Specifications
U.S. Department of Transportation
Federal Aviation Administration
SWF ASR
Roof Replacement
New Windsor, NY
PREPARED
BY:
DATE:
Infrastructure Engineering Center - Boston, AJW-2E18A
December 28, 2022
TABLE OF CONTENTS
DIVISION 1 - General Requirements 01100 Summary of Work……..……………………………………………Page 1
DIVISION 6 – Wood, Plastics, and Composites 06105 Miscellaneous Rough Carpentry ……………………………………Page 1
DIVISION 7 – Thermal and Moisture Protection 07210 Building Insulation………………………………………………….Page 1 07542 Polyvinyl-Chloride (PVC) Roofing………………………………...Page 6 07620 Sheet Metal Flashing and Trim……..………………………………Page 14 07716 Roof Expansion Assemblies…..…….…………..………………….Page 20 07920 Joint Sealants …………………………..…………………………..Page 25
APPENDIX A – Sample Cut Sheet
APPENDIX B – Roof Plan
ASR Roof Replacement DIVISION 1 December 28, 2022 New Windsor, NY
DIVISION 1
SECTION 01100 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 General.- These specifications, together with the referenced specifications, and standards specified in the Contract Documents, cover the requirements of the Federal Aviation Administration, hereinafter referred to as the Government or FAA, for certain work associated with the installation of a new roofing system at the Airport Surveillance Radar (ASR) serving Stewart International Airport located in New Windsor, NY.
1.2 Scope. – The Contractor shall provide the necessary labor, materials, supplies, and equipment to install a new Roofing system including flashing, insulation, and a polyvinyl-chloride (PVC) membrane.
A. Contractor’s work will consist of but not limited to:
• Remove and replace existing Metal Fascia Flashing (Approx 186 LF) with exact color, size and gauge.
• Remove existing Rubber Membrane (Approx 1800 SF) and dispose.
• Remove and replace existing insulation with same type and thickness to maintain existing R-Value. Insulation is believed to be 3” thickness. Contractor to verify.
• Place new PVC Roof Membrane (Approx 1800 SF) (White in color).
• Dispose of all debris off site.
• Take precautions as this is a fully functional facility. All work to be coordinated with
FAA COR/RE.
• Submit and receive approval on all materials before installation. Contractor to verify
All Dimensions.
• Contractor to install PVC membrane per manufacturer’s recommended installation and instructions
B. Installation Procedure During the construction and installation, all work shall be coordinated with the on-site Contracting Officer's Representative (COR). A project schedule with anticipated installation dates shall be submitted to the on-site COR. Contractor shall remove all flashing and insulation found on existing roof. Contractor shall dispose of all debris off site. Contractor shall replace existing flashing with exact match in gauge of steel and color. Contractor shall make note of existing insulation and replace with exact match in material, R-value, and thickness. Contractor shall submit on all material, and may proceed with installation once all submittals have been approved.
The Contractor shall keep the facility weather tight before departing the site daily.
Temporary roofing or weatherproofing will be subject to inspection of the on-site COR.
The Contractor will be responsible for the immediate repair of any damage that may result in an impact to the facility. All areas disturbed during construction shall be protected to insure that the facility or material does not incur damage from outside elements.
ASR Roof Replacement DIVISION 1 December 28, 2022
DIVISION 1
The Contractor is advised that this facility is fully operational and any unscheduled interruptions may cause aircraft accidents and loss of life. The facility shall remain operational throughout the entire contract unless a shutdown is scheduled.
1.3 Intent of Specifications.
A This specification identifies all labor, materials, plant and equipment to perform the work required to replace the roof of the facility. All work performed and all materials and equipment used shall be subject to the approval of the COR. This shall include, but not be limited to, testing, inspection, scheduling, reporting, and submittals.
1.4 Contract Documents. - These documents form a part of this specification:
A. Measurements: - All dimensions shall be verified by the contractor, using actual on site measurements. Any discrepancies between the specifications and the existing conditions shall be referred to the COR before any work is performed.
1.5 Document sources.
A. Federal specifications.- The Federal specifications, standards, supplements, amendments, and indices are prepared and issued by the General Services Administration of the Federal Government. They may be obtained from the Specifications Activity, Printed Materials Supply Division, Building 197, Naval Weapons Plant, Washington, D.
C. 20407.
B. Applicable documents.- The current issues of the following documents that are in effect on the date of issuance of the request for offer form a part of this specification and are applicable herein.
1. AIA American Institute of Architects
2. AISC American Institute of Steel Construction
3. ANSI American National Standards Institute
4. ACI American Concrete Institute
5. FS Federal Specification
6. OSHA Occupational Safety and Health Administration
7. ASTM American Society for Testing and Materials
8. NFPA National Fire Protection Association
C. Project Coordination- The contractor shall be required to coordinate his/her construction activities directly with the COR.
D. Layout of Work- The contractor shall lay out his/her work from the existing site and shall be responsible for all measurements in connection therewith. The contractor shall be held responsible for the execution of the work indicated in the contract documents.
ASR Roof Replacement DIVISION 1 December 28, 2022
PART 2 SITE ACCESS, CONSTRUCTION LIMITS, USE OF FACILITIES AND
WORK HOURS
2.1 General.-
2.2. Damage to site.- Damage to the FAA site or any abutting properties caused by the contractor's activities must be repaired by the contractor. All costs of repairs shall be paid by the contractor. After notice to proceed and prior to the commencement of construction, the contractor and the COR shall conduct joint inspections of the existing areas to be affected by the construction. Existing conditions shall be noted by both the contractor and the COR and will be used as the basis for determination of damages caused by the contractor's operations.
2.3 Contractor's use of premises.-
A. Work Hours. Work shall begin no earlier than 7:00 A.M. each morning Monday through Friday and shall end at 3:30 P.M. Any work that will, or may, cause loss of power to the ASR facility or support infrastructure must be scheduled and coordinated with the COR and the FAA. This may require the contractor to perform some of the work at night. Any deviation from this work schedule shall be submitted to the COR for approval. All work outside normal work hours shall be requested in writing to the COR 24 hours in advance. Approval of the request shall be allowed at the COR's discretion.
During construction, if the contractor plans to stop work, the contractor shall notify the COR at least 24 hours prior to that time. The contractor shall notify the COR 48 hours in advance in order to reschedule any on site activity after stopping work.
B. Contractor shall assume full responsibility for the protection and safekeeping of products stored on the site.
C. The contractor and subcontractors shall maintain the job site in a neat and orderly condition. This includes the daily removal of rubbish, waste materials, tools, equipment, and materials.
PART 3 COORDINATION, LOCAL PERMITS AND TESTING
3.1 General.-
A. Scope.- This section covers the requirements for testing and permits, inspections and approvals and coordination of construction required to complete the work.
3.2 Applicable Documents.- (not used).
3.3 Requirements.-
ASR Roof Replacement DIVISION 1 December 28, 2022
DIVISION 1
A. Project Coordination.- The contractor shall prepare a detailed schedule of work, and arrange the work so as to prevent conflicts between subcontractors. The contractor shall be responsible for coordination of the work by different trades, and all of the work of this contract. The contractor shall resolve all coordination conflicts that arise among subcontractors.
B. Local permits.- The contractor shall apply, pay fees, and obtain local building permits and inspections as required. Permits shall be posted as required.
C. Building Codes.- Construction shall be performed in compliance with the most current editions of BOCA, UBC Building Codes, the National Electrical Code and the specifications. If Contract Documents exceed code requirements, the Contract Documents shall govern.
D. Test and inspections.- During the progress of work make all tests for the installation required by these specifications. If applicable, perform all testing required by State or local authorities having jurisdiction of the work. Tests shall be made before systems are concealed or covered. Tests shall be made in the presence of the COR and other authorities requiring tests. Unless specified otherwise, the Contractor shall pay all costs, inspection charges, and fees required for testing the work or materials.
3.4 Existing Utilities.- During the progress of the work, the contractor shall provide for all existing utilities and services affected. Maintain existing outlets, switches and lighting, whether or not they are shown on the plans. Continue the existence of all impacted electrical and other services in the building as part of the finished product.
PART 4 GOVERNMENT FURNISHED MATERIAL - N/A.
PART 5 PLANNED CONTRACT PROGRESS SCHEDULE
5.1 SCHEDULE.- The contractor shall, within 10 days from date of award of contract (unless a different time is specified in the contract), submit to the CO for approval a realistic schedule, showing the order listed below.
5.2 Salient Features.
1. PVC Roof
PART 6 PRECONSTRUCTION CONFERENCE The contractor shall attend a preconstruction conference to be conducted by the FAA. Local procedures related to ingress-egress, use of premises, station security, construction work schedule, temporary facilities, material disposal, and Sector operations will be discussed. The time and location for the preconstruction conference shall be established by the CO after contract award.
PART 7 SUBMITTALS
ASR Roof Replacement DIVISION 1 December 28, 2022
DIVISION 1
7.1 General.-
A. Submittal requirements.- Provide submittals where required in the individual specification sections and as required below.
B. Prior to the Notice to Proceed.- Specific submittal data currently listed and required by the various sections of this specification shall be submitted to the COR for approval. The following submittal items must be approved by the FAA prior to the Notice to Proceed:
1. Construction Schedule.
2. Contractor’s preconstruction safety and health checklist.
3. Written certification that no Asbestos Containing Material will be provided and installed by the contractor.
C. Procedure. - Four complete sets of all product data shall be submitted and two sets will be marked and returned to the contractor. Each product sheet, submitted for approval, shall have in the lower right hand corner, just above the title block, a 4 inch by 4 inch open space in which the COR can indicate action taken. All submittals shall be accompanied by transmittal letters identifying the contents of the copy. Submittals shall be delivered in adequate time for FAA review (10 calendar days maximum) and FAA re-submittal review (10 calendar days maximum) before the work, which the respective submittal represents, is fabricated or delivered to the site. Work requiring approval shall not be initiated prior to approval of submittal. Submittals shall be checked by the contractor and coordinated with the work of other trades involved before they are submitted for approval. Submittals incompleteness or inadequate description will be justification for disapproval. Submittals shall bear the following information:
1. Specification page and paragraph number.
2. Name of project and facility.
3. Name of contractor and subcontractor or supplier.
4. Clearly identified contents and location of work.
D. By submitting product sheets, the contractor thereby represents that he has determined and verified the following:
1. Space limitations.
2. Coordination with equipment furnished under other specification sections.
3. Catalog numbers and similar data.
4. Compliance with requirements of the work and of the contract documents.
5. Compatibility with existing facility materials and sizes.
E. Shop drawing approval.- The checking, marking, or approval of the shop drawings and/or product data by the COR shall not be construed as a complete check, but will indicate only that the general method of construction and detailing is satisfactory.
Approval will not relieve the contractor of the responsibility for any error that may exist.
ASR Roof Replacement DIVISION 1 December 28, 2022
DIVISION 1
The contractor shall be responsible for the dimensions and design of adequate connections, details, and satisfactory service of the item.
1. Approved as submitted.- If "approved as submitted" is marked by the COR, each copy of the shop drawings or product data will be identified as having received such approval by being stamped and dated. After submittal has been approved, no substitution will be permitted without written approval by the COR.
2. Approved as noted.- If "approved as noted" is marked by the COR, the shop drawings or product data is satisfactory contingent upon contractor acceptance of corrections, notations, or both and, if accepted, does not require re-submittal.
3. Not approved.- If "not approved" is checked by the COR, the shop drawing or submittal data does not meet job requirements and the contractor must resubmit. If shop drawings or submittal data are disapproved, the contractor shall resubmit the corrected material, in the same quantity as specified for the original submittal.
F. Samples.- The Government reserves the right to request samples of any products or materials proposed for use on this project. Specific samples currently listed under various sections of this specification will be required.
G. Re-submittal.- Resubmit all items marked “disapproved” or “resubmit” within 10 calendar days of receipt. Resubmit construction schedule each 14 days after the original approval with actual dates filled in and dates for any additional submittal or re-submittals.
PART 8 TEMPORARY FACILITIES
8.1 General.- The contractor shall provide and pay for all temporary services and facilities as specified below and as necessary for the proper and expeditious execution of the work.
Contractor shall make, or have made, all connections to existing services and sources of supply as necessary and/or indicated and pay all charges for it. Contractor shall provide all labor, materials, equipment, and appurtenances necessary for the complete installation, operation, and maintenance of all temporary service systems and facilities. All work under this section shall comply with applicable laws, rules, regulations, codes, ordinances, and orders of all federal, state, and local authorities having jurisdiction for the safety of persons, materials, and property. Contractor shall remove all such temporary installations and connections when no longer necessary for the project work.
8.2 Temporary Lighting and Power.- Contractor will be allowed to use convenience power from the facility their ongoing construction needs if available. Contractor shall provide all temporary task lighting to illuminate the work areas as necessary. Temporary power and lightning will be necessary for any night work, and power shutdowns, that may be necessary during the project.
8.3 Dumpster.- There are no waste disposal units at the project sites. Contractor shall provide a suitable dumpster for construction waste. Have container emptied with suitable
ASR Roof Replacement DIVISION 1 December 28, 2022
DIVISION 1
frequency so that trash does not overflow and blow around site and adjacent property. A cover is required and shall be provided on the dumpster in order for the refuse not to blow out. Contractor shall be responsible for the timely, legal disposal of all construction waste.
Contractor shall dispose of all removed equipment that is deemed unusable by the FAA.
Determination shall be made by the COR. All construction waste shall be legally disposed of off the airport, by the Contractor.
8.4 Toilet Service.- There are no toilet facilities available on project sites. Employ a portable toilet contractor to provide one portable toilet on the job site for the duration of the contract. The paper shall be checked daily and the toilet shall be evacuated and recharged twice weekly.
PART 9 MATERIALS AND EQUIPMENT
1-9.1 General.- Material and equipment incorporated into the work shall conform to applicable specifications and standards and comply with size, make, type, and quality specified, or as specifically approved in writing by the COR. Manufactured and fabricated products shall be designed, fabricated, and assembled in accordance with the best engineering and shop practices. Like parts of duplicate units shall be manufactured to standard sizes and gages, and shall be interchangeable. Two or more items of the same kind shall be identical and manufactured by the same manufacturer. Products shall be suitable for service conditions. Equipment capacities, sizes, and dimensions shown or specified shall be adhered to unless variations are specifically approved in writing. Do not use material or equipment for any purpose other than for which it is designed or specified. Furnish and install products specified, under options and conditions for substitution stated in this section.
A. Transportation and handling.- Products shall be delivered in undamaged condition, in manufacturer's original containers or packing, with identifying labels intact and legible.
Shipments shall be inspected to ensure compliance with requirements of contract documents and approved submittals, that products are properly protected and undamaged immediately on delivery. Provide equipment and personnel to handle products by methods to prevent soiling or damage to products or packing.
9.2 Asbestos Containing Materials (ACM).-
The use of ACM for new material on this project is prohibited. Before the Notice to Proceed the contractor shall provide written certification to the Contracting Officer that no ACM will be used in the proposed construction.
PART 10 CONTRACT CLOSE OUT
10.1 Acceptance of work.- The Contractor shall schedule a final inspection with the COR. The Contractor shall correct discrepancies noted during the final inspection, clean the premises and notify the COR that the work is ready for acceptance.
ASR Roof Replacement DIVISION 1 December 28, 2022
PART 11 SAFETY AND HEALTH
11.1 Applicable Publications - The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
A. Code of Federal Regulations (CFR)
B. OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington DC 20402.
C - National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61)
D. Federal Standard (Fed. Std.)
E. Material Safety Data Sheets, Preparation and the submission of.
11.2 Work Covered by this Section - This section is applicable to all work covered by this contract
11.3 Definitions of Hazardous Materials - Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910; and to others as additionally defined in Fed. Std. 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCBs), explosives, and radioactive material, but may include others.
A. Spray Painting - No spray painting will be allowed within the building space.
B. Smoking - No smoking will be allowed within the building. Smoking shall be confined to designated areas outside the building.
11.4 Quality Assurance -
A. Safety Discussion during Preconstruction Conference - Representatives of the contractor shall provide the contractor’s safety and health programs during the preconstruction conference. All safety and health provisions pertinent to the work shall be discussed with the CO and the COR at this time. The contractor shall be prepared to discuss, in detail, the measures he/she intends to take in order to control any unsafe or unhealthy conditions associated with the planned work. The contractor’s superintendent, and his/her safety representative shall attend this meeting.
ASR Roof Replacement DIVISION 1 December 28, 2022
DIVISION 1
B. Compliance with Regulations - All work, including the handling of hazardous materials shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply.
C. Contractor Responsibility - The contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of the work.
1-11.4.4 Inspections, tests and reports - Not Used.
D. Safety Plan - The contractor shall submit a plan for maintaining a safe working environment for construction workers employed on this project, and for the rest of the personnel working in the building. As a minimum, the plan shall show scheduled inspections of equipment and job conditions to check for potential hazards. The plan shall contain a statement that current OSHA regulations on safety in the construction industry will be followed. The plan shall list the directions by automobile and the telephone number for the nearest hospital emergency room, and police and fire department numbers. The plan will be used by the COR to insure that the work is accomplished in accordance with accepted safety practices.
The COR may stop any operation that is in violation of the OSHA standards and fails to comply with the safety plan or accepted safe work practices.
11.5 Submittals -
A. Accident Reporting - A copy of each accident report, which the Contractor or subcontractors submit to insurance carriers, shall be forwarded through the COR to the CO as soon as possible after the accident occurs.
B. Permits - If hazardous materials are disposed of off site, submit copies of permits from applicable Federal, State, or municipal authorities.
C. Material Safety Data Sheets - The material safety data sheets shall be provided for posting on the job site by the COR on every material the contractor provides including but not limited to construction adhesives, paint, solvents for cleaning and fuel, if applicable. MSDS sheets shall be as printed by the material manufacturer.
D. OSHA Bulletins.- Post the bulletins on construction health and safety as required by law. Post an emergency notice with telephone numbers for medical, Police, Fire, EPA, and Poison Control Center telephone numbers in the stairwell area. Submit this item prior to commencing any work.
11.6 Materials and Equipment - Special facilities, devices, equipment, clothing, and similar items used by the contractor in the execution of work shall comply with the applicable regulations.
ASR Roof Replacement DIVISION 1 December 28, 2022
DIVISION 1
11.7 Hazardous Materials - The contractor shall bring to the attention of the COR any material suspected of being hazardous which he/she encounters during execution of the work. A determination will be made by the COR as to whether the contractor shall perform tests, and/or if the material is found hazardous and additional protective measures are needed, a contract change may be required, subject to applicable provisions of the contract.
11.8 Suspension of Work - When the contractor or his/her subcontractors are notified by the COR of any unsafe conditions caused by noncompliance with the provisions of the contract, the contractor shall immediately correct the unsafe or unhealthy condition. If the contractor fails to correct the problem condition(s) to the satisfaction of the COR promptly, all or any part of the work may be suspended in accordance with AMS Clause No. 3.10.1-8, “Suspension of Work”. When, in the opinion of the COR, satisfactory corrective action has been taken to correct the unsafe and unhealthy condition, a start order will be provided immediately. No extension of time or compensation will be allowed in connection with or by reason of this type of work stoppage.
11.9 Protection - The contractor shall take all necessary precautions to prevent injury to the public, building occupants or his/her employees. The contractor shall take all necessary precautions to prevent public or private property damage or loss.
A. Work shall not be performed in any area occupied by Federal employees unless adequate steps are taken for the protection of Federal employees.
B. Whenever practicable, the work area shall be fenced, barricaded, or otherwise blocked off to prevent unauthorized entry into the work area.
C. Alternate precautions - When the nature of the work prevents isolation of the work area, alternate precautions such as the posting of signs, the use of signal persons, the erection of barricades or similar protection around particularly hazardous operations shall be used as appropriate.
END OF DIVISION 1
ASR Roof Replacement DIVISION 6 September 13, 2022
DIVISION 6
SECTION 06105 - MISCELLANEOUS ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Rooftop equipment bases and support curbs.
2. Wood blocking and nailers.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, provide lumber that complies with the applicable rules of any rules-writing agency certified by the ALSC Board of Review. Provide lumber graded by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated.
1. Factory mark each piece of lumber with grade stamp of grading agency.
2. For exposed lumber indicated to receive a stained or natural finish, mark grade stamp on end or back of each piece
3. Provide dressed lumber, S4S, unless otherwise indicated.
B. Maximum Moisture Content of Lumber: 15 percent unless otherwise indicated.
2.2 FIRE-RETARDANT-TREATED MATERIALS
A. Fire-Retardant-Treated Lumber and Plywood by Pressure Process: Products with a flame spread index of 25 or less when tested according to ASTM E 84, and with no evidence of significant progressive combustion when the test is extended an additional 20 minutes, and with the flame front not extending more than 10.5 feet beyond the centerline of the burners at any time during the test.
1. Exterior Type: Treated materials shall comply with requirements specified above for fire-retardant-treated lumber and plywood by pressure process after being subjected to accelerated weathering according to ASTM D 2898. Use for exterior locations and where indicated.
2. Interior Type A: Treated materials shall have a moisture content of 28 percent or less when tested according to ASTM D 3201 at 92 percent relative humidity.
Use where exterior type is not indicated.
3. Design Value Adjustment Factors: Treated lumber shall be tested according
ASR Roof Replacement DIVISION 6 September 13, 2022
DIVISION 6
ASTM D 5664, and design value adjustment factors shall be calculated according to ASTM D 6841
B. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent.
C. Identify fire-retardant-treated wood with appropriate classification marking of testing and inspecting agency acceptable to authorities having jurisdiction.
D. Application: Treat all miscellaneous carpentry unless otherwise indicated.
2.3 DIMENSION LUMBER FRAMING
A. Non-Load-Bearing Interior Partitions: Construction or No. 2 grade of any species.
B. Other Framing: No. 2 grade and any of the following species:
1. Hem-fir (north); NLGA.
2. Southern pine; SPIB.
3. Douglas fir-larch; WCLIB or WWPA.
4. Mixed southern pine; SPIB.
5. Spruce-pine-fir; NLGA.
6. Douglas fir-south; WWPA.
7. Hem-fir; WCLIB or WWPA.
8. Douglas fir-larch (north); NLGA.
9. Spruce-pine-fir (south); NeLMA, WCLIB, or WWPA.
2.4 MISCELLANEOUS LUMBER
A. General: Provide miscellaneous lumber indicated and lumber for support or attachment of other construction, including the following:
1. Blocking.
2. Nailers.
3. Rooftop equipment bases and support curbs.
4. Cants.
5. Furring.
2.5 FASTENERS
A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacture.
1. Where carpentry is exposed to weather, in ground contact, pressure-preservative treated, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M
B. Power-Driven Fasteners: NES NER-272.
ASR Roof Replacement DIVISION 6 September 13, 2022
DIVISION 6
C. Screws for Fastening to Metal Framing: ASTM C 1002], length as recommended by screw manufacturer for material being fastened.
2.6 MISCELLANEOUS MATERIALS
A. Flexible Flashing: Self-adhesive butyl rubber or rubberized-asphalt compound, bonded to a high-density polyethylene film, aluminum foil, or spunbonded polyolefin to produce an overall thickness of not less than 0.025 inch.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Set carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit carpentry to other construction; scribe and cope as needed for accurate fit.
B. Do not splice structural members between supports unless otherwise indicated.
C. Securely attach carpentry work to substrate by anchoring and fastening as indicated, complying with the following:
1. NES NER-272 for power-driven fasteners.
2. Table 2304.9.1, "Fastening Schedule," in ICC's International Building Code.
3. Table R602.3(1), "Fastener Schedule for Structural Members," and Table R602.3(2), "Alternate Attachments," in ICC's International Residential Code for One- and Two-Family Dwellings.
3.2 PROTECTION
A. Protect wood that has been treated with inorganic boron (SBX) from weather. If, despite protection, inorganic boron-treated wood becomes wet, apply EPA-registered borate treatment. Apply borate solution by spraying to comply with EPA-registered label.
END OF SECTION 06105
ASR Roof Replacement DIVISION 7 December 28, 2022
Division 7
SECTION 07210 - BUILDING INSULATION
PART 1 - GENERAL
1. Foam-plastic board insulation.
2. Glass-fiber board insulation.
3. Glass-fiber blanket insulation.
4. Spray polyurethane foam insulation.
5. Vapor retarders.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Product test reports.
C. Research/evaluation reports.
PART 2 - PRODUCTS
2.1 FOAM-PLASTIC BOARD INSULATION
A. Extruded-Polystyrene Board Insulation: ASTM C 578, with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively, per ASTM E 84.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. DiversiFoam Products.
b. Dow Chemical Company (The).
c. Owens Corning.
2. Type X, 15 psi.
3. Type IV, 25 psi.
4. Type VI, 40 psi.
5. Type VII, 60 psi.
6. Type V, 100 psi.
2.2 GLASS-FIBER BOARD INSULATION
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
ASR Roof Replacement DIVISION 7 December 28, 2022
Division 7
1. CertainTeed Corporation.
2. Johns Manville.
3. Owens Corning.
B. Glass-Fiber Board Insulation: ASTM C 612, Type IA; foil faced, with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively, per ASTM E 84;
passing ASTM E 136 for combustion characteristics.
1. Nominal density of 2.25 lb/cu. ft., thermal resistivity of 4.3 deg F x h x sq.
ft./Btu x in. at 75 deg F.
2. Nominal density of 3 lb/cu. ft., thermal resistivity of 4.3 deg F x h x sq. ft./Btu x in. at 75 deg F.
3. Nominal density of 4.25 lb/cu. ft., thermal resistivity of 4.3 deg F x h x sq.
ft./Btu x in. at 75 deg F.
4. Nominal density of 6 lb/cu. ft., thermal resistivity of 4.4 deg F x h x sq. ft./Btu x in. at 75 deg F.
2.3 SPRAY POLYURETHANE FOAM INSULATION
A. Closed-Cell Polyurethane Foam Insulation: ASTM C 1029, Type II, with maximum flamespread and smoke-developed indexes of 75 and 450, respectively, per ASTM E 84.
a. BASF Corporation.
b. Dow Chemical Company (The).
c. Henry Company.
d. NCFI; Division of Barnhardt Mfg. Co.
2. Minimum density of 1.5 lb/cu. ft., thermal resistivity of 6.2 deg F x h x sq.
ft./Btu x in. at 75 deg F.
2.4 VAPOR RETARDERS
A. Polyethylene Vapor Retarders: ASTM D 4397, 10 mils thick, with maximum permeance rating of 0.13 perm.
B. Vapor-Retarder Tape: Pressure-sensitive tape of type recommended by vapor-retarder manufacturer for sealing joints and penetrations in vapor retarder.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
ASR Roof Replacement DIVISION 7 December 28, 2022
A. Comply with insulation manufacturer's written instructions applicable to products and applications indicated.
B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.
C. Extend insulation to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.
D. Provide sizes to fit applications indicated and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units to produce thickness indicated unless multiple layers are otherwise shown or required to make up total thickness.
E. Closed Cell or other approved mold / mildew resistant insulation is to be utilized in all applications unless noted otherwise.
3.2 INSTALLATION OF CAVITY-WALL INSULATION
A. Foam-Plastic Board Insulation: Install pads of adhesive spaced approximately 24 inches o.c. both ways on inside face, and as recommended by manufacturer. Fit courses of insulation between wall ties and other obstructions, with edges butted tightly in both directions. Press units firmly against inside substrates.
3.3 INSTALLATION OF INSULATION FOR FRAMED CONSTRUCTION
A. Apply insulation units to substrates by method indicated, complying with manufacturer's written instructions. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units.
B. Foam-Plastic Board Insulation: Seal joints between units by applying adhesive, mastic, or sealant to edges of each unit to form a tight seal as units are shoved into place. Fill voids in completed installation with adhesive, mastic, or sealant as recommended by insulation manufacturer.
C. Glass-Fiber Blanket Insulation: Install in cavities formed by framing members according to the following requirements:
1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends.
2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.
ASR Roof Replacement DIVISION 7 December 28, 2022
Division 7
3. Maintain 3-inch clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation.
4. Install eave ventilation troughs between roof framing members in insulated attic spaces at vented eaves.
5. For metal-framed wall cavities where cavity heights exceed 96 inches, support unfaced blankets mechanically and support faced blankets by taping flanges of insulation to flanges of metal studs.
6. For wood-framed construction, install blankets according to ASTM C 1320 and as follows:
a. With faced blankets having stapling flanges, secure insulation by inset, stapling flanges to sides of framing members.
b. With faced blankets having stapling flanges, lap blanket flange over flange of adjacent blanket to maintain continuity of vapor retarder once finish material is installed over it.
7. Vapor-Retarder-Faced Blankets: Tape joints and ruptures in vapor-retarder facings, and seal each continuous area of insulation to ensure airtight installation.
a. Exterior Walls: Set units with facing placed toward as indicated on Drawings.
b. Interior Walls: Set units with facing placed toward areas of high humidity.
D. Loose-Fill Insulation: Apply according to ASTM C 1015 and manufacturer's written instructions. Level horizontal applications to uniform thickness as indicated, lightly settle to uniform density, but do not compact excessively.
1. For cellulosic-fiber loose-fill insulation, comply with CIMA's Bulletin #2, "Standard Practice for Installing Cellulose Insulation."
E. Spray-Applied Insulation: Apply spray-applied insulation according to manufacturer's written instructions. Do not apply insulation until installation of pipes, ducts, conduits, wiring, and electrical outlets in walls is completed and windows, electrical boxes, and other items not indicated to receive insulation are masked. After insulation is applied, make flush with face of studs by using method recommended by insulation manufacturer.
F. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to prevent gaps in insulation using the following materials:
1. Loose-Fill Insulation: Compact to approximately 40 percent of normal maximum volume equaling a density of approximately 2.5 lb/cu. ft..
2. Spray Polyurethane Insulation: Apply according to manufacturer's written instructions.
3.4 INSTALLATION OF INSULATION FOR CONCRETE SUBSTRATES
ASR Roof Replacement DIVISION 7 December 28, 2022
Division 7
A. Install board insulation on concrete substrates by adhesively attached, spindle-type insulation anchors as follows:
1. Fasten insulation anchors to concrete substrates with insulation anchor adhesive according to anchor manufacturer's written instructions. Space anchors according to insulation manufacturer's written instructions for insulation type, thickness, and application indicated.
2. Apply insulation standoffs to each spindle to create cavity width indicated between concrete substrate and insulation.
3. After adhesive has dried, install board insulation by pressing insulation into position over spindles and securing it tightly in place with insulation-retaining washers, taking care not to compress insulation below indicated thickness.
4. Where insulation will not be covered by other building materials, apply capped washers to tips of spindles.
3.5 INSTALLATION OF VAPOR RETARDERS
A. Place vapor retarders on side of construction indicated on Drawings. Extend vapor retarders to extremities of areas to protect from vapor transmission. Secure vapor retarders in place with adhesives or other anchorage system as indicated. Extend vapor retarders to cover miscellaneous voids in insulated substrates, including those filled with loose-fiber insulation.
B. Seal vertical joints in vapor retarders over framing by lapping no fewer than two studs.
1. Fasten vapor retarders to wood framing at top, end, and bottom edges; at perimeter of wall openings; and at lap joints. Space fasteners 16 inches o.c.
2. Before installing vapor retarders, apply urethane sealant to flanges of metal framing including runner tracks, metal studs, and framing around door and window openings. Seal overlapping joints in vapor retarders with vapor-retarder tape according to vapor retarder manufacturer's written instructions. Seal butt joints with vapor-retarder tape. Locate all joints over framing members or other solid substrates.
3. Firmly attach vapor retarders to metal framing and solid substrates with vapor-retarder fasteners as recommended by vapor-retarder manufacturer.
C. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with vapor-retarder tape to create an airtight seal between penetrating objects and vapor retarders.
D. Repair tears or punctures in vapor retarders immediately before concealment by other work. Cover with vapor-retarder tape or another layer of vapor retarders.
END OF SECTION 07210
ASR Roof Replacement DIVISION 7 December 28, 2022
Division 7
SECTION 07542 - POLYVINYL-CHLORIDE (PVC) ROOFING
PART 1 - GENERAL
1. Adhered PVC membrane roofing system.
2. Mechanically fastened PVC membrane roofing system.
1.2 PERFORMANCE REQUIREMENTS
A. Energy Performance: Provide roofing system that is listed on the DOE's ENERGY STAR "Roof Products Qualified Product List" for low-slope roof products.
B. Roofing System Design: Provide membrane roofing system that is identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist uplift pressure calculated according to ASCE/SEI 7-05 (110 MPH, Exposure C, Importance factor of 1.25).
1.3 SUBMITTALS
B. LEED Submittals:
1. Product Data for Credit SS 7.2: For roof materials, indicating that roof materials comply with Solar Reflectance Index requirement.
2. Product Data for Credit EQ 4.1: For adhesives and sealants, including printed statement of VOC content.
C. Shop Drawings: For roofing system. Include plans, elevations, sections, details, and attachments to other work.
D. Samples for Verification: For the following products:
1. Sheet roofing, of color specified.
E. Manufacturer Certificates: Signed by roofing manufacturer certifying that roofing system complies with requirements specified in "Performance Requirements" Article.
1. Submit evidence of compliance with performance requirements.
F. Research/evaluation reports.
ASR Roof Replacement DIVISION 7 December 28, 2022
Division 7
G. Field quality-control reports.
H. Maintenance data.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by membrane roofing system manufacturer to install manufacturer's product.
B. Source Limitations: Obtain components including fasteners for membrane roofing system approved by membrane roofing manufacturer.
C. Exterior Fire-Test Exposure: ASTM E 108, Class A; for application and roof slopes indicated, as determined by testing identical membrane roofing materials by a qualified testing agency. Materials shall be identified with appropriate markings of applicable testing agency.
D. Pre-installation Roofing Conference: Conduct conference at Project site.
1.5 WARRANTY
A. Special Warranty: Manufacturer's standard or customized form, without monetary limitation, in which manufacturer agrees to repair or replace components of membrane roofing system that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 15 years from date of Substantial Completion.
2.1 PVC MEMBRANE ROOFING
A. PVC Sheet: ASTM D 4434, Type III, fabric reinforced.
a. Carlisle SynTec, Incorporated.
b. Duro-Last Roofing, Inc.
c. Johns Manville.
d. Sarnafil Inc.
2. Thickness: 60 mils, nominal.
3. Exposed Face Color: White.
ASR Roof Replacement DIVISION 7 December 28, 2022
Division 7
2.2 AUXILIARY MEMBRANE ROOFING MATERIALS
A. General: Auxiliary membrane roofing materials recommended by roofing system manufacturer for intended use, and compatible with membrane roofing.
1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.
2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):
a. Plastic Foam Adhesives: 50 g/L.
b. Gypsum Board and Panel Adhesives: 50 g/L.
c. Multipurpose Construction Adhesives: 70 g/L.
d. Fiberglass Adhesives: 80 g/L.
e. Contact Adhesive: 80 g/L.
f. Other Adhesives: 250 g/L.
g. PVC Welding Compounds: 510 g/L.
h. Adhesive Primer for Plastic: 650 g/L
i. Single-Ply Roof Membrane Sealants: 450 g/L.
j. Nonmembrane Roof Sealants: 300 g/L.
k. Sealant Primers for Nonporous Substrates: 250 g/L.
l. Sealant Primers for Porous Substrates: 775 g/L.
B. Sheet Flashing: Manufacturer's standard sheet flashing of same material, type, reinforcement, thickness, and color as PVC sheet membrane.
C. Bonding Adhesive: Manufacturer's standard.
D. Slip Sheet: Manufacturer's standard, of thickness required for application.
E. Metal Termination Bars: Manufacturer's standard, predrilled stainless-steel or aluminum bars, approximately 1 by 1/8 inch thick; with anchors.
F. Metal Battens: Manufacturer's standard, aluminum-zinc-alloy-coated or zinc-coated steel sheet, approximately 1 inch wide by 0.05 inch thick , prepunched.
G. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion resistance provisions in FM Approvals 4470, designed for fastening membrane to substrate, and acceptable to membrane roofing system manufacturer.
H. Miscellaneous Accessories: Provide pourable sealers, preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings, T-joint covers, lap sealants, termination reglets, and other accessories.
2.3 ROOF INSULATION
ASR Roof Replacement DIVISION 7 December 28, 2022
A. Polyisocyanurate Board Insulation: ASTM C 1289, Type II, Class 1, Grade 2, felt or glass-fiber mat facer on both major surfaces.
B. Tapered Insulation: Provide factory-tapered insulation boards fabricated to slope of 1/4 inch per 12 inches unless otherwise indicated.
C. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated.
2.4 INSULATION ACCESSORIES
A. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion resistance provisions in FM Approvals 4470, designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer.
B. Insulation Adhesive: Insulation manufacturer's recommended cold-applied adhesive formulated to attach roof insulation to substrate or to another insulation layer.
2.5 WALKWAYS
A. Flexible Walkways: Factory-formed, nonporous, heavy-duty, slip-resisting, surface-textured walkway pads or rolls, approximately 3/16 inch thick, and acceptable to membrane roofing system manufacturer. Pads to be 2 foot square.
PART 3 - EXECUTION
3.1 INSULATION INSTALLATION
A. Coordinate installing membrane roofing system components so insulation is not exposed to precipitation or left exposed at the end of the workday.
B. Comply with membrane roofing system and insulation manufacturer's written instructions for installing roof insulation.
C. Install tapered insulation under area of roofing to conform to slopes indicated.
D. Install insulation under area of roofing to achieve required thickness. Where overall insulation thickness is 2.7 inches or greater, install two or more layers with joints of each succeeding layer staggered from joints of previous layer a minimum of 6 inches in each direction.
E. Adhered Insulation: Install each layer of insulation and adhere to substrate as follows:
1. Prime surface of concrete or metal deck with asphalt primer at rate of 3/4 gal./100 sq. ft. and allow primer to dry.
ASR Roof Replacement DIVISION 7 December 28, 2022
Division 7
2. Set each layer of insulation in a solid mopping of hot roofing asphalt, applied within plus or minus 25 deg F of equiviscous temperature.
3. Set each layer of insulation in adhesive, firmly pressing and maintaining insulation in place.
F. Mechanically Fastened Insulation: Install each layer of insulation and secure to deck using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to deck type.
1. Fasten insulation to resist uplift pressure at corners, perimeter, and field of roof.
G. Mechanically Fastened and Adhered Insulation: Install each layer of insulation and secure first layer of insulation to deck using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to deck type.
1. Fasten first layer of insulation to resist uplift pressure at corners, perimeter, and field of roof.
2. Set each subsequent layer of insulation in a solid mopping of hot roofing asphalt, applied within plus or minus 25 deg F of equiviscous temperature.
3. Set each subsequent layer of insulation in adhesive, firmly pressing and maintaining insulation in place.
3.2 ADHERED MEMBRANE ROOFING INSTALLATION
A. Adhere membrane roofing over area to receive roofing and install according to membrane roofing system manufacturer's written instructions.
1. Install sheet according to ASTM D 5036.
B. Accurately align membrane roofing and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps.
C. Bonding Adhesive: Apply to substrate and underside of membrane roofing at rate required by manufacturer and allow to partially dry before installing membrane roofing.
Do not apply to splice area of membrane roofing.
D. In addition to adhering, mechanically fasten membrane roofing securely at terminations, penetrations, and perimeter of roofing.
E. Apply membrane roofing with side laps shingled with slope of roof deck where possible.
F. Seams: Clean seam areas, overlap membrane roofing, and hot-air weld side and end laps of membrane roofing and sheet flashings according to manufacturer's written instructions to ensure a watertight seam installation.
ASR Roof Replacement DIVISION 7 December 28, 2022
Division 7
1. Test lap edges with probe to verify seam weld continuity. Apply lap sealant to seal cut edges of sheet membrane.
2. Verify field strength of seams a minimum of twice daily and repair seam sample areas.
3. Repair tears, voids, and lapped seams in roofing that does not comply with requirements.
3.3 MECHANICALLY FASTENED…