This is a Request for Proposal (RFP) issued by the Federal Bureau of Prisons for vegetable harvesting services at the UNICOR (Federal Prison Industries) farm in Lompoc, California. The solicitation number is SV0202-26, with an offer due date of March 23, 2026 at 4:00 PM EST. The contract is structured as a one-year base period with two optional one-year extensions, fixed-price with economic price adjustment, on an indefinite delivery-indefinite quantity (IDIQ) basis. The requirement is designated as a total small business set-aside. The guaranteed minimum is $10,000.00, with estimated quantities to be determined through delivery orders. All items must be awarded to a single offeror, and failure to submit offers on all line items may result in exclusion from consideration.
The contractor shall provide labor and materials for harvesting, grading, and packing broccoli and celery from 380 to 450 acres planted in multiple blocks, with three anticipated harvesting opportunities per crop. UNICOR's desired delivery is 15 days or sooner after each delivery order issuance. Detailed quality control standards are specified for multiple broccoli varieties (Export Crowns 24's & 38's, Second Label Export Crowns, Premium Broccoli Crowns, Asia Cut Premium Broccoli Crowns, Song Hee-Green Premium Broccoli Crowns, and Premium Broccoli Bunch varieties) and celery, including growing standards, in-field packing standards, handling procedures, and post-harvest requirements. Boxes are provided by UNICOR or third-party vendors; transportation costs from field to cooler shall be priced separately. Invoices must be submitted weekly to UNICOR Central Accounts Payable in Lexington, Kentucky, or emailed to Accounts.payable@usdoj.gov. The Service Contract Act applies, and contractors must comply with Department of Justice residency requirements and security clearance procedures. Administrative Contracting Officer: Chad Privett (chad.privett2@usdoj.gov); questions are due by March 13, 2026 at 4:00 PM EST to Chad Privett or Jashua Hassler, submitted in writing only. Evaluation factors include ability to meet specifications (non-cost) and price (cost), with past performance considered significant but technical factors and past performance being more important than price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SV0202-26 HARVEST SOLICITATION Q AND A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER NUMBER:
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
Coll. No.
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
SV0202-26
Chad Privett
LOX1 100
LOX1
391014499
UNDETERMINED SOURCE
NA BLANK
WASHINGTON DC 20534
UNICOR FPI CENTRAL ACCOUNTS PAYABLE
PO BOX 11849
LEXINGTON, KY 40578-1849
1620000336 See Section B
UNICOR FUNDS 15X4500 FUNDS SHALL BE OBLIGATED BY INDIVIDUAL DELIVERY ORDERS AND NOT BY THE CONTRACT ITSELF
Chad Privett
X
115113
03/05/2026
03/20/2026
2:00 PM
LOX1
LOMPOC FARM
3901 KLEIN BLVD
LOMPOC CA 93436-2706
LOMPOC FARM
3901 KLEIN BLVD
LOMPOC CA 93436-2706
02/03/2026
LOMPOC FARM
3901 KLEIN BLVD
LOMPOC CA 93436-2706
02/03/2026
200 Emp
PROJECT LOCATION IS AS FOLLOWS:
UNICOR, Federal Prison Industries, Inc.
Lompoc Farm
3901 Klein Blvd.
Lompoc, CA 93436
Solicitation is issued as a one (1) year, with two (2) option years fixed-price with economic price adjustment indefinite delivery-indefinite quantity type contract.
SOLICITATION IS A TOTAL SET ASIDE FOR SMALL BUSINESS
ALL QUESTIONS RELATING TO THIS SOLICITATION MUST BE RECEIVED IN WRITING TO:
Chad.privett2@usdoj.gov and joshus.hassler2@usdoj.gov
QUESTIONST DUE NO LATER THAN FRIDAY, MARCH 13, 2026 AT 4:00 P.M. EST.
No phone calls will be accepted. All questions need to be submitted in writing. One amendment will be issued after closing date and time to answer all questions that have been submitted. At no time should any interested offer contact factory staff or central office staff to attempt to have questions answered. If the Contracting Officer becomes aware that contact has been made with anyone other than Chad Privett or Jashua Hassler, it may result in your offer being excluded from consideration for award.
For a list, description and total estimated quantities of all items, refer to Section B.
UNICOR's desired delivery is fifteen (15) days or sooner after issuance of each delivery order.
Vendors are required to provide their best manufacturing / delivery time for evaluation, and delivery schedule will be established at time of award.
Delivery orders will be issued in accordance with 52.216-19.
Vendors shall submit signed and dated offers by email to chad.privett2@usdoj.gov. Offers shall be submitted on the SF1449.
The date and time for receipt of proposals is MARCH 23, 2026 AT 4:00 P.M. EST.
Offer must indicate Solicitation No. SV0202-26, time specified for receipt of offer, name, address and telephone number of offeror, technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation, terms of any expressed warranty, price and any discount terms. Offer must include acknowledgment of all amendments, if any.
mailto:Chad.privett2@usdoj.gov mailto:joshus.hassler2@usdoj.gov
THE FOLLOWING INFORMATION IS REQUIRED TO BE COMPLETED BY THE OFFEROR:
SAM UNIQUE ENTITY ID NUMBER:
VENDOR'S POINT OF CONTACT:
VENDOR'S TELEPHONE & FAX NUMBER:
VENDOR'S EMAIL ADDRESS:
VENDOR'S BUSINESS SIZE (i.e. SMALL, LARGE, ETC.):
By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database (System Award Management) prior to award, during performance and through final payment of any contract resulting from this solicitation.
Administrative Contracting Officer: Chad Privett at chad.privett2@usdoj.gov.
Contracting Officer Representative: TBD
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Item No. Supplies/Service Quantity U/M Unit Price Total Price Deliver Date
0001 FARM1075
EA $1.00 End of period one
BROCCOLI-HARVESTING-SERVICES PERIOD ONE
0002 FARM1090
EA $1.00 End of period one
CELERY-HARVESTING-SERVICES PERIOD ONE
0003 FARM1075
EA $1.00 End of period two
BROCCOLI-HARVESTING-SERVICES PERIOD TWO
0004 FARM1090 EA $1.00 End of period two
CELERY-HARVESTING-SERVICES PERIOD TWO
0005 FARM1075 EA $1.00 End of period three
BROCCOLI-HARVESTING-SERVICES PERIOD THREE
0006 FARM1090
EA $1.00 End of period three
CELERY-HARVESTING-SERVICES PERIOD THREE
***PLEASE LIST YOUR PRICES AS QUANTITY. 1 EACH EQUAL $1.00.
mailto:chad.privett2@usdoj.gov
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; offers are being requested, and a written solicitation will not be issued. The solicitation number is SV0202-26 and this solicitation is issued as a Request For Proposal (RFP). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Revolutionary Overhaul E.O. 14275. The North American Industry Classification System code is 115115, Farm Labor Contractors and Crew Leaders. This requirement is set aside for small business. UNICOR, Federal Prison Industries, Inc. intends to enter into one (1) year, with two (2) option years fixed-price with economic price adjustment IDIQ type contract.
SEE SECTION B FOR LIST OF ITEMS
GUARANTEED MINIMUM IS $10,000.00 QUANTITIES ARE ESTIMATED
ALL ITEMS WILL BE AWARDED TO ONE OFFEROR. FAILURE TO SUBMIT AN OFFER ON ALL
ITEMS MAY PREVENT AN OFFER FROM BEING CONSIDERED FOR AWARD.
Any contract resulting from this solicitation will not be an obligation. Funds will be obligated by delivery orders.
NOTICE TO GOVERNMENT WHEN CONTRACTOR(S) DELAYS:
In the event the contractor(s) encounter difficulty in meeting performance requirements, or when there is an anticipated difficulty in complying with the delivery terms or completion dates, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely delivery/performance of this contract, the contractor must immediately notify the Administrative Contracting Officers at UNICOR.
This information will not be construed as a waiver by the Government of the required delivery schedule, or the Governments rights to impose consideration against delinquencies or other remedies provided by this contract.
BEST COMMERCIAL CUSTOMER CATEGORY:
Contractor agrees that FPI is in the category of the most favored or best commercial customer category of the Contractor and as such, the Contractor will:
During the contract period, the Contractor shall report to the Contracting Officer all price reductions offered to the category of customers that are considered by the Contractor to be their most favored or best commercial customer. A price reduction shall apply to purchases under this contract if, after the award date, the contractor revises downward its commercial catalog, price list, schedule, etc., to its best commercial customers (or category of customers) below the awarded price under this contract; Grants more favorable discounts or terms and conditions to its best commercial customers than those contained in this contract that would result in prices below the awarded price under this contract, an/or grants special discounts to its best commercial customer (or category of customers) that would result in prices lower than the awarded price under this contract.
The Contractor shall offer the price reduction to FPI with the same effective date, and for the same time period, as extended to the commercial customer (or category of customers).
The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract period.
The Contractor shall notify the Contracting Officer of any price reduction subject to this clause as soon as possible, but not later than 15 calendar days after its effective date.
Future requirements for these or similar items from this or other UNICOR factories may be added to the resulting contract if considered to fall within the scope of work and the price is determined to be fair and reasonable.
CONTRACTOR’S RESPONSIBILITY: It is the responsibility of the Contractor to follow any Special Security Requirements of the facility where the work is performed in the performance of the contract and to consider the effects of those security requirements in the pricing of the proposal.
WAGE DETERMINATION APPLICABLE TO THIS CONTRACT: The Service Contract Act (SCA) applies to this contract. The applicable SCA Wage Rate Determination is attached at the end of the contract text. Payment will be made to individuals used in the performance of this contract at the rates of wages contained in the wage rate determination.
DEPARTMENT OF JUSTICE CONTRACTOR RESIDENCY REQUIREMENT
For three of the five years immediately prior to submission of your offer/bid/quote, or prior to performance under a contract or commitment, individuals or contractor employees providing services to any Federal Bureau of Prisons facility must have: legally resided in the United States (U.S.); worked for the U.S. overseas in a Federal or military capacity; or been a dependent of a Federal or military employee serving overseas. If the individual is not a U.S. citizen, they must be from a country allied with the U.S. The following website provides current information regarding allied countries:
http://www.opm.gov/employ/html/citizen.htm
By signing this contract or commitment document, or by commencing performance, the contractor agrees to this restriction.
INVESTIGATIVE PROCEDURES FOR CONTRACTORS, CONSULTANTS AND VOLUNTEERS
The Bureau of Prisons (BOP) policies regarding investigative procedures for contractors and consultants are set forth in Program Statement (P.S.) 3000.02, Human Resource Management (HRM) Manual and P.S. 4100.03, Bureau of Prisons Acquisition Policy (BPAP).
In particular, the HRM Manual requires detailed security procedures for all individual contractors including contractors performing pursuant to any purchase order or any purchase card transaction, for which the period of performance is equal to or in excess of 30 days. Additionally, the policy is applicable whenever a contractor is performing pursuant to more than one purchase order or more than one purchase card transaction, for which the periods of performance, when combined, are equal to or exceed 30 days. The requirements of the HRM Manual, Part 731.2 and BPAP Part 37, for implementing such procedures for individual contractors for periods of service exceeding 30 days include:
Procedures Implemented by Human Resource Staff:
National Crime Information Center (NCIC) Check
Name Check
Procedures Implemented by Program Manager:
FD-258 Fingerprint Check
Law Enforcement Agency Checks
Vouchering of employers over the past five years
Completed SF-171 (Application for Federal Employment or Resume/Personal Qualifications
Completed Contractor Pre-employment Form Release of Information
National Agency Check and Inquiries (NACI) Check if applicable
Urinalysis
In addition to the above procedures, BPAP Part 37.103 states that Contracting Officers must ensure through the contracting process that each prospective individual contractor is advised that a urinalysis is required prior to contract award. Prior to award, the Contracting Officer shall also obtain from the Personnel Officer or the appropriate Cost Center Manager, written assurance that investigative procedures have been completed for contracts awarded to individuals. For contracts awarded to companies, this written assurance must be received prior to the contractor beginning performance. The HRM Manual, Part 731.2 states if the contractor is a company providing construction or maintenance services, all of the above procedures are required except for vouchering, urinalysis testing and law enforcement agency checks, however, the contractor’s employees must be closely supervised by institution staff.
INVOICES ARE TO BE MAILED TO:
UNICOR, Federal Prison Industries Central Accounts Payable
P.O. Box 11849
Lexington, KY 40578-1849
PH: 1-800-827-3168
Or
INVOICES ARE TO BE EMAILED TO:
Accounts.payable@usdoj.gov
Invoices must list the current Purchase Order/Contract Number (145xxxxxxx/146xxxxxxx)
STATEMENT OF WORK
GENERAL INTENTION
It is the intent of this solicitation to result in a one (1) year, with two (2) option years fixed-price with economic price adjustment indefinite delivery-indefinite quantity type contract for Vegetable Harvesting Services for the UNICOR Farm located in Lompoc, CA. Solicitation number is SV0202-26 and this solicitation is issued as a
Request for Proposal (RFP).
VEGETABLE HARVESTING SERVICES
FPI needs a qualified vendor to harvest mature broccoli and celery plants from the UNICOR Farm in Lompoc, CA. Awarded vendor shall supply all other materials and labor necessary to the harvesting process. Awarded vendor shall harvest, grade and pack the crops in accordance with Good Agricultural Practices established by local, state and federal authorities. Broccoli and celery shall be transported to coolers designated by the Farm Manager or designee and packed in accordance with quality control standards attached.
Vegetables may be transported by FPI Lompoc Farm at the discretion of the Farm Manager.
Coolers will be located in either the Lompoc Valley, CA, or, in Santa Maria Valley, CA.
A total of 380 to 450 acres will be harvested multiple times during the period of performance. Broccoli crops are planted in seven (7) to ten (10) acre blocks; celery crops are planted in one (1) to ten (10) acre blocks. It is anticipated that each crop will have three
(3) harvesting opportunities or cuttings. Invoices shall be submitted weekly.
Boxes will be provided for packing by FPI Lompoc or a third-party vendor.
Proposals should include all labor and materials necessary for harvesting. Transportation costs from field to cooler should be priced separately.
Additional crops may be added throughout the performance period. Pricing may be negotiated for each additional crop.
Contractor may be responsible for training inmate workers on proper harvest, grading and packing techniques. Procedures and pricing for inmate training may be negotiated in accordance with any contract awarded.
The period of performance for vegetable harvesting services is one (1) year, date of first harvest through twelve (12) months with two (2) option years.
mailto:Accounts.payable@usdoj.gov
Quality Control Standards
Broccoli Export Crowns 24's & 38's
Growing standards
A. The grower/supplier of the product is responsible for delivering product/supplying product that has been grown within industry standards.
1. This includes using water, pesticides, and fertilizers, etc. that meet state and federal guidelines.
2. The grower/supplier is responsible for having standard operating procedures that meet industry standards for growing practices.
In-field packing standards
A. Color
1. Crowns should be of uniform color ranging from Medium to Medium Dark green
B. Size and Shape
1. Head Size
a. 4.5" to 5.25" head diameter
b. No tolerance for diameter outside that given above
2. Head Type
a. Crown will have compact, smooth, high dome shaped heads with medium to medium plus head size
3. Stalk Type
a. Medium to large (I"-I.75") in diameter with no hollow. (Refer to defects)
C. Weight & Count
1. Count must meet carton criterion (24 or 38)
D. Defects
1. Soft rot- none will be allowed in any carton
2. Decay- none will be allowed in any carton
3. Orange bead- none will be allowed in any carton
4. Cat eye- light yellow around the side (25%). Must be communicated to export sales company
5. Water spotting- the presence of water spotting must be noted to export sales company
6. Hollow butt- an occasional slit in the butt is acceptable, anything larger than a slit must be communicated to the export sales company
7. Purpling- occasional/slight cast of purple is acceptable, but must be communicated to the export sales company
8. Bead structure & head compaction
a. No soft or puffy heads
b. No open beads
c. No loose beads
d. All issues regarding this defect must be communicated to the export sales company
E. Mechanical Damage
1. No thumb/finger prints on the heads
2. No broken or partially broken florets
3. No peeling of stalk
F. Pack Style
1. Trim- Crowns must be closely trimmed of most leaves and butts must be square and straight
2. Pack- Subject to change as directed by the export sales company
G. Handling
1. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
2. The harvest company crew boss is responsible for slowing down or stopping the crew to prevent product from overflowing off-packing trailers.
3. The harvest company crew boss is responsible for controlling tractor speed to prevent crews from throwing product onto the packing trailer
4. The harvest company crew boss is responsible for making sure cutting crew cuts product ahead of turns
5. The harvest company crew boss is responsible for making sure crew cleans packing tables completely before breaks and lunch
6. The harvest company crew boss and crews are responsible for handling packed product correctly. Cartons are to be stacked carefully, not thrown or roughly handled.
H. Packaging specifications
1. The harvest company is responsible for having two labels in the field prior to packing crowns. Crowns are to be packed two labels per trailer to ensure the right quality per label.
2. Broccoli must be packed in the correct carton and labeled according to quality. It is the responsibility of the harvesting company crew boss and the harvesting company to make sure the proper cartons are in the field and that the right product is packed in the correct label.
3. Proper cartons will be kept in stock.
4. Broccoli must be stacked on a #1 recycled hardwood pallet.
Post-Harvest Standards
A. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
B. Their harvesting company crew boss must accurately note on the harvest ticket the time harvesting is completed for each trailer load. At the completion of each trailer, the crew boss is responsible for calling the hauling company and notifying then that a trailer is completed. The crew boss must note the time of the call and to whom he/she spoke to.
C. Their hauling company is responsible for hauling trailer to the appointed cooling facility, this will be Apio Cooling unless otherwise communicated to the crew boss within 1 hour of harvest time.
D. The harvest company crew boss is responsible for accurately filling our harvest tickets.
E. The harvest company crew boss and crew are responsible for cleaning up the field and surrounding area of any items brought into harvest. This includes cartons, wickets, bags, pallets, etc.
Broccoli Second Label Export Crowns
Growing standards
A. The grower/supplier of the product is responsible for delivering product/supplying product that has been grown within industry standards.
1. This includes using water, pesticides, and fertilizers, etc. that meet state and federal guidelines.
2. The grower/supplier is responsible for having standard operating procedures that meet industry standards for growing practices.
In-field packing standards
A. Color
1. Crowns should be Dark green
B. Size and Shape
1. Head Size
a. 5" to 5.5" head diameter
2. Head Type
a. Crown will have compact, smooth, high dome shaped heads with medium-to-medium plus head size
3. Stalk Type
a. Medium to large (I"-I.75") in diameter with no hollow. (Refer to defects)
b. Length of approximately 2 fingers in length
C. Weight & Count
1. Count must meet carton criterion (38 or 44)
2. Hong Kong cartons should weigh 26 to 38 pounds
D. Defects
1. Soft rot- none will be allowed in any carton
2. Decay- none will be allowed in any carton
3. Orange bead- none will be allowed in any carton
4. Cat eye- light yellow around the side (25%). Must be communicated to export sales company
5. Water spotting- the presence of water spotting must be noted to export sales company
6. Hollow butt- an occasional slit in the butt is acceptable, anything larger than a slit must be communicated to the export sales company
7. Purpling- occasional/slight cast of purple is acceptable, but must be communicated to the export sales company
8. Bead structure & head compaction
a. No soft or puffy heads
b. No open beads
c. No loose beads
d. All issues regarding this defect must be communicated to the export sales company
E. Mechanical Damage
1. No thumb/finger prints on the heads
2. No broken or partially broken florets
3. No peeling of stalk
F. Pack Style
1. Trim- Crowns must be closely trimmed of most leaves and butts must be square and straight
2. Pack- Subject to change as directed by the export sales company
G. Handling
1. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
2. The harvest company crew boss is responsible for slowing down or stopping the crew to prevent product from overflowing off-packing trailers.
3. The harvest company crew boss is responsible for controlling tractor speed to prevent crews from throwing product onto the packing trailer
4. The harvest company crew boss is responsible for making sure cutting crew cuts product ahead of turns
5. The harvest company crew boss is responsible for making sure crew cleans packing tables completely before breaks and lunch
6. The harvest company crew boss and crews are responsible for handling packed product correctly. Cartons are to be stacked carefully, not thrown or roughly handled.
H. Packaging specifications
1. The harvest company is responsible for having two labels in the field prior to packing crowns. Crowns are to be packed two labels per trailer to ensure the right quality per label.
2. Broccoli must be packed in the correct carton and labeled according to quality. It is the responsibility of the harvesting company crew boss and the harvesting company to make sure the proper cartons are in the field and that the right product is packed in the correct label.
3. Proper cartons will be kept in stock.
4. Broccoli must be stacked on a #1 recycled hardwood pallet.
Post-Harvest Standards
A. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
B. Their harvesting company crew boss must accurately note on the harvest ticket the time harvesting is completed for each trailer load. At the completion of each trailer, the crew boss is responsible for calling the hauling company and notifying then that a trailer is completed. The crew boss must note the time of the call and to whom he/she spoke to.
C. Their hauling company is responsible for hauling trailer to the appointed cooling facility, this will be Apio Cooling unless otherwise communicated to the crew boss within 1 hour of harvest time.
D. The harvest company crew boss is responsible for accurately filling our harvest tickets.
E. The harvest company crew boss and crew are responsible for cleaning up the field and surrounding are of any items brought in to harvest. This includes: cartons, wickets, bags, Broccoli Premium Broccoli Crowns
Growing standards
A. The grower/supplier of the product is responsible for delivering product/supplying product that has been grown within industry standards.
1. This includes using water, pesticides, and fertilizers, etc. that meet state and federal guidelines.
2. The grower/supplier is responsible for having standard operating procedures that meet industry standards for growing practices.
In-field packing standards
A. Color
1. Crowns should be of uniform color ranging from Medium to Medium Dark green
B. Size and Shape
1. Head Size
a. 4.5" to 6.5" head diameter
b. No tolerance for diameter greater than 7”
2. Head Uniformity
a. Packed crowns can have no more than 2” difference in diameter
3. Head Type
a. Crown will have compact, smooth, high dome shaped heads with no greater than a medium plus head size
C. Weight & Count
1. Crowns cartons must weight a minimum of 20 pounds, net
2. Crowns carton weight should not exceed 25 pounds gross weight
D. Defects
1. Soft rot- none will be allowed in any carton
2. Decay- none will be allowed in any carton
3. Orange bead- no more than 1% per carton
4. Cat eye- no more than 5% cat eye per crown
5. Water spotting- the presence of water spotting must be noted to sales
6. Hollow butt- some stalks can show hollow butt with light discoloration
7. Purpling- must be communicated to sales
8. Insect damage
a. The presence of live insects is not allowed
9. No black spotting is allowed on stalks
10. No browning or yellowing of buds is allowed
E. Mechanical Damage
1. No serious mechanical damage
a. No thumb/finger prints on the heads
b. Shattering – no damage larger than size of a quarter per head
c. No carton mechanical/carton burn damage
F. Pack Style
1. Trim- Crowns must be closely trimmed of most leaves
2. Pack- Crowns must be packed in straight, uniform lines, leaving a good channel for ice.
G. Handling
1. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
2. The harvest company crew boss is responsible for slowing down or stopping the crew to prevent product from overflowing off-packing trailers.
3. The harvest company crew boss is responsible for controlling tractor speed to prevent crews from throwing product onto the packing trailer
4. The harvest company crew boss is responsible for making sure cutting crew cuts product ahead of turns
5. The harvest company crew boss is responsible for making sure crew cleans packing tables completely before breaks and lunch
6. The harvest company crew boss and crews are responsible for handling packed product correctly. Cartons are to be stacked carefully, not thrown or roughly handled.
H. Packaging specifications
1. The harvest company is responsible for having two labels in the field prior to packing crowns. Crowns are to be packed two labels per trailer to ensure the right quality per label.
2. Broccoli must be packed in the correct carton and labeled according to quality. It is the responsibility of the harvesting company crew boss and the harvesting company to make sure the proper cartons are in the field and that the right product is packed in the correct label.
3. Proper cartons will be kept in stock.
4. Broccoli must be stacked on a #1 recycled hardwood pallet.
Post-Harvest Standards
A. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
B. Their harvesting company crew boss must accurately note on the harvest ticket the time harvesting is completed for each trailer load. At the completion of each trailer, the crew boss is responsible for calling the hauling company and notifying then that a trailer is completed. The crew boss must note the time of the call and to whom he/she spoke to.
C. Their hauling company is responsible for hauling trailer to the appointed cooling facility, this will be Apio Cooling unless otherwise communicated to the crew boss within 1 hour of harvest time.
D. The harvest company crew boss is responsible for accurately filling our harvest tickets.
E. The harvest company crew boss and crew are responsible for cleaning up the field and surrounding are of any items brought in to harvest. This includes: cartons, wickets, bags, pallets, etc.
Quality Control Standards
Broccoli Asia Cut Premium Broccoli Crowns
Growing standards
A. The grower/supplier of the product is responsible for delivering product/supplying product that has been grown within industry standards.
1. This includes using water, pesticides, and fertilizers, etc. that meet state and federal guidelines.
2. The grower/supplier is responsible for having standard operating procedures that meet industry standards for growing practices.
In-field packing standards
A. Color
1. Crowns should be of uniform color ranging from Medium to Medium Dark green
B. Size and Shape
1. Head Size
a. 4.5" to 6.5" head diameter
b. No tolerance for diameter greater than 7”
2. Head Uniformity
a. Packed crowns can have no more than 2” difference in diameter
3. Head Type
a. Crown will have compact, smooth, high dome shaped heads with no greater than a medium plus head size
C. Weight & Count
1. Crowns cartons must weight a minimum of 20 pounds, net
2. Crowns carton weight should not exceed 25 pounds gross weight
D. Defects
1. Soft rot- none will be allowed in any carton
2. Decay- none will be allowed in any carton
3. Orange bead- no more than 1% per carton
4. Cat eye- no more than 5% cat eye per crown
5. Water spotting- the presence of water spotting must be noted to sales
6. Hollow butt- some stalks can show hollow butt with light discoloration
7. Purpling- must be communicated to sales
8. Insect damage
a. The presence of live insects is not allowed
9. No browning or yellowing of buds is allowed
E. Mechanical Damage
1. No serious mechanical damage
a. No thumb/finger prints on the heads
b. Shattering – no damage larger than size of a quarter per head
c. No carton mechanical/carton burn damage
F. Pack Style
1. Trim- Crowns must be closely trimmed of most leaves
2. Pack- Crowns must be packed in straight, uniform lines, leaving a good channel for ice.
3. Cut – Crowns must be cut at the longest lateral allowing for little or no stalk appearance.
G. Handling
1. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
2. The harvest company crew boss is responsible for slowing down or stopping the crew to prevent product from overflowing off-packing trailers.
3. The harvest company crew boss is responsible for controlling tractor speed to prevent crews from throwing product onto the packing trailer.
4. The harvest company crew boss is responsible for making sure cutting crew cuts product ahead of turns.
5. The harvest company crew boss is responsible for making sure crew cleans packing tables completely before breaks and lunch.
6. The harvest company crew boss and crews are responsible for handling packed product correctly. Cartons are to be stacked carefully, not thrown or roughly handled.
H. Packaging specifications
1. The harvest company is responsible for having two labels in the field prior to packing crowns. Crowns are to be packed two labels per trailer to ensure the right quality per label.
2. Broccoli must be packed in the correct carton and labeled according to quality. It is the responsibility of the harvesting company crew boss and the harvesting company to make sure the proper cartons are in the field and that the right product is packed in the correct label.
3. Proper cartons will be kept in stock.
4. Broccoli must be stacked on a #1 recycled hardwood pallet.
Post-Harvest Standards
A. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
B. Their harvesting company crew boss must accurately note on the harvest ticket the time harvesting is completed for each trailer load. At the completion of each trailer, the crew boss is responsible for calling the hauling company and notifying then that a trailer is completed. The crew boss must note the time of the call and to whom he/she spoke to.
C. Their hauling company is responsible for hauling trailer to the appointed cooling facility, this will be Apio Cooling unless otherwise communicated to the crew boss within 1 hour of harvest time.
D. The harvest company crew boss is responsible for accurately filling our harvest tickets.
E. The harvest company crew boss and crew are responsible for cleaning up the field and pallets, etc.
Quality Control Standards
Premium Broccoli Crowns
Broccoli “Song Hee-Green”
Growing standards
A. The grower/supplier of the product is responsible for delivering product/supplying product that has been grown within industry standards.
1. This includes using water, pesticides, and fertilizers, etc. that meet state and federal guidelines.
2. The grower/supplier is responsible for having standard operating procedures that meet industry standards for growing practices.
In-field packing standards
B. Color
1. Crowns should be of uniform color ranging from Medium to Medium Dark green
C. Size and Shape
1. Head Size
a. Crowns must have a minimum of 5" and a maximum of 7" head diameter
b. There is zero tolerance for any crowns greater than 7 ½” in diameter
2. Head Uniformity
a. Packed crowns can have no more than 2” difference in diameter
3. Head Type
a. Crown will have compact, smooth, high dome shaped heads with no greater than a medium plus head size
4. Crown Length
a. Crowns should be between 3 ½” and 4” in length
b. There is zero tolerance for crowns over 4 ½” in length
D. Weight & Count
1. Crowns cartons must weight a minimum of 20 pounds, net
2. Crowns carton weight should not exceed 25 pounds gross weight
E. Defects
1. Soft rot- none will be allowed in any carton
2. Decay- no beads can show presence of decay
3. Orange bead- no more than 1% per carton
4. Cat eye- no more than 5% cat eye per crown
5. Water spotting- the presence of water spotting must be noted to sales
6. Hollow butt- some stalks can show hollow butt with light discoloration
7. Purpling- must be communicated to sales
8. No black spotting is allowed on crown stalks
9. Insect damage
a. The presence of live insects is not allowed
10. No browning or yellowing of buds is allowed
F. Mechanical Damage
1. No serious mechanical damage
a. No thumb/finger prints on the heads
b. Shattering – no damage larger than size of a quarter per head
c. No carton mechanical/carton burn damage
G. Pack Style
1. Trim- Crowns must be closely trimmed of most leaves
2. Pack- Crowns must be packed in straight, uniform lines, leaving a good channel for ice.
3. Cut – Crowns must be cut at the longest lateral allowing for little or no stalk appearance.
H. Handling
1. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
2. The harvest company crew boss is responsible for slowing down or stopping the crew to prevent product from overflowing off-packing trailers.
3. The harvest company crew boss is responsible for controlling tractor speed to prevent crews from throwing product onto the packing trailer.
4. The harvest company crew boss is responsible for making sure cutting crew cuts product ahead of turns.
5. The harvest company crew boss is responsible for making sure crew cleans packing tables completely before breaks and lunch.
6. The harvest company crew boss and crews are responsible for handling packed product correctly. Cartons are to be stacked carefully, not thrown or roughly handled.
I. Packaging specifications
1. The harvest company is responsible for having two labels in the field prior to packing crowns. Crowns are to be packed two labels per trailer to ensure the right quality per label.
2. Broccoli must be packed in the correct carton and labeled according to quality. It is the responsibility of the harvesting company crew boss and the harvesting company to make sure the proper cartons are in the field and that the right product is packed in the correct label.
3. Proper cartons will be kept in stock.
4. Broccoli must be stacked on a #1 recycled hardwood pallet.
Post-Harvest Standards
A. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
B. Their harvesting company crew boss must accurately note on the harvest ticket the time harvesting is completed for each trailer load. At the completion of each trailer, the crew boss is responsible for calling the hauling company and notifying then that a trailer is completed. The crew boss must note the time of the call and to whom he/she spoke to.
C. Their hauling company is responsible for hauling trailer to the appointed cooling facility, this will be Apio Cooling unless otherwise communicated to the crew boss within 1 hour of harvest time.
D. The harvest company crew boss is responsible for accurately filling our harvest tickets.
E. The harvest company crew boss and crew are responsible for cleaning up the field and
Broccoli Premium Broccoli Bunch
Growing standards
A. The grower/supplier of the product is responsible for delivering product/supplying product that has been grown within industry standards.
1. This includes using water, pesticides, and fertilizers, etc. that meet state and federal guidelines.
2. The grower/supplier is responsible for having standard operating procedures that meet industry standards for growing practices.
In-field packing standards
A. Color
1. Bunches should be of uniform color ranging from Medium to Medium Dark green
B. Size and Shape
1. Head Size
a. 14’s must be from 3” to 5.5”
b. 18’s must be from 3” to 4.5”
2. Stalk Size
a. Must be slender with a maximum of 1.5”
3. Bunch Size
a. 14’s must have 2 to 4 heads
b. 18’s must have 2 to 4 heads
4. Heads must be compact with no open or flowing beads
C. Defects
1. Soft rot- none will be allowed in any carton
2. Decay- no beads can show presence of decay
3. Orange bead- no more than 1% per bunch
4. Cat eye- no more than 5% cat eye per bunch
5. Water spotting- the presence of water spotting must be noted to sales
6. Hollow butt- some stalks can show hollow butt with light discoloration
7. Purpling- must be communicated to sales
8. No black spotting is allowed on crown stalks
9. Insect damage
a. No more that 1 to 2 heads per box can show insect damage
b. The presence of live must be noted prior to harvest
D. Mechanical Damage
1. No serious mechanical damage
a. No thumb/finger prints on the heads
b. Shattering – no damage larger than size of a quarter per head
c. Carton mechanical/carton burn damage – occasional damage no larger than size of a quarter per head to be kept to a minimum
2. Serious mechanical damage
a. Broken stalks – zero to 1 allowed per carton
b. Broken laterals – no more than 1 bunch per carton
E. Pack Style
1. Trim- Crowns must be closely trimmed of most leaves
a. Stalk trimming to be done by hand or downward motion of knife
b. Broccoli in carton must be packed in straight, uniform lines, leaving a good channel for ice.
F. Handling
1. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
2. The harvest company crew boss is responsible for slowing down or stopping the crew to prevent product from overflowing off-packing trailers.
3. The harvest company crew boss is responsible for controlling tractor speed to prevent crews from throwing product onto the packing trailer.
4. The harvest company crew boss is responsible for making sure cutting crew cuts product ahead of turns.
5. The harvest company crew boss is responsible for making sure crew cleans packing tables completely before breaks and lunch.
6. The harvest company crew boss and crews are responsible for handling packed product correctly. Cartons are to be stacked carefully, not thrown or roughly handled.
G. Packaging specifications
1. The harvest company is responsible for having two labels in the field prior to packing crowns. Crowns are to be packed two labels per trailer to ensure the right quality per label.
2. Broccoli must be packed in the correct carton and labeled according to quality. It is the responsibility of the harvesting company crew boss and the harvesting company to make sure the proper cartons are in the field and that the right product is packed in the correct label.
3. Proper cartons will be kept in stock.
4. Broccoli must be stacked on a #1 recycled hardwood pallet.
Post-Harvest Standards
A. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
B. Their harvesting company crew boss must accurately note on the harvest ticket the time harvesting is completed for each trailer load. At the completion of each trailer, the crew boss is responsible for calling the hauling company and notifying then that a trailer is completed. The crew boss must note the time of the call and to whom he/she spoke to.
C. Their hauling company is responsible for hauling trailer to the appointed cooling facility, this will be Apio Cooling unless otherwise communicated to the crew boss within 1 hour of harvest time.
D. The harvest company crew boss is responsible for accurately filling our harvest tickets.
E. The harvest company crew boss and crew are responsible for cleaning up the field and surrounding are of any items brought in to harvest. This includes: cartons, wickets, bags, pallets, etc.
Quality Control Standards
Broccoli Bunch
Broccoli Highway One
Growing standards
A. The grower/supplier of the product is responsible for delivering product/supplying product that has been grown within industry standards.
1. This includes using water, pesticides, and fertilizers, etc. that meet state and federal guidelines.
2. The grower/supplier is responsible for having standard operating procedures that meet industry standards for growing practices.
In-field packing standards
A. Color
1. Bunches should be of uniform color ranging from purplish-gray to green
B. Size and Shape
1. Head Size
a. 14’s must be from 2 ¼” to 6” across
b. 18’s must be from 2 ¼” to 5” across
2. Stalk Size
a. Must be slender with a maximum of ¼” to 1 1/2”
3. Bunch Size
a. 14’s must have 2 to 8 heads
b. 18’s must have 2 to 6 heads
c. Total bunch length must be a minimum of 7” and cannot exceed 9”
4. Heads must be compact with no open or flowing beads
5. Bead Size
a. Beads may be small to large, but fairly uniform in size for each lot harvested
C. Defects
1. Soft rot- none will be allowed in any carton
2. Decay- no beads can show presence of decay
3. Orange bead- no more than 5% per bunch
4. Cat eye- no more than 10% cat eye per bunch
5. Water spotting- the presence of water spotting must be noted to sales
6. Hollow butt- some stalks can show hollow butt with light discoloration
7. Insect damage
a. No more than 4 heads per box can show insect damage
b. The presence of live must be noted to sales prior to harvest
D. Mechanical Damage
1. No serious mechanical damage
a. No thumb/finger prints on the heads
b. Shattering – no damage larger than size of a quarter per head
c. Carton mechanical/carton burn damage – occasional damage no larger than size of a quarter per head to be kept to a minimum
2. Serious mechanical damage
a. Broken stalks – zero to 1 allowed per carton
b. Broken laterals – no more than 1 bunch per carton
E. Pack Style
1. Trim- Crowns must be closely trimmed of most leaves and leaf spurs
a. Stalk trimming to be done by hand or downward motion of knife
b. Broccoli in carton must be packed in straight, uniform lines, leaving a good channel for ice.
F. Handling
1. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
2. The harvest company crew boss is responsible for slowing down or stopping the crew to prevent product from overflowing off-packing trailers.
3. The harvest company crew boss is responsible for controlling tractor speed to prevent crews from throwing product onto the packing trailer
4. The harvest company crew boss is responsible for making sure cutting crew cuts product ahead of turns
5. The harvest company crew boss is responsible for making sure crew cleans packing tables completely before breaks and lunch
6. The harvest company crew boss and crews are responsible for handling packed product correctly. Cartons are to be stacked carefully, not thrown or roughly handled.
G. Packaging specifications
1. The harvest company is responsible for having two labels in the field prior to packing crowns. Crowns are to be packed two labels per trailer to ensure the right quality per label.
2. Broccoli must be packed in the correct carton and labeled according to quality. It is the responsibility of the harvesting company crew boss and the harvesting company to make sure the proper cartons are in the field and that the right product is packed in the correct label.
3. Proper cartons will be kept in stock.
4. Broccoli must be stacked on a #1 recycled hardwood pallet.
Post-Harvest Standards
A. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
B. Their harvesting company crew boss must accurately note on the harvest ticket the time harvesting is completed for each trailer load. At the completion of each trailer, the crew boss is responsible for calling the hauling company and notifying then that a trailer is completed. The crew boss must note the time of the call and to whom he/she spoke to.
C. Their hauling company is responsible for hauling trailer to the appointed cooling facility, this will be Apio Cooling unless otherwise communicated to the crew boss within 1 hour of harvest time.
D. The harvest company crew boss is responsible for accurately filling our harvest tickets.
E. The harvest company crew boss and crew are responsible for cleaning up the field and surrounding are of any items brought in to harvest. This includes: cartons, wickets, bags, pallets, etc.
Quality Control Standards
Celery
Growing standards
A. The grower/supplier of the product is responsible for delivering product/supplying product that has been grown within industry standards.
1. This includes using water, pesticides, and fertilizers, etc. that meet state and federal guidelines.
2. The grower/supplier is responsible for having standard operating procedures that meet industry standards for growing practices.
In-field packing standards
A. At the time of harvest, celery will be:
1. Free from disease, mold, soft rot, and serious damage by any injury or defect which effects the processing.
2. Free from insect contamination, including presence or damage
3. Fairly firm
4. Free from branches, stocks, shoots, twigs
5. Cuts may be naked 24’s, 30’s or 36’s or sleeved at the crew boss’ discretion.
6. Free from foreign material including dirt, rocks, and plant material
7. Every effort will be made to remove leaves
8. Free from damage
9. Free from and coating other than whitewash, properly applied to prevent sun damage
B. Handling
1. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
2. The harvest company crew boss is responsible for slowing down or stopping the crew to prevent product from overflowing off-packing trailers.
3. The harvest company crew boss is responsible for controlling tractor speed to prevent crews from throwing product onto the packing trailer
4. The harvest company crew boss is responsible for making sure cutting crew cuts product ahead of turns
5. The harvest company crew boss is responsible for making sure crew cleans packing tables completely before breaks and lunch
6. The harvest company crew boss and crews are responsible for handling packed product correctly. Cartons are to be stacked carefully, not thrown or roughly handled.
C. Packaging specifications
1. Proper cartons will be kept in stock.
Post-Harvest Standards
A. Growers/Suppliers are responsible for selecting their own harvesting and hauling companies for their product.
B. Their harvesting company crew boss must accurately note on the harvest ticket the time harvesting is completed for each trailer load. At the completion of each trailer, the crew boss is responsible for calling the hauling company and notifying then that a trailer is completed. The crew boss must note the time of the call and to whom he/she spoke to.
C. Their hauling company is responsible for hauling trailer to the appointed cooling facility, this will be Apio Cooling unless otherwise communicated to the crew boss within 1 hour of harvest time.
D. The harvest company crew boss is responsible for accurately filling our harvest tickets.
E. The harvest company crew boss and crew are responsible for cleaning up the field and
PART II: FAR CLAUSES
52.212-4, (November 03, 2025)(DEVIATION) Terms and Conditions - Commercial Items.
(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.
(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price.