REQUEST FOR
PROPOSAL (RFP)
PROJECT Aerial High Voltage Power Line Repairs and Electrical Substation Monitoring with emergency reimbursable tree removal and trimming and other services on at the FDA White Oak Facility, Silver Spring, MD
CONTACT PERSON Frederick Miller 202-236-9234
ISSUING OFFICE General Services Administration, NCR, DC Service Center, 1800 & F Street NW, Washington, DC
Questions Due February 3, 2022
QUOTE DUE DATE February 14, 2022
1:00PM (LOCAL TIME)
SUBMIT PROPOSAL BY
E-MAIL Frederick.Miller@gsa.gov
SOLICITATION NO. 47PM0821R0001
GENERAL SERVICES ADMINISTRATION
Property of the United States Government Copying, Dissemination, or Distribution of These Drawings, Plans, or Specifications to Unauthorized Users is Prohibited.
SUBJECT: REQUEST FOR PROPOSALS (RFP)
AERIAL HIGH VOLTAGE POWER LINE REPAIRS, ELECTRICAL SUBSTATION
MONITORING WITH EMERGENCY REIMBURSABLE TREE REMOVAL AND TRIMMING
AND OTHER SERVICES ON WHITE OAK FEDERAL RESEARCH CENTER CAMPUS.
The General Services Administration, NCR, PBS, invites you to attend a site visit which will be held at the time place listed below.
LOCATION: GSA Federal Research Center
White Oak Campus
10903 Hampshire Avenue, Building 130, 2nd Floor Conference Room
Silver Springs, MD
TIME: 10:00 AM Eastern Time
DATE: TBD
POINT OF CONTACT: Frederick Miller, Contracting Officer
(202) 236-9234 (phone) frederick.miller@gsa.gov
The purpose of this site visit is to provide a briefing on the scope of work and specifications for the Aerial High Voltage Power Line Repairs, electrical substation monitoring, tree removal and trimming with other reimbursable emergency response services, so that the offers can ascertain the service to be performed, along with general conditions. Please send an email to frederick.miller@gsa.gov regarding site visit attendance by January 24, 2022.
No other site visit will be granted. All of offerors are responsible for taking notes of all relevant aspects of the services to be performed on the Federal Research Center White
Oak Campus. Attendance at this site visit conference and tour is vital to the preparation of a competitive proposal, and to understand the total result desired by the Government.
All questions, arising from the site visit must be submitted in writing by email to:
Frederick Miller at frederick.miller@gsa.gov by COB TBD.
Please ensure that all attendees have a picture ID available for entrance into the campus to get the Building 130 2nd Floor conference room for the site visit.
Proposal Submissions:
One (1) copy (including original) of the following items are required to be submitted for this Request for Proposals (RFP) solicitation as organized and in the order listed below.
Please label each attachment of your proposal separately by technical proposal and price proposal.
Technical Proposal:
Responses/Three (3) Evaluation Factors:
1. Past Performance
2. Personnel Qualifications (Staffing Capabilities)
3. Quality Control
Price Proposal:
Standard Form 33 (submit with original signatures)
Pricing Sheet/Pricing Summary Sheet for the Base/Option Periods
Acknowledgement of all amendments, if any
Representations and Certifications if not available through SAM at:
https://sam.gov/
Any proposal which fails to conform to the above requested submissions may be considered nonresponsive and categorized as unacceptable.
Offerors are advised that proposals and related materials become the property of the U.S. Government and will not be returned to the offeror.
TABLE OC CONTENTS
Part I – The Schedule
A Solicitation/contract form
B Supplies or services and prices/costs
C Description/specifications/statement of work
D Packaging and marking
E Inspection and acceptance
F Deliveries or performance
G Contract administration data
H Special contract requirements
Part II – Contract Clauses
I Contract clauses
Part III - List of Documents, Exhibits, and Other Attachments
J List of attachments
Part IV – Representations and Instructions
K Representations, certifications, and other statements of offerors or respondents
L Instructions conditions, and notices of offerors or respondents
M Evaluations factors for award
Section A
Solicitation/Contract form: Standard Form (33)
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. E-MAIL ADDRESS
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECS./WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)
DATEAMENDMENT NO.AMENDMENT NO. DATE
15A. NAME AND
ADDRESS
OF OFFER-
OR
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER SUCH
ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:
10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 6/2014)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB)
NEGOTIATED (RFP)
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
PAGE
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
PoP: 03/01/2022 - 02/28/2023
0002 Year 1 Tree Trimming
Contract Type: Firm Fixed Price
Contract Type: Firm Fixed Price
Pole Inspection
Contract Type: Firm Fixed Price hourly, Overtime, Sunday, Holiday etc. rates for all
Contract Type: Firm Fixed Price
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
AVE. SILVER SPRING, MD 20993-0000
Materials and Labor (Routine schedule which includes normal
Deliverable
AVE. SILVER SPRING, MD 20993-0000
Deliverable
Deliverable
AVE. SILVER SPRING, MD 20993-0000
Deliverable
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
Base Year O&M of CVG 114, 15 KV OHL and Street Lights inspect and test the poles.
that will be performing this job and their schedules).
__________LS
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE aerial distribution power lines patrol at least once a week.
Place of Performance: MD0819WO FRC Facility-Wide Site, In the first year of performance the contractor shall on approximately four miles of energized 15 Kv three phase
Distribution power lines shall be inspected by the ground this scope); Please provide details of the routine employees
MO
LS
Place of Performance: MD0819WO FRC Facility-Wide Site, Place of Performance: MD0819WO FRC Facility-Wide Site, PoP: 03/01/2022 - 02/28/2023
LS
PoP: 03/01/2022 - 02/28/2023
There are approximately 100 wood power distribution poles.
PoP: 03/01/2022 - 02/28/2023
Aerial Line Inspections personnel required to perform routine work specifically with
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
LS
Contract Type: Firm Fixed Price
AVE. SILVER SPRING, MD 20993-0000
Deliverable
Contract Type: Firm Fixed Price
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
AVE. SILVER SPRING, MD 20993-0000
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
cantilever street lights on wood power distribution poles.
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
AVE. SILVER SPRING, MD 20993-0000
Deliverable
Deliverable
AVE. SILVER SPRING, MD 20993-0000
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
Materials and Labor
Place of Performance: MD0819WO FRC Facility-Wide Site, poles lights, 15 parking lot wood pole lights, and 12
Deliverable
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE cantilever streets lights on wood power distribution poles.
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
PoP: 03/01/2022 - 02/28/2023
Place of Performance: MD0819WO FRC Facility-Wide Site, least once a week.
There are approximately 51 street and parking lot steel
Place of Performance: MD0819WO FRC Facility-Wide Site, Option Year 1 O&M of CVG 114, 15 KV OHL and Street Lights poles lights, 15 parking lot wood pole lights, and 12
Place of Performance: MD0819WO FRC Facility-Wide Site, Distribution power lines shall be inspected by ground at
There are approximately 51 street and parking lot steel
MO
Pole Lighting Preventive Maintenance __________
Contract Type: Firm Fixed Price
PoP: 03/01/2023 - 02/29/2024
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
LS
PoP: 03/01/2023 - 02/29/2024
Aerial Line Inspections
Contract Type: Firm Fixed Price
Pole lighting Preventive Maintenance
LS
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Contract Type: Firm Fixed Price
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
AVE. SILVER SPRING, MD 20993-0000
Contract Type: Firm Fixed Price
AVE. SILVER SPRING, MD 20993-0000
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
Deliverable
Deliverable
AVE. SILVER SPRING, MD 20993-0000
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
Deliverable
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
Place of Performance: MD0819WO FRC Facility-Wide Site, at least once a week.
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
Materials and Labor cantilever streets lights on wood power distribution poles
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
Deliverable
Place of Performance: MD0819WO FRC Facility-Wide Site, Place of Performance: MD0819WO FRC Facility-Wide Site, PoP: 03/01/2023 - 02/28/2024 poles lights, 15 parking lot wood pole lights, and 12
MO
Option Year II O&M of CVG 114, 15 KV OHL and Street Lights
Place of Performance: MD0819WO FRC Facility-Wide Site, Distribution power lines shall be inspected by ground patrol
Materials and Labor
PoP: 03/01/2024 - 02/28/2025
There are approximately 51 street and parking lot steel
Aerial Line Inspections
Option Year IV O&M of CVG 114, 15 KV OHL and Street Lights
PoP: 03/01/2024 - 02/28/2025
PoP: 03/01/2024 - 02/28/2025
Contract Type: Firm Fixed Price
Contract Type: Firm Fixed Price
Pole Lighting Preventive Maintenance
PoP: 03/01/2025 - 02/28/2026
LS
AVE. SILVER SPRING, MD 20993-0000
MO
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
LS
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
Contract Type: Firm Fixed Price
AVE. SILVER SPRING, MD 20993-0000
AVE. SILVER SPRING, MD 20993-0000
Contract Type: Firm Fixed Price
AVE. SILVER SPRING, MD 20993-0000
Deliverable
Deliverable
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
cantilever streets lights on wood power distribution poles
AVE. SILVER SPRING, MD 20993-0000
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE poles lights, 15 parking lot wood pole lights, and 12
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE patrol at least once a week.
Deliverable
Place of Performance: MD0819WO FRC Facility-Wide Site, Deliverable
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE
Place of Performance: MD0819WO FRC Facility-Wide Site, Place of Performance: MD0819WO FRC Facility-Wide Site, Materials and Labor
Distribution power lines shall be inspected by the ground
PoP: 03/01/2025 - 02/28/2026
MO
There are approximately 51 street and parking lot steel aerial distribution power lines
Place of Performance: MD0819WO FRC Facility-Wide Site, Option Year IV O&M of CVG 114, 15 KV OHL and Street Lights
Pole Lighting Preventive Maintenance on approximately four miles of energized 15 Kv three phase
Aerial Line Inspections __________
PoP: 03/01/2025 - 02/28/2026
Contract Type: Firm Fixed Price
Contract Type: Firm Fixed Price
LS
PoP: 03/01/2026 - 02/28/2027
PoP: 03/01/2026 - 02/28/2027
Year 4 Tree Trimming (After Base Year)
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
LS
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
PSC: Z1AA -- MAINTENANCE OF OFFICE BUILDINGS
AVE. SILVER SPRING, MD 20993-0000
AVE. SILVER SPRING, MD 20993-0000
AVE. SILVER SPRING, MD 20993-0000
Deliverable
Deliverable
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE cantilever streets lights on wood power distribution poles
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE poles lights, 15 parking lot wood pole lights, and 12
Infrastructure & Above Standard- RWA 10951 NEW HAMPSHIRE patrol at least once a week.
Place of Performance: MD0819WO FRC Facility-Wide Site, Place of Performance: MD0819WO FRC Facility-Wide Site, Place of Performance: MD0819WO FRC Facility-Wide Site, Distribution power lines shall be inspected by the ground
PoP: 03/01/2026 - 02/28/2027
There are approximately 51 street and parking lot steel
Pole Lighting Preventive Maintenance
Aerial Line Inspections __________
PoP: 03/01/2026 - 02/28/2027
Contract Type: Firm Fixed Price
Contract Type: Firm Fixed Price
Section B
Supplies or services and prices/costs:
To consolidate the long term operation, maintenance, inspection and repair activities associated with
Substation CVG-114, the 15Kv class Power Distribution System and Lighting to one responsible entity.
Expand to insure all underground equipment is included. All operations, maintenance, inspection and repair activities must be coordinated with the operations of the Central Utility Plant, the Air Force
Complex, FDA and GSA Facilities.
Section C
Description/Specifications/Statement of Work
See attached “Scope of Work”
U.S. General Services Administration Page 1
U.S. GENERAL SERVICES ADMINISTRATION
National Capital Region / Public Building Service Metropolitan Service Center, WPMEB Federal Research Center at White Oak
SCOPE OF WORK
§ 1.0 PROJECT IDENTIFICATION
1.10 Project Title: 5 Year Contract to Repair, Replace, Modify, Operate, and Maintain CVG-114
Substation, 15Kv Power Distribution, and Street Lighting.
1.20 Location: FDA White Oak Facility / Silver Spring, Maryland
1.30 Building: Campus Wide (MD0819WO)
1.40: Objective
To consolidate the long term operation, maintenance, inspection and repair activities associated with
Substation CVG-114, the 15KV class Power Distribution System and Street Lighting to one responsible entity. Expand to insure all underground equipment is included. All operation, maintenance, inspection and repair activities must be coordinated with the operations of the Central Utility Plant, the Air Force
Complex, FDA and GSA Facilities. The GSA COR is the responsible entity to ensure proper coordination prior to any scheduled or unscheduled work within this Scope.
1.50: History
In the past this scope of activities has been contracted to multiple offsite entities on an “as needed” basis for routine and emergency work. This mode of operation has often resulted in prolonged loss of power to certain facilities.
§ 2.0 SCOPE OF WORK
2.10: General
In general, the work consists of providing the necessary resources to efficiently coordinate, operate, maintain, troubleshoot, and repair the Government Owned property and equipment contained within this
Scope. Detailed contemporaneous record keeping and reporting of all activities conducted within this
Scope is a requirement.
2.20: Work Included Substation CVG-114 and Building 404.
The contractor shall provide all labor, supervision, tools, and equipment to accomplish the following during normal and afterhours operations. All work associated with the Scheduled Periodic Inspections and
U.S. General Services Administration Page 2
Maintenance shall be Fixed-firm price lump sum basis. Any work which may interrupt utility power to mission critical FDA or Air Force operations shall be scheduled as afterhours work. The repair threshold is supposed to cover all including but not limited to (Work associated with repairs, switching, and assistance with scheduled or unscheduled outages will be awarded on a project or unit price basis. Bidders shall submit hourly rates for all unscheduled activities which may occur during normal and afterhours).
1) Safely operate the Substation Switches, Circuit Breakers and auxiliary devices. On an occasional basis the contractor will have to rack out, rack in, open, close, or reset the circuit breakers to assist with unplanned and planned outages and work being performed by the Air Force, Central
Utility Plant, PEPCO, or GSA.
2) Repair or Replacement of faulty equipment or devices. If any equipment or device exhibits abnormal operation the contractor shall troubleshoot and recommend remedial action.
3) Technicians dispatched to troubleshoot and test shall be proficient in
DIGSI, SIGRA, and CFC Logic and NETA High Voltage, Medium
Voltage, and Low Voltage Testing and Commissioning experience, expertise, and Certification holders. Contractor shall have license to the most current Siemens software and keep all relays/devices compatible and up to date.
4) Perform the required Periodic Inspections and Preventive Maintenance for all Government Owned Electrical Equipment and Systems located in
Building 404 and the Substation Yard. Inspection, Testing, and Reporting shall be in accordance with the latest edition of NETA Standard for
Maintenance Testing Specifications for Electric Equipment and Systems, 2015 and GSA requirements. The Frequency of the Inspection and
Testing shall be in accordance with the NETA Maintenance
Frequency Matrix for Average Equipment Condition and Medium
Equipment Reliability Requirement. Technicians performing the inspection and testing shall be NETA certified.
5) Operate and Maintain the HVAC systems, interior and exterior lighting systems, eyewash, and fire extinguishing devices associated with Building
404. Technicians performing the inspection and testing of the HVAC
Systems shall be Maryland State Certified or equivalent federally recognized as Master HVACR. Must be knowledgeable about
SMACNA Standards and ASHRE Regulations.
6) Maintain the Substation Yard lighting.
7) Monitor and periodically drain the transformer containments.
8) Maintain the monitoring and control systems/devices between the Central
Utility Plant and the Substation.
9) Maintain the cleanliness of the Substation yard and interior of Building
404. Contractor shall, on a weekly basis, clear the yard, transformer containments, and interior spaces of Building 404 of debris, leaves, vegetation, etc.
10) Remove snow and ice to maintain a safe working area inside the fenced yard.
2.30: Work Not Included Substation CVG-114 and Building 404.
U.S. General Services Administration Page 3
1) Any PEPCO owned equipment is excluded from this scope. In essence PEPCO is responsible for all 69Kv equipment, the Station Service Transformers, the Station Service Panelboards, cabling and devices located on the source side of the 13.8Kv cable terminations in Sections 103 and 203.
2) Any PEPCO owned monitoring, communication, and protective devices/equipment located in
Building 404.
2.40: Contractor Furnished Materials Substation CVG-114 and Building 404.
Materials incidental to performing routine Operation and Maintenance activities are included in this scope.
Incidentals include such items as software, lubricants, cleaners, tapes, fasteners, filters, light bulbs, etc. and shall be provided by the Contractor.
2.50: Government Furnished Materials Substation CVG-114 and Building 404.
The Government is responsible to fund repairs or replacements of equipment and systems included in this
Scope. The Government has, onsite, a limited inventory of critical spares which are identified below. The contractor shall include in his proposal any additional critical spares thought to be necessary in fulfilling the intent of this Scope. Critical spares are those parts/materials that if failure occurs are long lead items that would result in a prolonged loss of power to mission critical systems.
Critical Spares currently in Government on site inventory: None
2.60: Electrical Equipment and Systems Substation CVG-114 and Building 404.
The following Government Owned electrical equipment and systems are located within the outdoor enclosures in the Substation Yard. The most recent 24 month visual, mechanical, and electrical inspection and maintenance of this equipment was completed in 2019. The periodic visual, mechanical, and electrical inspections and maintenance is up to date as of this award. Future inspections and maintenance shall be performed as required in section 2.20 item 4) of this scope.
1. Section 100: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6415 Relay-50/51.
2. Section 101: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6405 Relay-50/51, Siprotec
7UT6125 Relay-87/51G, Siprotec 7SJ6405 Relay-67.
3. Section 103: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6225 Relay-50/51, Siprotec
7SJ6225 Relay-67, Siprotec 7SJ6415 Relay-50/51, Siprotec 7SJ6415 Relay-67.
4. Section 104: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6225 Relay-50/51.
5. Section 105: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6225 Relay-50/51.
6. Section 106: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6405 Relay-50/51, Siprotec
7UT6125 Relay-87/51N.
7. Section 201: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6405 Relay-50/51, Siprotec
7UT6125 Relay-87/51G.
8. Section 203: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6225 Relay-50/51, Siprotec
7SJ6415 Relay-50/51, Siprotec 7SJ6225 Relay-67, Siprotec 7SJ6415 Relay-67.
9. Section 204: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6405 Relay-50/51, Siprotec
7UT6215 Relay-87/51G, Siprotec 7SJ6405 Relay-67.
10. Section 205: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6225 Relay-50/51.
11. Section 206: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6225 Relay-50/51.
12. Section 207: Siemens GMI Vacuum Circuit Breaker, Siprotec 7SJ6225 Relay-50/51.
The following Government Owned electrical equipment and systems are located in the Substation Yard:
U.S. General Services Administration Page 4
1. Transformer T1: Virginia Transformer Corporation
2. Transformer T1 Neutral Resistor: Power ohm Resistors Neutral Grounding Resistor 80 ohms.
3. Transformer T2: Virginia Transformer Corporation.
4. Transformer T2 Neutral Resistor: Power ohm Resistors Neutral Grounding Resistor 80 ohms.
5. Transformer T2A: Virginia Transformer Corporation
6. Transformer T2A Neutral Resistor: Virginia Transformer Neutral Grounding Resistor 80ohms.
7. Transformer T2B: Virginia Transformer Corporation
8. Transformer T2B Neutral Resistor: Virginia Transformer Neutral Grounding Resistor 80 ohms
The following Government Owned electrical equipment and systems are located in Building 404:
1. Battery Charger 1: American Battery Charging, Inc. Model ABC11-120-15.
2. Battery Charger 2: American Battery Charging, Inc. Model ABC11-120-15.
3. Battery Bank 1: C & D Lead Calcium reference manual RS01476.
4. Battery Bank 2: C & D Lead Calcium reference manual RS01476.
5. Automatic Transfer Switch 1:
6. Panelboard EP 404-1: 200 amp, 120/208v, 3 phase, 4 wire.
7. Panelboard EP 404-2: 125 volt DC.
8. Panelboard EP 424-1: 250 amp, 120/208v, 3 phase, 4 wire.
The following HVAC Equipment and associated controls are to be maintained and operated in accordance with the manufacturers’ recommendations. Visual inspection records, maintenance and repair logs are to be kept by the Contractor. Add Maximo requirement and deliver copies to the government.
1. AC-1: Window Unit, 115v, 5.6A, 6400 BTUH
2. AC-2: Mitsubishi
3. UH-1: Markel Mdl. F2F5103N, 208v, 16A, 3.3Kw.
4. UH-2: Markel Mdl. F2F5103N, 208v, 16A, 3.3Kw.
5. UH-3: Markel Mdl. F2F5103N, 208v, 16A, 3.3Kw.
6. EF-1: Daton Nominal 120 volt ac.
7. EF-2: Daton Nominal 120 volt ac.
2.70: Work Included 15Kv Class Power Distribution.
1. Tree trimming on approximately four miles of energized 15 KV three phase aerial distribution power lines. Trimming shall be performed in the first period of performance and once every four years thereafter. Bidders shall conduct an assessment of the current conditions and submit Lump
Sum pricing for each year of performance. Tree trimming shall adhere to ANSI Standard A 300 part 1, ANSI Z133.1 and OSHA 29 CFR 1910.26.
Trimming shall be performed by qualified line clearance tree trimmers and supervised by a licensed utility arborist.
Trees are to be trimmed for a four year growth schedule.
A minimum clearance of 10 feet radial distance and clear above the aerial lines shall be maintained during all periods of performance.
Leaning trees, dead trees, trees with exposed root structures, and diseased trees located close enough to strike the wires are to be removed.
Disposal of debris can be accommodated on site.
Emergency tree trimming and removal from trees or branches falling on lines.
2. Repair, maintenance, and restoration of aerial power distribution. In the event that any loss of service occurs the contractor will be called upon to perform the remedial activities required to
U.S. General Services Administration Page 5 restore service as soon as possible not to exceed four hours. The contractor shall include time and equipment to open cut-outs/switches to isolate damaged areas or scheduled outage at no additional cost to the government. The government will provide at least 24 hr notice for scheduled isolation needs. Emergency isolation would be subject to the maximum 4 hour limit above. This requirement may not occur on a regular basis but is deemed essential. Bidders shall submit hourly rates for labor and equipment, unit pricing for materials This work shall include, but not limited to:
Stocking poles, crossbars, insulators, cables, fuses, disconnects, and other items necessary to restore service.
Aerial cable repair.
Transformer replacement.
Hardware and ground wire tightening.
Pole and hardware change-out.
Transition inspection and repair (i.e. arrestors, cutouts, fuses, jumpers, and connectors)
Down guy/anchor repair and replacement.
Switching and grounding.
Utility notification and coordination as necessary.
4. Underground Work. There is a limited amount of underground distribution. Contractor shall have the capability to repair or replace underground distribution. This work is not considered routine and would be awarded on a project or time and material basis.
5. Wood Pole Testing and Inspection. There are approximately 100 wood power distribution poles.
In the first year of performance the contractor shall inspect and test the poles. If a pole fails inspection and shows dangerous conditions that are an immediate risk to public safety or conditions affecting the integrity of the circuit, the pole shall be replaced within 7 days of the inspection. Pole inspection and testing shall include:
Visually inspect the pole from top to bottom
Hammer sound the pole.
Bore the pole above ground.
Excavate the pole.
Measure the pole circumference at or near the ground line.
Bore the pole below the ground line
Scrape away any decayed wood from voids and checks using a check scraper.
Chip away any decayed wood from ground line to below ground line.
Measure the remaining sound wood circumference.
Calculate remaining pole strength.
Apply remedial treatment.
Backfill and tamp excavated area.
Secure tag(s) on pole to indicate inspection date.
Recordkeeping and Reporting.
6. Aerial line inspections. Distribution power lines shall be inspected by ground patrol at least once a week. If the inspection reveals a condition that is dangerous to public safety or a risk to circuit integrity, the defect shall be corrected within 30 days of the inspection. Visual inspection shall include:
Identify broken insulators, cutouts, supports, etc.
Identify conditions that may adversely affect reliable operation.
Inspect Distribution transformers for leaking oil, rust, dents, or other evidence of contact.
2.8: Materials Included 15Kv Power Distribution
U.S. General Services Administration Page 6
All labor, tools, equipment, etc. necessary and incidental to performing work for Tree trimming, Wood Pole
Inspection and Testing, and Aerial Line Inspections are to be furnished by the Contractor. The Contractor shall bid the Tree trimming, wood pole testing / inspection, and aerial line inspections on a Fixed-Firm price lump sum basis. Repairs required due to failed inspections, i.e. pole reinforcement, repairs, replacement, power restoration efforts, etc. will be awarded on a project or unit price basis.
2.9: Work Included Pole Lighting.
There are approximately 51 street and parking lot steel poles lights, 15 parking lot wood pole lights, and 12 cantilever street lights on wood power distribution poles. Contractor shall be responsible for Preventive and Reactive Maintenance of the pole lighting. Contractor shall maintain a log of the age, condition, repairs, replacements, etc. of all components and work performed on the pole lighting systems whether reactive or preventative. Preventive maintenance shall be bid firm price lump sum, reactive maintenance will be awarded on a project or unit price basis. Preventive maintenance shall consist of the following:
1. Performing Bulk re-lamping. This is currently Not a requirement for the steel pole street and parking lot lighting and the wood pole parking lot lighting. GSA is replacing the current luminaires with LED’s. Contractor shall maintain the 10 year warranty on the new LED lamps.
Contractor is required to coordinate all warranty repairs Subsequent bulk re-lamping on all wood pole lighting shall be performed when the lamps have reached 80% of their expected life.
2. Evening light measurement surveys. Surveys shall be conducted on all pole lighting once a year.
Actual light measurement at ground level beneath each fixture shall be taken. Reports shall be provided to the COR.
3. Cleaning of glassware, reflectors, and photo controls. Cleaning shall be performed once a year on all pole lighting and during any re-lamping.
4. Perform electrical test. Electrical test shall be performed on all pole lighting in the first year of performance and every five years thereafter. The test shall determine that the fuse operates and the pole lighting is electrically safe and code compliant.
5. Lighting Controls. The contractor is responsible for maintaining the controls; disconnect devices, transformers, and electrical circuits associated with the pole lighting and power for the eastern entrance guard booth. The maintenance tasks and reporting for the associated equipment and devices shall be in accordance with GSA and FDA requirements and complying with NETA MTS
Standard. The frequency of maintenance inspection and testing shall be based on Average equipment condition and Medium equipment reliability.
Reactive Maintenance shall be priced on a unit cost basis. Bidders shall provide unit pricing for reactive maintenance where applicable. Reactive maintenance consists of the following:
1. Pole knockdowns.
2. Burnt out bulbs or ballasts.
3. Any activities not associated with the preventive maintenance.
2.10: Materials Included Street Pole Lighting.
The contractor shall maintain an inventory of light fixtures, bulbs, ballasts, fuses, photo cells, controllers, circuit disconnects and all other appurtenances related with the lighting systems. The Government will maintain a limited inventory of steel poles and complete fixtures in case of knockdowns.
2.11: Period of Performance
1. March 1, 2022 – February 28, 2027
2.12: Pricing
U.S. General Services Administration Page 7
All routine scheduled work within this Scope shall be quoted as firm fixed price for each year of performance. Emergency calls/events for services are to be responded to onsite with all appropriate tools, equipment and personnel as soon as possible not to exceed one hour, Urgent calls/events for services are to be responded to within two hours, all other calls for service are considered scheduled. Normal response time for “scheduled” service shall be 24 hours. The governments’ intent is that requests for “scheduled” ( non-emergency/non-urgent) service be made at least 48 hours in advance of the need for service.
Any charges or premiums for travel time, after hours, night differentials, etc. shall be clearly defined in the bid proposal.
Normal Hourly, Overtime, Sunday, Holiday, etc. rates for all personnel required to perform work specifically within this Scope of Work shall be provided. These rates will be used to evaluate the costs for work not bid as fixed lump sum.
2.13: Schedule
The periodic testing, inspection, and maintenance work shall be performed on a regularly scheduled basis.
The bidder shall provide the government with proposed schedules for regularly scheduled work defined in this Scope. The schedules shall illustrate the proposed regularly scheduled activities, their start date, and their duration. The schedules will be used as an aid in evaluating the bidders understanding of the Scope of Work. Work activities not shown on the schedules should be limited to work performed on an “as required” basis.
2.14: Drawings
The following drawings are provided for information and use. Respondents to this inquiry are expected to conduct a site visit to assist in their understanding of the Scope of Work. Additional drawings will be provided upon request.
1. General Arrangement Switchgear CVG-114.
2. 200 & 400 Area Utility Electric Distribution.
3. 300 Area Utility Electric Distribution.
4. White Oak Campus Lighting.
5. Electrical Roadway and Guard Booths.
§ 3.0 GENERAL CONDITIONS
The Contractor / Vendor shall comply with all conditions and stipulations listed in this document. Non-compliance with any of the following conditions shall be considered a breach of contract and may result in termination of the contract.
Acronym explanations and other information: The terms and references listed below refer directly to the specific government entity or employee only.
1) Campus – The Food and Drug Administration White Oak Campus
2) CO – Government Contracting Officer
3) GSA – General Services Administration
4) FDA – Food and Drug Administration
5) BM – GSA Building Management Official
6) COTR – Contracting Officer’s Technical Representative (Project Representative designated by the CO)
U.S. General Services Administration Page 8
7) CSO – Campus Safety Officer
8) CFO – Campus Fire Officer
9) SOW – Scope of Work
10) FARR – Federal Acquisition Rules and Regulations
11) PR – Project Representative
12) Contractor – A company or individual with a formal contract to A) do a specific job, B) supply labor and materials, and C) provide and oversee staff and subcontractors if needed.
13) Normal Work Hours shall be daytime working hours (an 8 hour shift between 8:00am and
4:00pm) Monday through Friday, excluding holidays, and is based on a 40 hour week.
14) Names, titles, and contact information shall be provided at the start of this project and updated as necessary.
3.10: Omissions or misrepresentations contained in this Scope of Work are unintentional, not on purpose, and shall not in any way or manner circumvent or supersede existing requirements such as, but not limited to, laws, codes, rules, and regulations of local ordinance, state law, Federal law, and the FARR act. In all instances, local / state / Federal laws, acts, and ordinances shall dominate and determine actual requirements of this Scope of Work.
3.10.1: Honeywell Building Solutions is the operations and maintenance contractor for the campus buildings and Central Utility Plants. The contractor shall interface and coordinate with
Honeywell Building Solutions regarding performance of any work that impacts CVG-114.
3.20: The Contractor and employees hired to perform work at the above stated site must pass and secure FDA/GSA security clearance and must display the pass at all times while on the campus.
Any contractor or contractor’s employee who has frequent exposure to the campus must obtain an HSPD-12 credential and must display it at all times while on the campus.
3.30: The Contractor shall supply GSA with the following information. This information is needed in order for FDA security to approve all employees who are both assigned to this job by the
Contractor and require access to the campus:
1) Name (Last, First, Middle Initial)
2) Date of Birth
3) Social Security Number (last four digits)
The Contractor vehicle shall be subjected to inspection by FDA security, at a designated location, and the driver must adhere to all government requirements. The following Contractor vehicle information is needed:
1) Tag # (including the state)
2) Make
3) Model
4) Year
5) Color
6) Operator’s name
7) Operator’s license information
3.40: On-site parking will be provided for the Contractor’s employees’ personal vehicles.
U.S. General Services Administration Page 9
3.40.1: The Contractor shall, five (5) days prior to the start of the work, give to the CO or COTR a written list of all contractors, Contractor Agents, Sub-Contractors, employees of the Sub-
Contractors, and all personnel who may be on-site for the performance of the work described within this SOW. The government shall not be responsible in any way for delays caused by security clearance procedures or issues.
3.50: Unless otherwise provided elsewhere herein, the Contractor shall provide and pay for labor;
equipment; tools; mechanical equipment and machinery; transportation; qualified supervision;
and other facilities and services necessary for the successful prosecution and completion of the work, whether temporary or permanent and whether or not incorporated or to be incorporated in the work except water, heat, and utilities when available and offered by GSA.
3.50.1: The Contractor shall assign to the contract as his agent, a competent superintendent capable of communicating in English and capable of reading and thoroughly understanding the contract documents and thoroughly experienced in the type of work being performed, who shall receive instructions from the CO, COTR, or authorized representatives. The superintendent shall use his best skill and attention and shall have full authority to execute the orders or directions of the
CO, COTR, or authorized representatives without delay and to promptly supply such equipment, tools, labor, and incidentals as may be required. Such superintendence shall be furnished irrespective of the amount of work sublet. Said superintendent shall be on the project site at all times when the work is in progress and must be reachable by cellular phone.
3.50.2: The Contractor shall assign to this project a Supervisor that has attended all work related meetings prior to the start of work. The Contractor will be held responsible for the Supervisor’s knowledge of the SOW and the work’s objectives and requirements.
3.50.3: The Contractor shall enforce strict discipline and good order among the Contractor’s employees, subcontractors, and other persons carrying out the work in the contract. Individuals not maintaining proper conduct can be removed from the job site, permanently or temporarily, at the discretion of GSA.
3.60: The Contractor shall maintain the following information at the job site, including but not limited to, a copy of this SOW, all permits, burn permits, Material Safety Data Sheets (for Chemicals, known hazardous materials, and other compounds and items to be used during this project), environmental compliances, and any other documents pertaining to the work to be performed and shall display them as required by applicable law and when requested.
3.70: The Contractor shall provide a complete list of all chemicals, known hazardous materials, and other items or compounds which will be used during the performance of this work. This list and complete copies of the Material Safety Data Sheet shall be given to the CSO, CFO, and either the CO or COTR.
3.70.1: This list and complete copies of the Material Safety Data Sheet shall be displayed and maintained within the area where this work is to be performed.
3.70.2: In the event of a spill or other hazardous event, the CSO, COTR, CO, and CFO shall be notified immediately of the occurrence and the steps being taken to remedy the situation.
3.70.3: Contact information for the CFO, CSO, COTR, and CO is as follows. Please notify these individuals in the following order:
1) Campus Fire Officer: Mega Center (301-763-0040)
U.S. General Services Administration Page 10
2) Campus Safety Officer: Anne Laurie Wong (301-332-3967)
3) Contracting Officer’s Technical Representative:
4) Contracting Officer:
3.70.4: Burn permits (GSA Form 1755) are issued by the GSA and must be requested forty eight (48) hours before any burn activity. Burn permits must be filled out completely and correctly in order for GSA to accept them. Absolutely no burn activity is allowed within this campus unless the Contractor is issued and is in possession of this Burn Permit. Contact the COTR or the
Project Manager to obtain this permit.
3.70.5: Burn permits must be accompanied by a Fire Alarm Outage Request Form. The Fire Alarm
Outage Request Form must be filled out completely and correctly in order for GSA to accept it.
Contact the Project Manager or the Building Manager to obtain this form.
3.80: SAFETY REQUIREMENTS:
The Contractor shall comply with all applicable local, state, and Federal codes, including but not limited to fire codes; the National Electrical Code (NEC); American Society of Heating, Refrigerating and Air
Conditioning (ASHRAE); and Occupational Safety and Health Administration (OSHA) regulations. The
Contractor shall preserve the integrity of all environmental compliance and historical elements of the building where this work is done.
All contractor(s) shall comply with the safety guidelines and requirements contained in NCR’s Section
01546 – Safety and Health specification.
3.90: FIRE, ENVIRONMENTAL AND LIFE SAFETY REQUIREMENTS
All contractor(s) and Sub-contractors shall comply with the safety guidelines and requirements contained in NCR’s Section 01546 – Safety and Health specification.
The Contractor shall not use Government supplies or materials, including but not limited to trash receptacles or any other Government property or items unless the CO or the COTR specifically provides for that item’s use within this SOW or by a specifically written exemption.
3.90.1: The Contractor shall identify some of the precautions necessary to protect the safety and health of employees, visitors, and facility occupants, and to prevent the loss of or damage to property and the environment.
3.90.2: The following Sections of Work Specifications (located elsewhere), indicate the scope of work and specific measures, to control hazardous materials/conditions:
Section 018111- Sustainable Design Requirements
Section 017419- Construction Nonhazardous Waste & Management Disposal
Section 017410- Construction Indoor Air Quality Management for Construction
Section 00900 - PCB Removal and Disposal
Section 02085 - Asbestos Abatement Procedures
Section 02085R - Asbestos Roofing Removal Procedures
Section 02087 - Avian Excreta Removal
Section 02089 - Small PCB Items and Lamps
Section 02090 - Lead Based Paint Control Procedures
U.S. General Services Administration Page 11
Use the following References to get further clarifications about the control of hazardous materials/conditions. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
Current edition of the publications will be used.
A. Code of Federal Regulations (CFRs):
29 CFR 1910 - OSHA General Industry Safety and Health Standards
29 CFR 1926 -OSHA Construction Industry Standards
40 CFR Chapter 1 Subchapter R– Toxic Substances Control Act (TSCA)
40 CFR Part 61 – EPA National Emission Standard for Hazardous Air Pollutants
(NESHAPs)
40 CFR Part 761 – Polychlorinated Biphenyl Manufacturing, Processing, Distribution and Use
40 CFR Parts 260 through 271 – EPA Resource Conservation and Recovery Act (RCRA)
41 CFR Parts 102 - Federal Management Regulation
B. Other Recognized Standards:
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTM)
National Fire Code (NFC)
National Fire Protection Association (NFPA)
70E National Electrical Code (NEC)
Underwriters laboratories (UL)
Federal Standard 313E - Material Safety Data, Transportation Data and Disposal Data for
Hazardous Materials Furnished to Government Activity
ASME B31.9, Code for Pressure Piping, Section on Building Services Piping
C. All applicable State and Local Regulations shall apply.
D. DEFINITION OF HAZARDOUS MATERIALS: Refer to hazardous and toxic materials/ substances, Subparts H and Z of 29 CFR 1910; and to others as defined in
Federal Standard 313.
(i) Those hazardous materials most commonly encountered can include pesticides, cleaning agents, paints, adhesives, strippers, solvents, asbestos, polychlorinated biphenyls (PCB's), mercury vapor lamps, explosives, and radioactive materials, but may include others. Any unlabeled substance should be handled as hazardous material until properly identified.
(ii) All thermal systems insulation (i.e., boiler insulation, duct insulation, pipe insulation), surfacing materials (i.e., plaster and sprayed-on fireproofing) and miscellaneous materials (i.e., asphalt flooring, ceiling tiles, adhesives and mastics, drywall, roofing, gaskets and cement board), installed no later than
1980, must be considered asbestos containing unless proven otherwise in accordance with 29 CFR 1926.1101.
(iii) All finished/painted surfaces of buildings constructed prior to 1978 shall be considered finished with lead based paint unless proven otherwise.
U.S. General Services Administration Page 12
(iv) Products likely to contain PCB's are electrical transformers, capacitors, voltage regulators, fluorescent light ballasts and oil switches. Transformer vaults with PCB contaminated floors are identified by signage at the entry door
3.90.3: All work containing the disturbance or dismantling of structures having hazardous materials, the transport and disposal shall comply with the applicable requirements of 29 CFR 1910/1926, and 40 CFR 761/260-271.
All work involving the dismantling or disposal of structures containing asbestos; and/or the removal and disposal of asbestos, shall also comply with the requirements of 40 CFR Part 61, Subparts A and M, and 29 CFR 1915.1001 (where applicable), as well as GSA Specification
02085 (Asbestos Abatement Procedures).
All work involving the dismantling or disposal of structures containing lead based paint shall comply with 29 CFR 1926.62, as well as GSA Specification 02090 (Lead Based Paint
Abatement Procedures). It shall be the responsibility of the Contractor to adequately test and characterize the waste by the toxicity characteristics leaching procedures (TCLP) – Lead.
All work involving the dismantling or disposal of structures containing PCBs shall comply with 40 CFR 761. Removal and disposal of gross PCBs (contamination) and large PCB items (greater than or equal to 3 pounds (1.36 kg) of dielectric fluid) shall also comply with
GSA Specification 00900 (PCB Removal and Disposal). Work involving the removal of PCB light ballasts, switches and similar small PCB items (less than 3 pounds (1.36 kg) shall also comply with GSA Specification 02089 (PCB Light Ballasts, Switches and Mercury Lamps).
All work involving the dismantling or disposal of structures containing asbestos, lead paint, and/or PCBs shall comply with all local and municipal health and safety requirements.
3.90.4: All Contractors shall assume full responsibility and liability for compliance with applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part, or that of his/her employees or subcontractors, which results in illness, injury or death.