Supplemental Red Hole Bridge Repairs Work Data Sheet.docx

DOCX document 14 KB Posted

Attached to
RED HOLE BRIDGE REPAIR
Solicitation number
140L6221Q0018
Issued by

View the file

Other files

File Type Posted
01500 Temporary Facilities and Controls.docx DOCX document
01505 Mobilization.docx DOCX document
4026 21872 01 Red Hole 24 40 11 Poured Joint Sealant.docx DOCX document
01009 General Information and Requirements.docx DOCX document
Bid Schedule Red Hole Bridge Repairs.xlsx XLSX spreadsheet
Sol_140L6221Q0018.pdf PDF
RED HOLE BRIDGE DRAWINGS 2020 11 23.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLEMENTAL WORK DATA SHEET

A. Red Hole Bridge Repair:

Install three (3) type 3 object markers which are shown on sheet D2 of the plans. Removing material off bearing seats as shown on sheet S1. Install the D. S. Brown Delastic – LS joint sealant or approved equal at Abutment 1 and Abutment 2 shown on sheet S1. A two component, low modulus, rapid-cure joint sealant intended for use as a bridge joint sealant. Furnish backer rod and primer intended for use with the selected joint sealant. Regrade and armor surface runoff channel on the downstream side of Abutment 2 as shown on Sheet D1.

File details come from the government source that posted it. Updated .