This is a Surplus Material Evaluation Form (v1.2) used to document and evaluate surplus items being offered in federal contract proposals in compliance with FAR 11.302(b).

The form requires offerors to provide comprehensive information across four main sections. Section A requests item identification details including National Stock Number (NSN), part number, drawing revision, and manufacturer. Section B establishes the surplus provenance, requiring the Federal Supply Code for Manufacturer (FSCM), original manufacturer contract number, source of subsequent purchase, DLA sale information, drawing availability with revision dates, and complete history of storage, packaging, rework, reconditioning, repair, or other modifications since initial government or manufacturer sale. Section C specifies warranty terms, with a presumed 12-month warranty period per FAR 52.246-17 unless otherwise stated. Section D classifies the surplus condition into four categories: (1) new and unused with no signs of deterioration; (2) new and reconditioned with replaced gaskets, seals, or O-rings per technical orders; (3) new and modified with component replacements for configuration updates; or (4) used and overhauled to serviceable status per applicable technical specifications. For categories (2), (3), and (4), offerors must identify the source and provide detailed summaries of reconditioning, modification, or overhaul work performed, along with relevant technical order compliance documentation. The form requires completion by the Source of Surplus (identified by company name and CAGE code) with signature and date from the SOS Releasing Official, and mandates two attachments: a copy of the original packing label and a Request for Quote Form.

View the file

Other files

File Type Posted
FA812126R0015.pdf PDF
FA812126R0015.pdf PDF
PKGRQMT_REPORT.pdf PDF
CDRL1_REPORT.pdf PDF
Price_Matrix.xlsx XLSX spreadsheet
EDL_REPORT.pdf PDF
Engineering_Instruction.pdf PDF
ITMDESC_REPORT.pdf PDF
UIIEC_REPORT.pdf PDF
Qual_Req_CSI.pdf PDF
TRNSPDATA_REPORT.pdf PDF
SPI.pdf PDF
FA_REPORT.pdf PDF
Quality Assurance FA.pdf PDF
Quality Assurance.pdf PDF
DID_FATP.pdf PDF
DID_FATIP.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SURPLUS MATERIAL EVALUATION FORM, v1.2 PREVIOUS EDITION IS OBSOLETE

REQUIRED INFORMATION FOR SURPLUS MATERIAL EVALUATION

Submission of the following information for each item of surplus material included in the offeror's proposal is required to comply with the terms and conditions of FAR 11.302 (b). Information must be adequate to provide the basis for determinations required by the policy contained in FAR 11.302 (b).

A. ITEM INFORMATION

Surplus Item Identification NSN Noun Part Number Drawing Rev: & Manufacturer:

B. SURPLUS INFORMATION

Federal Supply Code for Manufacturer (FSCM) (marked on items per MIL-STD-130) _________________ Quantity available for verification at dealer's facility: ___________

Original manufacturer, government contract number:

Material was subsequently purchased as surplus from (Manufacturer or Agency):

DLA sale number _____________________ Date of sale by Government _________________

Do you have the drawings for this item? NO YES

If yes, Revision letter/number _________________ Date of Last Revision

History of items since initially sold as surplus by Government or manufacturer: _______________________________________________________ (Storage Location, Packaging, Rework, Reconditioning, Repair, etc.)

Are items being offered in original unbroken containers? ____________ Date of manufacture or packaging: _______________

C. WARRANTY INFORMATION

Material offered is warranted by the Contractor for a period of ____ months as contemplated by FAR 52.246-17, Warranty of Supplies of a Noncomplex Nature.

(12 Months is presumed unless otherwise specified. If surplus is purchased, warranty may or may not be included in the award.)

D. CONDITION OF SURPLUS

The surplus items offered fit the conditional definition indicated below:

(Check the appropriate definition and provide requested information. Use additional paper if more space is necessary.)

(NOTE: Dates, Technical Order compliance, quality considerations, and component sources are essential information for categories (2), (3), and (4) b l )

_______(1) New and unused: material has never been installed or used. It shows no signs of rust, corrosion, or other deterioration due to age or improper packaging/preservation. It has not been reconditioned and shows no evidence of disassembly or reassembly.

______ (2) New and reconditioned: material has never been installed or used. It shows no signs of rust, corrosion, or other deterioration due to age or improper packaging/preservation. Reconditioning is allowed to the extent that gaskets, seals, O-rings, or other such cure-dated items have been or will be replaced prior to use in accordance with the applicable technical orders and specifications.

Source of reconditioning: Summary of reconditioning:

_____ (3) New and modified: material has never been installed or used. It shows no signs of rust, corrosion, or other deterioration due to age or improper packaging/preservation. Components may have been (or may need to be) replaced in accordance with the applicable technical specifications for the purpose of configuration update or modification.

Source of modification: Summary of modification:

_____ (4) Used and overhauled: material which has been previously installed in operational equipment. It has been or can be completely overhauled, repaired, reconditioned, or modified per the applicable technical specifications to serviceable status.

Source of overhaul: Overhaul technical order:

SOURCE OF SURPLUS (X one) ATTACHMENTS REQUIRED Company Name: Cage:

SOS Releasing Officials NAME (Last, First, Middle Initial)

Signature Date Signed

1. A copy of the label from the original packing

2. Request for Quote Form