Supplemental Red Hole Bridge Repairs Work Data Sheet.docx
DOCX document 14 KB Posted
- Attached to
- RED HOLE BRIDGE REPAIR Federal contract opportunity
- Solicitation number
- 140L6221Q0018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Schedule Red Hole Bridge Repairs.xlsx | XLSX spreadsheet | |
| 01009 General Information and Requirements.docx | DOCX document | |
| 01505 Mobilization.docx | DOCX document | |
| 01500 Temporary Facilities and Controls.docx | DOCX document | |
| RED HOLE BRIDGE DRAWINGS 2020 11 23.pdf | ||
| Sol_140L6221Q0018.pdf | ||
| 4026 21872 01 Red Hole 24 40 11 Poured Joint Sealant.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLEMENTAL WORK DATA SHEET
A. Red Hole Bridge Repair:
Install three (3) type 3 object markers which are shown on sheet D2 of the plans. Removing material off bearing seats as shown on sheet S1. Install the D. S. Brown Delastic – LS joint sealant or approved equal at Abutment 1 and Abutment 2 shown on sheet S1. A two component, low modulus, rapid-cure joint sealant intended for use as a bridge joint sealant. Furnish backer rod and primer intended for use with the selected joint sealant. Regrade and armor surface runoff channel on the downstream side of Abutment 2 as shown on Sheet D1.