SUBREGIONAL_OPERATING_GROUP_SOUTHERN_AVENUE_INTERCEPTOR_REHABILITATION_PROJECTS_1,_2,_3,_&_4.pdf
PDF 215 KB Posted
- Attached to
- SUBREGIONAL OPERATING GROUP SOUTHERN AVENUE INTERCEPTOR REHABILITATION PROJECTS 1, 2, 3, & 4
- Solicitation number
- WS90160114
- Issued by
- Maricopa County, Phoenix City, Arizona
About this file
This is a Request for Qualifications (RFQ) issued by the City of Phoenix Office of the City Engineer for engineering design and construction administration and inspection services related to the Subregional Operating Group (SROG) Southern Avenue Interceptor Rehabilitation Projects 1, 2, 3, and 4. The SROG is governed by an Intergovernmental Agreement between the cities of Glendale, Mesa, Phoenix, Scottsdale, and Tempe. The project involves the rehabilitation of approximately 9,790 linear feet of large-diameter sanitary sewer pipe organized into 14 segments and 82 associated manholes located primarily along Southern Avenue between 48th Street and 51st Avenue, and Broadway Road from 51st Avenue to the 91st Avenue Wastewater Treatment Plant. The pipe materials include polyvinyl chloride-lined reinforced concrete pipe (RCP). The estimated construction cost is $33 million. Qualified consultants must submit Statements of Qualifications electronically through the City's Procurement Portal by 12:00 pm, Phoenix time, on Friday, March 13, 2026. A pre-submittal meeting is scheduled for 9:30 am on Wednesday, March 4, 2026, at City Hall in person and via Microsoft Teams. Selection notification is anticipated in April 2026, with scope meetings scheduled for early May 2026.
The RFQ evaluation process is qualifications-based with no formal interviews, utilizing a Selection Panel to assess submittals against seven criteria totaling 1,021 possible points: design experience of the prime firm (150 points), construction administration and inspection experience of the prime firm (150 points), design experience of key personnel and subconsultants (125 points), construction administration and inspection experience of key personnel and subconsultants (125 points), project understanding and approach (300 points), staffing information for key personnel (150 points), and reference checks (21 points). The City intends to select a final list of three to five teams and will enter negotiations with the highest-ranked team for execution of a contract upon City Council approval. Personnel requirements include OSHA trenching and excavation certification and confined space training certification for inspectors, and a NACE Level III inspector on staff or as a subconsultant for manhole coating inspections. Consultants must maintain all project records electronically and utilize the City's UNIFIER web-based project management database. Submissions are limited to 14 pages in PDF format with 10-point minimum font size and must include an information sheet with firm legal name, vendor number, address, phone number, and designated contact person.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF PHOENIX, ARIZONA
OFFICE OF THE CITY ENGINEER
DESIGN AND CONSTRUCTION PROCUREMENT
REQUEST FOR QUALIFICATIONS
SUBREGIONAL OPERATING GROUP SOUTHERN AVENUE
INTERCEPTOR REHABILITATION PROJECTS 1, 2, 3, & 4
ENGINEERING SERVICES
OPENGOV ID NO. WS90160114
RFQ Rev. 1/25 Page | 2
The City of Phoenix is seeking a qualified consultant to provide professional design and possible construction administration and inspection services for the rehabilitation of large diameter sanitary sewer on the Sub-regional Operating Group (SROG) Southern Avenue Interceptor. This project consists of 9,790 feet of pipe (14 segments) and 82 manholes to be rehabilitated.
The pipeline is owned and operated by SROG, governed by an Intergovernmental Agreement between the cities of Glendale, Mesa, Phoenix, Scottsdale, and Tempe. This project site is located primary along Southern Avenue between 48th Street and 51st Avenue and Broadway Road from
51st Avenue to the 91st Avenue Wastewater Treatment Plant where regional flows are conveyed for treatment. Ownership percentages vary for the partner cities based on agrees upon allowable flow volumes. The estimated construction cost is $33 million.
Project Description
The Sub-Regional Operating Group Southern Avenue Interceptor Condition Assessment, Project
No. WS90160107 was completed in 2025. The Assessment recommended a multi-year rehabilitation design program spanning over six years. The scope of services will focus on
Projects 1, 2, 3 & 4 as identified in the 2025 Condition Assessment report. Fourteen (14) sewer pipe segments, or approximately 9,790 linear feet, and 82 associated manholes were identified in this project for rehabilitation. The consultant will be tasked to prepare design documents for construction, and possible Construction Administration & Inspection Services.
The overall Southern Avenue Interceptor system is approximately 19 miles in length with pipe diameters ranging in size from 48 to 90 inches with 153 associated manholes and structures. The pipe material is polyvinyl chloride-lined reinforced concrete pipe (RCP), also known as T-Lock lined RCP.
The National Association of Sewer Service Companies Pipe Assessment Certification Program and Manhole Assessment Certification Program standards were utilized in preparing the report to identify and code defects, assessing conditions of the interceptor, and planning for the rehabilitation of sewer pipes and manholes.
Scope of Work
The Design scope for this project will include, but is not limited to:
• Evaluating existing documentation including assessment reports, videos, as-builts, and other investigative data and/or reports that may be available on pipe and manhole condition to identify viable rehabilitation alternatives.
• Investigating and proposing appropriate repair and rehabilitation methods.
• Addressing any sewer capacity reductions resulting from proposed rehabilitation methods.
• Providing rehabilitation or repair design to correct all sewer and manholes defects at identified project locations.
• Assisting the City in obtaining all required permits, easements and approvals for the work.
Page | 3
• Preparing and submitting project documents for review and approval at the 60%, 90%, and 100% design stages, including cost estimates, construction drawings, technical specifications, and any necessary special provisions.
• Assisting the City throughout the bidding period.
The potential CA&I scope for this project will include, but is not limited to:
• Assisting the Contractor in obtaining permits and approvals for the work.
• Providing oversight of the project construction activities to ensure protection against defects and deficiencies in the work of contractors and their subcontractors and subconsultants.
• Inspecting the site through various stages of construction to inspect the quality of the executed work and to verify the work is in accordance with construction documents and specifications.
• Confirming contractors’ work progress and qualities of work completed.
• Reviewing contractor cost proposals, submittals, shop drawings, requests for information
(RFIs), payment applications, change orders, etc.
• Performing field inspections (visual, probe, and testing) as required for completed repairs and reject work not conforming to project documents and specifications.
• Providing field reports with associated photos/videos of observations and tests performed.
• Evaluating CCTV or digital documentation of rehabilitation performed on pipe segments.
• Conducting project-related pre-construction and progress meetings.
• Preparing punch list of corrective work to be performed by the contractor and any subsequent re-inspections.
• Reviewing contractor as-builts, including documentation of the size, locations, orientation of repairs, rehab material and deliver final record drawings to the City.
• Tracking, compiling, and categorizing all project related documents, including inspection reports, progress photos, important project correspondence, meeting minutes, RFIs, Submittals, etc., on a USB drive, following completion of the project, and deliver to the City
Project Manager.
• Providing data from construction to update Computerized Maintenance Management
System per direction of City’s Water Asset Management Team.
• Providing public outreach services.
Certifications and personnel requirements:
Page | 4
• Inspectors are required to have OSHA trenching and excavation certification and confined space training certification.
• The Consultant is required to have a NACE Level III inspector on staff or as a subconsultant for manhole coating inspections
Use of UNIFIER, an Application Service Provider (ASP) web-based project management database, may be required. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the Project Manager.
• The Consultant will be required to maintain all project records in electronic format.
• The City provides an ASP web-based project management database which the Consultant will be required to utilize in the fulfillment of the contract requirements.
• The Consultant shall provide a computerized networked office platform with broadband internet connectivity.
• UNIFIER training will be provided through the City of Phoenix to firms under contract.
Pre-Submittal Meeting
A pre-submittal meeting will be held at 9:30 am, Phoenix time on Wednesday, March 4, 2026, at
200 W. Washington Street, City Hall, Floor 9, Water Services Department, Training Room AND via Teams. At this meeting, City staff will discuss the scope of work, general project requirements, and respond to questions from the attendees. It is strongly recommended that interested firms attend the pre-submittal meeting. Inquiries regarding the project scope outside of this pre-submittal meeting must be directed to the Contracts Specialist.
Pre-Submittal Meeting Teams Information:
Join the meeting now
Meeting ID: 233 096 570 275 78
Passcode: WZ3Ls27b
Statement of Qualifications Evaluation Criteria
A firm will be selected through a qualifications-based selection process based on the criteria below. Subcriteria are listed in order of importance in relation to project services. City of Phoenix project experience is not required.
No. Evaluation Criteria Scoring Method Weight (Points) https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjY2NTRjNWQtNmM2Zi00ZDlhLTljMGYtYWQ4OTI4NTQzMDZj%40thread.v2/0?context=%7b%22Tid%22%3a%2296b9695c-4f0e-42bd-8adf-ba755760346b%22%2c%22Oid%22%3a%224951ff9e-68ba-4d50-b51e-3c5f6a06e001%22%7d
Page | 5
1. Design Experience of the Prime Firm
Describe the experience and qualifications of the prime firm in providing design services for similar projects. Identify projects the submitting firm has completed.
For each project listed, provide:
A. Description of the project including scope and project owner
B. Role of the firm and explain how this relates to the services being solicited
C. Project’s original contract value, final contract value, and reason for variance
D. Project’s start date and completion date
Points Based 150 (14.7% of Total)
2. Construction Administration and
Inspection Experience of the Prime Firm
Describe the experience and qualifications of the prime firm in providing construction administration and inspection (CA&I) services for similar projects. Identify projects the submitting firm has completed.
Include assigned CA&I personnel if different from personnel performing design services.
For each project listed, provide:
A. Description of the project including scope and project owner
B. Role of the firm and explain how this relates to the services being solicited
C. Project’s original contract value, final contract value, and reason for variance
D. Project’s start date and completion date
Points Based 150 (14.7% of Total)
Page | 6
3. Design Experience of the Key Personnel and Subconsultants
Describe the experience and qualifications of the specific project team expected to be assigned to this project in providing design services for similar projects. For each key person identified, list their length of time with the firm. List each key person’s role in the projects provided. If a project selected for a key person is the same as one selected for the firm, provide just the project name and the role of the key person. For each project listed, provide:
A. Description of the project including scope and project owner
B. Role of the team or team member and explain how this relates to the services being solicited
C. Project’s original contract value, final contract value, and reason for variance
D. Project’s start date and completion date
Points Based 125 (12.2% of Total)
Page | 7
4. Construction Administration and
Inspection Experience of Key Personnel and Subconsultants
Describe the experience and qualifications of the project team expected to be assigned to this project in providing construction administration and inspection services for similar projects. For each key person identified, list their length of time with the firm. List each key person’s role in the projects provided. If a project selected for a key person is the same as one selected for the firm, provide just the project name and the role of the key person. Include assigned
CA&I personnel if different from personnel performing design services. For each project listed, provide:
A. Description of the project including scope and project owner
B. Role of the team or team member and explain how this relates to the services being solicited
C. Project’s original contract value, final contract value, and reason for variance
D. Project’s start date and completion date
Points Based 125 (12.2% of Total)
5. Project Understanding and Approach
Describe your firm’s understanding of the
City’s need for this project, including important considerations such as project issues and challenges. Describe the team’s approach to the project, including important considerations such as scope, schedule, and budget.
Points Based 300 (29.4% of Total)
Page | 8
6. Staffing Information for Key Personnel
Provide the following:
A. Team’s availability and commitment to the project, including subconsultants
B. Team’s plan to maintain continuity of the proposed services
C. Organization chart showing key personnel, current professional licenses or certifications, and assigned roles for both Design and
Construction Administration and
Inspection Services for the project
D. Identify the location of the lead firm’s principal office and the home office location of key staff on this project.
Points Based 150 (14.7% of Total)
7. Reference Checks
Use the form provided in the Attachments section to obtain at least three references. It is preferred no more than one be a City of
Phoenix project. If your firm has not completed prior projects with other agencies, you will not be penalized. It is recommended there be references outside the City of Phoenix.
*These points are in addition to the 1,000 points for the SOQ.
Points Based 21 (2.1% of Total)
Submittal Requirements
Electronic Submittal Process: Firms interested in this project must submit a Statement of
Qualifications (SOQ) electronically through the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix.
Submittal requirements are as follows:
Vendor Information: All firms must be registered in the City’s Vendor Management System prior to submitting a proposal. The vendor number should be included on the cover of the
SOQ. Information on how to register with the City is available at:
https://www.phoenix.gov/financesite/Pages/EProc-help.aspx
If your firm is already registered with the City of Phoenix’s Procurement system, please visit https://procurement.opengov.com/portal/phoenix to login and access the electronic solicitation.
https://procurement.opengov.com/portal/phoenix https://www.phoenix.gov/financesite/Pages/EProc-help.aspx https://procurement.opengov.com/portal/phoenix
Page | 9
Submittals:
• Submit only one SOQ electronically, in .PDF format only, addressing all evaluation criteria. No hard copies will be accepted.
• Clearly display the firm legal name, vendor number, project title, and project number on the cover of the SOQ.
• A maximum of 14 pages is permitted to address all content in the SOQ submittal.
(Maximum page limit includes evaluation criteria and all additional content. It does not include information sheet.)
• Submit electronically the Statement of Qualifications by 12:00 pm, Phoenix time, on
Friday, March 13, 2026.
• Page size must meet requirements of 8½” x 11”.
• Font size must not be less than 10 point.
• Content count:
o Each side of a page containing evaluation criteria and additional content will be counted toward the maximum page limit noted above.
o Pages that have project photos, charts and/or graphs will be counted towards the maximum page limit noted above.
o Front and back covers, information sheet, Table of Contents pages, and divider (tab) pages will NOT be counted toward the maximum page limit noted above, unless they include evaluation criteria and additional content that could be considered by the selection panel.
Information Sheet: Provide an information sheet that includes project title, OpenGov ID number, legal firm name (not a trade name), address, phone number, vendor number, and the name, title, email address and signature of your contact person for the project. Do not include any additional information.
Evaluation Criteria: Address the SOQ evaluation criteria.
Note: All pages exceeding the specified maximum page limit will be removed from the submittal and not considered in evaluating a submitted SOQ.
Grounds for Disqualification
Please be advised that the following will be grounds for disqualification, and will be strictly enforced:
• Submitting a Statement of Qualifications for a different project.
• Violating the “Contact with City Employees” policy contained in this RFQ.
Selection Process and Schedule
Page | 10
Interested teams will submit a Statement of Qualifications (SOQ). The team will be selected through a qualifications-based selection process. A Selection Panel will evaluate each SOQ per the criteria set forth in Section 5 above.
The City will select a team based on the SOQ’s received; no formal interviews will be conducted. The City may conduct a due diligence review on the team(s) receiving the highest evaluation.
The City expects to create a final list of at least three, but not more than five teams for this project.
The City will enter into negotiations with the selected team and execute a contract upon completion of negotiation of fees and contract terms for City Council approval.
The following tentative schedule has been prepared for this project.
Pre-submittal Meeting 9:30 am on Wednesday, March 4, 2026
SOQs Due 12:00 pm on Friday, March 13, 2026
Selection Notification April 2026
Scope Meeting Early May 2026
If the City is unsuccessful in negotiating a contract with the best-qualified team, the City may then negotiate with the next most qualified team until a contract is executed, or the City may decide to terminate the selection process. Once a contract is executed with the successful firm, the procurement is complete.
The firm selected for this project will be notified directly by the City. Notification to all other firms on the status of a short list for this project will be posted on the City of Phoenix’s Procurement
Portal:
https://procurement.opengov.com/portal/phoenix
General Information
Citywide Capital Improvement Projects. Consulting and contractor services supporting the
City’s Capital Improvement Projects are procured under the authority of the City Engineer, currently located within the Street Transportation Department. Design and Construction
Procurement coordinates the citywide consulting and construction contracting procurement processes.
Changes to Request for Qualifications. Any changes to this Request for Qualifications
(RFQ) will be in the form of a Notification. The City of Phoenix shall not be held responsible for any oral instructions. Notifications are available on both the Current Opportunities and City's eProcurement Portal at https://procurement.opengov.com/portal/phoenix.
It shall be the responsibility of the registered RFQ holder to determine, prior to the submittal of the Statement of Qualifications, if a Notification has been issued. Registered
Page | 11
RFQ holders may refer to the web page or call the Contracts Specialist (listed below) to ascertain if a Notification has been issued for this project.
Alternate Format. For more information or a copy of this publication in an alternate format, contact the Contracts Specialist (listed below) - Voice or TTY 711. Requests will only be honored if made within the first week of the advertising period.
Release of Project Information/Public Records Request. The City shall provide the release of all public information concerning the project, including selection announcements and contract awards. Those desiring to release information to the public must receive prior written approval from the City. To submit a Public Records Request, visit phoenix.gov/prr.
City Rights. The City of Phoenix reserves the right to reject any or all Statements of
Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received.
Contact with City Employees. This policy is intended to create a level playing field for all
Proposers, assure that contracts are awarded in public, and protect the integrity of the selection process. OFFERORS THAT VIOLATE THIS POLICY WILL BE DISQUALIFIED.
Beginning on the date the RFQ is issued and until the date the contract is awarded or the RFQ withdrawn, all persons or entities that respond to the RFQ, including their authorized employees, agents, representatives, proposed partner(s), subcontractor(s), joint venture(s), member(s), or any of their lobbyists or attorneys (collectively the Proposer), will refrain from any direct or indirect contact with any person (other than the designated Contract Specialist) who may play a part in the selection process, including members of the evaluation panel, the City Manager, Assistant
City Manager, Deputy City Managers, Department heads, the Mayor and other members of the
Phoenix City Council. As long as the RFQ solicitation is not discussed, Proposers may continue to conduct business with the City and discuss business that is unrelated to this RFQ solicitation with City staff.
Commencing on the date and time a solicitation is published, potential or actual proposers
(including their representatives) will only discuss matters associated with the solicitation with the
Mayor, any members of City Council, the City Manager, any Deputy City Manager, or any department director directly associated with the solicitation (including in each case their assigned staff, except for the designated procurement officer) at a public meeting, posted under the Arizona
Revised Statutes, until the resulting contract(s) are awarded or all offers or responses are rejected and the solicitation is cancelled without any announcement by the procurement officer of the City’s intent to reissue the same or a similar solicitation.
Proposers may discuss their proposal or the RFQ solicitation with the Mayor or one or more members of the Phoenix City Council, provided such meetings are scheduled through the
Contract Specialist (listed below), conducted in person at 200 W. Washington, Phoenix, Arizona
85003, and are posted as open meetings with the City Clerk at least twenty-four (24) hours prior to the scheduled meetings. The City Clerk will be responsible for posting the meetings. The posted notice shall identify the participants and the subject matter, as well as invite the public to participate.
Conflict of Interest. The City reserves the right to disqualify any Proposer on the basis of any real or apparent conflict of interest that is disclosed by the proposal submitted or any other data https://phoenix.gov/prr
Page | 12 available to the City. This disqualification is at the sole discretion of the City. Any Proposer submitting a proposal herein waves any right to object now or at any future time, before any body or agency, including but not limited to, the City Council of the City of Phoenix or any court.
Protest Procedures. Firms responding to disqualification or a procurement outcome are referred to the Code of the City of Phoenix Chapter 2, Article XII, Section 2-187 to 2-190.4, which governs protest procedures utilized throughout the selection process. The procedures may be reviewed through the City of Phoenix website at:
http://www.codepublishing.com/az/phoenix/
A copy of the Protest Policy is also available online at:
https://www.phoenix.gov/administration/departments/streets/careers/business-opportunities.html
Questions - Questions pertaining to this selection process or contract issues should be submitted via the Procurement Portal.
Vendor Questionnaire
*Response required http://www.codepublishing.com/az/phoenix/ https://www.phoenix.gov/administration/departments/streets/careers/business-opportunities.html
File details come from the government source that posted it. Updated .