Supplement 1 _ Spec Building Conceptual Layou.pdf
PDF 1 MB Posted
- Attached to
- 2025 Industrial Building
- Solicitation number
- PE-77648-NONST-2025-000000019
- Issued by
- Terrell County, Georgia
About this file
This is a conceptual site layout document for a Spec Building project in Tifton, Georgia, prepared by the City of Atlanta's Community and Economic Development department. The document presents a proposed 100,000 square foot building with associated site infrastructure, including truck dock parking, employee parking, storage areas, and detention pond facilities. The site is located on Eldorado Road and Orgill Way in Tift County, with the site encompassing approximately 400 feet by 250 feet. The layout identifies potential wetlands areas and indicates compliance considerations with the National Wetland Inventory (N.W.I.). The document is marked as preliminary and is intended for estimating and permitting purposes only, not for construction.
This document is the property of Georgia Power Company and is provided without consent to modify, distribute, or reproduce. The drawing was prepared by P. Schneider, checked by P. Schneider, and approved by P. Schneider, with the last release date of April 17, 2025, and the document dated May 2, 2025. The conceptual layout serves as a planning tool for the proposed development and does not constitute a final construction document or binding specification for the project scope or requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REQUEST FOR PROPOSALS.pdf | ||
| Supplement 2 _ Proposed Spec Building Concept.pdf | ||
| RFP Description.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REL. NO.
R E
M A
R K
S R
E L
N
O
R E
L
D A
T E
CHECKED BY:
DRAWN BY:
APPROVED BY:
SCALE:
DATE:
LAST REL.:
CITY:
COUNTY:
SITE ID NO.
PROJECT NAME
A t l a n t a
G e o r g i a
C o m m u n i t y a n d E c o n o m i c D e v e l o p m e n t
1000 200
SCALE IN FEET
100 300
AND/OR PERMITTING.
PURPOSES ONLY AND NOT INTENDED FOR CONSTRUCTION
THIS DOCUMENT IS INTENDED FOR ESTIMATING
WITHOUT THE CONSENT OF THE GEORGIA POWER COMPANY
DO NOT MODIFY, DISTRIBUTE OF REPRODUCE
OF THE GEORGIA POWER COMPANY
THIS DOCUMENT IS THE PROPERTY
T I
F T
O N
G A
T I
F T
C O
U N
T Y
S P
E
B U I
L D I
N G
O
N C
E P
T U
L
L
Y O
U T
PSCHNEID
PSCHNEID
PSCHNEID
AS SHOWN
TIFTON
TIFT
MAY-02-25
APR-17-25
WITH STORAGE
TRUCK DOCK
PARKING
EMPLOYEE
PER N.W.I.
WETLANDS
POTENTIAL
PER N.W.I.
WETLANDS
POTENTIAL
PER N.W.I.
WETLANDS
POTENTIAL
PER N.W.I.
WETLANDS
POTENTIAL
POND
DETENTION
PROPOSED
POND
DETENTION
PROPOSED
ORGILL WAY
ORGILL W
AY
T
IF
T O
N E
L D
O R
A D
O R
O A
D
250'
BUILDING
100,000 SF
PROPOSED
File details come from the government source that posted it. Updated .