNECT

SWITCH. PROVIDE POWER CONNECTION BETWEEN JOCKEY PUMP CONTROLLER

AND MOTOR. COORDINATE REQUIREMENTS WITH APPROVED SHOP DRAWINGS.

PROVIDE POWER CONNECTION TO FIRE PUMP CONTROLLER/ ATS INTEGRAL

MOLDED-CASE SWITCHES. PROVIDE POWER CONNECTION BETWEEN FIRE PUMP

CONTROLLER AND MOTOR. COORDINATE REQUIREMENTS WITH APPROVED

SHOP DRAWINGS.

PROVIDE FUSED DISCONNECT SWITCH FOR FIRE PUMP DISCONNECT. FUSED

DISCONNECT SWITCH SHALL BE SUITABLE FOR USE AS SERVICE EQUIPMENT AND

SHALL BE LOCKABLE IN THE CLOSED POSITION PER NEC 695.

REFER TO

SHEET E-601 FOR

CONTINUATION

(3

KC

MI

L, #2

G

ND

, IN

3-

1/2 "C

B4

(3

KC

MI

L, #2

G

ND

, IN

3-

1/2 "C

5 S

ET

S

3) #5

KC

MI

L, #5

KC

MI

L G

ND

, IN

3-

1/2 "C

A4

REFER TO

SHEET E-604 FOR

CONTINUATION

A3

REFER TO

SHEET E-604 FOR

CONTINUATION

5 S

ET

S

3) #5

KC

MI

L, #5

KC

MI

L G

ND

, IN

3-

1/2 "C

B3

REFER TO

SHEET E-604 FOR

CONTINUATION

2 S

ET

S

3) #2

KC

MI

L, #2

GN

D, IN

2- 1/2

"C

2 S

ET

S

3) #2

KC

MI

L, #2

GN

D, IN

2- 1/2

"C

2 S

ET

S

3) #2

KC

MI

L, #2

GN

D, IN

2- 1/2

"C

N.C.

200AT

1200AF

4000AT

4000AF

N.C.

52-UA

4000AT

4000AF

N.C.

52-UB

1 1

2 2

S.A.

'MCB-12A2'

1200A, 15kV, 750MVA, 3Ø, 3W

N.C.

52-LVA

N.C.

52-LVB

N.C.

NP-A1

N.C.

NP-A2

N.C.

NP-B1

N.C.

NP-B2

11 SETS - (3)#500KCMIL,

#500KCMIL GND, IN 3-1/2"C

(3

1/0

1/0 G

ND

IN

2"

C, 2-

HR

R

AT

ED

(3

1/0

1/0 G

ND

IN

2"

C, 2-

HR

R

AT

ED

4 4 4 4

REFER TO

SHEET E-601 FOR

CONTINUATION

REFER TO

SHEET E-601 FOR

CONTINUATION

REFER TO

SHEET E-601 FOR

CONTINUATION

REFER TO

SHEET E-604 FOR

CONTINUATION

(3

1/0

1/0 G

ND

IN

2"

C, 2-

HR

R

AT

ED

FIRE PUMP

(75 HP)

JOCKEY PUMP

(1 HP)

(3)#12, #12 GND

IN 3/4"C

(3)#12, #12 GND

IN 3/4"C

4000AT

4000AF

600AF

1000AS

'XFMR-12B1'

1000 / 1500kVA, 13.2kV-480/277V, 110kV BIL, Z=7.0%, CAST COIL

(3)#1/0, #1/0 GND,

IN 2"C, 2-HR RATED

(3)#1/0, #1/0 GND,

IN 2"C, 2-HR RATED

'FPD-12B'

(FOURTH FLOOR

SUBSTATION ROOM)

480V, 3Ø, 3W, 100KAIC

'FPD-12A'

(FOURTH FLOOR

SUBSTATION ROOM)

480V, 3Ø, 3W, 100KAIC

7 7

TYPE 1 SURGE

PROTECTION DEVICE

SPD

SPD

TYPE 1 SURGE

PROTECTION DEVICE

600AF

1000AS

FIRE PUMP

CONTROLLERJP

REFER TO

SHEET E-604 FOR

CONTINUATION

JOCKEY PUMP

CONTROLLER

10 10

52N.C.

200AT

1200AF

S.A.

52N.C.

200AT

1200AF

S.A.

52N.C.

200AT

1200AF

S.A.

Sheet Identification

Seal

Client/Owner/Project Address

M A

I N

G

P O

E L

E C

T R

I C

A L

U P

G R

A D

E

CallisonRTKL Inc.

Issue Drawing Log

2101 L Street, NW Suite 200

Washington, D.C. 20037

Tel: 202 833 4400

Fax: 202 887 5168

Project No: 3026089

CallisonRTKL Project No: 000-160045.00

© 2017 CallisonRTKL Inc.

USGPO

735 N. Capitol Street, NW

Washington, DC 20401

11/16/16 SCHEMATIC DESIGN

Consultant

02/03/17 PROGRESS REVIEW

03/16/17 ISSUED FOR 100% CD

ELECTRICAL

SINGLE LINE

E-602

2000A

500A G

1000A, 208/120V, 3Ø, 4W, 22KAIC

'PDU-A1'

(8TH FLOOR UPS ROOM)

300kVA, 480V-208Y/120V, K-13

1000A, 208/120V, 3Ø, 4W, 22KAIC

2000A N

500A G

UPS DISTRIBUTION SINGLE LINE

SCALE: NOT TO SCALE

'PDU-B1'

300kVA, (8TH FLOOR UPS ROOM)

480V-208Y/120V, K-13

500AT

800AF

500AT

600AF

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE ALL SHUTDOWNS WITH OWNER.

CONTRACTOR SHALL HAVE A THOROUGH UNDERSTANDING OF THE EXISTING

POWER DISTRIBUTION SYSTEM AND ITS LOADS AND BE ABLE TO

IDENTIFY/DISCUSS ALL IMPACTS OF REQUESTED SHUTDOWNS/CUTOVERS WITH

THE OWNER. ALL OWNER CONCERNS MUST BE ADDRESSED SATISFACTORILY

PRIOR TO APPROVAL OF EACH SHUTDOWN / CUTOVERS.

2. REFER TO FLOOR PLANS FOR ACTUAL LOCATION OF EQUIPMENT.

3. ANY CONTROL, COMMUNICATIONS, MONITORING, ETC. WIRING SHALL BE RUN IN

DEDICATED RACEWAYS, INDEPENDENT OF POWER WIRING.

4. PROVIDE CORE DRILL THROUGH FLOOR SLABS FOR CONDUIT RUNS AS

REQUIRED. CORE DRILL LOCATIONS SHALL BE COORDINATED WITH AND

APPROVED BY THE STRUCTURAL ENGINEER.

7. REFER TO PROPOSED DATA CENTER PHASING SEQUENCE ON DRAWING E-301 -

E-303.

DRAWING NOTES:

PROVIDE NAMEPLATE FOR EXISTING 'RDC' PANEL. REFER TO DETAIL #4 ON

DRAWING E-501 FOR ADDITION INFORMATION.

INSTALLATION OF UPS AND ASSOCIATED WIRING SHALL BE PHASED WITH

DEMOLITION OF EXISTING UPS SYSTEM SUCH THAT A MINIMUM OF ONE (1) UPS IS

SUPPLYING POWER TO THE DATA CENTER AT ALL TIMES. REFER TO DRAWING

ED-601 FOR ADDITIONAL INFORMATION.

COORDINATE INSTALLATION OF FEEDER TO THE 'RDC' PANELS LOCATED IN THE

DATA CENTER WITH EXISTING EQUIPMENT LOCATED BELOW THE DATA CENTER'S

RAISED ACCESS FLOOR.

COORDINATE CABLE AND CONDUIT CONNECTION BETWEEN UPS AND BATTERY

CABINETS WITH UPS MANUFACTURER. TYPICAL FOR EACH BATTERY CABINET.

FINAL CABLE AND CONDUIT SIZE REQUIREMENTS SHALL BE COORDINATED WITH

THE APPROVED UPS SHOP DRAWING.

REFER TO ELECTRICAL CONDUIT PLANS FOR CONDUIT ROUTING FROM

SWITCHGEARS USG-12A/B TO UPS SYSTEM.

CONTRACTOR SHALL PROVIDE DRY-CONTACT, WIRING, AND CONDUIT FROM UPS

TO SWITCHGEARS' 'USG-12A' AND 'USG-12B' CONTROL INTERFACE FOR STATUS

MONITORING OF THE UPSs. REFER TO SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

UPS SHALL BE CAPABLE OF PROVIDING AN INTERNAL LOCAL NEUTRAL SYSTEM

REFERENCE INDEPENDENT OF THE BUILDING GROUNDING SYSTEM.

PROVIDE 100% RATED CIRCUIT BREAKERS. TYPICAL FOR ALL PDU CIRCUIT

BREAKERS.

400AT

400AF

500A, 208/120V, 3Ø, 4W, 10KAIC

EX.

PANEL

'RDC-A1'

EX.

PANEL

'RDC-A2'

EX.

PANEL

'RDC-A3'

EX.

PANEL

'RDC-A4

EX. 'RDC-A1'

(8TH FLOOR DATA CENTER)

400AT

400AF

EX.

PANEL

'RDC-B1'

EX.

PANEL

'RDC-B2'

EX.

PANEL

'RDC-B3'

225A

EX.

PANEL

'RDC-B4

EX. 'RDC-B1'

(8TH FLOOR DATA CENTER)

225A225A225A225A225A225A225A

2 S

ET

S

3) #3

KC

MI

L, #1 /0

GN

D, IN

3"

C

400AT

400AF

250AT

250AF

SPARESPARE

400AT

400AF

250AT

250AF

SPARE SPARE

500A, 208/120V, 3Ø, 4W, 10KAIC

1 1

ST ST ST STSTST

A1

REFER TO

SHEET E-602 FOR

CONTINUATION

15 MIN. VRLA

BATTERY IN

MATCHING

CABINET

A2

'UPS-A'

(8TH FLOOR UPS ROOM)

300KVA, 0.9PF

480V-480V, 3Ø, 3W, 65KAIC

2 S

ET

S

3) #2

KC

MI

L, #2

GN

D, IN

2- 1/2

"C

B1

15 MIN. VRLA

BATTERY IN

MATCHING

CABINET

B2

'UPS-B'

(8TH FLOOR UPS ROOM)

300KVA, 0.9PF

480V-480V, 3Ø, 3W, 65KAIC

2 S

ET

S

3) #2

KC

MI

L, #2

GN

D, IN

2- 1/2

"C

REFER TO

SHEET E-602 FOR

CONTINUATION

REFER TO

SHEET E-602 FOR

CONTINUATION

REFER TO

SHEET E-602 FOR

CONTINUATION

2 SETS - (2)#350KCMIL,

#3/0 GND, IN 3"C

PROVIDE CONTROL CIRCUIT

TO 'USG-12A' AND 'USG-12B'

CONTROL INTERFACE

PROVIDE CONTROL CIRCUIT

TO 'USG-12A' AND 'USG-12B'

CONTROL INTERFACE

7 7

500AT

600AF

600A, 480V, 3Ø, 3W, 65KAIC

500AT

600AF

LOAD BANK

500AT

600AF

500AT

600AF

E1

500AT

600AF }

(2) SPACE

400AF500AT

600AF

SPARE

(5

0K

CM

IL,

#3 /0

GN

D, IN

4"

C

(5

0K

CM

IL,

#3 /0

GN

D, IN

4"

C

SWITCHBOARD 'UPS-A-MBM'

(8TH FLOOR UPS ROOM)

500AT

600AF

600A, 480V, 3Ø, 3W, 65KAIC

500AT

600AF

LOAD BANK

500AT

600AF

500AT

600AF

E1

500AT

600AF }

(2) SPACE

400AF500AT

600AF

SPARE

SWITCHBOARD 'UPS-A-MBM'

(8TH FLOOR UPS ROOM)

2 S

ET

S

3) #3

KC

MI

L, #1 /0

GN

D, IN

3"

C

}250AF

SPACE

}250AF

SPACE

42 SETS - (2)#350KCMIL,

#3/0 GND, IN 3"C

8 (TYP.) 8

(TYP.)

E2 E2600A, 480V, 3Ø, 3W, 65KAIC

600A, 480V, 3Ø, 3W, 65KAIC

300A G

300A G

300A G

300A G

Sheet Identification

Seal

Client/Owner/Project Address

M A

O

E L

E C

T R

I C

A L

U P

G R

A D

E

CallisonRTKL Inc.

Issue Drawing Log

2101 L Street, NW Suite 200

Washington, D.C. 20037

Tel: 202 833 4400

Fax: 202 887 5168

Project No: 3026089

CallisonRTKL Project No: 000-160045.00

© 2017 CallisonRTKL Inc.

USGPO

735 N. Capitol Street, NW

Washington, DC 20401

11/16/16 SCHEMATIC DESIGN

Consultant

02/03/17 PROGRESS REVIEW

03/16/17 ISSUED FOR 100% CD

ELECTRICAL

E-603

'XFMR-DP-12A1'

225kVA, 480-480/277V, Z=5.75%

(4

0, #1 /0

GN

D, IN

4"

C

5 2 1

PANEL 'DP-12A1'

(THIRD FLOOR SWITCHGEAR ROOM)

350AT

400AF

30AT(3P)

100AF

90AT(3P)

100AF

20AT(1P)

100AF

200A G

A4

REFER TO

SHEET E-602 FOR

CONTINUATION

(3

1/0 G

ND

IN

3/

4" C

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE ALL SHUTDOWNS WITH OWNER.

CONTRACTOR SHALL HAVE A THOROUGH UNDERSTANDING OF THE

EXISTING POWER DISTRIBUTION SYSTEM AND ITS LOADS AND BE ABLE

TO IDENTIFY/DISCUSS ALL IMPACTS OF REQUESTED

SHUTDOWNS/CUTOVERS WITH THE OWNER. ALL OWNER CONCERNS

MUST BE ADDRESSED SATISFACTORILY PRIOR TO APPROVAL OF EACH

SHUTDOWN / CUTOVERS.

2. REFER TO FLOOR PLANS FOR ACTUAL LOCATION OF EQUIPMENT.

3. ANY CONTROL, COMMUNICATIONS, MONITORING, ETC. WIRING SHALL

BE RUN IN DEDICATED RACEWAYS, INDEPENDENT OF POWER WIRING.

4. PROVIDE CORE DRILL THROUGH FLOOR SLABS FOR CONDUIT RUNS AS

REQUIRED. CORE DRILL LOCATIONS SHALL BE COORDINATED WITH

AND APPROVED BY THE STRUCTURAL ENGINEER.

DRAWING NOTES:

REFER TO DETAIL #4 ON DRAWING E-504 FOR SPD INSTALLATION.

COORDINATE WITH SPD MANUFACTURE ON EXACT BREAKER

AMPERAGE AND CABLING REQUIREMENTS.

REFER TO ELECTRICAL CONDUIT PLANS FOR CONDUIT ROUTING

FROM SWITCHGEARS USG-12A/B TO 1600A SWITCHBOARDS.

(3

2, #8

G

ND

, IN

1-

1/2 "C

'XFMR-RP-12A1'

45kVA, 480-208/120V, Z=5.75%

150A

(4

1/0

6 G

ND

IN

2" C

PANEL

'RP-12A1'

1600A N

1600A, 480V, 3Ø, 3W, 42KAIC

SWITCHBOARD 'SBD-12A'

(FIRST FLOOR POWER BRANCH)

1600AT

1600AF

800A G

SWITCHBOARD 'SBD-12B'

(FIRST FLOOR POWER BRANCH)

1600AT

1600AF

A3 B3

20AT(1P)

100AF

ELECTRICAL DISTRIBUTION SINGLE LINE

SCALE: NOT TO SCALE

35AT(3P)

100AF

100AT(3P)

100AF

(6) SPACE

20AT(1P)

100AF

(1) SPARE

20AT(3P)

100AF

(6) SPARE

3RD FLOOR

LIGHTING

'LCD-1'

3RD FLOOR

LIGHTING

'LCD-2'

60AT(3P)

100AF

(3

4, #1

/0

GN

D, IN

1- 1/2

"C

2 2

20AT(1P)

100AF

}100AF(3P)

400A N

20AT(1P)

100AF

20AT(1P)

100AF

LIGHT WELL

LIGHTING

4TH FLOOR

LIGHTING

'LCD-3'

4THFLOOR

LIGHTING

'LCD-4'

400A, 480/277V, 3Ø, 4W, 18KAIC

'XFMR-DP-12B1'

225kVA, 480-480/277V, Z=5.75%

5 2 1

PANEL 'DP-12B1'

(THIRD FLOOR SWITCHGEAR ROOM)

350AT

400AF

30AT(3P)

100AF

90AT(3P)

100AF

20AT(1P)

100AF

200A G

B4

(3

1/0 G

ND

IN

3/

4" C

(3

2, #8

G

ND

, IN

1-

1/2 "C

'XFMR-RP-12B1'

45kVA, 480-208/120V, Z=5.75%

150A

PANEL

'RP-12B1'

20AT(1P)

100AF

35AT(3P)

100AF

15AT(3P)

100AF

3RD FLOOR

LIGHTING

'LCD-4'

3RD FLOOR

LIGHTING

'LCD-3'

20AT(1P)

100AF

400A N

20AT(1P)

100AF

4TH FLOOR

LIGHTING

'LCD-2'

4THFLOOR

LIGHTING

'LCD-1'

400A, 480/277V, 3Ø, 4W, 18KAIC

(6) SPACE

20AT(1P)

100AF

(1) SPARE

20AT(3P)

100AF

(5) SPARE

}100AF(3P)

THIRD FLOOR

SWITCHGEAR ROOM

THIRD FLOOR

SWITCHGEAR ROOM

REFER TO

SHEET E-602 FOR

CONTINUATION

REFER TO

SHEET E-602 FOR

CONTINUATION

REFER TO

SHEET E-602 FOR

CONTINUATION

20AT(1P)

100AF

100A

(4

1/0

8 G

ND

IN

2" C

PANEL

'HP-12B1'

EIGHTH FLOOR

UPS ROOM

'XFMR-RP-12A2'

15kVA, 480-208/120V, Z=5.75%

50A

PANEL

'RP-12A2'

EIGHTH FLOOR

UPS ROOM

(4

6, #8

G

ND

IN

1- 1/2

"C

(4

1/0

8 G

ND

IN

2" C

(3

8 G

ND

IN

3/ 4"

C

'XFMR-RP-12B2'

15kVA, 480-208/120V, Z=5.75%

50A

PANEL

'RP-12B2'

EIGHTH FLOOR

UPS ROOM

(4

6, #8

G

ND

IN

1- 1/2

"C

DMM

60AT(3P)

100AF

(3

4, #1

/0

GN

D, IN

1- 1/2

"C

DMM

800AT(3P)

800AF

(3) SPARE

800AT(3P)

800AF

(8) SPARE

800AT(3P)

800AF

(3) SPARE

800AT(3P)

800AF

(8) SPARE

1600A N

1600A, 480V, 3Ø, 3W, 42KAIC

800A G

(4

0, #1 /0

GN

D, IN

4"

C

20AT(3P)

100AF

3RD FLOOR

HALLWAY

LIGHTING

JP

REFER TO

SHEET E-602 FOR

CONTINUATION

CU-1

(11.8 kW)

(3

8, #1

0 G

ND

IN

1" C

(3

8, #1

0 G

ND

IN

1" C

35AF

60AS

CU-2

(11.8 kW)

(3

8, #1

0 G

ND

IN

1" C

(3

8, #1

0 G

ND

IN

1" C

35AF

60AS100A

(4

1/0

8 G

ND

IN

2" C

PANEL

'HP-12A1'

EIGHTH FLOOR

UPS ROOM

(3

8 G

ND

IN

3/ 4"

C

SPD

TYPE 2

SPD

SPD

TYPE 2

SPD

SPD

TYPE 2

SPD

SPD

TYPE 2

SPD

Sheet Identification

Seal

Client/Owner/Project Address

M A

O

E L

E C

T R

I C

A L

U P

G R

A D

E

CallisonRTKL Inc.

Issue Drawing Log

2101 L Street, NW Suite 200

Washington, D.C. 20037

Tel: 202 833 4400

Fax: 202 887 5168

Project No: 3026089

CallisonRTKL Project No: 000-160045.00

© 2017 CallisonRTKL Inc.

USGPO

735 N. Capitol Street, NW

Washington, DC 20401

11/16/16 SCHEMATIC DESIGN

Consultant

02/03/17 PROGRESS REVIEW

03/16/17 ISSUED FOR 100% CD

ELECTRICAL

E-604

GPO - Main Electrical Upgrade - Drawings Combined (2018-02-12)
G-000
GPO - Main Electrical Upgrade - Arch Combined (2018-02-12)
GPO - Main Electrical Upgrade - Arch Combined (2018-02-12)
Sheets
A-001 - GENERAL INFORMATION
A-002
Sheets
A-002 - INDEX SHEET
GPO - Main Electrical Upgrade - Arch Combined (2018-02-12)
Sheets
A-012 - 2ND FLOOR EGRESS
A-013 - 3RD FLOOR EGRESS
A-014 - 4TH FLOOR EGRESS
A-101 - CONSTRUCTION PLAN - 1ST FLOOR
A-102 - CONSTRUCTION PLAN - 2ND FLOOR
A-103 - CONSTRUCTION PLAN - 3RD FLOOR
A-104 - CONSTRUCTION PLAN - 4TH FLOOR
A-105 - CONSTRUCTION, RCP & FINISH PLANS- 8TH FLOOR
D-102 - DEMOLITION PLAN - 2ND FLOOR
D-103 - DEMOLITION PLAN - 3RD FLOOR
D-104 - DEMOLITION PLAN - 4TH FLOOR
A-106
Sheets
A-106 - ROOF PLAN
GPO - Main Electrical Upgrade - Arch Combined (2018-02-12)
Sheets
A-202 - REFLECTED CEILING PLAN - 2ND FLOOR
A-203 - REFLECTED CEILING PLAN - 3RD FLOOR
A-204 - REFLECTED CEILING PLAN - 4TH FLOOR
A-302 - FINISH PLAN - 2ND FLOOR
A-303 - FINISH PLAN - 3RD FLOOR
A-304 - FINISH PLAN - 4TH FLOOR
A-402 - BUILDING SECTION
A-500 - STAIR DETAILS
A-501 - ARCHITECTURAL DETAILS AND DOOR SCHEDULE
A-502 - PARTITION TYPES & DETAILS
A-503 - ARCHITECTURAL DETAILS
A-504 - ADDITIONAL DETAILS
GPO - Main Electrical Upgrade - Structural Combined (2018-02-12)
GPO - Main Electrical Upgrade - Structural Combined (2018-02-12)
S-001
S-002
S-101
S-102
S-103
GPO - Main Electrical Upgrade - Structural Combined (2018-02-12)
S-201

S-202

GPO - Main Electrical Upgrade - Mechanical Combined (2018-02-12)
GPO - Main Electrical Upgrade - Mechanical Combined (2018-02-12)
GPO - Main Elec Upgrade
MD-100 MD-100 (1)
M-100
M-101
M-102
GPO - Main Electrical Upgrade - Mechanical Combined (2018-02-12)
GPO - Main Electrical Upgrade - Drawings Combined (2018-02-12).pdf
GPO - Main Electrical Upgrade - Arch Combined (2018-02-12)
A-002
Sheets
A-002 - INDEX SHEET
A-106
Sheets
A-106 - ROOF PLAN
GPO - Main Electrical Upgrade - Electrical Combined (2018-02-12)
GPO - Main Electrical Upgrade - Electrical Combined (2018-02-12)
GPO - Main Electrical Upgrade - Electrical 100% CD (2017-03-16)
E-001 ELECTRICAL LEGEND AND ABBREVIATIONS
E-002 ELECTRICAL LEGEND AND FIXTURE SCHEDULE
ED-101 ELECTRICAL POWER PLAN - FIRST FLOOR - DEMOLITION
ED-102 ELECTRICAL POWER PLAN - SECOND FLOOR - DEMOLITION
ED-103 ELECTRICAL POWER PLAN - THIRD FLOOR - DEMOLITION
ED-104 ELECTRICAL POWER PLAN - EIGHTH FLOOR - DEMOLITION
ED-105 ELECTRICAL POWER PLAN - ROOF - DEMOLITION
E-101 ELECTRICAL POWER PLAN - SECOND FLOOR
E-102 ELECTRICAL POWER PLAN - THIRD FLOOR
E-103 ELECTRICAL POWER PLAN - FOURTH FLOOR
E-104 ELECTRICAL POWER PLAN - EIGHTH FLOOR
E-105
GPO - Main Electrical Upgrade - Electrical Combined (2018-02-12)
GPO - Main Electrical Upgrade - Electrical 100% CD (2017-03-16)
E-110 ELECTRICAL CONDUIT PLAN - BASEMENT
E-111 ELECTRICAL CONDUIT PLAN - BASEMENT
E-112 ELECTRICAL CONDUIT PLAN - FIRST AND SECOND FLOOR
E-113 ELECTRICAL CONDUIT PLAN - THIRD FLOOR
E-114 ELECTRICAL CONDUIT PLAN - FOURTH FLOOR
E-115 ELECTRICAL CONDUIT PLAN - SEVENTH FLOOR
E-121 ELECTRICAL LIGHTING PLAN - THIRD FLOOR
E-122 ELECTRICAL LIGHTING PLAN - FOURTH FLOOR
E-123 ELECTRICAL LIGHTING PLAN - EIGHTH FLOOR
E-201 ELECTRICAL SWITCHGEAR ELEVATIONS
E-202 ELECTRICAL SWITCHGEAR ELEVATIONS
E-301 ELECTRICAL PHASING PLAN - UPS ROOM
E-302 ELECTRICAL PHASING PLAN - UPS ROOM
E-303 ELECTRICAL PHASING PLAN - UPS ROOM
E-401
GPO - Main Electrical Upgrade - Electrical Combined (2018-02-12)
GPO - Main Electrical Upgrade - Electrical 100% CD (2017-03-16)
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-505 ELECTRICAL DETAILS
E-506 ELECTRICAL DETAILS
ED-601 ELECTRICAL SINGLE LINE - DEMOLITION
GPO - Main Electrical Upgrade - Drawings Combined (2018-02-12).pdf
GPO - Main Electrical Upgrade - Arch Combined (2018-02-12)
A-002
Sheets
A-002 - INDEX SHEET
A-106
Sheets
A-106 - ROOF PLAN
GPO - Main Electrical Upgrade - Electrical Combined (2018-02-12)
E-601
GPO - Main Electrical Upgrade - Drawings Combined (2018-02-12).pdf
GPO - Main Electrical Upgrade - Arch Combined (2018-02-12)
A-002
Sheets
A-002 - INDEX SHEET
A-106
Sheets
A-106 - ROOF PLAN
GPO - Main Electrical Upgrade - Electrical Combined (2018-02-12)
GPO - Main Electrical Upgrade - Electrical Combined (2018-02-12)
GPO - Main Electrical Upgrade - Electrical 100% CD (2017-03-16)
E-602 ELECTRICAL SINGLE LINE
E-603 ELECTRICAL SINGLE LINE
E-604 ELECTRICAL SINGLE LINE
E-901 ELECTRICAL PANEL SCHEDULES
E-902 ELECTRICAL PANEL SCHEDULES
GPO - Main Electrical Upgrade - Fire Protection Combined (2018-02-12)
GPO - Main Electrical Upgrade - Fire Protection Combined (2018-02-12)
FP-100
GPO - Main Electrical Upgrade - Fire Pump Combined (2018-02-12)
FP001
FP101
FP102

File details come from the government source that posted it. Updated .