Submittal Schedule 242400 RPR APRON PAVING.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
JKSE 242400, Repair Apron Paving
Solicitation number
W50S7L-24-B-0001
Issued by

About this file

This document is a Submittal Schedule that lists the required technical submittals for a federal construction contract opportunity, JKSE 242400, Repair Apron Paving.

The key details are:

  • The project involves preparation and installation of asphaltic pavement, full depth bituminous asphalt replacement, deep mill and overlay, and repainting lines over an area of approximately 107,395 square feet. There is an option to mill and overlay an additional 27,500 square feet.
  • The contract duration is 50 calendar days after notice to proceed, including inspection and punch list.
  • The solicitation is set aside 100% for Small Businesses under NAICS code 237310 with a size standard of $45 million.
  • The estimated construction magnitude is between $250,000 and $500,000.
  • The pre-bid conference is scheduled for August 20, 2024 and the bid opening is planned for September 10, 2024.
  • The solicitation and related documents will be available on the SAM.gov website.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberSolicitation/Contract No.
JKSE 242400RPR APRON PAVING
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies RequiredREQUIRED SUBMISSION DATE (BY CONTRACTOR)NUMBER OF COPIES REQUIREDSUBMITAL NUMBERDATE REVIEWED BY A&EDATE REVIEWED BY FACILITY ENG.DATE REVIEWED BY C.O.APPROVEDCONTRACTOR RESUBMIT DATERESUBMITTAL NUMBERRESUBMITTAL APPROVALREMARKS
LINE NUMBERSPECIFICATION SECTION, ITEM OR DESCRIPTION OF ITEMCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATION/MAINTENANCE DATATESTING/REPORTS/PROPOSALQualifications
101 00 00 General Requirements - 3.15 Start of Work Notification330D PSW
201 00 00 General Requirements - 3.27 Crane Operations (Form 7460)3330D PSW
301 00 00 General Requirements - 3.28 AF Form 103330D PSW
501 00 00 General Requirements - 3.32 Progress Report (Form 3065)330D PSW
701 00 00 General Requirements - 3.34 Notice of Final Inspection315D SN
801 00 00 General Requirements - 3.36 As-builts330D PTFP
901 00 10 Site Security - 3.1 Contractor Entry Authorization List (CEAL)330D PSW
1001 36 00 Environmental Protection - 2.3 Copies of Environmental Permits330D PSW
1101 36 00 Environmental Protection - 6.1.2 MT DEQ Notification of Demolition (MTACP02-R6)330D PSW
1201 36 00 Environmental Protection - Attachment 1: Waste Management Plan330D PSW
1301 36 00 Environmental Protection - Attachment 2: Recovered Materials Written Determination Form330D PSW
1401 36 00 Environmental Protection - Attachment 3: Recycled Materials Use Report330D PSW
1501 36 00 Environmental Protection - Attachment 4: Monthly Report of Solid Waste Disposal & Diversion310D SRO
1631 20 00 1.3.A.1 Crushed Base Course Field Density330D SRO
1731 20 00 1.3.B.1 Lab Max and Optimum Moisture330D PSW
1831 20 00 1.4 Base Course Gradation330D PSW
1932 11 00 1.4 Crushed Base Course Field Density330D SRO
2032 11 00 1.4 Lab Max and Optimum Moisture330D PSW
2131 20 00 1.4 Base Course Gradation330D PSW
2232 12 13 2.A- Asphalt Prime and Tack Coat33330D PSW
2332 12 16- 3.8.A Asphalt Conrete Pavement - MTPWSS Type B Asphalt33330D PSW
2432 12 16- 3.8.A Asphalt Conrete Pavement - PG 58-28 Binder33330D PSW
2532 12 16 - 3.29 PAVEMENT AND MATERIAL TESTING REQUIREMENTS330D SRO
26FAA Paint P-620 - Paint33330D PSW
27FAA Paint P-620 - Reflective Beads33330D PSW
2801 00 00 General Requirements - 3.36 As-builts330D PSW
Schedule of Abbreviations:
AWC= After Work CompletedBMF=Before Material Delivery
PTSW= Prior to Starting WorkSN=Advance Notification
AFA= After Final AcceptanceSRO=After Each Occurrence
PTO= Prior to OutagePTFI=Prior to Final Inspection
PTNP= Prior to Notice to ProceedPTFP=Prior to Final Payment
ANTP= After Notice to ProceedPTCW=Prior to Completing Work
EWD= Each work day AF Form 3000 not requiredAFI=After Final Inspection
PTFA= Prior to Final AcceptancePT=Prior To
ACA= After Contract AwardPSS=Per Submittal Schedule

&"Times New Roman,Regular"&12Attachment 2

&"Times New Roman,Regular"&12AF Form 66 02:

&F-&D &"Times New Roman,Regular"&12 SS-&P

REQUIRED TECHNICAL SUBMITTALS