This is a Request for Qualifications (RFQ) issued by the City of Phoenix Office of the City Engineer for design and construction administration and inspection services related to the Subregional Operating Group (SROG) Southern Avenue Interceptor Rehabilitation Projects 1, 2, 3, and 4. The SROG is governed by an Intergovernmental Agreement between the cities of Glendale, Mesa, Phoenix, Scottsdale, and Tempe. The project involves the rehabilitation of approximately 9,790 linear feet of large diameter sanitary sewer pipe organized into 14 segments and 82 associated manholes located primarily along Southern Avenue between 48th Street and 51st Avenue, and along Broadway Road from 51st Avenue to the 91st Avenue Wastewater Treatment Plant. The pipe material is polyvinyl chloride-lined reinforced concrete pipe (RCP). A pre-submittal meeting will be held on March 4, 2026, at 9:30 am at City Hall or via Teams. Statements of Qualifications must be submitted electronically through the City's Procurement Portal by 12:00 pm on March 13, 2026, with a maximum of 14 pages. The estimated construction cost is $33 million, and the City expects to notify selected teams in April 2026 with a scope meeting scheduled for early May 2026.

Consultants will be evaluated on seven criteria including design experience (150 points), construction administration and inspection experience (150 points), key personnel experience (125 points each for design and CA&I), project understanding and approach (300 points), staffing information (150 points), and reference checks (21 points), totaling 1,021 points. Inspectors must hold OSHA trenching and excavation certification and confined space training certification, and the consultant must have a NACE Level III inspector on staff for manhole coating inspections. The City will use UNIFIER, a web-based project management database, which will require consultant training and electronic record maintenance. The selection will be qualifications-based with no formal interviews conducted, and the City will create a short list of three to five teams for negotiations. No specific set-asides or incumbent information is provided. The design scope includes evaluation of existing documentation, investigation of rehabilitation alternatives, permit and easement assistance, and preparation of design documents at 60%, 90%, and 100% completion stages. The potential construction administration and inspection scope includes contractor oversight, site inspections, field testing, punch list preparation, and updating of the Computerized Maintenance Management System.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF PHOENIX, ARIZONA

OFFICE OF THE CITY ENGINEER

DESIGN AND CONSTRUCTION PROCUREMENT

REQUEST FOR QUALIFICATIONS

SUBREGIONAL OPERATING GROUP SOUTHERN AVENUE

INTERCEPTOR REHABILITATION PROJECTS 1, 2, 3, & 4

ENGINEERING SERVICES

OPENGOV ID NO. WS90160114

RFQ Rev. 1/25 Page | 2

The City of Phoenix is seeking a qualified consultant to provide professional design and possible construction administration and inspection services for the rehabilitation of large diameter sanitary sewer on the Sub-regional Operating Group (SROG) Southern Avenue Interceptor. This project consists of 9,790 feet of pipe (14 segments) and 82 manholes to be rehabilitated.

The pipeline is owned and operated by SROG, governed by an Intergovernmental Agreement between the cities of Glendale, Mesa, Phoenix, Scottsdale, and Tempe. This project site is located primary along Southern Avenue between 48th Street and 51st Avenue and Broadway Road from

51st Avenue to the 91st Avenue Wastewater Treatment Plant where regional flows are conveyed for treatment. Ownership percentages vary for the partner cities based on agrees upon allowable flow volumes. The estimated construction cost is $33 million.

Project Description

The Sub-Regional Operating Group Southern Avenue Interceptor Condition Assessment, Project

No. WS90160107 was completed in 2025. The Assessment recommended a multi-year rehabilitation design program spanning over six years. The scope of services will focus on

Projects 1, 2, 3 & 4 as identified in the 2025 Condition Assessment report. Fourteen (14) sewer pipe segments, or approximately 9,790 linear feet, and 82 associated manholes were identified in this project for rehabilitation. The consultant will be tasked to prepare design documents for construction, and possible Construction Administration & Inspection Services.

The overall Southern Avenue Interceptor system is approximately 19 miles in length with pipe diameters ranging in size from 48 to 90 inches with 153 associated manholes and structures. The pipe material is polyvinyl chloride-lined reinforced concrete pipe (RCP), also known as T-Lock lined RCP.

The National Association of Sewer Service Companies Pipe Assessment Certification Program and Manhole Assessment Certification Program standards were utilized in preparing the report to identify and code defects, assessing conditions of the interceptor, and planning for the rehabilitation of sewer pipes and manholes.

Scope of Work

The Design scope for this project will include, but is not limited to:

• Evaluating existing documentation including assessment reports, videos, as-builts, and other investigative data and/or reports that may be available on pipe and manhole condition to identify viable rehabilitation alternatives.

• Investigating and proposing appropriate repair and rehabilitation methods.

• Addressing any sewer capacity reductions resulting from proposed rehabilitation methods.

• Providing rehabilitation or repair design to correct all sewer and manholes defects at identified project locations.

• Assisting the City in obtaining all required permits, easements and approvals for the work.

Page | 3

• Preparing and submitting project documents for review and approval at the 60%, 90%, and 100% design stages, including cost estimates, construction drawings, technical specifications, and any necessary special provisions.

• Assisting the City throughout the bidding period.

The potential CA&I scope for this project will include, but is not limited to:

• Assisting the Contractor in obtaining permits and approvals for the work.

• Providing oversight of the project construction activities to ensure protection against defects and deficiencies in the work of contractors and their subcontractors and subconsultants.

• Inspecting the site through various stages of construction to inspect the quality of the executed work and to verify the work is in accordance with construction documents and specifications.

• Confirming contractors’ work progress and qualities of work completed.

• Reviewing contractor cost proposals, submittals, shop drawings, requests for information

(RFIs), payment applications, change orders, etc.

• Performing field inspections (visual, probe, and testing) as required for completed repairs and reject work not conforming to project documents and specifications.

• Providing field reports with associated photos/videos of observations and tests performed.

• Evaluating CCTV or digital documentation of rehabilitation performed on pipe segments.

• Conducting project-related pre-construction and progress meetings.

• Preparing punch list of corrective work to be performed by the contractor and any subsequent re-inspections.

• Reviewing contractor as-builts, including documentation of the size, locations, orientation of repairs, rehab material and deliver final record drawings to the City.

• Tracking, compiling, and categorizing all project related documents, including inspection reports, progress photos, important project correspondence, meeting minutes, RFIs, Submittals, etc., on a USB drive, following completion of the project, and deliver to the City

Project Manager.

• Providing data from construction to update Computerized Maintenance Management

System per direction of City’s Water Asset Management Team.

• Providing public outreach services.

Certifications and personnel requirements:

Page | 4

• Inspectors are required to have OSHA trenching and excavation certification and confined space training certification.

• The Consultant is required to have a NACE Level III inspector on staff or as a subconsultant for manhole coating inspections

Use of UNIFIER, an Application Service Provider (ASP) web-based project management database, may be required. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the Project Manager.

• The Consultant will be required to maintain all project records in electronic format.

• The City provides an ASP web-based project management database which the Consultant will be required to utilize in the fulfillment of the contract requirements.

• The Consultant shall provide a computerized networked office platform with broadband internet connectivity.

• UNIFIER training will be provided through the City of Phoenix to firms under contract.

Pre-Submittal Meeting

A pre-submittal meeting will be held at 9:30 am, Phoenix time on Wednesday, March 4, 2026, at

200 W. Washington Street, City Hall, Floor 9, Water Services Department, Training Room AND via Teams. At this meeting, City staff will discuss the scope of work, general project requirements, and respond to questions from the attendees. It is strongly recommended that interested firms attend the pre-submittal meeting. Inquiries regarding the project scope outside of this pre-submittal meeting must be directed to the Contracts Specialist.

Pre-Submittal Meeting Teams Information:

Join the meeting now

Meeting ID: 233 096 570 275 78

Passcode: WZ3Ls27b

Statement of Qualifications Evaluation Criteria

A firm will be selected through a qualifications-based selection process based on the criteria below. Subcriteria are listed in order of importance in relation to project services. City of Phoenix project experience is not required.

No. Evaluation Criteria Scoring Method Weight (Points) https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjY2NTRjNWQtNmM2Zi00ZDlhLTljMGYtYWQ4OTI4NTQzMDZj%40thread.v2/0?context=%7b%22Tid%22%3a%2296b9695c-4f0e-42bd-8adf-ba755760346b%22%2c%22Oid%22%3a%224951ff9e-68ba-4d50-b51e-3c5f6a06e001%22%7d

Page | 5

1. Design Experience of the Prime Firm

Describe the experience and qualifications of the prime firm in providing design services for similar projects. Identify projects the submitting firm has completed.

For each project listed, provide:

A. Description of the project including scope and project owner

B. Role of the firm and explain how this relates to the services being solicited

C. Project’s original contract value, final contract value, and reason for variance

D. Project’s start date and completion date

Points Based 150 (14.7% of Total)

2. Construction Administration and

Inspection Experience of the Prime Firm

Describe the experience and qualifications of the prime firm in providing construction administration and inspection (CA&I) services for similar projects. Identify projects the submitting firm has completed.

Include assigned CA&I personnel if different from personnel performing design services.

For each project listed, provide:

A. Description of the project including scope and project owner

B. Role of the firm and explain how this relates to the services being solicited

C. Project’s original contract value, final contract value, and reason for variance

D. Project’s start date and completion date

Points Based 150 (14.7% of Total)

Page | 6

3. Design Experience of the Key Personnel and Subconsultants

Describe the experience and qualifications of the specific project team expected to be assigned to this project in providing design services for similar projects. For each key person identified, list their length of time with the firm. List each key person’s role in the projects provided. If a project selected for a key person is the same as one selected for the firm, provide just the project name and the role of the key person. For each project listed, provide:

A. Description of the project including scope and project owner

B. Role of the team or team member and explain how this relates to the services being solicited

C. Project’s original contract value, final contract value, and reason for variance

D. Project’s start date and completion date

Points Based 125 (12.2% of Total)

Page | 7

4. Construction Administration and

Inspection Experience of Key Personnel and Subconsultants

Describe the experience and qualifications of the project team expected to be assigned to this project in providing construction administration and inspection services for similar projects. For each key person identified, list their length of time with the firm. List each key person’s role in the projects provided. If a project selected for a key person is the same as one selected for the firm, provide just the project name and the role of the key person. Include assigned

CA&I personnel if different from personnel performing design services. For each project listed, provide:

A. Description of the project including scope and project owner

B. Role of the team or team member and explain how this relates to the services being solicited

C. Project’s original contract value, final contract value, and reason for variance

D. Project’s start date and completion date

Points Based 125 (12.2% of Total)

5. Project Understanding and Approach

Describe your firm’s understanding of the

City’s need for this project, including important considerations such as project issues and challenges. Describe the team’s approach to the project, including important considerations such as scope, schedule, and budget.

Points Based 300 (29.4% of Total)

Page | 8

6. Staffing Information for Key Personnel

Provide the following:

A. Team’s availability and commitment to the project, including subconsultants

B. Team’s plan to maintain continuity of the proposed services

C. Organization chart showing key personnel, current professional licenses or certifications, and assigned roles for both Design and

Construction Administration and

Inspection Services for the project

D. Identify the location of the lead firm’s principal office and the home office location of key staff on this project.

Points Based 150 (14.7% of Total)

7. Reference Checks

Use the form provided in the Attachments section to obtain at least three references. It is preferred no more than one be a City of

Phoenix project. If your firm has not completed prior projects with other agencies, you will not be penalized. It is recommended there be references outside the City of Phoenix.

*These points are in addition to the 1,000 points for the SOQ.

Points Based 21 (2.1% of Total)

Submittal Requirements

Electronic Submittal Process: Firms interested in this project must submit a Statement of

Qualifications (SOQ) electronically through the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix.

Submittal requirements are as follows:

Vendor Information: All firms must be registered in the City’s Vendor Management System prior to submitting a proposal. The vendor number should be included on the cover of the

SOQ. Information on how to register with the City is available at:

https://www.phoenix.gov/financesite/Pages/EProc-help.aspx

If your firm is already registered with the City of Phoenix’s Procurement system, please visit https://procurement.opengov.com/portal/phoenix to login and access the electronic solicitation.

https://procurement.opengov.com/portal/phoenix https://www.phoenix.gov/financesite/Pages/EProc-help.aspx https://procurement.opengov.com/portal/phoenix

Page | 9

Submittals:

• Submit only one SOQ electronically, in .PDF format only, addressing all evaluation criteria. No hard copies will be accepted.

• Clearly display the firm legal name, vendor number, project title, and project number on the cover of the SOQ.

• A maximum of 14 pages is permitted to address all content in the SOQ submittal.

(Maximum page limit includes evaluation criteria and all additional content. It does not include information sheet.)

• Submit electronically the Statement of Qualifications by 12:00 pm, Phoenix time, on

Friday, March 13, 2026.

• Page size must meet requirements of 8½” x 11”.

• Font size must not be less than 10 point.

• Content count:

o Each side of a page containing evaluation criteria and additional content will be counted toward the maximum page limit noted above.

o Pages that have project photos, charts and/or graphs will be counted towards the maximum page limit noted above.

o Front and back covers, information sheet, Table of Contents pages, and divider (tab) pages will NOT be counted toward the maximum page limit noted above, unless they include evaluation criteria and additional content that could be considered by the selection panel.

Information Sheet: Provide an information sheet that includes project title, OpenGov ID number, legal firm name (not a trade name), address, phone number, vendor number, and the name, title, email address and signature of your contact person for the project. Do not include any additional information.

Evaluation Criteria: Address the SOQ evaluation criteria.

Note: All pages exceeding the specified maximum page limit will be removed from the submittal and not considered in evaluating a submitted SOQ.

Grounds for Disqualification

Please be advised that the following will be grounds for disqualification, and will be strictly enforced:

• Submitting a Statement of Qualifications for a different project.

• Violating the “Contact with City Employees” policy contained in this RFQ.

Selection Process and Schedule

Page | 10

Interested teams will submit a Statement of Qualifications (SOQ). The team will be selected through a qualifications-based selection process. A Selection Panel will evaluate each SOQ per the criteria set forth in Section 5 above.

The City will select a team based on the SOQ’s received; no formal interviews will be conducted. The City may conduct a due diligence review on the team(s) receiving the highest evaluation.

The City expects to create a final list of at least three, but not more than five teams for this project.

The City will enter into negotiations with the selected team and execute a contract upon completion of negotiation of fees and contract terms for City Council approval.

The following tentative schedule has been prepared for this project.

Pre-submittal Meeting 9:30 am on Wednesday, March 4, 2026

SOQs Due 12:00 pm on Friday, March 13, 2026

Selection Notification April 2026

Scope Meeting Early May 2026

If the City is unsuccessful in negotiating a contract with the best-qualified team, the City may then negotiate with the next most qualified team until a contract is executed, or the City may decide to terminate the selection process. Once a contract is executed with the successful firm, the procurement is complete.

The firm selected for this project will be notified directly by the City. Notification to all other firms on the status of a short list for this project will be posted on the City of Phoenix’s Procurement

Portal:

https://procurement.opengov.com/portal/phoenix

General Information

Citywide Capital Improvement Projects. Consulting and contractor services supporting the

City’s Capital Improvement Projects are procured under the authority of the City Engineer, currently located within the Street Transportation Department. Design and Construction

Procurement coordinates the citywide consulting and construction contracting procurement processes.

Changes to Request for Qualifications. Any changes to this Request for Qualifications

(RFQ) will be in the form of a Notification. The City of Phoenix shall not be held responsible for any oral instructions. Notifications are available on both the Current Opportunities and City's eProcurement Portal at https://procurement.opengov.com/portal/phoenix.

It shall be the responsibility of the registered RFQ holder to determine, prior to the submittal of the Statement of Qualifications, if a Notification has been issued. Registered

Page | 11

RFQ holders may refer to the web page or call the Contracts Specialist (listed below) to ascertain if a Notification has been issued for this project.

Alternate Format. For more information or a copy of this publication in an alternate format, contact the Contracts Specialist (listed below) - Voice or TTY 711. Requests will only be honored if made within the first week of the advertising period.

Release of Project Information/Public Records Request. The City shall provide the release of all public information concerning the project, including selection announcements and contract awards. Those desiring to release information to the public must receive prior written approval from the City. To submit a Public Records Request, visit phoenix.gov/prr.

City Rights. The City of Phoenix reserves the right to reject any or all Statements of

Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received.

Contact with City Employees. This policy is intended to create a level playing field for all

Proposers, assure that contracts are awarded in public, and protect the integrity of the selection process. OFFERORS THAT VIOLATE THIS POLICY WILL BE DISQUALIFIED.

Beginning on the date the RFQ is issued and until the date the contract is awarded or the RFQ withdrawn, all persons or entities that respond to the RFQ, including their authorized employees, agents, representatives, proposed partner(s), subcontractor(s), joint venture(s), member(s), or any of their lobbyists or attorneys (collectively the Proposer), will refrain from any direct or indirect contact with any person (other than the designated Contract Specialist) who may play a part in the selection process, including members of the evaluation panel, the City Manager, Assistant

City Manager, Deputy City Managers, Department heads, the Mayor and other members of the

Phoenix City Council. As long as the RFQ solicitation is not discussed, Proposers may continue to conduct business with the City and discuss business that is unrelated to this RFQ solicitation with City staff.

Commencing on the date and time a solicitation is published, potential or actual proposers

(including their representatives) will only discuss matters associated with the solicitation with the

Mayor, any members of City Council, the City Manager, any Deputy City Manager, or any department director directly associated with the solicitation (including in each case their assigned staff, except for the designated procurement officer) at a public meeting, posted under the Arizona

Revised Statutes, until the resulting contract(s) are awarded or all offers or responses are rejected and the solicitation is cancelled without any announcement by the procurement officer of the City’s intent to reissue the same or a similar solicitation.

Proposers may discuss their proposal or the RFQ solicitation with the Mayor or one or more members of the Phoenix City Council, provided such meetings are scheduled through the

Contract Specialist (listed below), conducted in person at 200 W. Washington, Phoenix, Arizona

85003, and are posted as open meetings with the City Clerk at least twenty-four (24) hours prior to the scheduled meetings. The City Clerk will be responsible for posting the meetings. The posted notice shall identify the participants and the subject matter, as well as invite the public to participate.

Conflict of Interest. The City reserves the right to disqualify any Proposer on the basis of any real or apparent conflict of interest that is disclosed by the proposal submitted or any other data https://phoenix.gov/prr

Page | 12 available to the City. This disqualification is at the sole discretion of the City. Any Proposer submitting a proposal herein waves any right to object now or at any future time, before any body or agency, including but not limited to, the City Council of the City of Phoenix or any court.

Protest Procedures. Firms responding to disqualification or a procurement outcome are referred to the Code of the City of Phoenix Chapter 2, Article XII, Section 2-187 to 2-190.4, which governs protest procedures utilized throughout the selection process. The procedures may be reviewed through the City of Phoenix website at:

http://www.codepublishing.com/az/phoenix/

A copy of the Protest Policy is also available online at:

https://www.phoenix.gov/administration/departments/streets/careers/business-opportunities.html

Questions - Questions pertaining to this selection process or contract issues should be submitted via the Procurement Portal.