Amendment 001 - SOW Correction.pdf

PDF 334 KB Posted

Attached to
SV0151-24 Water Source Heat Pumps
Solicitation number
SV0151-24
Issued by

About this file

This document is an Amendment to the solicitation for a federal contract opportunity. The amendment makes a correction to the Statement of Work (SOW) for the replacement of 20 water source heat pumps (WSHPs) with Daikin (or equivalent) wall mount units in the UNICOR office building in Washington, DC. The original solicitation number is SV0151-24. The amendment provides details on the size of the replacement units, the scope of work to remove the old units and install the new ones, and a one-year warranty. The overall requirement remains a firm fixed price award for the WSHP replacement project. The closing date for offers is not extended by this amendment. Offerors are required to acknowledge receipt of the amendment.

View the file

Other files

File Type Posted
Amendment 002 - QA.pdf PDF
SV0151-24 Water Source Heat Pumps1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Amendment #001 05/14/2024

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

UNICOR, FEDERAL PRISON INDUSTRIES, INC.

400 First St NW Washington, DC 20534

UNICOR, FEDERAL PRISON INDUSTRIES, INC.

400 First St NW Washington, DC 20534 Attn: Josh Hassler, Contract Specialist

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

SV0151-24 X

9B. DATED (SEE ITEM 11)

05/08/2024

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY

CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers __ is extended___ is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

X D. OTHER (Specify type of modification and authority) FAR 15.206 Amending the Solicitation.

E. IMPORTANT : Contractor ____is not __X__ is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See attachment A.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Josh Hassler, Contract Specialist

15B. CONTRACTOR/OFFEROR 15C. DATE

SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

_______________________________________ BY

Signature of the person authorized to sign) (Signature of contracting officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105

STANDARD FORM 30 (REV. 10-

83) Prescribed by GSA

FAR(48 CFR) 53.243

Attachment A: 05/14/2024 Corrected SOW

Replacement of TWENTY WSHPs with Daikin (or equivalent) wall mount units

Size 015 (14,500) BTU’s cooling and (18,200) BTU’s heating provide all subs, and materials to perform the mechanical work below.

Provide and install twenty new Daikin console WSHPs to replace existing.

Shut off and secure the electrical power source to the unit.

Recover the refrigerant per EPA guidelines if necessary.

Disconnect the electrical wiring and water piping.

Demo and remove the old WSHP.

Set the new WSHP in the same location.

Connect the existing condenser water and drain piping with minimal.

modifications.

Connect the existing electric power source with minimal modifications.

Once the water is restored, verify there are no leaks.

Perform start-up to insure proper operation.

Clean up any debris created during this process.

Replacement will be performed during normal working hours.

A one-year warranty provided.